Boulder Politics

Boulder City Council · Document

Attachment B Applicant's Plan Set and Written Statement_Part1

Special Meeting, October 23, 2025 · item 3B: Consideration of a Site Review and Use Review to redevelop approximately 7.96 acres of an existing 9.86-acre site at 2952 Baseline Rd. with … · 20 pages

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

2952 BASELINE SITE REVIEW SET PROJECT TEAM

SHEET INDEX

OWNER

ARCHITECT

GEORGE WILLIAMS, LLLP 6700 LOOKOUT ROAD SUITE 3 BOULDER, COLORADO 80301-3313

COBURN ARCHITECTURE 2718 PINE STREET #100 BOULDER, CO P: 303.442.3351

CIVIL ENGINEER

LANDSCAPE ARCHITECT

THE SANITAS GROUP 801 MAIN STREET, SUITE 210 LOUISVILLE, CO 80027 P: 303.981.9238

CIVITAS 1200 BANNOCK STREET, DENVER, CO 80204 P: 303.571.0053

TRAFFIC ENGINEER LSC TRANSPORTATION CONSULTANTS 1889 YORK STREET DENVER, CO P: 303.333.1105

SCOPE OF WORK

428 RESIDENTIAL UNITS

NEW MIXED USE DEVELOPMENT:

PHASE ONE: 2 BEDROOMS: 1 UNIT 3 BEDROOMS: 9 UNITS 4 BEDROOMS: 20 UNITS 5 BEDROOMS: 69 UNITS 6 BEDROOMS: 23 UNITS

WITH 59,919 SF OF COMMERCIAL SPACE

PHASE TWO: STUDIOS: 81 UNITS 1 BEDROOMS: 146 UNITS 2 BEDROOMS: 62 UNITS 3 BEDROOMS: 17 UNITS

PROJECT INFORMATION LEGAL DESCRIPTION:

(C) CIVITAS, 2024 - LUMION

R T R

T

TRACTS OF LAND LOCATED IN THE NORTHWEST QUARTER OF SECTION 5, TOWNSHIP 1 SOUTH, RANGE 70 WEST OF THE 6TH P.M., CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO. SEE SURVEY FOR FULL LEGAL DESCRIPTION

ZONING:

BC-2

BUILDING TYPE:

MIXED-USE

LOT SIZE:

429,419 SF

SETBACK MINIMUMS :

T T R

BC-2

R

R T

T

T

INTERIOR SIDE (ADJACENT PROPERTY): REQUIRED: 0' or 12' | PROPOSED: 12'

R T

R T

T

PHASE TWO

T

T

T

DN ONE PHASE UP

PHASE ONE*: REAR (SOUTHWEST/MULTI-USE PATH): REQUIRED: 20' | PROPOSED: 8' INTERIOR SIDE (MULTI-USE PATH): REQUIRED: 12' | PROPOSED: 12'

R

R

R

R

T

INTERIOR SIDE (LOT LINE) REQUIRED: 12' | PROPOSED: 8'

T

UP

R T

R T

R T

T

PHASE TWO*: FRONT (BASELINE RD): REQUIRED: 20' | PROPOSED: 10'

T

R T T

R

T

T

T T

T

R

FRONT (30TH ST): REQUIRED: 20' | PROPOSED: 10'

R T

T

EXISTING TO REMAIN

R

R

INTERIOR SIDE (SOUTHEAST OF BLDG D): REQUIRED: 12' | PROPOSED: 10'

T

SIDE ADJ. STREET (NORTH OF BROKER): REQUIRED: 15' | PROPOSED: 10' *MODIFICATION REQUESTED

MAX ALLOWABLE HEIGHT (FROM BLDG LOW POINT 25' AWAY):

VICINITY MAP 1" = 200'-0"

PROPOSED BUILDING HEIGHTS

rl SHEET NAME 00-ARCH SITE SR-0.0 TITLE SHEET SR-0.1 PROJECT INFO SR-0.2 RENDERED SITE PLAN SR-0.3 RENDERINGS SR-0.4 RENDERINGS SR-0.5 RENDERINGS SR-0.6 RENDERINGS SR-0.6.1 RENDERINGS SR-0.7 CONCEPT DIAGRAMS SR-0.8 ARCHITECTURAL SITE PLAN AND ENTRIES SR-0.9 ARCHITECTURAL SITE PLAN - ROOF DECKS SR-0.10 SETBACK AND EASEMENT PLAN SR-0.11 PRELIMINARY ADDRESSING PLAN SR-0.12 PHASE 1 CIRCULATION AND ACCESIBILITY PLAN SR-0.13 CIRCULATION AND ACCESIBILITY PLAN SR-0.14 TRANSIT CONNECTIONS SR-0.15 PARKING PHASE DIAGRAMS SR-0.16 PHASE 1 VEHICLE PARKING PLAN SR-0.17 PHASE 2 VEHICLE PARKING PLAN SR-0.18 BIKE PARKING PLAN SR-0.19 SOLAR ACCESS 35 FEET SR-0.20 SOLAR ACCESS WITH HEIGHT MODIFICATION SR-0.21 ARCHITECTURAL SITE PLAN - HEIGHT BONUS SR-0.22 BROKER INN DIAGRAMS SR-0.23 BUILDING DETAILING OVERVIEW

BC-2

35'-0" *MODIFICATION REQUESTED

002-CIVIL C1.00 C1.01 C1.02 C2.00 C2.01 C2.02 C3.00 C3.01 C3.02 C3.03 C3.04 C3.05 C4.00 C4.01 C4.02 C4.03 C4.04 C4.05 C4.06 DR-1 DR-2 DR-3 DR-4 DR-5 DR-6 DR-7 DR-8 DR-9 DR-10 DR-11 DR-12 DR-13

EXISTING SITE CONDITIONS MASTER LOT & EASEMENT EXHIBIT PHASE 1 LOT & EASEMENT EXHIBIT PRELIMINARY UTILITY PLAN PHASE 1 UTILITY PLAN PHASE 1 UTILITY DETAIL PRELIMINARY GRADING PLAN PHASE 1 GRADING PLAN PRELIMINARY X-SECTIONS BOX CULVERT PLAN & PROFILE (0+00 TO 4+60) BOX CULVERT PLAN PROFILE (4+60 TO END) PRELIMINARY SAFETY RACK DETAILS TURN MOVEMENT EXHIBIT A TURN MOVEMENT EXHIBIT B TURN MOVEMENT EXHIBIT C TURN MOVEMENT EXHIBIT D TURN MOVEMENT EXHIBIT E TURN MOVEMENT EXHIBIT F TURN MOVEMENT - SPROUTS EXISTING CONDITIONS DRAINAGE PLAN EXISTING CONDITIONS DRAINAGE PLAN EXISTING CONDITIONS DRAINAGE PLAN EXISTING CONDITIONS DRAINAGE PLAN PROPOSED CONDITIONS DRAINAGE PLAN PROPOSED CONDITIONS DRAINAGE PLAN PROPOSED CONDITIONS DRAINAGE PLAN PROPOSED CONDITIONS DRAINAGE PLAN RECORD DETENTION AREAS EXISTING DRAINAGE SCHEMATIC PROPOSED DRAINAGE SCHEMATIC PHASE 1 PROPOSED DRAINAGE WEST PHASE 1 PROPOSED DRAINAGE EAST

rl

SHEET NAME

BUILDING A SR000a SR001a SR002a SR003a SR004a SR005a SR006a SR007a SR008a SR009a

PERSPECTIVE LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 ROOF PLAN ELEVATIONS COB AREA PLAN MATERIAL BOARD BUILDING FORM AND MASSING

BUILDING B SR000b SR001b SR002b SR003b SR004b SR005b SR006b SR007b SR008b SR009b SR010b

PERSPECTIVE LEVEL 0 LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 ROOF PLAN ELEVATIONS AREA PLAN MATERIAL BOARD BUILDING FORM AND MASSING

BUILDING C SR000c SR001c SR002c SR003c SR004c SR005c SR006c SR007c SR008c

PERSPECTIVE LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 ROOF PLAN ELEVATIONS COB AREA PLAN MATERIAL BOARD

BUILDING D SR000d SR001d SR002d SR003d SR004d SR005d SR006d SR007d SR008d

PERSPECTIVE LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 ROOF PLAN ELEVATIONS COB AREA PLAN MATERIAL BOARD

DETAILS SR100 SR101 SR102 SR103 SR104

MATERIAL DETAILS WINDOW DETAILS WINDOW DETAILS DOOR DETAILS STOREFRONT DETAILS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

2952 BASELINE ROAD, BOULDER CO

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

003-LANDSCAPE L-000 LANDSCAPE CONCEPT L-001 LANDSCAPE CONCEPT L-002 LANDSCAPE CONCEPT L-003 SITE REFERENCE PLAN L-004 LANDSCAPE CONCEPT L-005 OPEN SPACE PLAN L-006 BICYCLE PARKING L-007 PLANTING SCHEDULE L-100 SITE MATERIALS AND LAYOUT L-100-R BLDG B ROOF DECK L-101 SITE MATERIALS AND LAYOUT L-101-R BLDG A ROOF DECK L-102 SITE MATERIALS AND LAYOUT L-103 SITE MATERIALS AND LAYOUT L-103-RB BLDG D&E ROOF DECK LEVEL 4&5 L-104 LANDSCAPE MATERIALS L-105 LANDSCAPE MATERIALS L-106 LANDSCAPE MATERIALS L-200 PLANTING PLAN L-201 PLANTING PLAN L-202 PLANTING PLAN L-203 PLANTING PLAN L-204 PLANTING PLAN L-205 PLANTING PLAN L-206 PLANTING PLAN L-300 SITE SECTIONS L-301 SITE DETAILS L-302 SITE DETAILS L-400 PHASE 1 LANDSCAPE MATERIALS L-401 PHASE 1 PLANTING PLAN

REQUESTED HEIGHT MODIFICATION

PHASE ONE:

DATE PRINTED:

9/18/2025 3:54:52 PM

BUILDING E: 54'-7 5/8"

BUILDING E: 55'-0"

2025.08.27

PHASE TWO:

CITY

STAMP

SITE REVIEW

BUILDING A: 54'-4 1/8"

BUILDING A: 55'-0"

BUILDING B: 54'-6"

BUILDING B: 55'-0"

BUILDING C: 50'-6 5/8"

BUILDING C: 51'-2"

BUILDING D: 51'-0"

BUILDING D: 51'-6"

SHEET No.

SR-0.0 PHASING PLAN & NARRATIVE 1" = 200'-0"

TITLE SHEET

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

2952 BASELINE ROAD, BOULDER CO

DATE PRINTED:

9/12/2025 11:46:57 PM

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27

T CITY S

AMP SHEET No.

SR-0.1 PROJECT INFO

A

B

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

J

2952 BASELINE I 2952 BASELINE ROAD, BOULDER CO C

D G

D E

KEY CONCEPTS

B D

A. New multi-use path as shown in TMP connecting area to the north of the site with the multi-use path to the south. This multi-use is separate from the major pedestrian zones to reduce the likelihood of conflicts between cyclists and pedestrians. B. Dramatically reduced the number of access points, down to a total of four. The main street layout is a simple L shape allowing for circulation, access to parking garages and service. The entries on Baseline maintain the existing traffic patterns and the entries on 30th are lined up with existing median cuts. These are designed to be narrow, slow and pedestrian oriented per City Council direction, and are private as this would be a non-standard street section. All service drives are now internal to the site.

F G

H G

(W OO

NE RF )

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

C D H

E

A

(W OO

I

NE RF )

C. The garages would be designed to be structurally independent and allow for removal someday if car parking is no longer needed

E

B

D. 60,707 sf of commercial spaces are proposed to replace the 54,222 sf of commercial that exists on site, all located on the ground floor and along the major pedestrian through ways. A mixture of restaurant and retail spaces are planned with restaurant uses being located primarily around the village green to enliven and activate the village center. The Dark Horse is likely to be in building D or A. E. In pursuit of common and public space excellence as directed by council, along with transportation innovation, the southern drive would actually be a multi-function woonerf. The woonerf creates a pedestrian first zone where it can tie in to the existing hotel use, drawing people through. Anchoring each end of the woonerf 'jewel' buildings are designed to draw the eye and terminating major views into the site. This pedestrian focus continues through, along primary pedestrian travel ways and features responsive landscaping and retail street frontage. F. The center space would be a mix of green space and pavers mix that would function as a village square. The drive as it heads south from this intersection would be an integrated woonerf with limited car traffic, limited parallel parking and street trees at normal spacing.

DATE PRINTED:

7/11/2025 9:36:06 AM

G. The buildings have been stepped back adjacent to the village square. This benefit is two-fold: it allows more light and air into the central gathering space and also allows for roof decks in these locations that tie back to the village square and serve to further enliven that zone. The buildings include material changes and massing adjustments along the streets and at parking garage access points to assist with wayfinding, helping to make the site easy to navigate and exceptionally user friendly. H. Residential uses have been located on the ground floor in two key areas: along 30th to address the student housing across the street, and on the West side of D to respond to the adjacent student housing use, avoiding commercial in a location where it doesn't respond to context. I. After study it is apparent that the flood on the site can be moved to a pipe, which is critical to allow the site plan public space upgrades. It would be collected on the west side of the site along 36, piped to the NE corner, and then brought back to the surface in a bubbler, matching historic flows off the site and causing no change to downstream flood patterns. J. This is a secondary drive allowing for emergency vehicle access and direct access to the student housing section. This access point also must be preserved as the property to the west has an access easement to it on title.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

SHEET No.

SR-0.2 RENDERED SITE PLAN

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

DATE PRINTED:

7/11/2025 9:36:08 AM

2952 BASELINE ROAD, BOULDER CO

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.3 RENDERINGS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

DATE PRINTED:

7/11/2025 9:36:10 AM

2952 BASELINE ROAD, BOULDER CO

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.4 RENDERINGS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

DATE PRINTED:

7/11/2025 9:36:11 AM

2952 BASELINE ROAD, BOULDER CO

(C) CIVITAS, 2024 - LUMION

(C) CIVITAS, 2024 - LUMION

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.5 RENDERINGS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

DATE PRINTED:

7/11/2025 9:36:12 AM

2952 BASELINE ROAD, BOULDER CO

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.6 RENDERINGS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

DATE PRINTED:

7/11/2025 9:36:13 AM

2952 BASELINE ROAD, BOULDER CO

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

(C) COBURN, 2024 - ENSCAPE

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.6.1 RENDERINGS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

2952 BASELINE ROAD, BOULDER CO

VEHICULAR AND PEDESTRIAN CONNECTION

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

BUILDING EROSION

HEIGHT CHANGES

MAKING THE STREET EDGE AND HIDING PARKING

DATE PRINTED:

7/11/2025 9:36:15 AM

SITE REVIEW 2025.08.27 2025.05.28 2025.07.11

SHEET No.

SR-0.7 PRIMARY STREETSCAPE

PUBLIC, COMMON, AND PRIVATE SPACES

JEWELS AND WAYFINDING

CONCEPT DIAGRAMS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

D

2952 BASELINE

2952 BASELINE ROAD, BOULDER CO

D

D

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

LEGEND PROPERTY BOUNDARY PUBLIC RIGHT OF WAY SECTION LINE CENTER LINE EASEMENT EX. FENCE EX. GUARD RAIL CHANNEL OR SWALE FLOWLINE EXISTING

MAJOR CONTOUR MINOR CONTOUR

EXISTING

STORM SEWER

EXISTING

SANITARY SEWER

EXISTING

WATER

EXISTING

TELEPHONE CABLE TELEVISION FIBER OPTIC NATURAL GAS

D EXISTING

ELECTRIC (OVERHEAD) ELECTRICAL (UNDERGROUND) DRY UTILITIES (E, T, CATV, FOC)

EXISTING

UTILITY MANHOLE FIRE HYDRANT

EXISTING

WATER VALVE

EXISTING EXISTING

LIGHT POLE SIGN

2025.08.27 07.11.2025

EXISTING

WATER METER POWER POLE

SITE SITEREVIEW REVIEW

EXISTING

EXISTING SHEET No.

EXISTING

STORM STRUCTURE DESIGNATOR SANITARY SEWER STRUCTURE DESIGNATOR

C1.00

EXISTING EXISTING

D

EXISTING SITE CONDITIONS

x- 500 YEAR FLOOD

BASELINE ROAD

x- 100 YEAR FLOOD

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

x- FLOOD PLANE CONVEYANCE x- HIGH HAZARD PROPERTY LINE EXISTING BUILDING

EXISTING BUILDING

2952 BASELINE

T

T R

R

T R

PROPERTY LINE

mom cnc

RR

RR

4'-6"

cash

25' - 0"

vestibule with carts/hadnicap/produce field bins

mgr

books

12'-0"

break

189

'-0 "

4'-0"

7'-0"

11'-6"

12

BUILDING A LOW POINT

BUILDING A LOW POINT

12' Door Package

33'-0"

7'-0"

6'-0"

21'-0"

3'-6"

33'-0"

x- 100 YEAR FLOOD

scan

6'-0"

33'-0"

7'-0"

7'-0"

6'-0"

6'-6"

32'-0"

prep

R

x- 500 YEAR FLOOD

6'-0"

6'-6" 6'-0"

T

32'-0"

6'-0"

6'-0" 3'-6"

6'-0"

7'-0"

8'-0"

10'-0"

6'-0"

7'-0"

400

2952 BASELINE ROAD, BOULDER CO

deli bakery prep

7'-0"

7'-0"

36'-0"

6'-0"

BUILDING B

7'-0"

6'-0"

36'-0"

7'-6"

7'-6"

8'-0"

7'-6"

7'-0"

7'-0"

36'-0" 4'-0"

T

T

6'-6"

6'-6"

60'-0"

363 sf dairy 5'-6"

R T

7'-0"

BUILDING C

6'-0" 36'-0"

6'-0"

PROPERTY LINE

NEW CARTER WAY

EXISTING BUILDING PROPERTY LINE

6'-0"

6'-0"

6'-0"

6'-0" 32'-0"

25' - 0"

cooler

450 sf

produce cooler

prep

frozen

PROPERTY LINE

COMMERCIAL TRASH PROPERTY LINE

RESIDENTIAL TRASH COMMERCIAL TRASH

R T

DN

T

T

T

R

BUILDING E LOW POINT

" -0 25' T

RESIDENTIAL TRASH

PROPOSED TRASH SERVICE

WILLIAMS WAY RESIDENTIAL TRASH

R T

T

COMMERCIAL TRASH

R

WILLIAMS

RESIDENTIAL TRASH

T R

WA Y

R

T

PROPOSED TRASH SERVICE

x- 500 YEAR FLOOD

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

COMMERCIAL TRASH R T

25 '-

0"

BUILDING A R T

BUILDING A LOW POINT

R T

RESIDENTIAL TRASH

BUILDING D

3OTH STREET

BUILDING E

R T

x- 100 YEAR FLOOD

x- FLOOD PLANE CONVEYANCE

R

25' -

T

0"

R T

PROPERTY LINE

NE

x- HIGH HAZARD ZONE T

CA

RT

ER

WA

DN

Y( WO

ON

PH

AS

AS

W

EXISTING BROKER INN

ET

EO

WO

NE

R

PH

x- FLOOD PLANE CONVEYANCE

BUILDING D LOW POINT

BIKE

T

R T

ER

F)

R

R T

EXISTING SITE

E

IST

ING

AS

T

EX

x- FLOOD PLANE CONVEYANCE

PH

VEHICLE GARAGE ACCESS

PHASE TWO

SIT

6

ET

BUILDING ENTRIES / LOBBIES

E3

WO

RO UT

LEGEND

PEDESTRIAN GARAGE ACCESS

x- 500 YEAR FLOOD PROPERTY LINE

DATE PRINTED:

8/28/2025 1:56:13 PM

PROPERTY LINE

SITE REVIEW 2025.08.27

T CITY S

AMP

SHEET No.

SR-0.8 ARCHITECTURAL SITE PLAN 1 1" = 50'-0"

0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

ARCHITECTURAL SITE PLAN AND ENTRIES

x- 500 YEAR FLOOD

BASELINE ROAD

x- 100 YEAR FLOOD

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

x- FLOOD PLANE CONVEYANCE x- HIGH HAZARD PROPERTY LINE EXISTING BUILDING

EXISTING BUILDING

2952 BASELINE

T

T R

R

T R

PROPERTY LINE

x- 100 YEAR FLOOD

BUILDING B BUILDING C

T

PROPERTY LINE

NEW CARTER WAY

EXISTING BUILDING

x- 500 YEAR FLOOD

R

PROPERTY LINE

2952 BASELINE ROAD, BOULDER CO

OPEN COURTYARD

T

T

R T

PROPERTY LINE T

T

ROOF DECK

PROPERTY LINE

T

T

R

T

WILLIAMS WAY WILLIAMS T

T

R

T

T R

WA Y

R

T

BUILDING E x- 500 YEAR FLOOD

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

UP R T

ROOF DECK

BUILDING A R T

R T

3OTH STREET

BUILDING D

UP

R T

x- 100 YEAR FLOOD T

T

ROOF DECK

x- FLOOD PLANE CONVEYANCE

R

ROOF DECK

T T

R T

PROPERTY LINE

x- FLOOD PLANE CONVEYANCE

T T

NE

x- HIGH HAZARD ZONE T R

AS

AS

RT

ER

WA

Y( WO

ON

PH

PH

CA

EXISTING BROKER INN

ET

EO

WO

NE

ROOF DECK

W

T

R T

ER

F)

R

R T

EXISTING SITE

E

IST

ING

AS

T

EX

x- FLOOD PLANE CONVEYANCE

PH

AMENITY ROOF DECKS

PHASE TWO

SIT

6

ET

BUILDING ENTRIES

E3

WO

RO UT

LEGEND

x- 500 YEAR FLOOD PROPERTY LINE

DATE PRINTED:

8/28/2025 1:56:20 PM

PROPERTY LINE

SITE REVIEW 2025.08.27

T CITY S

AMP

SHEET No.

SR-0.9 ARCHITECTURAL SITE PLAN - ROOF DECKS 1 1" = 50'-0"

0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

ARCHITECTURAL SITE PLAN - ROOF DECKS

BASELINE ROAD 2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

EXISTING BUILDING

10' - 0"

PROPERTY LINE EXISTING BUILDING PROPERTY LINE

2952 BASELINE

T

T R

R

T R

12' - 0"

BUILDING B BUILDING C

T

PROPERTY LINE

" 1/2

PROPERTY LINE

12' - 0"

5 '20

2952 BASELINE ROAD, BOULDER CO

R

NEW CARTER WAY

EXISTING BUILDING

R T

8' -

0"

12' - 0"

PROPERTY LINE T

T

PROPERTY LINE

12' - 0"

R

T

WILLIAMS WAY

T

WILLIAMS T

T R

DN

WA Y

R

T

BUILDING E

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

UP

BUILDING D

10' - 0"

R T

BUILDING A R T

R T

T

3OTH STREET

UP

T

R

T T

R T

8' -

0"

PROPERTY LINE

T T

T R

0"

EO

NE WO

10 '-

NE

RT

ER

ET

EXISTING BROKER INN

AS

AS

CA

WA

Y( WO

ON

PH

PH

W

T

R T

ER

F)

R

R T

6

ING

EXISTING SITE

EX

SETBACKS

PHASE TWO

IST

PH

AS

ET

EASEMENTS

E

E3

10' - 0"

SIT

LEGEND

WO

RO UT

PROPERTY LINE

DATE PRINTED:

8/28/2025 2:40:49 PM

PROPERTY LINE

SITE REVIEW 2025.08.27

T CITY S

AMP

SHEET No.

SR-0.10 SETBACK AND EASEMENT DIAGRAM 1 1" = 50'-0"

0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

SETBACK AND EASEMENT PLAN

BASELINE ROAD 2718 Pine Street #100 Boulder, Colorado p: 303-442-3351 PROPERTY LINE EXISTING BUILDING

EXISTING BUILDING

2952 BASELINE

T

T R

R

T R

PROPERTY LINE

BUILDING B T

PROPERTY LINE

5 '20

" 1/2

BUILDING C

PROPERTY LINE

645 NEW CARTER WAY

2952 BASELINE ROAD, BOULDER CO

2952 BASELINE

R T

NEW CARTER WAY

EXISTING BUILDING

R

PROPERTY LINE T

T

PROPERTY LINE R T

WILLIAMS WAY

T

WILLIAMS T

T R

WA Y

R

T

DN

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

UP R T

BUILDING E UP

R T

R T

BUILDING A

2922 BASELINE

T

3OTH STREET

625 30TH STREET

T

BUILDING D 615 NEW CARTER WAY

R

T T

R T

PROPERTY LINE

T T

NE T

EO

NE WO

R

ET

AS

AS

CA

RT

ER

EXISTING BROKER INN

PH

PH

W

WA

Y( WO

ON

555 30TH STREET T

R T

ER

F)

R

R T

E

EXISTING SITE

EX

IST

ING

AS PH

PHASE TWO

SIT

6

WO

E3

ET

RO UT

PROPERTY LINE

DATE PRINTED:

8/28/2025 1:56:33 PM

PROPERTY LINE

SITE REVIEW 2025.08.27

T CITY S

AMP

SHEET No.

SR-0.11 PRELIMINARY ADDRESSING PLAN 1 1" = 50'-0"

0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

PRELIMINARY ADDRESSING PLAN

EV

WV

EV

S

T

MARKER \AT&T FOV

T

TR

TR

EV

EV

WM

FOV

EV

SANITARY MANHOLE RIM ELEV: 5334.92' INV IN: 5327.02' (S) 18" PVC INV OUT: 5326.92' (N) 18" PVC

MARKER \AT&T EV

V

FOV FOV FOV

H

D

EV WM

Y

PHASE 1

BASELINE ROAD (RIGHT-OF-WAY 1808.76' N89°48'17"E VARIES)

BASIS OF BEARINGS N89°48'17"E 2662.03' (AM)

GV

N89°48'17"E 1808.76' (C)

(C)

SANITARY MANHOLE RIM ELEV: 5343.27' INV IN: 5333.27' (W) 8" PVC INV OUT: 5333.22' (E) 8" PVC

MAINTENANCE EASEMENT (REC. NO. 878554)

EV

EV

WV

WV WV

WV

WM

GV

PHASE 2

SANITARY MANHOLE RIM ELEV: 5335.52' INV IN: 5328.52' (S) 8" PVC INV IN: 5327.62' (W) 8" PVC INV OUT: 5327.52' (E) 8" PVC

SANITARY MANHOLE RIM ELEV: 5341.23' INV IN: 5332.18' (S) 8" PVC INV IN: 5331.03' (W) 8" PVC INV OUT: 5330.98' (E) 8" PVC

WV

WV

SANITARY MANHOLE RIM ELEV: 5335.13' INV IN: 5327.53' (W) 8" PVC INV IN: 5327.13' (S) 18" PVC INV OUT: 5327.03' (N) 18" PVC

WV

WV

BASELINE ROAD

WV

S89°48'17"W 853.27' (C) 853.27' (C) S89°48'17"W S

CO

S

S

S00°15'23"E 95.00' (C)

WM

EV

S

EV

V

EV

WM

ER

H

SANITARY MANHOLE RIM ELEV: 5344.56' INV IN: 5335.11' (W) 8" PVC INV OUT: 5334.96' (E) 8" PVC

D

EV

Y

BASELINE ROAD (RIGHT-OF-WAY VARIES)

EV

WV

S

S

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

EV

CO CO

CO

EM

20' UTILITY EASEMENT (REC. NO. 877842)

MW

EV

EV

EV

EV EV

PROPERTY LINE

TR

V

TWO STORY BRICK AND CONCRETE BUILDING

WV

WM

2952 BASELINE

CO

EV

S

MW

EV

D H

TWO STORY BRICK AND CONCRETE BUILDING

Y

EXISTING BUILDING LOT 1

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

CO

POSTED ADDRESS: 2890 BASELINE RD.

POSTED ADDRESS: EXISTING BUILDING 2850 BASELINE RD.

EAST BASELINE SUBDIVISION REC. NO. 3220321

MW

EV

EV

MW

MW

FOV

PROPERTY LINE

CO

30' UTILITY EASEMENT (REC. NO. 900903)

EV

STORM INLET RIM ELEV: 5335.01' INV IN: 5332.01' (W) 18" RCP INV OUT: 5331.81' (E) 18" RCP

EV

EV

EV

MW

GM

CO

CO

CO

PROPERTY LINE

PROPERTY LINE

SANITARY MANHOLE RIM ELEV: 5344.86' INV IN: 53342.16' (SE) 8" PVC INV IN: 5341.96' (E) 8" PVC INV OUT: 5341.76 (N) 8" PVC

F

D

C

TR

TR

TR

S S

6" PVC TOP OF PIPE ELEV:5346.72'

WATER LINE EASEMENT (BK. 972, PG. 402)

EM

GM

EP

EP

R T

STORM GRATE RIM ELEV: 5345.52' INV OUT:5344.00' (NW) 8" PVC

S S

MW

BUILDING E

EV

MW

CO

STORM INLET JOINT ACCESS (REC NO 2748174)

MW

CO

2952 BASELINE ROAD, BOULDER CO

WV

D

CO

Y

CO

STORM INLET RIM ELEV: 5334.66' INV IN: 5331.26' (W) 18" RCP INV OUT: 5330.96' (E) 18" RCP

EP

EAVE

JOINT ACCESS (REC NO 607702)

P G

S

ST ST

ST

H

BUILDING POSTED ADDRESS: 2920 BASELINE

ER

1 HC SPACE MW

8 SPACES

CO

1 STORY EXISTING BUILDING MASONRY

4 SPACES

CO

EXCEPTED PORTION (TC)

EV

2 SPACES

7 SPACES

MW

4 SPACES

WV

7 SPACES

WV

7 SPACES

GV

WV

WV

EM

5 SPACES

GV

GV

SEWER LINE AGREEMENT (BK. 972, PG. 400)

5 SPACES

H

Y

3 SPACES 2 HC SPACES

D

CO

5 SPACES

CO

2 HC SPACES 3 SPACES

CO

S S S

5 SPACES

CO

CO

S

6 SPACES

W

CO

CO

6 SPACES

C

6 SPACES

D

W

30' UTILITY EASEMENT (REC. NO. 900903)

F

DRIVEWAY EASEMENT (REC. NO. 01073936)

GM

S CO

EV

ACCESS EASEMENT (REC. NO. 00646928)

PROPERTY LINE EP

WM

EV WV EV

TR

DN

INV:5343.05' 6" PVC EP

EV

F

D

PROPERTY LINE

C

INV:5342.89' 6" PVC WV

Y

D

H

TR

WALK IN COOLER T

R

2 STORY BRICK FRAME ON CONC. BLD W/ATTACHED SHEDS, FRIDGE & DECK POSTED ADDRESS: 2922 BASELINE

U. ( R S. IG H I HT GH W OF AY W 36 AY VA RI ES )

SANITARY MANHOLE RIM ELEV: 5335.89' INV IN: 5331.59' (W) 8" PVC INV IN: 5328.89' (S) 18" PVC INV OUT: 5328.79' (N) 18" PVC

9 SPACES

9 SPACES

30' ACCESS EASEMENT (REC. NO. 58445)

9 SPACES

15 SPACES

SHED

SHED

8 SPACES

WILLIAMS WAY

10 SPACES

S

10 SPACES

TR

S

RECORDING LEASE (REC. NO. 974494) (REC. NO. 01078771)

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

WV

SURVEY LS-12-0070 SIDEWALK EASEMENT (REC. NO. 876114)

WV

EV

1 HC SPACE

S

1 HC 1 HC SPACE SPACE

9 SPACES

WV

CO

S CO

CO

MB GM

3OTH STREET

EM

EP

MW

EP

EP

WV

CO

10' UTILITY EASEMENT (REC. NO. 900903)

WV

10' UTILITY EASEMENT (REC. NO. 900904) F

TR

D

C

TR

S

WV

1 HC 1 HC SPACE SPACE

11 SPACES

PROPERTY LINE UTILITY EASEMENT (REC. NO. 055502)

8 SPACES

30TH STREET (70' RIGHT-OF-WAY)

PARCEL 4 (TC)

GV

15' UTILITY EASEMENT (REC. NO. 055501)

TR

TR

17 SPACES

4 WV

13 SPACES SP AC ES

ACCESS EASEMENT (REC. NO. 58446)

WV

8 SPACES WV

WV

S

SIDEWALK EASEMENT (REC. NO. 876114)

H

D

WV

GM Y

F

D

UNIVERSITY OF COLORADO WILLIAMS VILLAGE CAMPUS

11 SPACES

S

7 SPACES

IST

EL EC .

4 SPACES

ING

6 SPACES

EX

PH

15' UTILITY EASEMENT (REC. NO. 55503)

WM

3 HC SPACES

E

10' UTILITY EASEMENT (REC. NO. 900904)

15' UTILITY EASEMENT (REC. NO. 055501)

SIT

AS

EO

NE

8 SPACES

C

WV

TR

6

SIDEWALK EASEMENT (REC. NO. 58444)

W HE ATE AT R ER

UP

Y

S

WV

ACCESSIBLE BUILDING ENTRIES LOADING ACCESS

SP AC ES

12

1 SP HC AC E

SP AC ES

10

SP AC ES

EL EC . MARKER \COMM

SP AC ES

13 EV

SP AC ES

WV

WM

WV

Y

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

12

L=294.26' R=318.72' ∆=52°53'55" CH=N26°43'23"W 283.92' (AM)

SP AC ES

UNIVERSITY OF COLORADO WILLIAMS VILLAGE CAMPUS

SP AC ES

N53°10'43"W 60.00' (C)

S3 6 1 2 °4 6. 9 49 '17 ' " (C W )

10

MULTI-USE PATH ON STREET BIKE LANE

FOV

H

SP AC

ES

VEHICLE SITE ACCESS

13

10' UTILITY EASEMENT (REC. NO. 55503)

ACCESSIBLE ROUTES

INV:5340.86' 8" METAL

5

INV:5351.57' 12" RCP *SOUTHWEST END NOT LOCATED

PEDESTRIAN SITE ACCESS

INV:5341.14' 8" METAL

30TH STREET (70' RIGHT-OF-WAY)

U. ( R S. IG H I HT GH W OF AY W 36 AY VA RI ES )

11

D

FW OR K

16 SPACES

EO

R.O.W. LEASE (REC. NO. 01022065)

PRIMARY BUILDING ENTRIES

SANITARY MANHOLE RIM ELEV: 5340.48' INV IN: 5330.83' (S) 18" PVC INV IN: 5330.78' (NW) 18" PVC INV OUT: 5330.63' (N) 18" PVC

2 S PAC ES

SC OP

SP AC ES

10' UTILITY EASEMENT (REC. NO. 900903)

4

E3

UP D

UP

SP AC ES

LEGEND

TR

H

RO UT

DATE PRINTED:

8/28/2025 2:43:55 PM

3

SITE REVIEW 2025.08.27

INV:5351.18' 6" PVC INV:5351.26' 6" PVC *NORTH ENDS NOT FOUND

S

T CITY S

SANITARY MANHOLE RIM ELEV: 5351.20' INV IN: 5335.35' (SE) 18" PVC INV OUT: 5335.30' (N) 18" PVC

AMP INV:5351.14' 18" RCP W/FES *SOUTHWEST END NOT LOCATED

1

PHASE 1 CIRCULATION AND ACCESIBILITY PLAN 1" = 50'-0"

(R U EC TIL IT . NO Y EA . 01 SE 02 ME 20 N 66 T )

S5 2 5 3 °1 4. 0' 19 43 ' " (C E )

SHEET No.

SR-0.12 0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

PHASE 1 CIRCULATION AND ACCESIBILITY PLAN

BASELINE ROAD 2718 Pine Street #100 Boulder, Colorado p: 303-442-3351 PROPERTY LINE EXISTING BUILDING

2952 BASELINE

T

T R

R

T R

PROPERTY LINE

mom cnc

break

BUILDING B

RR

RR

4'-6"

cash

vestibule with carts/hadnicap/produce field bins

mgr

books

12'-0"

EXISTING BUILDING

12' Door Package

12

189

'-0 "

4'-0"

11'-6"

7'-0"

33'-0"

BUILDING C

7'-0"

6'-0"

21'-0"

3'-6"

33'-0"

scan

6'-0"

33'-0"

7'-0"

7'-0"

6'-0"

6'-6"

32'-0"

6'-0"

6'-0"

6'-0"

6'-0"

prep

6'-0"

R

2952 BASELINE ROAD, BOULDER CO

32'-0"

6'-0"

3'-6" 7'-0"

6'-0" 8'-0"

10'-0" 7'-0"

400

deli bakery prep

7'-0"

7'-0"

6'-0"

36'-0"

36'-0"

7'-6"

7'-6"

8'-0"

7'-6"

7'-0"

7'-0"

4'-0"

36'-0"

7'-0" 6'-6"

6'-6"

60'-0"

363 sf dairy 5'-6"

R T

ANSI A

6'-0"

6'-0"

7'-0"

6'-0"

TARGETED F&B ACTIVATION

6'-0" 36'-0"

6'-0"

PROPERTY LINE

NEW CARTER WAY

EXISTING BUILDING PROPERTY LINE

6'-0"

6'-6"

32'-0"

T

cooler produce cooler

450 sf

prep

frozen

PROPERTY LINE

PROPERTY LINE R T

DN

R T

R T

TARGETED F&B ACTIVATION

WILLIAMS WAY WILLIAMS T

R T R

WA Y

R

T

BUILDING E

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

R T

BUILDING D TARGETED F&B ACTIVATION

BUILDING A R T

TARGETED F&B ACTIVATION

3OTH STREET

R T

R T

R T R T

PROPERTY LINE

ANSI A

NE T

NE WO

R

EO

LEGEND

RT

ER

ET

EXISTING BROKER INN

AS

AS

CA

WA

DN

Y( WO

ON

PH

PH

PRIMARY BUILDING ENTRIES

W

T

R T

ER

F)

R

TARGETED F&B ACTIVATION

ACCESSIBLE BUILDING ENTRIES R T

6

ING

EXISTING SITE

EX

VEHICLE SITE ACCESS

PHASE TWO

IST

PH

AS

ET

ACCESSIBLE ROUTES

E

E3

SIT

PEDESTRIAN SITE ACCESS

RO UT

WO

SHORT TERM PARKING

MULTI-USE PATH ON STREET BIKE LANE

PROPERTY LINE

DATE PRINTED:

8/28/2025 2:45:40 PM

PROPERTY LINE

SITE REVIEW 2025.08.27

T CITY S

AMP

SHEET No.

SR-0.13 CIRCULATION AND ACCESIBILITY PLAN 1 1" = 50'-0"

0 PLAN

TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

CIRCULATION AND ACCESIBILITY PLAN

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

2952 BASELINE

2952 BASELINE ROAD, BOULDER CO

DATE PRINTED:

7/11/2025 9:37:01 AM

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SITE REVIEW 2025.05.28 2025.08.27 2025.07.11

T CITY S

AMP

SHEET No.

SR-0.14 TRANSIT CONNECTIONS 1 1" = 300'-0"

0 PLAN

TRUE

150'

300'

SCALE: 1" = 300'-0"

600'

TRANSIT CONNECTIONS

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351 171 EXISTING SPACES IN THE NORTH LOT

2952 BASELINE MAINTENANCE EASEMENT (REC. NO. 878554)

BASELINE ROAD

10 SPACES

4 SPACES 7 SPACES

8 SPACES

4 SPACES 7 SPACES

7 SPACES

5 SPACES 3 SPACES 2 HC SPACES

5 SPACES

5 SPACES

4 SPACES

6 SPACES

5 SPACES

6 SPACES

7 SPACES

1 HC SPACE

4 SPACES

30' UTILITY EASEMENT (REC. NO. 900903)

1 HC 4 SPACES SPACE

9 SPACES

8 SPACES

DRIVEWAY EASEMENT (REC. NO. 01073936)

9 SPACES

10 SPACES

9 SPACES

9 SPACES

10 SPACES

8 SPACES

15 SPACES

12 SPACES

9 SPACES

10 SPACES

9 SPACES

9 SPACES

10 SPACES

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

SP AC ES

13

PARKING UNCHANGED BY THIS PHASE

ISL

7 SPACES

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

E

11 SPACES ES 2 SP AC

SP AC ES 4

SP AC ES

12

SP AC ES

UT (R ILIT EC Y E . NO AS E . 01 MEN 02 T 20 66

)

2

3

3

SP AC ES

SP AC ES

SP AC ES

SP AC ES

10

EA

DISCLAIMER: Disclaimer: The buildings illustrated in this submittal THESE DOCUMENTS are representative of theARE size,PROVIDED massing, BY architectural COBURN and detailing. ARCHITECTURE INC., FOR THE character Repeat building types, if any, DESIGN THIS detailing, SPECIFICcoloring, PROJECT may haveINTENT their ownOFunique and AND ONLY THIS but will PROJECT. CONTRACTOR final configuration be THE consistent with the SHALLofBEbuildings RESPONSIBLE FOR ALL quality shown in this package. Window CONSTRUCTION COORDINATION, METHODS locations illustrated on the floor plans are AND MATERIALS REQUIRED FOR THE approximate. Final window locations subject to SUCCESSFUL COMPLETION THE PROJECT. revision dependent upon site OF specific conditions. See THISplan for INCLUDES BUT IS NOT LIMITED TOLot THE site lot specific building orientation. QUALITY OF are WORKMANSHIP ANDcivil site MATERIALS specific metrics included on the plan. REQUIRED FOR EXECUTION OF THESE DOCUMENTS AND WORK OR MATERIALS SUPPLIED BY ANY SUBCONTRACTORS. ALL WORK SHALL COMPLY WITH GOVERNING CODES AND ORDINANCES. THE CONTRACTOR SHALL REVIEW AND UNDERSTAND ALL DOCUMENTS AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES IN THE DRAWINGS, FIELD CONDITIONS OR DIMENSIONS.

SP AC ES

12

1 SP HC AC E

R.O.W. LEASE (REC. NO. 01022065)

PARKING TO BE ADDED IN PHASE 1

CE S

SP AC ES

16 SPACES

6

SP A

12

SIDEWALK EASEMENT (REC. NO. 58444)

S

11

SIDEWALK EASEMENT (REC. NO. 876114)

SP AC E

11 SPACES ES 2 SP AC

SP AC ES

SP AC ES

PARKING UNCHANGED BY THIS PHASE

E3

EL EC . UP UP W UP HE ATE AT R SC ER OP EO FW OR DKR ELE C. IV

5

7 SPACES

SP AC ES 4

SP AC ES

R.O.W. LEASE (REC. NO. 01022065)

10

S

1 SP HC AC E

SP AC ES

16 SPACES

PARKING TO BE REMOVED PHASE 1

CE S

SP AC E

6

SP A

12

10' UTILITY EASEMENT (REC. NO. 900903)

5

11

SP AC ES

E3

RO UT

SIDEWALK EASEMENT (REC. NO. 58444)

3

1" = 160'-0"

ACCESS EASEMENT (REC. NO. 58446)

ES

6 SPACES

15' UTILITY EASEMENT (REC. NO. 55503)

SIDEWALK EASEMENT (REC. NO. 876114)

13

10' UTILITY EASEMENT (REC. NO. 900903)

4 SPACES

EL EC . UP UP W UP HE ATE AT R SC ER OP EO FW OR EL EC K . 13

UT (R ILIT EC Y E . NO AS E . 01 MEN 02 T 20 66

PARKING - EXISTING

SP AC

8 SPACES

11 SPACES ES

SP AC ES 4

2 SP AC

SP AC E 5

R.O.W. LEASE (REC. NO. 01022065)

E

12

3

13 SPACES

4

8 SPACES

10

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

ISL

SP AC ES

16 SPACES

13

SP AC ES

EA

13

SP AC ES

207 EXISTING PARKING SPACES IN THE SOUTH LOT TO REMAIN

S

1 SP HC AC E

10

8 SPACES

15' UTILITY EASEMENT (REC. NO. 055501)

3 HC SPACES

7 SPACES

4 SPACES

CE S

SP AC ES

1 HC 1 HC SPACE SPACE

17 SPACES

ACCESS EASEMENT (REC. NO. 58446)

6 SPACES

RO UT

SIDEWALK EASEMENT (REC. NO. 58444)

SP AC ES

SP A

12

3 HC SPACES

EL EC . UP UP W UP HE ATE AT R SC ER OP EO FW ORD EL KR IV EC. 11

6

1 SPACE

4 SPACES 7 SPACES 8 SPACES

11 SPACES

13 SPACES SP AC ES

1 HC 1 HC SPACE SPACE

9 SPACES

10' UTILITY EASEMENT (REC. NO. 900904)

8 SPACES

15' UTILITY EASEMENT (REC. NO. 55503)

SIDEWALK EASEMENT (REC. NO. 876114)

10

E3

1 HC SPACE

8 SPACES

6 SPACES

10' UTILITY EASEMENT (REC. NO. 900903)

8 SPACES

4 SPACES 7 SPACES

7 SPACES

5 SPACES 3 SPACES 2 HC SPACES

15 SPACES

15' UTILITY EASEMENT (REC. NO. 055501)

8 SPACES

RO UT

1 HC 1 HC SPACE SPACE

9 SPACES

UTILITY EASEMENT (REC. NO. 055502) 4

8 SPACES

15' UTILITY EASEMENT (REC. NO. 55503)

378 PARKING SPACES REMAINING

8 SPACES

17 SPACES

ACCESS EASEMENT (REC. NO. 58446)

30' ACCESS EASEMENT (REC. NO. 58445) ES

SP AC ES

15' UTILITY EASEMENT (REC. NO. 055501)

13 SPACES SP AC ES

SP AC

64 STRUCTURED PARKING SPACES 1 HC 1 HC SPACE SPACE

11 SPACES UTILITY EASEMENT (REC. NO. 055502)

4

5 SPACES

5 SPACES

5 SPACES 6 SPACES

6 SPACES

2 HC SPACES 3 SPACES

6 SPACES

7 SPACES

30' UTILITY EASEMENT (REC. NO. 900903)

1 HC SPACE

8 SPACES

DN

JOINT ACCESS (REC NO 607702)

ACCESS EASEMENT (REC. NO. 00646928)

SP AC ES

1 HC 1 HC SPACE SPACE

17 SPACES

SP AC ES

3

10' UTILITY EASEMENT (REC. NO. 900904)

17 SPACES

SP AC ES

13

11 SPACES

1 HC 4 SPACES SPACE

9 SPACES

SP AC ES

10 SPACES 2

10

9

UTILITY EASEMENT (REC. NO. 055502)

378 PARKING SPACES REMAINING 1 HC SPACE

10' UTILITY EASEMENT (REC. NO. 900904)

17 SPACES

UP

14 SPACES WATER LINE EASEMENT (BK. 972, PG. 402) JOINT ACCESS (REC NO 607702)

JOINT ACCESS (REC NO 2748174)

4 SPACES

SP AC ES

1 HC SPACE

SP AC ES

4 SPACES

SP AC ES

SEWER LINE AGREEMENT (BK. 972, PG. 400)

1 HC SPACE

2 SPACES

3 HC SPACES

10

1 HC 1 HC SPACE SPACE

9 SPACES

4 SPACES

ES

7 SPACES

SP AC

JOINT ACCESS (REC NO 2748174)

10

30' ACCESS EASEMENT (REC. NO. 58445)

SP AC ES

150 PARKING SPACES 3

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

1 HC SPACE

2 SPACES

ACCESS EASEMENT (REC. NO. 00646928)

12 SPACES

9 SPACES

10 SPACES

9 SPACES

8

11

1 HC SPACE

9

SP AC ES

2952 BASELINE ROAD, BOULDER CO

30' UTILITY EASEMENT (REC. NO. 900903)

1 HC SPACE

SP AC ES

SP AC ES

2 SPACES

10

SP AC ES

9 SPACES

ES

10 SPACES

30' ACCESS EASEMENT (REC. NO. 58445)

SP AC ES

8 SPACES

DRIVEWAY EASEMENT (REC. NO. 01073936)

7 SP AC ES

10 SPACES

SP AC ES

SP AC ES

7 SPACES

2

1 SPACE

10 SPACES 2

5 SPACES

4 SPACES 7 SPACES

8 SPACES

4 SPACES 7 SPACES

7 SPACES

5 SPACES 3 SPACES 2 HC SPACES

5 SPACES

5 SPACES

5 SPACES 6 SPACES

2 HC SPACES 3 SPACES

6 SPACES 6 SPACES

30' UTILITY EASEMENT (REC. NO. 900903)

1 HC SPACE

7 SPACES

1 HC 4 SPACES SPACE

9 SPACES 4 SPACES

10 SPACES

14 SPACES WATER LINE EASEMENT (BK. 972, PG. 402) JOINT ACCESS (REC NO 607702)

8 SPACES

8

11

150 EXISTING SURFACE SPACES IN THE WEST LOT(TO BE REMOVED, PHASE 1)

SEWER LINE AGREEMENT (BK. 972, PG. 400)

7

SP AC ES

SP AC

JOINT ACCESS (REC NO 2748174)

10

12 SPACES

3

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

1 HC SPACE

2 SPACES

ACCESS EASEMENT (REC. NO. 00646928)

7 SPACES

7

SP AC ES

7 SPACES

SP AC ES

7 SP AC ES

2 SPACES

2 10

SP AC ES

5 SPACES

2

1 SPACE

10 SPACES

WATER LINE EASEMENT (BK. 972, PG. 402)

30' UTILITY EASEMENT (REC. NO. 900903)

15 SPACES

14 SPACES

4 SPACES

SEWER LINE AGREEMENT (BK. 972, PG. 400)

8 SPACES

DRIVEWAY EASEMENT (REC. NO. 01073936)

30' UTILITY EASEMENT (REC. NO. 900903)

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

BASELINE ROAD

20' UTILITY EASEMENT (REC. NO. 877842)

6 SPACES

BASELINE ROAD

MAINTENANCE EASEMENT (REC. NO. 878554)

20' UTILITY EASEMENT (REC. NO. 877842)

20' UTILITY EASEMENT (REC. NO. 877842)

2 HC SPACES 3 SPACES

MAINTENANCE EASEMENT (REC. NO. 878554)

UT (R ILIT EC Y E . NO AS E . 01 MEN 02 T 20 66

)

PARKING - PHASE 1 DEMO

1

1" = 160'-0"

)

PARKING - PHASE 1 COMPLETE 1" = 160'-0"

ISSUED/REVISION SCHEDULE NO.

DESCRIPTION

AUTHOR CHECKED

DATE

MAINTENANCE EASEMENT (REC. NO. 878554)

BASELINE ROAD

BASELINE ROAD

20' UTILITY EASEMENT (REC. NO. 877842)

30' UTILITY EASEMENT (REC. NO. 900903) 12'-0" 4'-0"

11'-6"

7'-0"

7 SPACES

3'-6" 7'-0"

6'-0"

21'-0"

6'-0"

4 SPACES

6'-6" 6'-0"

prep 6'-0"

6'-6" 6'-0"

8 SPACES

6'-0"

32'-0"

6'-0"

6'-0"

3'-6"

6'-0"

36'-0"

8'-0"

7'-0"

5 SPACES

deli bakery prep 7'-0"

400

6'-0"

6'-0"

7 SPACES

36'-0"

6'-0"

UP

8'-0"

7'-6"

7'-6"

7'-6"

7'-0"

7'-0"

36'-0"

406 PARKING SPACES * 4'-0"

7'-0"

7 SPACES

36'-0"

7 SPACES

3 SPACES 2 HC SPACES

6'-6"

6'-6"

60'-0"

363 sf dairy

5'-6"

6 SPACES

2 HC SPACES 3 SPACES

6 SPACES

7'-0"

6'-0"

7'-0"

10'-0"

4 SPACES

5 SPACES

5 SPACES

5 SPACES

6 SPACES

30' UTILITY EASEMENT (REC. NO. 900903)

cooler

JOINT ACCESS (REC NO 607702)

450 sf

produce cooler

prep

frozen

9 SPACES

9 SPACES

10 SPACES

DN

30' ACCESS EASEMENT (REC. NO. 58445)

275 PARKING SPACES 1 HC SPACE

64 STRUCTURED PARKING SPACES

1 HC 1 HC SPACE SPACE

9 SPACES

64 STRUCTURED PARKING SPACES

10' UTILITY EASEMENT (REC. NO. 900904)

11 SPACES UTILITY EASEMENT (REC. NO. 055502)

1 HC 1 HC SPACE SPACE

51 PARKING SPACES

8 SPACES

17 SPACES

4

15' UTILITY EASEMENT (REC. NO. 055501)

13 SPACES SP AC ES

ACCESS EASEMENT (REC. NO. 58446) 8 SPACES

7 SPACES

4 SPACES

6 SPACES

SIDEWALK EASEMENT (REC. NO. 876114)

11 SPACES

EL EC . UP UP W UP HE ATE AT R SC ER OP EO F WSPACES TO REMAIN 103 PARKING OR EL EC K .

RO UT

6

12

1 SP HC AC E

ES

2 SP AC

CE S

SP AC ES

4

SP A

S

11

SP AC E

E3

SP AC ES

SIDEWALK EASEMENT (REC. NO. 58444)

10' UTILITY EASEMENT (REC. NO. 900903)

E3

6

103 PARKING SPACES TO REMAIN

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

PARKING TO BE ADDED IN PHASE 2 PARKING UNCHANGED BY THIS PHASE

10

PARKING UNCHANGED BY THIS PHASE

SP AC ES

R.O.W. LEASE (REC. NO. 01022065)

SP AC ES

SP AC ES

13

16 SPACES

10

13

PARKING TO BE REMOVED PHASE 2

SP AC ES

5

RO UT

3 HC SPACES

8 SPACES

15' UTILITY EASEMENT (REC. NO. 55503)

3OTH STREET

1 HC 4 SPACES SPACE

scan

7'-0"

6'-0"

6'-0"

6'-0"

32'-0"

7'-0"

9 SPACES

12' Door Package

"

6'-0"

JOINT ACCESS (REC NO 2748174)

ACCESS EASEMENT (REC. NO. 00646928)

ES

vestibule with carts/ hadni cap/pr oduce field bins

mgr

books

7'-0"

32'-0"

9 SPACES

SP AC

cash

33'-0"

10 SPACES

3

1 HC SPACE

2 SPACES

8 SPACES

DN

15 SPACES

SP AC ES

12 SPACES

10

SP AC ES

10 SPACES

2

RR

4'-6"

189 33'-0"

4 SPACES

10 SPACES

1 SPACE

WATER LINE EASEMENT (BK. 972, PG. 402)

RR

12'-0

4 SPACES

UP

14 SPACES

break

33'-0"

1 HC SPACE

SEWER LINE AGREEMENT (BK. 972, PG. 400)

mom cnc

8 SPACES

DRIVEWAY EASEMENT (REC. NO. 01073936)

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

SP AC ES

SP AC ES

12

DATE PRINTED:

8/27/2025 3:35:06 PM

3

* PARKING ABOVE AND BELOW LEVEL 1

UT (R ILIT EC Y E . NO AS E . 01 MEN 02 T 20 66

5

PARKING - PHASE 2 DEMO 1" = 160'-0"

SITE REVIEW 2025.08.27 2025.05.28

)

4

PARKING - PHASE 2 COMPLETE 1" = 160'-0"

NOT FOR CONSTRUCTION SHEET No.

SR-0.15 SR-0.24 PARKING PHASE DIAGRAMS

EV

W V

EV

S

T

MARKER \AT&T FOV

T

TR

TR

EV

EV

WM

FOV

SANITARY MANHOLE RIM ELEV: 5334.92' INV IN: 5327.02' (S) 18" PVC INV OUT: 5326.92' (N) 18" PVC

MARKER \AT&T

EV

EV

V

FOV FOV

H

D

FOV

EV WM WM

Y

BASIS OF BEARINGS N89°48'17"E 2662.03' (AM)

G V

BASELINE ROAD (RIGHT-OF-WAY 1808.76' N89°48'17"E VARIES)

N89°48'17"E 1808.76' (C)

(C)

SANITARY MANHOLE RIM ELEV: 5343.27' INV IN: 5333.27' (W) 8" PVC INV OUT: 5333.22' (E) 8" PVC

MAINTENANCE EASEMENT (REC. NO. 878554)

EV

EV

W V

W V W V

G V

W V

W V

BASELINE ROAD

W V W V

SANITARY MANHOLE RIM ELEV: 5335.52' INV IN: 5328.52' (S) 8" PVC INV IN: 5327.62' (W) 8" PVC INV OUT: 5327.52' (E) 8" PVC

SANITARY MANHOLE RIM ELEV: 5341.23' INV IN: 5332.18' (S) 8" PVC INV IN: 5331.03' (W) 8" PVC INV OUT: 5330.98' (E) 8" PVC

S89°48'17"W 853.27' (C) 853.27' (C) S89°48'17"W S

SANITARY MANHOLE RIM ELEV: 5335.13' INV IN: 5327.53' (W) 8" PVC INV IN: 5327.13' (S) 18" PVC INV OUT: 5327.03' (N) 18" PVC

W V

W V

CO

S

S

S00°15'23"E 95.00' (C)

WM

EV

S

EV

V

EV WM

ER

H

SANITARY MANHOLE RIM ELEV: 5344.56' INV IN: 5335.11' (W) 8" PVC INV OUT: 5334.96' (E) 8" PVC

D

EV

Y

BASELINE ROAD (RIGHT-OF-WAY VARIES)

EV

W V

S

S

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

EV

CO CO

CO

EM

20' UTILITY EASEMENT (REC. NO. 877842)

MW

EV

EV

EV

EV EV

PROPERTY LINE

TR

V

WM

2952 BASELINE

CO

EV

S

MW

H

D

EV

Y

EXISTING LOT BUILDING 1

RELINQUISHMENT OF RIGHTS OF ACCESS (BK. 880, PG. 88)

CO

TWO STORY BRICK AND CONCRETE BUILDING

TWO STORY BRICK AND CONCRETE BUILDING

W V

POSTED ADDRESS: 2890 BASELINE RD.

EXISTING BUILDING

MW

EV

POSTED ADDRESS: 2850 BASELINE RD.

EAST BASELINE SUBDIVISION REC. NO. 3220321

EV

MW

MW

FOV

PROPERTY LINE

CO

30' UTILITY EASEMENT (REC. NO. 900903)

EV

STORM INLET RIM ELEV: 5335.01' INV IN: 5332.01' (W) 18" RCP INV OUT: 5331.81' (E) 18" RCP

EV

EV

EV

MW

GM

EXISTING BUILDING

ER

CO

CO

CO

PROPERTY LINE

PROPERTY LINE

SANITARY MANHOLE RIM ELEV: 5344.86' INV IN: 53342.16' (SE) 8" PVC INV IN: 5341.96' (E) 8" PVC INV OUT: 5341.76 (N) 8" PVC

S S

MW

F

D

C

TR

TR

TR

S S

6" PVC TOP OF PIPE ELEV:5346.72'

WATER LINE EASEMENT (BK. 972, PG. 402)

GM

EM

EP

EP

R T

BUILDING E

STORM GRATE RIM ELEV: 5345.52' INV OUT:5344.00' (NW) 8" PVC

EV

MW

CO

STORM INLET JOINT ACCESS (REC NO 2748174)

MW

CO

2952 BASELINE ROAD, BOULDER CO

D

W V

CO

Y

CO

STORM INLET RIM ELEV: 5334.66' INV IN: 5331.26' (W) 18" RCP INV OUT: 5330.96' (E) 18" RCP

EP

EAVE

JOINT ACCESS (REC NO 607702)

S

G

P

ST ST

ST

H

1 STORY MASONRY BUILDING POSTED ADDRESS: 2920 BASELINE

1 HC SPACE MW

8 SPACES

CO

4 SPACES

CO

EXCEPTED PORTION (TC)

EV

2 SPACES

7 SPACES

MW

4 SPACES

W V

7 SPACES

W V

7 SPACES

G V

W V W V

EM

5 SPACES

G V G V

SEWER LINE AGREEMENT (BK. 972, PG. 400)

5 SPACES

Y

3 SPACES 2 HC SPACES

H

D

CO

5 SPACES

CO

2 HC SPACES 3 SPACES

CO

S S S

5 SPACES

CO

CO

S

6 SPACES

W

CO

CO

6 SPACES

C

6 SPACES

D

W

30' UTILITY EASEMENT (REC. NO. 900903)

F

DRIVEWAY EASEMENT (REC. NO. 01073936)

GM

S CO

EV

PROPERTY LINE

ACCESS EASEMENT (REC. NO. 00646928)

EP

WM

EV W V

EV

INV:5343.05' 6" PVC

TR

DN

EP

EV

F

D

PROPERTY LINE

C

INV:5342.89' 6" PVC W V

Y

D

H

TR

T

U. (R S. IG HIG HT HW OF AY W 36 AY VA RI ES )

STANDARD PARKING SPACE

171 EXISTING SPACES IN THE NORTH LOT TO REMAIN

9 SPACES

SANITARY MANHOLE RIM ELEV: 5335.89' INV IN: 5331.59' (W) 8" PVC INV IN: 5328.89' (S) 18" PVC INV OUT: 5328.79' (N) 18" PVC S

RECORDING LEASE (REC. NO. 974494) (REC. NO. 01078771)

W V

SIDEWALK EASEMENT (REC. NO. 876114)

EV

PARCEL 4 (TC)

1 HC SPACE

S

1 HC 1 HC SPACE SPACE

9 SPACES

W V

S

CO CO

COMPACT PARKING SPACE

3OTH STREET

CO

MB GM

EM

EP

MW

EP

EP

W V

ACCESSIBLE PARKING SPACE

CO

10' UTILITY EASEMENT (REC. NO. 900903)

W V

10' UTILITY EASEMENT (REC. NO. 900904)

SHORT TERM PARKING/LOADING ZONE

F

TR

D

C

TR

S

VEHICLE ENTRY

W V

1 HC 1 HC SPACE SPACE

11 SPACES

PROPERTY LINE

UTILITY EASEMENT (REC. NO. 055502)

8 SPACES G V

15' UTILITY EASEMENT (REC. NO. 055501)

TR

TR

STRUCTURED PARKING

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

SURVEY LS-12-0070 W V

30TH STREET (70' RIGHT-OF-WAY)

EXISTING PARKING SPACE TO REMAIN

R

2 STORY BRICK FRAME ON CONC. BLD W/ATTACHED SHEDS, FRIDGE & DECK POSTED ADDRESS: 2922 BASELINE

9 SPACES

WALK IN COOLER

9 SPACES

LEGEND

30' ACCESS EASEMENT (REC. NO. 58445)

8 SPACES

SHED

15 SPACES

WILLIAMS WAY SHED

10 SPACES

S

10 SPACES

TR

SURFACE PARKING

17 SPACES

4 W V

13 SPACES SP

AC

ACCESS EASEMENT (REC. NO. 58446)

W V

ES

8 SPACES

E

S S

.

SIDEWALK EASEMENT (REC. NO. 876114)

H

D

W V

GM

Y

F

D

UNIVERSITY OF COLORADO WILLIAMS VILLAGE CAMPUS

11 SPACES

EL EC

7 SPACES

6 SPACES

4 SPACES

15' UTILITY EASEMENT (REC. NO. 55503)

WM

3 HC SPACES

SIT

10' UTILITY EASEMENT (REC. NO. 900904)

15' UTILITY EASEMENT (REC. NO. 055501)

EX

TOTAL SURFACE PARKING: 2 SPACES

COMPACT PARKING SPACES

8 SPACES

IST

PH

TOTAL: 2

TOTAL: 39 + 3 ACCESSIBLE

W V W V

ING

AS

EO

NE

SHORT TERM PARKING SPACES

STANDARD PARKING SPACES

C

W V

TOTAL: 22

SP AC ES 1 SP HC AC E

DR

INV:5351.57' 12" RCP *SOUTHWEST END NOT LOCATED

IVE

19' - 0"

AIS

LE

10

13

EASEMENT AND R.O.W GRANT PARCEL C (BOOK 1195, PAGE 552)

PHASE 1 PARKING STALL SCHEDULE

PHASED PARKING COUNTS

1/16" = 1'-0"

12

DATE PRINTED: 9/12/2025 12:48:45 AM

528 TOTAL SPACES ON SITE

378 EXISTING SPACES TO REMAIN(-169) 2 NEW SHORT TERM SPACES

103 EXISTING SPACES TO REMAIN (-275) 2 (FROM PHASE 1) 11 NEW SHORT TERM SPACES

SP AC ES

SP AC E

PHASE 2 (SR 0.17)

L=294.26' R=318.72' ∆=52°53'55" CH=N26°43'23"W 283.92' (AM)

UNIVERSITY OF COLORADO WILLIAMS VILLAGE CAMPUS

SITE REVIEW

3

SURFACE SPACES

PHASE 1 (SR 0.16)

Y

S

N53°10'43"W 60.00' (C)

EXISTING

WM

W V

S3 12 6 ° 4 6. 9 49 '17 " ' (C W )

24' BACKUP

W V

H

24' BACKUP

8' - 0"

SP AC ES

8' - 0"

SP AC ES

10

7' - 9"

D

.

(REC. NO. 55503)

13

24' BACKUP

EL EC

SP AC ES 10' UTILITY EASEMENT

EV

9' - 0"

FOV

30TH STREET (70' RIGHT-OF-WAY)

SP AC ES

INV:5340.86' 8" METAL

D

12

INV:5341.14' 8" METAL

16 SPACES

11

SANITARY MANHOLE RIM ELEV: 5340.48' INV IN: 5330.83' (S) 18" PVC INV IN: 5330.78' (NW) 18" PVC INV OUT: 5330.63' (N) 18" PVC

ES

FW OR K

MARKER \COMM

15' - 0"

19' - 0"

ACCESSIBLE

EO

R.O.W. LEASE (REC. NO. 01022065)

U. (R S. IG HIG HT HW OF AY W 36 AY VA RI ES )

PARKING LEGEND C.O.B. SMALL CAR

OP

W V

4

SC

Y

S

SP AC ES

10' UTILITY EASEMENT (REC. NO. 900903)

SIDEWALK EASEMENT (REC. NO. 58444)

2 S PAC

UP

TR

TOTAL VEHICLE PARKING: 64 SPACES *(8) TANDEM SPACES NOT INCLUDED

C.O.B. STANDARD

207 EXISTING PARKING WA HE T SPACES IN THE SOUTH AT ER ER TO REMAIN LOT

SP AC ES

E3 6

UP

5

TOTAL: 8

UP

SP AC ES

TANDEM PARKING SPACES*

TR

H

RO UT

2025.08.27

INV:5351.18' 6" PVC INV:5351.26' 6" PVC *NORTH ENDS NOT FOUND

GARAGE SPACES T CITY S

0

64 (FOR USE BY BUILDING E) (+64)

AMP

TOTAL PARKING ON SITE

528

444

64 (FROM PHASE 1) 457 (FOR PUBLIC USE)

S

SANITARY MANHOLE RIM ELEV: 5351.20' INV IN: 5335.35' (SE) 18" PVC INV OUT: 5335.30' (N) 18" PVC

637

INV:5351.14' 18" RCP W/FES *SOUTHWEST END NOT LOCATED

1

(R U EC TIL IT . NO Y EA . 01 SE 02 ME 20 N 66 T )

S5 25 3°1 4. 0' 19 4 3 ' " (C E )

SHEET No.

SR-0.16

BROKER INN DIAGRAMS

0

1" = 50'-0" PLAN TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

PHASE 1 VEHICLE PARKING PLAN

STRUCTURED PARKING

LEGEND

PHASE ONE:

STANDARD PARKING SPACE COMPACT PARKING SPACE

PHASE 1

PHASE 2

PHASE TWO:

STANDARD PARKING SPACES

STANDARD PARKING SPACES

TOTAL: 39 + 3 ACCESSIBLE

TOTAL: 277 + 9 ACCESSIBLE

COMPACT PARKING SPACES

COMPACT PARKING SPACES

TOTAL: 22

TOTAL: 171

ACCESSIBLE PARKING SPACE

BASELINE ROAD

SHORT TERM PARKING LOADING ZONE (TO BE STRIPED) EXISTING PARKING SPACE

TANDEM PARKING SPACES*

TANDEM PARKING SPACES*

TOTAL: 8

TOTAL: 14

2718 Pine Street #100 Boulder, Colorado p: 303-442-3351

PROPERTY LINE

VEHICLE ENTRY

EXISTING BUILDING

R

T R

PROPERTY LINE

mom cnc

break

RR

RR

4'-6"

cash

TOTAL VEHICLE PARKING: 64 SPACES *(8) TANDEM SPACES NOT INCLUDED

vestibule with carts/hadnicap/produce field bins

mgr

books

12'-0"

EXISTING BUILDING

12' Door Package

33'-0"

3'-6" 7'-0"

6'-0"

21'-0"

EXISTING TO REMAIN

4'-0"

189

"

33'-0"

scan

6'-0"

33'-0"

7'-0"

TOTAL: 103

7'-0"

6'-0"

6'-6"

32'-0"

6'-0"

6'-0"

6'-0"

6'-0"

prep

R

TOTAL VEHICLE PARKING: 560 SPACES *(14) TANDEM SPACES NOT INCLUDED

6'-0"

6'-0"

T

6'-0"

32'-0"

6'-0"

6'-0"

3'-6"

6'-0" 36'-0"

2952 BASELINE ROAD, BOULDER CO

7'-0"

8'-0"

10'-0"

6'-0"

7'-0"

7'-0"

400

deli bakery prep

7'-0"

6'-0"

7'-0"

6'-0"

36'-0"

SURFACE PARKING

36'-0"

6'-0"

8'-0"

7'-6"

7'-6"

7'-6"

7'-0"

7'-0"

4'-0"

36'-0"

3

6'-6"

6'-6"

60'-0"

SR-0.17

363 sf dairy 5'-6"

R T

7'-0"

PROPERTY LINE

6'-6"

NEW CARTER WAY

32'-0"

EXISTING BUILDING PROPERTY LINE

BUILDING B 7'-0"

BUILDING C

12 '-0

11'-6"

THESE THREE SPACES WILL INCLUDE SIGNAGE INDICATING "NO PARKING XXAM - XXPM"

2952 BASELINE

T

T R

cooler produce cooler

450 sf

PHASE ONE:

PHASE TWO:

SHORT TERM PARKING SPACES

SHORT TERM PARKING SPACES

TOTAL: 2

TOTAL: 11

prep

frozen

PROPERTY LINE R T

DN

R

R T

T

TOTAL SURFACE PARKING: 2 SPACES

PROPERTY LINE

LOADING SPACES

WILLIAMS WAY T

WILLIAMS

R T R

TOTAL: 8

WAY

R

T

TOTAL SURFACE PARKING: 11 SPACES *(8) LOADING SPACES NOT INCLUDED

BUILDING E

Disclaimer: The buildings illustrated in this submittal are representative of the size, massing, architectural character and detailing. Repeat building types, if any, may have their own unique detailing, coloring, and final configuration but will be consistent with the quality of buildings shown in this package. Window locations illustrated on the floor plans are approximate. Final window locations subject to revision dependent upon site specific conditions. See site plan for lot specific building orientation. Lot specific metrics are included on the civil site plan.

R T

R T

3OTH STREET

R T

R T

BUILDING D

BUILDING A R T R T

PROPERTY LINE

0"

PH PH ASE AS ON ET E WO

20 '-

NE

T R

W

CA

EXISTING BROKER INN

RT

ER

WA

Y( WO T

E3 6

R T

E SIT

ING

3

T

VEHICLE PARKING - BLDG B - LEVEL 0 1" = 50'-0"

EXISTING SITE

EX

PH 8' - 0"

F)

TO BE STRIPED AND MARKED WITH SIGN INDICATING "LOADING AND UNLOADING ONLY"

20' - 0"

7' - 9"

ON ER

PHASE TWO

IST

AS

ET 9' - 0"

R T

R

LOADING ZONE

ACCESSIBLE

19' - 0"

19' - 0"

15' - 0"

C.O.B. SMALL CAR

T R

T

PARKING LEGEND C.O.B. STANDARD

R

R

WO

RO UT

R

T T R

8' - 0" 7' - 0"

24' BACKUP

24' BACKUP

24' BACKUP

PARKING STALL SCHEDULE 1/16" = 1'-0"

DATE PRINTED: 9/12/2025 12:41:49 AM

PHASED PARKING COUNTS

CITY S

TAMP

EXISTING

PHASE 1 (SR 0.16)

PHASE 2 (SR 0.17)

SURFACE SPACES

528 TOTAL SPACES ON SITE

378 EXISTING SPACES TO REMAIN(-169) 2 NEW SHORT TERM SPACES

103 EXISTING SPACES TO REMAIN (-275) 2 (FROM PHASE 1) 11 NEW SHORT TERM SPACES

GARAGE SPACES

0

64 (FOR USE BY BUILDING E) (+64)

64 (FROM PHASE 1) 457 (FOR PUBLIC USE)

TOTAL PARKING ON SITE

528

444

637

SITE REVIEW 2025.08.27

SHEET No.

SR-0.17 VEHICLE PARKING 1 1" = 50'-0"

0 PLAN TRUE

25'

50'

SCALE: 1" = 50'-0"

100'

PHASE 2 VEHICLE PARKING PLAN