ATTACHMENT B - Agreement

Special Meeting, February 12, 2026 · item 2B: Consideration of a motion to authorize the city manager to enter into a revocable license agreement with the University of Colorado, general… · 26 pages

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

ATTACHMENT 'B'

REVOCABLE LICENSE AGREEMENT This Revocable License Agreement (“Agreement”) is entered into by and between The Regents of the University of Colorado, a body corporate, on behalf of the University of Colorado Boulder (the “University”), and the City of Boulder, a Colorado home rule city (the "City"). Recitals Whereas, the University wishes to construct and extend underground chilled water lines, which are more particularly described in Exhibit B, portions of which will encroach upon the City’s Folsom Street public right-of-way (“ROW”), from Main Campus of the University to the North Boulder Creek area of the University (the “Project”). Whereas, the University requires a revocable license agreement to complete the Project and to access and maintain the underground chilled water lines into perpetuity. Whereas, the City wishes to enter into an Agreement with the University to allow the University to complete the Project and to provide a revocable license to the University for purposes of allowing the University to access the Property to maintain the underground chilled water lines for twenty years. Agreement NOW THEREFORE, in consideration of the mutual promises made herein, the University and the City enter into this Agreement as follows: 1. Term. The term of this Agreement shall be twenty years (“Term”). The effective date of this Agreement will be the last date that the authorized University officer signs the Agreement. Upon termination, the University agrees to restore the ROW to its original condition unless a new permit has been applied for or is issued. 2. Grant of Revocable License. The City hereby grants the University a revocable license (“License”) to allow the University to access City property depicted in Exhibit A (“Property”) for purposes of completing the Project and maintaining the University’s underground chilled water lines. Exhibit A is attached, incorporated by reference, and made a part of this Agreement. On the Property, the Project shall be constructed and maintained consistent with the plans attached in Exhibit B. 3. Restoration and Repair of Property. The University agrees that upon completion of the Project, and after any maintenance of the underground chilled water lines, it will remove any equipment or personal property placed on the Property in accordance with regular, accepted industry practices and applicable laws and regulations, and will restore any portion of the Property affected by the University’s use under the License to a condition equivalent to its present condition. The City will give notice to the University in a reasonable and timely manner of any condition that the City discovers for which the University is responsible under this Agreement, and the University will remedy any defect in a reasonable and timely manner. 4. Revocation and Removal. The City may elect to revoke the License and this Agreement by providing written notice to the University of such election. The notice of 1

ATTACHMENT 'B'

revocation by the City shall be delivered to the University not less than one hundred and eighty (180) days prior to the effective date of revocation. The decision to revoke may be made whenever the City, in its sole discretion, determines to revoke pursuant to Section 115 of the Boulder Revised Charter. All releases shall survive revocation. The University shall remove, at its expense, the underground water chiller lines and associated encroachments within thirty days of revocation. In the event that the University does not remove the encroachment(s) within thirty days, the University agrees to reimburse the City for the costs of removal. 5. Relocation. In the event that the City, pursuant to section 8-5-14 “Relocation of Facilities” of the Boulder Revised Code, as the same may be amended from time to time, decides to relocate any segment of the water chiller lines, the University agrees to be responsible for reasonable expenses associated with such relocation. In the event of any such relocation, the City agrees to provide the University with ninety (90) days’ notice in writing unless failure to relocate poses a threat to health, safety, or welfare of the public or individuals as determined by the City in which case the City will have the right to move the water chiller lines without such notice or with lesser notice. It is the intent of the City to act in good faith and not require relocation unless it determines there is a public safety or some other bona fide purpose for such relocation. Following relocation, all affected property shall be restored to, at a minimum, the condition which existed prior to construction at the University's expense. 6. Impact on the City. The University’s use of the License will be conducted in such a manner as to minimize any disruption or interference with the City’s operations. All University activities will be coordinated between CU Boulder’s department of Facilities Management and the City’s Planning & Development Services (“P&DS”) department. The University will communicate the following information to P&DS: Construction schedule; instrument deployment schedule; and any other construction-related information requested by the City. This Agreement does not control or limit any improvements the City wishes to make on, or use it chooses to make of, the Property. 7. Permits, Approvals, Codes and Standards. The University will comply with all applicable City standards and codes in its use of the Property or pursuant to this Agreement. The University will be responsible for acquiring appropriate City permits to complete the Project, which City permits shall not be unreasonably withheld. 8. Insurance. Prior to execution of this Agreement, the University shall submit to the City insurance policies or Certificates of Insurance as evidence of compliance with the provisions of this paragraph and subject to approval by the City. The University shall, at University’s sole expense, procure and maintain or cause to be procured and maintained with insurers approved by the City, who any licensed to do business in Colorado and have an AM Best rating of at least A-VI, worker’s insurance as required by state law and a comprehensive general liability insurance policy with minimum limits of $1 million per occurrence and a $2 million aggregate. The University agrees that the above stated policy limits shall be raised to meet any additional coverage necessitated by amendments to the Colorado Governmental Immunity Act that may expose the City to judgments greater than the insurance coverage required in this License. 2

ATTACHMENT 'B'

This policy shall be written on a primary basis, non-contributory with any other insurance coverage and/or self-insurance carried by the City. This policy shall be maintained in full force and effect for the duration of the License. The University or University's insurance broker shall notify the City of any cancellation or reduction in coverage or limits of any insurance policy within seven days of receipt of insurers' notification to that effect. The University shall obtain and submit proof of substitute insurance in the event of expiration or cancellation of coverage and shall provide the City with an updated Certificate of Insurance annually. Additional Insurance Requirements: a. All insurers must be licensed or approved to do business within the State of Colorado. b. The Certificate Holder shall be identified as: City of Boulder, 1777 Broadway, P.O. Box 791, Boulder, CO 80306. c. A Separation of Insureds Clause must be included in general liability policies. d. The University shall advise the City in the event any general aggregate or other aggregate limits are reduced below the required per occurrence limit. At its own expense, University will reinstate the aggregate limits to comply with the minimum requirements and shall furnish to the City a new certificate of insurance showing such coverage is in force. e. The City and University shall cooperate with each other in the collection of any insurance proceeds that may be payable in the event of any loss, including the execution and delivery of any proof of loss or other actions required to affect recovery. f. The University shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to this License by reason of its failure to procure or maintain insurance or by reason of its failure to procure or maintain insurance in sufficient amounts, durations or types. 9. Environmental Matters. The University will not cause or permit the storage, treatment or disposal of any Hazardous Materials in, on, or about any part of the Property by the University, its agents, employees or contractors in violation of any state or federal Environmental Law. The University will not permit the Property to be used or operated in a manner that may cause the Property or any part of the Property to be contaminated by any Hazardous Materials in violation of any Environmental Laws. Through the duration of the Project and for any subsequent maintenance and use of the water chiller lines, the University will follow the requirements of the City for protection of streams, wetlands, and bodies of water, and other similar standards, as found in 9-3-9 of the Boulder Revised Code, for or about any part of the Property. The University will notify the City of any and all enforcement, cleanup, remedial, removal, or other governmental or enforcement cleanup or other governmental or regulatory actions instituted, completed or threatened pursuant to any Environmental Laws relating to any Hazardous Materials affecting any part of the Property. 3

ATTACHMENT 'B'

The University will notify the City of all claims made or threatened by any third party against the City relating to damage, contribution, cost recovery, compensation, loss or injury resulting from any Hazardous Materials on or about the Property or any part of the Property as a result of the University’s use of the Property. The University holds the City harmless from the same and subject to the limitations of the Colorado Governmental Immunity Act, as further articulated in Section 10 of this Agreement. "Hazardous Materials" means asbestos, explosives, radioactive materials, hazardous waste, hazardous substances, or hazardous materials including, without limitation, substances defined as "hazardous substances" in the Comprehensive Environmental Response Compensation Liability Act of 1980, as amended, 42 U.S.C. section 9601-9657 ("CERCLA"); the Hazardous Material Transportation Act of 1975, 49 U.S.C. section 1801-1812; the Resource Conservation Recovery Acts of 1976, 42 U.S.C. section 6901-6987; the Occupational Safety and Health Act of 1970, 29 U.S.C. 651 et seq., or any other federal, state or local statute, law, ordinance, code, rule, regulation, order or decree regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials, wastes or substances now or at any time hereinafter in effect (collectively, "Environmental Laws"). "Hazardous Waste" means hazardous waste as defined under the Resource Conservation Recovery Act of 1976, 42 U.S.C. section 6901-6987. 9. Status and Assignment. This Agreement constitutes a mere license. It does not create an interest in land. It is not coupled with an interest. No subsequent act or course of dealing shall serve to alter the status of the Agreement except by written amendment duly executed by the authorized agents of the City and the University. This Agreement is not assignable. 10. Governmental Immunity. It is specifically understood and agreed that nothing contained in this Agreement shall be construed as an express or implied waiver by the University or the City of its governmental immunity or of the governmental immunity of the State of Colorado, as an express or implied acceptance by University or the City of liabilities arising as a result of actions which lie in tort or could lie in tort in excess of the liabilities allowable under the Colorado Governmental Immunity Act, C.R.S. §§ 24-10-101 et seq., as a pledge of the full faith and credit of the State of Colorado, or as the assumption by the University or the City of a debt, contract or liability in violation of Article XI, Section 1, of the Constitution of the State of Colorado. 11. Liability. Each Party shall be responsible for any claims, damages, losses, or liabilities arising out of the acts or omissions of its own officers, employees, agents, or contractors in the performance of this Agreement. Nothing in this Agreement shall be construed to require either Party to assume responsibility for the acts or omissions of the other Party, or of the other Party’s officers, employees, agents, or contractors. This provision is intended solely to allocate responsibility between the Parties in accordance with applicable law and does not constitute an agreement to indemnify, hold harmless, or otherwise assume liability for acts or omissions of the other Party.

4

ATTACHMENT 'B' 12. Colorado Law Applies. This Agreement shall be governed, construed, performed and enforced in accordance with the laws of the State of Colorado. IN WITNESS WHEREOF, the University and the City have caused this Agreement to be executed by their duly authorized representatives.

The Regents of the University of Colorado, a body corporate By: _______________________________ Printed Name: ______________________ Title: _____________________________ Date: _____________________________ City of Boulder, a Colorado home rule city

By: __________________________________ Nuria Rivera-Vandermyde, City Manager Attest: _________________________________ City Clerk Approved as to Form: ________________________________ City Attorney Date: _____________________________

5

ATTACHMENT 'B'

PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO

Flatirons, Inc. Land Surveying Services

www.FlatironsInc.com

ATTACHMENT 'B'

J A COB K

ES

SI

RV

EY O

R

Z

P ROF

38409

ED

COL

DO L I CE UNT

J ESS

RA

NS

O

PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO

O NA

L L A ND

SU

Flatirons, Inc. Land Surveying Services

www.FlatironsInc.com

ATTACHMENT 'B'

J A CO B K

ES

SI

RV

EYO

R

Z

PROF

38409

ED

J ESS

DO L I CE UNT

COL

RA

NS

O

PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO

ONA

L L A ND

SU

Flatirons, Inc. Land Surveying Services

www.FlatironsInc.com

20 ATTACHMENT19'B'

18

17

15

16

14

13

12

11

10

9

8

7

6

5

4

3

2

1 STAMP

ATTACHMENT 'B'

EXHIBIT 'B'

UCB Project No: UCB001213

Project Title: Site - North of Boulder Creek - util expansion - package four

11-24-2025

L

L

UNIVERSITY OF COLORADO BOULDER

engineering

regent administrative ctr. boulder, co 80309

http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K J

PROJECT TEAM

PARTIAL DEMOLITION & RESTORATION PLAN - PHASE 1

G-102

PARTIAL DEMOLITION & RESTORATION PLAN - PHASE 2

G-103

PARTIAL DEMOLITION & RESTORATION - PHASE 2

G-104

PARTIAL DEMOLITION & RESTORATION - PHASE 3

G-201

PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 1

G-202

PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2

G-203

PARTIAL SITE CONSTRUCTION LIMITS - PHASE 2

G-204

PARTIAL SITE PLANS - PHASE 3

G-300

TRAFFIC CONTROL SIGNAGE

G-301

PARTIAL TRAFFIC CONTROL PLAN - PHASE 1

G-302

PARTIAL TRAFFIC CONTROL PLAN - PHASE 2

G-303

PARTIAL TRAFFIC CONTROL PLAN - PHASE 2

G-304

PARTIAL TRAFFIC CONTROL PLAN - PHASE 3

G-500

GENERAL DETAILS

M-201

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-202

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-203

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-204

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-205

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-206

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-207

PARTIAL SITE MECHANICAL PLAN & PROFILE

M-600

MECHANICAL DETAILS- DIRECT BURY PIPING

C-101

NOTES & LEGEND

C-102

NOTES & LEGEND

C-110

EXISTING CONDITIONS & DEMOLITION PLAN

C-200

SITE PLAN

C-300

EROSION CONTROL PLAN

C-310

EROSION CONTROL DETAILS

C-320

EROSION CONTROL DETAILS

C-330

EROSION CONTROL DETAILS

C-340

EROSION CONTROL DETAILS

C-400

OVERALL UTILITY PLAN

C-450

SANITARY SEWER PLAN & PROFILE

C-500

SITE DETAILS

C-501

SITE DETAILS

C-510

UTILITY DETAILS

C-511

UTILITY DETAILS

18

● ● ● ●

● ● ● ● ● ● ● ● ●

● ● ● ● ● ● ● ● ●

17

● ● ● ● ● ● ● ● ●

● ●

● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●

● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●

● ●

● ● ●

● ●

● ● ● ● ● ● ●

●

16

DESIGN TEAM UTILITY COOLING ST+B ENGINEERING PROJECT MANAGER TODD SPACEK, PE

PROJECT LOCATION TELEPHONE: (303) 900-8782 EMAIL: TSPACEK@STB.ENGINEERING

LANDSCAPE ARCHITECT LIME GREEN DESIGN, INC. MATHEW EVANS

SURVEY FLATIRONS, INC. ZACH GOWAN

TELEPHONE: (303) 733-7558 EMAIL: MEVANS@LGDINC.COM

APPLICABLE STANDARDS

20TH STREET TO THE NORTH SIDE OF BOULDER CREEK, SOUTH OF THE NORTH BOULDER CREEK PRACTICE FACILITY TO THE WEST OF THE PRACTICE FACILITY TO THE CORNER OF FULSOME AND BOULDER STREET THE PRMENADE BETWEEN THE PRACTICE FACILITY AND THE FOOTBALL STADIUM. BOULDER, CO 80302

PROJECT SCOPE OVERVIEW PACKAGE #4 PROJECT CONSISTS OF UTILITY INFRASTRUCTURE WORK TO ROUTE NEW CHILLED WATER PIPING FROM CENTRAL CAMPUS TO TIE IN POINT AT RESIDENCE HALL 1 POINT. SCOPE INCLUDES THE FOLLOWING:

TELEPHONE: (303) 443-7001 EMAIL: ZGOWAN@FLATIRONSINC.COM

·

·

UCB BOULDER TEAM BRIAN MOFFITT MANAGER | DESIGN & CONSTRUCTION

BRYAN BIROSAK DIRECTOR | UTILITY & ENERGY SERVICES

PROJECT GENERAL NOTES

TELEPHONE: (303) 946-9122 EMAIL: brian.moffitt@colorado.edu

TELEPHONE: (303) 735-4983 EMAIL: bryan.birosak@colorado.edu

·

PHASE ONE: OPEN CUT DIRECT BURY 6-INCH CHILLER WATER PIPING FROM RESIDENCE HALL 1 CONNECTION POINT IN 20TH STREET TO 18-INCH CHILLED WATER PIPING IN ATHENS STREET EAST TO GRANDVIEW AVENUE ON NORTH BANK OF BOULDER CREEK. PROVIDE TEES AND FLANGED VALVES FOR FUTURE EXPANSION.

G F

Regent Administrative Ctr. Boulder, CO 80309

ST+B Project No.:

2815.02

ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE

NO

AGA - AMERICAN GAS ASSOCIATION

1 DESIGN DEVELOPMENT

06/06/25

ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS

2 CONSTRUCTION DOCs REVIEW

06/27/25

ASME - AMERICAN SOCIETY OF MECHANICAL ENGINEERS

3 city of boulder tech doc review 07/09/25

NEC - NATIONAL ELECTRIC CODE

4 BID PRICING SET

08/06/25

NEMA - NATIONAL ELECTRIC MANUFACTURER'S ASSOCIATON

5 bid pricing set - addendum 2

09/05/25

NFPA - NATIONAL FIRE PROTECTION ASSOCIATION

6 bid pricing set - addendum 4

09/09/25

UL - UNDERWRITER'S LABORATORIES

7 city of boulder tech doc review 10/22/25

EPA - ENVIRONMENTAL PROTECTION AGENCY

8 for construction set *

SUBMISSION

DATE

11/04/25

9 city of boulder corrections rev. 11/24/25

APPLICABLE CODES

PHASE TWO: OPEN CUT DIRECT BURY 18-INCH CHILLED WATER PIPING THROUGH GRANDVIEW AVE PARKING LOT TRANSITIONING INTO LOT 169 SOUTH OF THE LOWER PRACTICE FIELD AND THROUGH LOT 169 TO HORIZONTAL DIRECTION DRILL BORE PIT IN LOT 177. PHASE 3: HORIZONTAL DIRECTIONAL BORE OF 20-INCH CHILLED WATER PIPING FROM BORE PIT IN LOT 177, UNDER BOULDER CREEK AND UP FOLSOM TOWARDS RECEIVING BORE PIT NEAR COLORADO AVENUE. OPEN CUT DIRECT BURY 20-INCH CHILLED WATER PIPING FROM CAMPUS TIE IN POINT IN COLORADO AVENUE TO END POINT OF HDD BORE. PROVIDE TEES AND FLANGED VALVES FOR FUTURE EXPANSION. SANITARY PIPE & MANHOLE RELOCATION IN COLORADO AVENUE AND FOLSOM STREET TO MEET COB UTILITY SEPARATION REQUIREMENTS.

INTERNATIONAL BUILDING CODE (IBC)

2021

INTERNATIONAL EXISTING BUILDING CODE (IEBC)

2021

INTERNATIONAL FIRE CODE

2021

INTERNATIONAL MECHANICAL CODE

2021

INTERNATIONAL PLUMBING CODE

2021

ASME BOILER AND PRESSURE VESSEL CODE

2015

NATIONAL ELECTRICAL CODE (NEC / NFPA 70)

2023

THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS - AS ADOPTED BY COLORADO DEPT. OF PUBLIC SAFETY, DIVISION OF FIRE PREVENTION AND CONTROL.

W.E. O'NEIL GMGC RYAN DICKINSON | PROJECT EXECUTIVE

TELEPHONE: (720) 275-1996 EMAIL: rdickinson@weoneil.com

DARREN HOLLIDAY | PROJECT MANAGER

TELEPHONE: (310) 710-3283 EMAIL:dholliday@weoneil.com

Sheet Name

project cover sheet A

G-101

● ●

PKG No. 4 CITY OF BOULDER CORRECTION REVIEW- 11.24.25

OVERALL SITE CHILLED WATER SYSTEM PLAN

● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●

PKG No. 4 CITY OF BOULDER TECH DOC REVIEW - 10.22.25

G-100

PKG No. 4 ADDENDUM 4 - 09.09.25

● ● ● ● ● ● ● ● ● ●

PKG No. 4 ADDENDUM 2 - 09.05.25

PKG No. 4 CITY OF BOULDER TECH DOC REVIEW - 07.09.25

PROJECT COVER SHEET

19

● ● ● ● ● ● ● ● ● ●

●

G-000

PKG No. 4 BID PRICING DOCUMENTS - 08.06.25

C B

20

PKG No. 4 CONSTRUCTION DOCs REVIEW - 06.26.25

'●' '◊' '○'

NUMBER NAME

A

11/24/2025 10:56 AM

PKG No. 4 DESIGN DEVELOPMENT - 06.06.25

D

DELIVERABLE KEY: ISSUED DISCONTINUED REFERENCE ONLY

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G000_Cover.dwg

DELIVERABLE

PROJECT DESCRIPTION

H

I

DRAWING PACKAGE

scale: none

E

scale: none

C

E

scale: none

overall ucb boulder campus

D

project site plan

B

area of work

University Colorado Boulder

F

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

J

K

(303) 431-6100

Sheet No.

G-000

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

20

19

18

17

15

16

13

14

12

11

9

10

7

8

6

5

4

3

2

1 STAMP

ATTACHMENT 'B'

GENERAL NOTES:

HWR HWS CHS CHR

VERIFY RES HALL 1 CHILLED WATER SUPPLY & RETURN PIPING AND THE EXISTING CONNECTION POINTS OF CHILLED WATER SUPPLY & RETURN PIPING.

RES HALL 1 BLDG A

RES HALL 1 ALIGNMENT

HEATING PLANT

2.

ALL EXISTING UTILITIES SHOWN ARE BASED ON SURVEY PROVIDED BY FLATIRONS SURVEYING, DATED JANUARY 2025. LOCATION OF UTILITIES ARE NOT PRECISE OR EXACT AND CONTRACTOR SHALL BE AWARE OF POTENTIAL CONFLICTS.

3.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

6" (CHS/R) OR 6" HDPE DR 9 HDPE DIRECT BURY TO RES HALL 1 PACKAGE 1 TIE-IN POINT.

(E) STEAM LINES.

CHS

K

11-24-2025

EXHIBIT 'B'

CHR

EXPECTED UTILITY CROSSING, TYP. BURIED CONDUIT WITH COPPER AND FIBER FOR MARINE COURT

(E) FIRE HYDRANT.

(303) 431-6100

K

L

RES HALL 1 BLDG B

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

L

1.

PHASE 1 PHASE 2

(E) STEAM VAULT (E) MANHOLE #404.

18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY

18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY

(E) FIRE HYDRANT.

J

J

(E) FIELD LIGHTS. APPROXIMATE LOCATION OF 25' WIDE CITY OF BOULDER EASEMENT FOR SANITARY SEWER & WATER MAINS AND 30' WIDE PUBLIC SERVICE COMPANY EASEMENT

EXPECTED UTILITY CROSSING, TYP. CHS

CHR (E) OVERHEAD ELECTRICAL. (E) FIRE HYDRANT. (E) ELECTRICAL TRANSFORMER.

EXISTING CITY OF BOULDER 30' SANITARY EASEMENT.

(E) CONDUIT WITH COPPER AND FIBER FOR NEWTON COURT & THE CHILDREN CENTER. (E) FIELD LIGHTS.

(E) SANITARY EASEMENT.

2&3 G204

(E) XCEL FIBER WITHOUT TRACER.

(E) BUILDING

(E) FIELD LIGHTS. 18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY. (E) FIBER VAULT.

PHASE 2 PHASE 3

CHR

(E) FIRE HYDRANT. CHR (E) IRRIGATION LINE

CHS EXPECTED UTILITY CROSSING, TYP.

(E) SIDEWALK EXISTING CITY OF BOULDER 30' SANITARY EASEMENT.

G

EXISTING STORM WATER RETENTION

20" HDPE CHS/R BORE (E) IRRIGATION VALVES. STORM MANHOLE RIM ELEV: 5,320.48' INV IN: 5,317.48' (S) 12" PVC INV OUT: 5,316.18' (NE) 12" PVC

AVOID WATER METER VAULT AND MAINTAIN WATER UTILITY CROSSING HORIZONTAL SEPARATION 10 FT; VERTICAL SEPARATION 18". (E) WATER MANHOLE

(E) WATER VALVES

(E) FO BOX COVER

SANITARY MANHOLE: RIM ELEV: 5,324.03' INV IN: 5,314.76' (W) 15" PVC (FROM BLDG) INV IN: 5,314.80' (SW) 15" CLAY (FROM BLDG) INV OUT: 5,314.70' (E) 15" CLAY

STORM MANHOLE RIM ELEV: 5,329.82 INV IN: 5,321.77 (W) 12" RCP INV IN: 5,324.62' (S) 30" RCP INV OUT: 5,319.95' (NE) 30" RCP

STORM MANHOLE: RIM ELEV: 5,323.09' INV IN: 5,316.54' (SW) 30" RCP INV OUT: 5,314.09' (NE) 30" RCP

STORM INLET RIM ELEV: 5,330.75' FLOWLINE ELEV: 5,330.53' INV OUT: 5,322.86' (E) 12" RCP

20" HDPE (CHS/R) BORE UNDER FOLSOM STORM UTILITY CROSSING. HORIZONTAL SEPARATION 5 FT; VERTICAL SEPARATION 18".

(E) OVERHEAD ELECTRICAL POLE.

AVOID (E) GAS LINE. ELECTRICAL UTILITY CROSSING. HORIZONTAL SEPARATION 10 FT; VERTICAL SEPARATION 18".

(E) SIDEWALK STORM MANHOLE: RIM ELEV: 5,338.38' INV IN: 5,331.37' (W) 18" RCP (FROM BLDG) INV IN: 5,332.19' (S) 30" RCP INV OUT: 5,327.38' (N) 30" RCP

E

RETAINING WALL ENDS.

STORM UTILITY CORSSING. HORIZONTAL SEPARATION 5 FT; VERTICAL SEPARATION 18". GAS UTILITY. HORIZONTAL SEPARATION 18"; VERTICAL SEPARATION 12".

NO STORM MANHOLE: RIM ELEV: 5,352.14' INV IN: 5,342.24' (E) 12" RCP INV IN: 5,339.90' (S) 30" RCP INV OUT: 5,338.58' (N) 30" RCP

LOCATION OF IRRIGATION VALVING AND CONTROL.

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

D

3 city of boulder tech doc review 07/09/25 20" HDPE CHS/R BORE UNDER FOLSOM

CITY ROW.

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25

SANITARY MANHOLE: RIM ELEV: 5,363.49' INV IN: 5,355.14' (S) 12" CLAY INV IN: 5,355.24' (SW) INV OUT: 5,355.09' (N) 15" CLAY

C

C

SANITARY MANHOLE: RIM ELEV: 5,364.45' INV IN: 5,355.56' (S) 15" PVC INV OUT: 5,355.36' (NE) 15" CLAY (E) FENCE SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION.

20" HDPE CHS/R BORE UNDER FOLSOM (E) FENCE

NEW PIPE CONNECTIONS TO EXISTING 20" CHILLED WATER SUPPLY AND RETURN PIPING. INSTALL FULL SIZED ISOLATION VALVES.

FIELD VERIFY THE EXISTING CHILLED WATER SUPPLY & RETURN PIPING IDENTIFICATIONS.

20" ID DIP, 18" SEPARATION B/W CHILLED WATER LINES.

4,5,6 G204

STORM INLET: RIM ELEV: 5,367.27' FLOWLINE ELEV: 5,366.22' INV IN: 5,352.52' (S) 30" RCP INV OUT: 5,352.39' (E) 30" RCP STORM MANHOLE: RIM ELEV: 5,367.15' INV IN: 5,354.94' (W) 42" RCP INV IN: 5,352.88' (S) 30" RCP INV OUT: 5,352.75' (N) 30" RCP

(E) 16" WATER WATER & STORM UTILITY CROSSINGS. HORIZONTAL SEPARATION 10 FT WATER, 5 FT STORM; VERTICAL SEPARATION 18" FOR WATER AND SEWER. (TYPICAL) STORM MANHOLE: RIM ELEV: 5,367.20' INV IN: 5,351.22' (W) 30" RCP INV OUT: 5,351.13' (N) 30" RCP

B

CHS

SECTION HDPE OR DUCTILE PIPING FROM HDSS IN COLORADO AVE.

B

(E) RETURN AS SHOWN ON EXISTING UTILITY PLANS

STORM MANHOLE: RIM ELEV: 5,369.92' INV IN: 5,365.83' (W) 42" RCP INV OUT: 5,356.95' (E) 42" RCP

(E) SIDEWALK

(E) 12"SS

CHR SANITARY MANHOLE: RIM ELEV: 5,367.71' INV IN: 5,356.59' (W) 15" CLAY INV OUT: 5,356.50' (N) 15" CLAY

SANITARY MANHOLE: RIM ELEV: 5,369.68' INV IN: 5,357.80' (W) 15" CLAY INV OUT: 5,357.76' (E) 15" CLAY

20 x 20 x 8 TEES, PIPING EXTENDED INTO LAWN OF SOUTH SIDE OF STREET, PROVIDE CAPPED VALVES.

20x20x20 TEE, CAPPED / PLUGGED FOR FUTURE EASTERN EXPANSION. SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION. SANITARY MANHOLE, RIM ELEV: 5368.90' INV IN: 12" (SE) 5362.72' INV OUT: 12" (N) 5362.66'

Sheet Name

811

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

A

1 G100

OVERALL SITE CHILLED WATER SYSTEM PLAN SCALE: 1" = 80'-0" 0

20

19

18

20'

80'

17

overall site chilled water system plan

CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES.

160'

16

15

14

13

12

11

10

9

8

7

6

5

4

3

Sheet No.

G-100

2

1

A

(E) SUPPLY AS SHOWN ON EXISTING UTILITY PLANS

8" BRANCHES CAPPED & PLUGGED FOR FUTURE EXTENSION.

11/24/2025 10:35 AM

CITY ROW.

ST+B Project No.:

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G100_Utility.dwg

SANITARY MANHOLE: RIM ELEV: 5,351.11' INV IN: 5,343.74' (S) 15" CLAY INV OUT: 5,343.61' (N) 15" CLAY

D

F

SANITARY MANHOLE RIM ELEV: 5,328.11' INV IN: 5,317.62' (S) 15" CLAY INV OUT: 5,317.56' (NE) 15" CLAY

G

STREAM (BOULDER CREEK).

F

STORM INLET: GRATE ELEV: 5,296.96' INV IN: 5292.51' (NE) 15" CCP INV OUT: 5,293.09' (S) 18" CCP

H

STORM 18" RCP INV: 5292.43'

CHR

H

(E) SANITARY EASEMENT.

(E) ELECTRICAL TRANSFORMER.

E

CHS (E) RAW WATER IRRIGATION DITCH.

Regent Administrative Ctr. Boulder, CO 80309

18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY.

University Colorado Boulder

CHS PROPOSED UNDERGROUND BORE PATH XCEL AND COMCAST LINE RELOCATION FROM EXISTING OVERHEAD POLES.

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

SANITARY MANHOLE: RIM ELEV: 5,309.01' INV IN: 5,300.96' (W) 21" PVC INV OUT: 5,293.65 (SE) 21" PVC

I

(E) OVERHEAD UTILITY POLE.

20

19

18

17

15

16

14

13

12

11

10

9

7

8

5

6

4

3

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

2.

K

3.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

CONSTRUCTION FENCING, TYP.

(E) PLAYGROUND

LIMITS OF EXCAVATION, TYP.

PHASE 1

ST+B Project No.:

D

PHASE 2

STORM DRAIN.

NO

(E) FIRE HYDRANT.

SUBMISSION

G F

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

C

C

9 city of boulder corrections rev. 11/24/25

PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 1 0

5'

20'

B

SCALE: 1" = 20'-0"

B

1 G201

40'

partial site construction limits plan phase 1

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

Sheet No.

G-201

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:39 AM

2815.02

3 city of boulder tech doc review 07/09/25

(E) MANHOLE #404.

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G201_Ph1.dwg

FLOOD LINE

H

I

E

CITY OF BOULDER 30' EASEMENT

30'-0" (FENCING)

12'-0" (EXCAVATION)

F

G

30'-0" (FENCING)

E

12'-0" (EXCAVATION)

D

CONSTRUCTION FENCING, TYP.

Regent Administrative Ctr. Boulder, CO 80309

H

LIMITS OF EXCAVATION, TYP.

University Colorado Boulder

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

J

HEATING PLANT

11-24-2025

L

1.

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

EXHIBIT 'B'

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

4

3

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

2.

K

3.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGINATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

J

PHASE 2

PHASE 1

12'-0" (EXCAVATION)

11-24-2025

L

1.

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

K

EXHIBIT 'B'

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

30'-0" (FENCING)

I

I

LIMITS OF EXCAVATION, TYP.

12'-0" (EXCAVATION)

E

30'-0" (FENCING)

(E) ELECTRICAL MANHOLE.

(E) CITY OF BOULDER 30' SANITARY EASEMENT.

CONSTRUCTION FENCING, TYP.

D

( E) C SA ITY NIT OF AR BO Y E UL A S DE EM R 3 EN 0' T.

NO

G F

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

3 city of boulder tech doc review 07/09/25

(E) OVERHEAD POWER POLE.

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25 (E) FIRE PARKING ISLAND WITH POLE LIGHTS AND SIGN.

PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2 SCALE: 1" = 20'-0" 0

5'

20'

B

B

1 G202

C

C

(E) ELECTRICAL VAULT.

40'

partial site construction limits plan phase 2

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

Sheet No.

G-202

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:38 AM

H

ST+B Project No.:

LIMITS OF EXCAVATION, TYP.

(E) FIRE HYDRANT.

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G202_Ph2.dwg

(E) HIGH VOLTAGE ELECTRICAL.

E

(E) FENCED ELECTRICAL EQUIPMENT ENCLOSURE.

D

F

(E) WATER VALVES.

Regent Administrative Ctr. Boulder, CO 80309

ELECTRICAL TRANSFORMER.

University Colorado Boulder

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

CONSTRUCTION FENCING, TYP.

20

19

18

17

16

15

14

13

12

11

10

9

7

8

5

6

4

3

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

2.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

(E) FIBER VAULT.

D

(E) ELECTRICAL TRANSFORMER.

SUBMISSION

F

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

C B

B

C

9 city of boulder corrections rev. 11/24/25

1 G203

PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2 SCALE: 1" = 20'-0" 0

5'

20'

40'

partial site construction limits plan phase 2

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

Sheet No.

G-203

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:35 AM

2815.02

3 city of boulder tech doc review 07/09/25

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G203_Ph2.dwg

ST+B Project No.: NO

G

H

I PHASE 3

E

PHASE 2

E

LIMITS OF EXCAVATION, TYP.

D

CONSTRUCTION FENCING, TYP.

Regent Administrative Ctr. Boulder, CO 80309

30'-0" (FENCING)

F

12'-0" (EXCAVATION)

1 M-400

University Colorado Boulder

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

J

K

3.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

11-24-2025

L

1.

L

EXHIBIT 'B'

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

4

3

2

1 STAMP

ATTACHMENT 'B'

2&3 G-204

EXISTING UTILITIES:

5

2.

1

K

125'

3.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES. AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.

1.

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

PHASE 2

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

3

7

J

2

2 G204

PILOT & REAM PHASE - NORTH END OF BORE EQUIPMENT LAYOUT SCALE: 1" = 20'-0" 20'

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

40'

STREAM (BOULDER CREEK).

EXISTING STORM WATER RETENTION

G

100 '

40' DRILL SET BACK TO ACHIEVE 5' OF COVER IN PIT

DRILL RIG WEST ALIGNMENT 8' x 53'

F

DRILL RIG EAST ALIGNMENT 8' x 53'

8' CONSTRUCTION FENCE WORK AREA WILL BE MATTED TO PROTECT HARD SURFACES

11 '

11 '

TAG

TYPE

DIMENSIONS, W X L

1

AA DD240T 300 GPM MUD PUMP ATTACHED

8' x 70'

2

MUD PUMP

11' x 52'

3

TULSA 750 MIXING SYSTEM

11' x 52'

4

JOHN DEERE EXCAVATOR WITH DECKHAND

10' x 15'

5

FLOAT TRAILER / DRILL PIPE TRAILER

8' x 53'

6

FRACK TANK

9' x 50'

7

BORE ENTRY PIT / MUD CONTAINMENT PIT

10' x 10'

REMARKS

REMARKS

E

24 '

PIPE PULL PHASE - SOUTH END OF BORE EQUIPMENT LAYOUT

NO

SCALE: 1" = 20'-0" 0

5'

20'

40'

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

C CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF THE CHILLED WATER SUPPLY AND RETURN PIPING.

B

B

DIRECT BURY

HORIZONTAL BORE

C

9 city of boulder corrections rev. 11/24/25

Sheet Name

SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION.

A

partial site plan - phase 3

A

8" CHS/R CAPPED & PLUGGED FOR FUTURE EXTENSION. 11/24/2025 10:36 AM

2815.02

3 city of boulder tech doc review 07/09/25

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G204_Ph3.dwg

ST+B Project No.: 3 G204

G

HDD EQUIPMENT LEGEND

DRILL BIT ENTRY

F

REMOVE ASPHALT FOR HDD SURFACE ENTRY 4' x 15'

E

HDD PIT 10' x 15'

D

H

HDD TO OPEN CUT TRANSITION

Regent Administrative Ctr. Boulder, CO 80309

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

EXHIBIT 'B'

University Colorado Boulder

SOUTH END - EQUIPMENT SET UP

H

I

5'

http://stb.engineering (303) 900-8782

I

0

engineering

(303) 431-6100

4 6

11-24-2025

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

L

1.

J

PILOT & REAM PHASE NORTH LOCATION

GENERAL NOTES:

PHASE 3

180'

Sheet No.

1 G204

SCALE: 1" = 50'-0" 0 10'

20

19

18

17

16

15

14

13

12

11

10

9

G-204

PARTIAL SITE PLAN - PHASE 3

8

50'

100'

7

6

5

4

3

2

1

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

3

4

2

1 STAMP

ATTACHMENT 'B' CROWN AT CENTERLINE. FIBER MESH REINFORCEMENT.

COMPACTED CRUSHED LIMESTONE BASE CA-10.

MATCH EXISTING BORDER IF EXISTS. IF NOT BROOM FINISH ENTIRE MODULE.

L

1/4" / FT

NEW CAST IN PLACE CONCRETE WALKWAY.

COMPACTED SUBGRADE.

4" COMPACTED CA-10 GRANULAR FILL ON COMPACTED SUBGRADE.

NOTE: IN EXCEPTION TO 1/4" / FT. SLOPE, MATCH ADJACENT SIDEWALK ELEVATIONS.

FIBER MESH REINFORCEMENT.

TYPICAL SIDEWALK-CURB SECTION

EXISTING CONCRETE WALKWAY.

6"

EXISTING BASE COURSE.

4" COMPACTED BASE COURSE CA-10.

EXISTING SUBGRADE.

COMPACTED SUBGRADE.

6 G500

1/2"

4" JOINT SEALANT TO MATCH PAVEMENT/WALK COLOR.

CONCRETE WALK. 6" FIBER MESH REINFORCEMENT.

1/4"R

1/2"

engineering

1-1/4"

BACKER ROD.

http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

1/4"R JOINT FILLER.

WALK TOOLED SCORE JOINT

NEW WALK TO EXISTING WALK

5 G500

SCALE: NONE

CONCRETE WALK CONTROL JOINTS

4 G500

SCALE: NONE

(303) 431-6100

JOINT SEALANT SECTION SCALE: NONE

J

SCALE: NONE

BROOM FINISH. 4"

11-24-2025

NOTE: JOINT SEALANT DETAIL APPLIES TO ALL PAVING DETAILS WHERE EXPANSION JOINT APPEARS.

J

K

7 G500

SCALE: NONE

TROWEL CUT 1/3" DEPTH OF WALK BEFORE TOOLING.

FIBER MESH REINFORCEMENT.

4"

TYPICAL SIDEWALK SECTION

NEW CAST IN PLACE CONCRETE WALKWAY.

RE: DETAIL 4/G500.

(N) OR (E) CURB.

6"

8 G500

4" SMOOTH FINISH TO COMPLETELY SURROUND EACH 5' x (MATCH EXISTING OF NEAREST ADJACENT SIDEWALK) MODULE; ONLY WHERE ADJACENT EXISTING WALK CONTAINS A SMOOTH FINISH AT CONTROL JOINTS.

BROOM FINISH PAVING.

L

℄

CONCRETE WALK.

MATERIAL VARIES (RE: PLANS).

EXHIBIT 'B'

K

BROOM FINISH.

42'' MINIMUM FINAL PAVEMENT WIDTH, ROTOMILLING IS AN ACCEPTABLE ALTERNATIVE TO MINIMUM PAVEMENT WIDTH

IN STREET

SEE BEDDING DETAIL DRAWING NO. C03

TYPICAL TRENCH SECTION TRENCH WIDTH NOTES: 1.

G

2.

3.

4.

PIPE DIAMETER

MINIMUM COVER TO BE BELOW OFFICIAL STREET GRADE. MINIMUM DISTANCE BETWEEN EDGE OF TRENCH AND EDGE OF ASPHALT, OR LIP OF CURBLINE, SHALL BE 3 FEET. REFER TO DRAWING NO. C.04 FOR PAVEMENT RESTORATION FOR PAVEMENT LESS THAN 3 YEARS OLD. ON STATE HIGHWAYS, REFER TO CDOT UTILITY REQUIREMENTS.

MINIMUM WIDTH

ORIENTING SUB.

MAXIMUM WIDTH

6''

1'-6''

2'-6''

8''

1'-8''

2'-8''

12''

2'-0''

3'-0''

16''

2'-4''

3'-4''

20''

2'-8''

3'-8''

24''

3'-0''

4'-0''

MUD MOTOR.

NON-MAGNETIC COLLAR.

STEERING TOOL.

HORIZONTAL THRUST BLOCK DETAIL

C4 G500

SCALE: NONE

VERTICAL THRUST BLOCK DETAIL

C2 G500

SCALE: NONE

UTILITY TRENCH WIDER THAN 16" DETAIL

2 G500

SCALE: NONE

BIT.

BENT MOTOR HOUSING.

BOTTOM HOLE ASSEMBLY DETAIL SCALE: NONE

F

C6 G500

ANGULAR OFFSET.

PILOT HOLE

HORIZONTAL DRILLING RIG. DRILLING FLUID RETURNS.

ENTRY POINT.

E

DRILL PIPE.

EXIT POINT.

TRENCH WIDTH SEE UTILITY TRENCH DWG

H

12''

G

SEE TABLE 1

F

1

o

E

COVER AS SPECIFIED

WIDTH

SAWCUT 6'' BEYOND TRENCH WALL EACH SIDE PRIOR TO PAVING

Regent Administrative Ctr. Boulder, CO 80309

COMPACTED BACKFILL AS SPECIFIED

FOR TRENCHES GREATER THAN 5 FEET IN DEPTH, SIDEWALLS SHALL BE SLOPED AT 45 ANGLE OR SUITABLY BRACED OR SHEETED AS NECESSARY FOR THE SAFETY OF THE WORKERS AND THE PROTECTION OF OTHER UTILITIES AS REQUIRED BY OSHA.

H

EXISTING STREET SURFACE

University Colorado Boulder

I

NEW STREET SURFACE AS SPECIFIED, 6'' MIN OR MATCH EXIST DEPTH

I

UNIFORM CUT LINE ASPHALT/CONCRETE

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

IN OPEN FIELD

ST+B Project No.: NO

UNDISTURBED SOIL

ANNULUS. DIRECTION OF PROGRESS.

BEDDING ZONE

D

DESIGNED DRILLED PATH.

GRANULAR EMBEDMENT MATERIAL SQUEEGEE SAND OR 1/4'' WASHED CHIPS

1/4 PIPE OD, 4'' MIN OR 2'' BELOW BELL WHICHEVER IS GREATER

DRILLING FLUID RETURNS. DRILL PIPE.

ALLOWED WITH RCP

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25

DRILL PIPE.

8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25

C

C

TRENCH WIDTH SEE UTILITY TRENCH DWG GRANULAR EMBEDMENT MATERIAL 3/8" - 3/4" WASHED ANGULAR CHIPS

12'' MIN

ANNULUS.

BEDDING ZONE

UNDISTURBED SOIL

TYPICAL DIRECTION OF PROGRESS.

PULLBACK

DRILL PIPE.

B

B

1/4 PIPE OD, 4'' MIN OR 2'' BELOW BELL WHICHEVER IS GREATER

PREFABRICATED PULL SECTION.

DRILLING FLUID RETURNS.

PIPE SUBGRADE FOUNDATION MATERIAL IF REQUIRED REQUIRED WITH ALL PIPE EXCEPT RCP

(MAY BE USED WITH RCP AT CONTRACTOR'S OPTION)

Sheet Name

general details A

A

ANNULUS. 11/24/2025 10:37 AM

SUBMISSION

3 city of boulder tech doc review 07/09/25

PREREAMING

PIPE SUBGRADE FOUNDATION MATERIAL IF REQUIRED

2815.02

D

HAND PLACED SELECT MATERIAL HAVING NO ROCKS GREATER THAN 2 INCHES IN SIZE

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G500_Details.dwg

12'' MIN

DIRECTION OF PROGRESS.

C5 G500

20

CURB & GUTTER DETAIL

C3 G500

SCALE: NONE

19

18

17

16

CURB AND GUTTER JOINTS DETAIL

C1 G500

SCALE: NONE

15

14

13

12

PIPE BEDDING DETAIL

1 G500

SCALE: NONE

11

10

9

8

7

HDD PROCESS DETAILS

Sheet No.

SCALE: NONE

G-500

6

5

4

3

2

1

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

4

3

2

1 STAMP

1.

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

I

I

J

K

2.

11-24-2025

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

L

1.

K

EXHIBIT 'B'

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

4+80

5+00

5+20

5+40

5+60

5+80

6+00

6+20

6+40

6+60

6+80

7+00

7+20

7+40

FLOOD LINE

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

(E) FIRE HYDRANT. PROTECT DURING CONSTRUCTION.

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R

H

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

F

G

OIT BURIED FIER CONDUIT, HAND DIG WITHIN 24".

1 M202

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0" 5'

20'

40'

E

0

PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.

(E) STEAM B.O.P.

5315 GRADE

(E) TELECOM

3'-3" (3'-0" MIN.)

5315

(E) ELECTRICAL 5307.0'

(E) GAS, 30" BELOW GRADE. 5306.6'

ST+B Project No.:

(E) ELECTRICAL T.O.P.

NO

(E) GAS T.O.P.

5310

5310

D

18" DUCTILE IRON HD

5305 (E) MV DUCTBANK. 5307.9' (N) CHS/R

PE CHS/R

5305

(E) SANITARY 5309.5'

(E) ELECTRICAL

(E) SANITARY T.O.P.

(N) CHS/R

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

5300

(E) SANITARY 5303.0'

5300

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25

(E) STORM 5304.22'

(E) SANITARY T.O.P.

4 BID PRICING SET

7 city of boulder tech doc review 10/22/25

C

C

(E) STORM T.O.P.

3+20

3+40

3+60

3+80

4+00

4+20

4+40

4+60

0

5'

10'

4+80

5+00

5+20

5+40

5+60

5+80

6+00

6+20

6+40

6+60

6+80

7+00

7+20

7+40

2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M202 SCALE: 1" = 20'-0" HORIZONTAL

20'

40'

VERTICAL

B

5'

B

0

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

partial site mechanical plans & profiles Sheet No.

M-202

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:36 AM

2815.02

3 city of boulder tech doc review 07/09/25

SS OR 20" IPS DR9 HD

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M202_Plan Profile Ph1.dwg

(E) STEAM MAINS. 5311.72'

H

4+60

G

4+40

F

4+20

E

4+00

D

3+80

Regent Administrative Ctr. Boulder, CO 80309

3+60

University Colorado Boulder

3+40

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

3+20

20

19

18

17

15

16

14

13

12

11

10

9

7

8

5

6

3

4

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

I

I

J

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R

K

2.

11-24-2025

L

1.

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

EXHIBIT 'B'

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

8+40

8+60

8+80

9+00

9+20

9+40

9+60

9+80

10+00 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

H

OIT BURIED FIBER CONDUIT, HAND DIG WITHIN 24". 9+80

10+00

10+20

10+40

10+60

10+80

11+00

11+20

11+40

11+60

11+80

1 M203

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

PROTECT OVERHEAD ELECTRICAL DURING CONSTRUCTION. (E) ST MANHOLE. RIM ELEV: 5307.68' INV IN: 5302.33' (N) 12" CLAY INV OUT: 5302.30' (SE) 12" CLAY

(E) OVERHEAD POWER POLE, PROTECT DURING CONSTRUCTION.

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER

3 M203

SCALE: 1" = 20'-0" 5'

20'

0

5'

20'

40'

(E) OVERHEAD ELECTRICAL

(E) OVERHEAD ELECTRICAL (E) FIBER (2) 4", HAND DIG WITHIN 24". 5305.4'

5315

GRADE

5310

(E) ELECTRICAL DUCTBANK. 5304.85'

(E) WATER T.O.P.

ST+B Project No.:

5310

GRADE

(E) DUCTBANK T.O.P.

3'-0" MIN.

D

5310

5305

(E) DUCTBANK T.O.P.

(E) ELECTRICAL T.O.P.

5305

DR9 HDPE CHS/R 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R

(N) CHS/R

5300

C

7+60

7+80

8+00

8+20

8+40

8+60

8+80

9+00

20'

40'

VERTICAL

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

8 for construction set *

11/04/25

(E) SANITARY 5302.1' CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.

(E) SANITARY T.O.P.

9+20

9+40

9+60

9+80

10+00

9+80

10+00

10+20

10+40

10+60

10+80

11+00

11+20

11+40

11+60

4 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER M203 SCALE: 1" = 20'-0" 0

5'

HORIZONTAL

10'

0

5'

20'

40'

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

partial site mechanical plans & profiles Sheet No.

M-203

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:35 AM

06/27/25

B

5'

2 CONSTRUCTION DOCs REVIEW

B

0

06/06/25

(E) SANITARY T.O.P.

2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M203 SCALE: 1" = 20'-0" HORIZONTAL

1 DESIGN DEVELOPMENT

9 city of boulder corrections rev. 11/24/25

(E) SANITARY 5302.1'

(E) STORM T.O.P.

7+40

(E) 8" GAS, 61" BELOW GRADE. 5303.1' (E) FIBER T.O.P.

(E) 12" STORM, 60" BELOW GRADE. 5303.0'

7+20

5300 (N) CHS/R

DATE

7 city of boulder tech doc review 10/22/25

5300

(N) CHS/R

CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.

SUBMISSION

C

5300

2815.02

3 city of boulder tech doc review 07/09/25

(E) DUCTBANK T.O.P.

5305

NO

5310

(E) ELECTRICAL, (5) 1-1/2", 30" BELOW GRADE. 5304.9'

(E) ELECTRICAL DUCTBANK. 5304.7'

(E) ELECTRICAL DUCTBANK. 5304.7'

18" DUCTILE IRON HDSS OR 20" IPS

5315 PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.

(E) 2" WATER, 50" BELOW GRADE. 5303.8'

(E) GAS T.O.P.

5305

5315

(E) FIBER T.O.P.

PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES, TYP RE: 4/M-600.

(E) 8" GAS, 32" BELOW GRADE. 5305.4'

5315

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M203_Plan Profile Ph1.dwg

SCALE: 1" = 20'-0"

40'

E

0

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER

5'-8" (3'-0" MIN)

F

G

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

G

8+20

F

8+00

E

7+80

D

7+60

Regent Administrative Ctr. Boulder, CO 80309

7+40

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

7+20

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

University Colorado Boulder

(E) SANITARY MANHOLE. RIM ELEV: 5309.01' INV IN: 5300.96' (W) 24" PVC INV OUT: 5300.65' (SE) 24" PVC

H

PROTECT OVERHEAD ELECTRICAL DURING CONSTRUCTION.

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

4

3

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

J

K

2.

11+80

12+00

12+20

12+40

12+60

12+80

13+00

13+20

13+40

13+60

13+80

14+00

14+20

14+40

14+60

14+80

15+00

15+20

15+40

15+60

15+80

16+00

16+20

16+40

16+60

16+80

17+00

17+20

17+40

http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

17+60

I

11+60

engineering

I

11+40

11-24-2025

L

1.

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

EXHIBIT 'B'

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

F

1 M204

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0" 5'

20'

40'

5315

5315 CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.

5310

(E) ELECTRICAL

(E) FIBER (2) 1" LINES, HAND DIG WITHIN 24". 5305.3'

(E) ELECTRICAL (2) 1" LINES, 24" BELOW GRADE. 5303.7'

(E) FIBER

5304.7' (E) ELECTRICAL T.O.P.

PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES TYPICAL. RE: 4/M-600.

(E) FIBER (2) 1" LINES, HAND DIG WITHIN 24". 5303.4'

D

(E) ELECTRICAL T.O.P.

5'-6" (3'-0" MIN)

NO

5310

(E) ELECTRICAL

(E) ELECTRICAL DUCTBANK. 40" BELOW GRADE. 5300.05'

GRADE

(E) FIBER T.O.P.

5305

ST+B Project No.:

(E) ELECTRICAL DUCTBANK. 36" BELOW GRADE. 5300.2'

(E) ELECTRICAL

(E) ST 5303.7'

(E) IRR 5303.8'

(E) STORM

(E) FIBER, HAND DIG WITHIN 24". (2) 2" LINES. 28" BELOW GRADE. 5300.3'

(E) FIBER (2) 2" LINES, HAND DIG WITHIN 24". 21" BELOW GRADE. 5300.4'

(E) FIBER

5305

(E) FIBER T.O.P.

(E) GAS 53##.#'

(E) IRR T.O.P.

5300

CHS/R 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

11/04/25

9 city of boulder corrections rev. 11/24/25

CHS/R (E) ELECTRICAL (STREET LIGHTING)

(E) 8" GAS, 63" BELOW GRADE. 5301.2'

C

1 DESIGN DEVELOPMENT

8 for construction set *

(E) STORM, 36" BELOW GRADE ( PRIVATE STORM LINE ) 9 5300.3'

(E) GAS T.O.P.

(E) STORM T.O.P.

11+40

11+60

11+80

12+00

12+20

12+40

12+60

12+80

13+00

13+20

13+40

13+60

13+80

14+00

14+20

14+40

14+60

14+80

15+00

15+20

15+40

15+60

15+80

16+00

16+20

16+40

16+60

16+80

17+00

17+20

17+40

17+60

2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M204 SCALE: 1" = 20'-0" 40'

VERTICAL

0

5'

10'

B

20'

B

0 HORIZONTAL 5'

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

partial site mechanical plans & profiles Sheet No.

M-204

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:37 AM

DATE

C

5300

SUBMISSION

7 city of boulder tech doc review 10/22/25

(E) GAS T.O.P.

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE

2815.02

3 city of boulder tech doc review 07/09/25

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M204_Plan Profile Ph2.dwg

E

0

G

G

(E) ELECTRICAL VAULT.

F

(E) FIRE PARKING ISLAND WITH POLE LIGHTS.

E

(E) PARKING LIGHT POLE, PROTECT DURING CONSTRUCTION.

D

H

(E) OVERHEAD POWER POLE, PROTECT DURING CONSTRUCTION.

Regent Administrative Ctr. Boulder, CO 80309

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

University Colorado Boulder

(E) FIBER VAULT. PROTECT DURING CONSTRUCTION.

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

H

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

(E) FIRE HYDRANT. PROTECT DURING CONSTRUCTION.

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

4

3

2

1 STAMP

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

J

K

2.

17+80

18+00

18+20

18+40

18+60

18+80

19+00

19+20

19+40

19+60

19+80

http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

20+00

I

17+60

engineering

I

17+40

11-24-2025

L

1.

L

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

K

EXHIBIT 'B'

1.

GENERAL NOTES:

J

ATTACHMENT 'B'

EXISTING UTILITIES:

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR

2&3 G204

SCALE: 1" = 20'-0" 5'

20'

40'

5315

5315

5310

NO

5310 CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.

D

5305

5305

PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.

(E) 16"ST ( PRIVATE STORM LINE ) 5295.0' 9

GRADE

5300

SUBMISSION

G

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25

5300

(E) STORM T.O.P.

8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25

(E) IRR T.O.P.

5295 18" DUCTILE IRON HDSS OR

PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.

20" IPS DR9 HDPE CHS/R

5295

C

3'-0" MIN.

(E) IRR 5299.3'

C

F

2815.02

3 city of boulder tech doc review 07/09/25

(E) STORM, 36" BELOW GRADE. 5297.5' (E) STORM

17+60

17+80

18+00

18+20

18+40

18+60

18+80

19+00

19+20

19+40

19+60

19+80

20+00

2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M205 SCALE: 1" = 20'-0" HORIZONTAL

20'

40'

VERTICAL

0

5'

10'

B

5'

B

0

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

partial site mechanical plans & profiles Sheet No.

M-205

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:37 AM

H

ST+B Project No.:

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M205_Plan Profile Ph2.dwg

E

0

E

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER

D

1 M205

Regent Administrative Ctr. Boulder, CO 80309

F

G

PROVIDE CONCRETE ANCHOR BLOCKS ON HDPE WITH FUSED / FLEXIBLE RESTRAINT ANCHOR PLATES.

University Colorado Boulder

PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.

TRANSITION FROM DUCTILE IRON TO HDPE. SEE DETAIL 12/M600. ISP X DIPS RESTRAINED MECHANICAL JOINT ADAPTER WITH STEEL PIPE INTERNAL STIFFER. HDPE SECTION ANCHOR FLEX RESTRAINT WITH CONCRETE BLOCKING.

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS

20

19

18

17

15

16

13

14

12

11

10

9

8

7

5

6

3

4

2

1 STAMP

ATTACHMENT 'B'

EXISTING UTILITIES:

EXHIBIT 'B'

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

L

11-24-2025

L

1.

2.

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K J

J

K

(303) 431-6100

(E) SANITARY MANHOLE, RIM ELEV: 5363.49' INV IN: 5355.15' INV IN: 5355.24' INV OUT: 5355.09'

I

I

CONSTRUCTION FENCING. PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.

1 M206

PARTIAL SITE PLAN SCALE: 1" = 40'-0" 10'

40'

80'

F

0

3'-0" MIN. (DIRECT BURIED)

(E) 16" CW

(E) 8" GAS, 35" BELOW GRADE. 5360.5' EXIT ANGLE, 10° MIN, 14° MAX. 12°

(E) GAS

APPROX. TOTAL LENGTH OF DRY BORE: 1185' 4-1/2"

(E) SANITARY MANHOLE, RIM ELEV: 5363.49'

NO

EXCAVATED PIT. (20'x14'x7' DEEP)

(E) 8" WATER, 55" BELOW GRADE. 5361.8'

EXIT RADIUS 1400 FT

14'-0"

DRILL RIG.

D

(E) WATER

(E) 12" SANITARY, 87" BELOW GRADE. 5357.1'

(E) 12" SANITARY, 76" BELOW GRADE. 5360.1'

ENTRY RADIUS 1400 - 1600 FT

431'-4 3/4"

BOULDER CREEK EXTENTS

24'-3 1/4"

60'-0" ENTRY ANGLE, 14°

SUBMISSION

G

DATE

1 DESIGN DEVELOPMENT

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

9 city of boulder corrections rev. 11/24/25 342'-2"

293'-2 1/2"

C

C

60'-0"

CROSS SECTION SCALE: 1" = 40'-0"

B

0

10'

40'

80'

B

2 M206

partial site chilled water system plan & cross section

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

Sheet No.

M-206

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:34 AM

2815.02

3 city of boulder tech doc review 07/09/25 5292.00' BO CREEK

(E) SANITARY

(E) SANITARY

H

ST+B Project No.:

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M206_Plan Profile Ph3.dwg

E

LINE REPRESENTS 100 FT TO THE NORTH OF INTERSECTION.

F

G

H

CHR

E

CHS

D

EXCAVATED PIT. (20'x14'x7' DEEP)

Regent Administrative Ctr. Boulder, CO 80309

DRILL RIG.

University Colorado Boulder

CHR

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

CHS

CHS CHR

20

19

18

17

15

16

14

13

12

11

9

10

7

8

5

6

3

4

2

1 STAMP

CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.

SEE G SHEETS FOR SITE COORDINATION.

2.

CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.

3.

GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.

4.

THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.

5.

CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.

6.

THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

7.

CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.

8.

CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.

9.

CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.

10.

THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.

11.

ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.

12.

THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.

SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.

J

PROVIDE CONCRETE ANCHOR BLOCKS ON HDPE WITH FUSED / FLEXIBLE RESTRAINT ANCHOR PLATES.

TRANSITION FROM DUCTILE IRON TO HDPE. RE: DETAIL 12/M600. ISP X DIPS RESTRAINED MECHANICAL JOINT ADAPTER WITH STEEL PIPE INTERNAL STIFFER. HDPE SECTION ANCHOR FLEX RESTRAINT WITH CONCRETE BLOCKING.

CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF EXISTING CHILLED WATER SUPPLY AND RETURN PIPING.

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

(303) 431-6100

1+20

1+40

1+60

1+80

2+00

2+20

2+40

2+60

2+80

3+00

3+20

3+40

3+60

3+80

4+00

4+20

4+40

4+00

4+20

4+40

4+60

4+80

5+00

SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.

F

G

8" CHS/R PIPING w/ CAPPED VALVES

5 M207

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER

1 M207

SCALE: 1" = 20'-0" 5'

20'

3 M207

SCALE: 1" = 20'-0"

40'

0

5'

20'

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0"

40'

0

5'

20'

40'

5375

5375 GRADE (COLORADO AVE)

(E) IRR T.O.P.

(E) WATER T.O.P.

5365

20" CHS/R (DUCTILE IRON)

(E) GAS T.O.P.

20" CHS/R 5365.6'

5360

5360

5360

16" MIN. SEPARATION BETWEEN CHS/R & (E) WATER CROSSING.

C

5365

5361.8'

5365

20" CHS/R (DUC

TILE IRON)

20" CHS/R 5364.4'

(N) CHS/R T.O.P.

5360

5360

20" CHS/R 5364.4'

(E) ST 5352.88'

5360

5355

(E) ST T.O.P.

EXCAVATED PIT. (20'x14'x7' DEEP)

5355

06/06/25

2 CONSTRUCTION DOCs REVIEW

06/27/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

11/04/25

5355

(E) ST 5351.1' (E) ST T.O.P.

4+20

4+40

4+60

4+80

1+00

5+00

B

6 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" HORIZONTAL

0

5'

20'

40'

VERTICAL

1+20

1+40

1+60

1+80

2+00

2+20

2+40

2+60

2+80

3+00

3+20

3+40

3+60

3+80

4+00

4+20

4+40

2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" 0

5'

HORIZONTAL

10'

0

5'

20'

40'

VERTICAL

4+00

4+20

4+40

4+60

4+80

5+00

4 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" 0

5'

HORIZONTAL

10'

0

5'

20'

40'

VERTICAL

0

5'

10'

B

4+00

811

A

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

partial site mechanical plans & profiles Sheet No.

M-207

2

1

A

Sheet Name

CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:38 AM

1 DESIGN DEVELOPMENT

9 city of boulder corrections rev. 11/24/25

18" MIN. SEPARATION BETWEEN CHS/R & (E) WATER CROSSING.

5355

DATE

8 for construction set *

(N) CHS/R T.O.P.

(E) SANITARY, 36" BELOW GRADE. 5361.0' (E) SANITARY T.O.P.

SUBMISSION

7 city of boulder tech doc review 10/22/25

(N) CHS/R T.O.P.

CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.

LOWER WATER HYDRANT FEED BELOW (N) CHS/R. 18" MIN SEPARATION.

5355

5365

20" CHS/R (DUCTILE IRON)

(E) ST, ±9'-2" BELOW GRADE.

5355

NO

2815.02

3 city of boulder tech doc review 07/09/25

(E) 8" WATER, 55" BELOW GRADE. 5362.6' (E) WATER T.O.P.

8" CHS/R PIPING w/ CAPPED VALVES. 5364.75'

(N) CHS/R T.O.P.

5370

GRADE (FOLSOM STREET)

(E) GAS 5363.5'

(E) WATER T.O.P.

20" CHS/R (DUCTILE IRON)

(E) CHS/R

5370

(E) ELECTRICAL T.O.P.

(E) 8" WATER, 54" BELOW GRADE. 5364.5'

5365

(E) W, ±10'-7" BELOW GRADE.

5370

18"

5365

(E) 2" ELECTRICAL, 33" BELOW GRADE. 5365.0'

ST+B Project No.:

C

(E) WATER, 44" BELOW GRADE. 5367.4'

PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.

GRADE (COLORADO AVE)

(E) IRR 5367.3'

1'-6"

D

6'-0"

(E) WATER, ±3'-7" BELOW GRADE.

5370

5375

3'-0" MIN

5370

3'-0" MIN

5370

6'-0" 6'-0" (3'-0" MIN)

GRADE

5375

18"

5375

3'-0" MIN

5375

30x42

Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M207_Plan Profile Ph2.dwg

E

0

PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER

G

(E) SANITARY MANHOLE, RIM ELEV: 5368.90' INV IN: 12" (SE) 5362.72' INV OUT: 12" (N) 5362.66'

F

H

MAINTAIN 10' OR MORE SEPARATION BETWEEN (E) SANITARY & (N) CHS/R.

E

20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)

10' MIN. SEPARATION.

D

10' MIN.

LOWER 6" HYDRANT FEED BELOW CHILLED WATER.

10'-0"

Regent Administrative Ctr. Boulder, CO 80309

1'-6"

(E) SANITARY MANHOLE, RIM ELEV: 5367.71' INV IN: 15" (W) 5356.59' INV OUT: 15" (N) 5356.50'

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)

20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)

20" CHR (DUCTILE IRON)

University Colorado Boulder

20" CHS (DUCTILE IRON)

H

8'-9"

1+00

I

SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.

CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF EXISTING CHILLED WATER SUPPLY AND RETURN PIPING.

I

11-24-2025

L

(E) SANITARY MANHOLE, RIM ELEV: 5364.45' INV IN: 15" (S) 5355.56' INV OUT: 15" (NE) 5355.36'

1.

K

2.

(E) SANITARY MANHOLE, RIM ELEV: 5363.49' INV IN: 12" (S) 5355.14' INV IN: 15" (SW) 5355.24' INV OUT: 15" (N) 5355.09'

K

ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.

L

1.

GENERAL NOTES:

J

EXHIBIT 'B'

ATTACHMENT 'B'

EXISTING UTILITIES:

20

19

18

17

16

15

14

13

12

11

10

9

8

7

5

6

4

3

2

1 STAMP

ATTACHMENT 'B'

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K

K

(303) 431-6100

L

L

EXHIBIT 'B'

NO

G F E

Regent Administrative Ctr. Boulder, CO 80309

H

University Colorado Boulder

ST+B Project No.:

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

D

3 city of boulder tech doc review 07/09/25 4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

2 CONSTRUCTION DOCs REVIEW 06/27/25

7 city of boulder tech doc review 10/22/25 8 for construction set *

11/04/25

9

11/24/25

CITY OF BOULDER CORRECTIONS REV.

C

C

811

B

B

30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\EXISTING CONDITIONS & DEMOLITION PLAN.dwg

E

F

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

I

J

THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.

J

11/24/2025

Sheet Name

A

A

11/24/2025 9:01 AM

EXISTING CONDITIONS & DEMOLITION PLAN

Sheet No.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

C-110 1

20

19

18

17

16

15

14

13

12

11

10

9

8

7

5

6

4

3

2

1 STAMP

ATTACHMENT 'B'

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K

K

(303) 431-6100

L

L

EXHIBIT 'B'

G F

Regent Administrative Ctr. Boulder, CO 80309

ST+B Project No.: NO

H

University Colorado Boulder

E

E

F

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

I

J

THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.

J

11/24/2025

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

D

3 city of boulder tech doc review 07/09/25

8 for construction set *

11/04/25

9

11/24/25

CITY OF BOULDER CORRECTIONS REV.

C

C

7 city of boulder tech doc review 10/22/25

811

B

B

30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\SITE PLAN.dwg

2 CONSTRUCTION DOCs REVIEW 06/27/25

Sheet Name

A

A

11/24/2025 9:01 AM

SITE PLAN

Sheet No.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

C-200 1

20

19

18

17

16

15

14

13

12

11

10

9

8

7

5

6

4

3

1

2 STAMP

ATTACHMENT 'B'

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K

K

(303) 431-6100

L

L

EXHIBIT 'B'

I G F

Regent Administrative Ctr. Boulder, CO 80309

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

D

3 city of boulder tech doc review 07/09/25 4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

2 CONSTRUCTION DOCs REVIEW 06/27/25

8 for construction set *

11/04/25

9

11/24/25

CITY OF BOULDER CORRECTIONS REV.

C

C

7 city of boulder tech doc review 10/22/25

B

811

B

30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\EROSION CONTROL PLAN.dwg

ST+B Project No.: NO

H

University Colorado Boulder

E

E

F

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

J

THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.

J

11/24/2025

Sheet Name

A

A

11/24/2025 9:01 AM

EROSION CONTROL PLAN

Sheet No.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

C-300 1

20

19

18

17

16

15

14

13

12

11

10

9

8

7

5

6

4

3

2

1 STAMP

ATTACHMENT 'B'

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K

K

(303) 431-6100

L

L

EXHIBIT 'B'

H G

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

D

3 city of boulder tech doc review 07/09/25

4'Ø SSWR MH 2

4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

2 CONSTRUCTION DOCs REVIEW 06/27/25

8 for construction set *

11/04/25

9

11/24/25

CITY OF BOULDER CORRECTIONS REV.

C

C

7 city of boulder tech doc review 10/22/25

811

B

B

30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\OVERALL UTILITY PLAN.dwg

ST+B Project No.: NO

F

Regent Administrative Ctr. Boulder, CO 80309

E

E

F

4'Ø SSWR MH 1

University Colorado Boulder

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

I

J

THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.

J

11/24/2025

Sheet Name

A

A

11/24/2025 9:01 AM

OVERALL UTILITY PLAN

Sheet No.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

C-400 1

20

19

18

17

16

15

14

13

12

11

10

9

8

7

5

6

4

3

2

1 STAMP

ATTACHMENT 'B'

engineering http://stb.engineering (303) 900-8782

25188 genesee trail rd suite 120 golden, co 80401

http://martinmartin.com

12499 west colfax ave lakewood, co 80215

K

K

(303) 431-6100

L

L

EXHIBIT 'B'

4'Ø SSWR MH 1 STA: 10+80.06

J

THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.

J

A

4'Ø SSWR MH 2 STA: 11+97.18

11/24/2025

NO

H G F

Regent Administrative Ctr. Boulder, CO 80309

E

4'Ø SSWR MH

4'Ø SSWR MH 1

4'Ø SSWR MH 2

4'Ø SSWR MH

F E

ST+B Project No.:

2815.02

SUBMISSION

DATE

1 DESIGN DEVELOPMENT

06/06/25

D

3 city of boulder tech doc review 07/09/25 4 BID PRICING SET

08/06/25

5 bid pricing set - addendum 2

09/05/25

6 bid pricing set - addendum 4

09/09/25

D

2 CONSTRUCTION DOCs REVIEW 06/27/25

8 for construction set *

11/04/25

9

11/24/25

CITY OF BOULDER CORRECTIONS REV.

C

C

7 city of boulder tech doc review 10/22/25

811

B

B

30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\SANITARY SEWER PLAN & PROFILE.dwg

University Colorado Boulder

G

H

UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four

I

I

A

FOLSOM ST SANITARY REALIGNMENT

Sheet Name

A

A

11/24/2025 9:02 AM

SANITARY SEWER PLAN & PROFILE

Sheet No.

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2