ATTACHMENT 'B'
REVOCABLE LICENSE AGREEMENT This Revocable License Agreement (“Agreement”) is entered into by and between The Regents of the University of Colorado, a body corporate, on behalf of the University of Colorado Boulder (the “University”), and the City of Boulder, a Colorado home rule city (the "City"). Recitals Whereas, the University wishes to construct and extend underground chilled water lines, which are more particularly described in Exhibit B, portions of which will encroach upon the City’s Folsom Street public right-of-way (“ROW”), from Main Campus of the University to the North Boulder Creek area of the University (the “Project”). Whereas, the University requires a revocable license agreement to complete the Project and to access and maintain the underground chilled water lines into perpetuity. Whereas, the City wishes to enter into an Agreement with the University to allow the University to complete the Project and to provide a revocable license to the University for purposes of allowing the University to access the Property to maintain the underground chilled water lines for twenty years. Agreement NOW THEREFORE, in consideration of the mutual promises made herein, the University and the City enter into this Agreement as follows: 1. Term. The term of this Agreement shall be twenty years (“Term”). The effective date of this Agreement will be the last date that the authorized University officer signs the Agreement. Upon termination, the University agrees to restore the ROW to its original condition unless a new permit has been applied for or is issued. 2. Grant of Revocable License. The City hereby grants the University a revocable license (“License”) to allow the University to access City property depicted in Exhibit A (“Property”) for purposes of completing the Project and maintaining the University’s underground chilled water lines. Exhibit A is attached, incorporated by reference, and made a part of this Agreement. On the Property, the Project shall be constructed and maintained consistent with the plans attached in Exhibit B. 3. Restoration and Repair of Property. The University agrees that upon completion of the Project, and after any maintenance of the underground chilled water lines, it will remove any equipment or personal property placed on the Property in accordance with regular, accepted industry practices and applicable laws and regulations, and will restore any portion of the Property affected by the University’s use under the License to a condition equivalent to its present condition. The City will give notice to the University in a reasonable and timely manner of any condition that the City discovers for which the University is responsible under this Agreement, and the University will remedy any defect in a reasonable and timely manner. 4. Revocation and Removal. The City may elect to revoke the License and this Agreement by providing written notice to the University of such election. The notice of 1
ATTACHMENT 'B'
revocation by the City shall be delivered to the University not less than one hundred and eighty (180) days prior to the effective date of revocation. The decision to revoke may be made whenever the City, in its sole discretion, determines to revoke pursuant to Section 115 of the Boulder Revised Charter. All releases shall survive revocation. The University shall remove, at its expense, the underground water chiller lines and associated encroachments within thirty days of revocation. In the event that the University does not remove the encroachment(s) within thirty days, the University agrees to reimburse the City for the costs of removal. 5. Relocation. In the event that the City, pursuant to section 8-5-14 “Relocation of Facilities” of the Boulder Revised Code, as the same may be amended from time to time, decides to relocate any segment of the water chiller lines, the University agrees to be responsible for reasonable expenses associated with such relocation. In the event of any such relocation, the City agrees to provide the University with ninety (90) days’ notice in writing unless failure to relocate poses a threat to health, safety, or welfare of the public or individuals as determined by the City in which case the City will have the right to move the water chiller lines without such notice or with lesser notice. It is the intent of the City to act in good faith and not require relocation unless it determines there is a public safety or some other bona fide purpose for such relocation. Following relocation, all affected property shall be restored to, at a minimum, the condition which existed prior to construction at the University's expense. 6. Impact on the City. The University’s use of the License will be conducted in such a manner as to minimize any disruption or interference with the City’s operations. All University activities will be coordinated between CU Boulder’s department of Facilities Management and the City’s Planning & Development Services (“P&DS”) department. The University will communicate the following information to P&DS: Construction schedule; instrument deployment schedule; and any other construction-related information requested by the City. This Agreement does not control or limit any improvements the City wishes to make on, or use it chooses to make of, the Property. 7. Permits, Approvals, Codes and Standards. The University will comply with all applicable City standards and codes in its use of the Property or pursuant to this Agreement. The University will be responsible for acquiring appropriate City permits to complete the Project, which City permits shall not be unreasonably withheld. 8. Insurance. Prior to execution of this Agreement, the University shall submit to the City insurance policies or Certificates of Insurance as evidence of compliance with the provisions of this paragraph and subject to approval by the City. The University shall, at University’s sole expense, procure and maintain or cause to be procured and maintained with insurers approved by the City, who any licensed to do business in Colorado and have an AM Best rating of at least A-VI, worker’s insurance as required by state law and a comprehensive general liability insurance policy with minimum limits of $1 million per occurrence and a $2 million aggregate. The University agrees that the above stated policy limits shall be raised to meet any additional coverage necessitated by amendments to the Colorado Governmental Immunity Act that may expose the City to judgments greater than the insurance coverage required in this License. 2
ATTACHMENT 'B'
This policy shall be written on a primary basis, non-contributory with any other insurance coverage and/or self-insurance carried by the City. This policy shall be maintained in full force and effect for the duration of the License. The University or University's insurance broker shall notify the City of any cancellation or reduction in coverage or limits of any insurance policy within seven days of receipt of insurers' notification to that effect. The University shall obtain and submit proof of substitute insurance in the event of expiration or cancellation of coverage and shall provide the City with an updated Certificate of Insurance annually. Additional Insurance Requirements: a. All insurers must be licensed or approved to do business within the State of Colorado. b. The Certificate Holder shall be identified as: City of Boulder, 1777 Broadway, P.O. Box 791, Boulder, CO 80306. c. A Separation of Insureds Clause must be included in general liability policies. d. The University shall advise the City in the event any general aggregate or other aggregate limits are reduced below the required per occurrence limit. At its own expense, University will reinstate the aggregate limits to comply with the minimum requirements and shall furnish to the City a new certificate of insurance showing such coverage is in force. e. The City and University shall cooperate with each other in the collection of any insurance proceeds that may be payable in the event of any loss, including the execution and delivery of any proof of loss or other actions required to affect recovery. f. The University shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to this License by reason of its failure to procure or maintain insurance or by reason of its failure to procure or maintain insurance in sufficient amounts, durations or types. 9. Environmental Matters. The University will not cause or permit the storage, treatment or disposal of any Hazardous Materials in, on, or about any part of the Property by the University, its agents, employees or contractors in violation of any state or federal Environmental Law. The University will not permit the Property to be used or operated in a manner that may cause the Property or any part of the Property to be contaminated by any Hazardous Materials in violation of any Environmental Laws. Through the duration of the Project and for any subsequent maintenance and use of the water chiller lines, the University will follow the requirements of the City for protection of streams, wetlands, and bodies of water, and other similar standards, as found in 9-3-9 of the Boulder Revised Code, for or about any part of the Property. The University will notify the City of any and all enforcement, cleanup, remedial, removal, or other governmental or enforcement cleanup or other governmental or regulatory actions instituted, completed or threatened pursuant to any Environmental Laws relating to any Hazardous Materials affecting any part of the Property. 3
ATTACHMENT 'B'
The University will notify the City of all claims made or threatened by any third party against the City relating to damage, contribution, cost recovery, compensation, loss or injury resulting from any Hazardous Materials on or about the Property or any part of the Property as a result of the University’s use of the Property. The University holds the City harmless from the same and subject to the limitations of the Colorado Governmental Immunity Act, as further articulated in Section 10 of this Agreement. "Hazardous Materials" means asbestos, explosives, radioactive materials, hazardous waste, hazardous substances, or hazardous materials including, without limitation, substances defined as "hazardous substances" in the Comprehensive Environmental Response Compensation Liability Act of 1980, as amended, 42 U.S.C. section 9601-9657 ("CERCLA"); the Hazardous Material Transportation Act of 1975, 49 U.S.C. section 1801-1812; the Resource Conservation Recovery Acts of 1976, 42 U.S.C. section 6901-6987; the Occupational Safety and Health Act of 1970, 29 U.S.C. 651 et seq., or any other federal, state or local statute, law, ordinance, code, rule, regulation, order or decree regulating, relating to, or imposing liability or standards of conduct concerning hazardous materials, wastes or substances now or at any time hereinafter in effect (collectively, "Environmental Laws"). "Hazardous Waste" means hazardous waste as defined under the Resource Conservation Recovery Act of 1976, 42 U.S.C. section 6901-6987. 9. Status and Assignment. This Agreement constitutes a mere license. It does not create an interest in land. It is not coupled with an interest. No subsequent act or course of dealing shall serve to alter the status of the Agreement except by written amendment duly executed by the authorized agents of the City and the University. This Agreement is not assignable. 10. Governmental Immunity. It is specifically understood and agreed that nothing contained in this Agreement shall be construed as an express or implied waiver by the University or the City of its governmental immunity or of the governmental immunity of the State of Colorado, as an express or implied acceptance by University or the City of liabilities arising as a result of actions which lie in tort or could lie in tort in excess of the liabilities allowable under the Colorado Governmental Immunity Act, C.R.S. §§ 24-10-101 et seq., as a pledge of the full faith and credit of the State of Colorado, or as the assumption by the University or the City of a debt, contract or liability in violation of Article XI, Section 1, of the Constitution of the State of Colorado. 11. Liability. Each Party shall be responsible for any claims, damages, losses, or liabilities arising out of the acts or omissions of its own officers, employees, agents, or contractors in the performance of this Agreement. Nothing in this Agreement shall be construed to require either Party to assume responsibility for the acts or omissions of the other Party, or of the other Party’s officers, employees, agents, or contractors. This provision is intended solely to allocate responsibility between the Parties in accordance with applicable law and does not constitute an agreement to indemnify, hold harmless, or otherwise assume liability for acts or omissions of the other Party.
4
ATTACHMENT 'B' 12. Colorado Law Applies. This Agreement shall be governed, construed, performed and enforced in accordance with the laws of the State of Colorado. IN WITNESS WHEREOF, the University and the City have caused this Agreement to be executed by their duly authorized representatives.
The Regents of the University of Colorado, a body corporate By: _______________________________ Printed Name: ______________________ Title: _____________________________ Date: _____________________________ City of Boulder, a Colorado home rule city
By: __________________________________ Nuria Rivera-Vandermyde, City Manager Attest: _________________________________ City Clerk Approved as to Form: ________________________________ City Attorney Date: _____________________________
5
ATTACHMENT 'B'
PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO
Flatirons, Inc. Land Surveying Services
www.FlatironsInc.com
ATTACHMENT 'B'
J A COB K
ES
SI
RV
EY O
R
Z
P ROF
38409
ED
COL
DO L I CE UNT
J ESS
RA
NS
O
PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO
O NA
L L A ND
SU
Flatirons, Inc. Land Surveying Services
www.FlatironsInc.com
ATTACHMENT 'B'
J A CO B K
ES
SI
RV
EYO
R
Z
PROF
38409
ED
J ESS
DO L I CE UNT
COL
RA
NS
O
PART OF FOLSOM STREET RIGHT-OF-WAY LOCATED IN THE NORTHEAST QUARTER OF SECTION 31, TOWNSHIP 1 NORTH, RANGE 70 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF BOULDER, COUNTY OF BOULDER, STATE OF COLORADO
ONA
L L A ND
SU
Flatirons, Inc. Land Surveying Services
www.FlatironsInc.com
20 ATTACHMENT19'B'
18
17
15
16
14
13
12
11
10
9
8
7
6
5
4
3
2
1 STAMP
ATTACHMENT 'B'
EXHIBIT 'B'
UCB Project No: UCB001213
Project Title: Site - North of Boulder Creek - util expansion - package four
11-24-2025
L
L
UNIVERSITY OF COLORADO BOULDER
engineering
regent administrative ctr. boulder, co 80309
http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K J
PROJECT TEAM
PARTIAL DEMOLITION & RESTORATION PLAN - PHASE 1
G-102
PARTIAL DEMOLITION & RESTORATION PLAN - PHASE 2
G-103
PARTIAL DEMOLITION & RESTORATION - PHASE 2
G-104
PARTIAL DEMOLITION & RESTORATION - PHASE 3
G-201
PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 1
G-202
PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2
G-203
PARTIAL SITE CONSTRUCTION LIMITS - PHASE 2
G-204
PARTIAL SITE PLANS - PHASE 3
G-300
TRAFFIC CONTROL SIGNAGE
G-301
PARTIAL TRAFFIC CONTROL PLAN - PHASE 1
G-302
PARTIAL TRAFFIC CONTROL PLAN - PHASE 2
G-303
PARTIAL TRAFFIC CONTROL PLAN - PHASE 2
G-304
PARTIAL TRAFFIC CONTROL PLAN - PHASE 3
G-500
GENERAL DETAILS
M-201
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-202
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-203
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-204
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-205
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-206
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-207
PARTIAL SITE MECHANICAL PLAN & PROFILE
M-600
MECHANICAL DETAILS- DIRECT BURY PIPING
C-101
NOTES & LEGEND
C-102
NOTES & LEGEND
C-110
EXISTING CONDITIONS & DEMOLITION PLAN
C-200
SITE PLAN
C-300
EROSION CONTROL PLAN
C-310
EROSION CONTROL DETAILS
C-320
EROSION CONTROL DETAILS
C-330
EROSION CONTROL DETAILS
C-340
EROSION CONTROL DETAILS
C-400
OVERALL UTILITY PLAN
C-450
SANITARY SEWER PLAN & PROFILE
C-500
SITE DETAILS
C-501
SITE DETAILS
C-510
UTILITY DETAILS
C-511
UTILITY DETAILS
18
● ● ● ●
● ● ● ● ● ● ● ● ●
● ● ● ● ● ● ● ● ●
17
● ● ● ● ● ● ● ● ●
● ●
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
● ●
● ● ●
● ●
● ● ● ● ● ● ●
●
16
DESIGN TEAM UTILITY COOLING ST+B ENGINEERING PROJECT MANAGER TODD SPACEK, PE
PROJECT LOCATION TELEPHONE: (303) 900-8782 EMAIL: TSPACEK@STB.ENGINEERING
LANDSCAPE ARCHITECT LIME GREEN DESIGN, INC. MATHEW EVANS
SURVEY FLATIRONS, INC. ZACH GOWAN
TELEPHONE: (303) 733-7558 EMAIL: MEVANS@LGDINC.COM
APPLICABLE STANDARDS
20TH STREET TO THE NORTH SIDE OF BOULDER CREEK, SOUTH OF THE NORTH BOULDER CREEK PRACTICE FACILITY TO THE WEST OF THE PRACTICE FACILITY TO THE CORNER OF FULSOME AND BOULDER STREET THE PRMENADE BETWEEN THE PRACTICE FACILITY AND THE FOOTBALL STADIUM. BOULDER, CO 80302
PROJECT SCOPE OVERVIEW PACKAGE #4 PROJECT CONSISTS OF UTILITY INFRASTRUCTURE WORK TO ROUTE NEW CHILLED WATER PIPING FROM CENTRAL CAMPUS TO TIE IN POINT AT RESIDENCE HALL 1 POINT. SCOPE INCLUDES THE FOLLOWING:
TELEPHONE: (303) 443-7001 EMAIL: ZGOWAN@FLATIRONSINC.COM
·
·
UCB BOULDER TEAM BRIAN MOFFITT MANAGER | DESIGN & CONSTRUCTION
BRYAN BIROSAK DIRECTOR | UTILITY & ENERGY SERVICES
PROJECT GENERAL NOTES
TELEPHONE: (303) 946-9122 EMAIL: brian.moffitt@colorado.edu
TELEPHONE: (303) 735-4983 EMAIL: bryan.birosak@colorado.edu
·
PHASE ONE: OPEN CUT DIRECT BURY 6-INCH CHILLER WATER PIPING FROM RESIDENCE HALL 1 CONNECTION POINT IN 20TH STREET TO 18-INCH CHILLED WATER PIPING IN ATHENS STREET EAST TO GRANDVIEW AVENUE ON NORTH BANK OF BOULDER CREEK. PROVIDE TEES AND FLANGED VALVES FOR FUTURE EXPANSION.
G F
Regent Administrative Ctr. Boulder, CO 80309
ST+B Project No.:
2815.02
ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE
NO
AGA - AMERICAN GAS ASSOCIATION
1 DESIGN DEVELOPMENT
06/06/25
ASTM - AMERICAN SOCIETY FOR TESTING MATERIALS
2 CONSTRUCTION DOCs REVIEW
06/27/25
ASME - AMERICAN SOCIETY OF MECHANICAL ENGINEERS
3 city of boulder tech doc review 07/09/25
NEC - NATIONAL ELECTRIC CODE
4 BID PRICING SET
08/06/25
NEMA - NATIONAL ELECTRIC MANUFACTURER'S ASSOCIATON
5 bid pricing set - addendum 2
09/05/25
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
6 bid pricing set - addendum 4
09/09/25
UL - UNDERWRITER'S LABORATORIES
7 city of boulder tech doc review 10/22/25
EPA - ENVIRONMENTAL PROTECTION AGENCY
8 for construction set *
SUBMISSION
DATE
11/04/25
9 city of boulder corrections rev. 11/24/25
APPLICABLE CODES
PHASE TWO: OPEN CUT DIRECT BURY 18-INCH CHILLED WATER PIPING THROUGH GRANDVIEW AVE PARKING LOT TRANSITIONING INTO LOT 169 SOUTH OF THE LOWER PRACTICE FIELD AND THROUGH LOT 169 TO HORIZONTAL DIRECTION DRILL BORE PIT IN LOT 177. PHASE 3: HORIZONTAL DIRECTIONAL BORE OF 20-INCH CHILLED WATER PIPING FROM BORE PIT IN LOT 177, UNDER BOULDER CREEK AND UP FOLSOM TOWARDS RECEIVING BORE PIT NEAR COLORADO AVENUE. OPEN CUT DIRECT BURY 20-INCH CHILLED WATER PIPING FROM CAMPUS TIE IN POINT IN COLORADO AVENUE TO END POINT OF HDD BORE. PROVIDE TEES AND FLANGED VALVES FOR FUTURE EXPANSION. SANITARY PIPE & MANHOLE RELOCATION IN COLORADO AVENUE AND FOLSOM STREET TO MEET COB UTILITY SEPARATION REQUIREMENTS.
INTERNATIONAL BUILDING CODE (IBC)
2021
INTERNATIONAL EXISTING BUILDING CODE (IEBC)
2021
INTERNATIONAL FIRE CODE
2021
INTERNATIONAL MECHANICAL CODE
2021
INTERNATIONAL PLUMBING CODE
2021
ASME BOILER AND PRESSURE VESSEL CODE
2015
NATIONAL ELECTRICAL CODE (NEC / NFPA 70)
2023
THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS - AS ADOPTED BY COLORADO DEPT. OF PUBLIC SAFETY, DIVISION OF FIRE PREVENTION AND CONTROL.
W.E. O'NEIL GMGC RYAN DICKINSON | PROJECT EXECUTIVE
TELEPHONE: (720) 275-1996 EMAIL: rdickinson@weoneil.com
DARREN HOLLIDAY | PROJECT MANAGER
TELEPHONE: (310) 710-3283 EMAIL:dholliday@weoneil.com
Sheet Name
project cover sheet A
G-101
● ●
PKG No. 4 CITY OF BOULDER CORRECTION REVIEW- 11.24.25
OVERALL SITE CHILLED WATER SYSTEM PLAN
● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ●
PKG No. 4 CITY OF BOULDER TECH DOC REVIEW - 10.22.25
G-100
PKG No. 4 ADDENDUM 4 - 09.09.25
● ● ● ● ● ● ● ● ● ●
PKG No. 4 ADDENDUM 2 - 09.05.25
PKG No. 4 CITY OF BOULDER TECH DOC REVIEW - 07.09.25
PROJECT COVER SHEET
19
● ● ● ● ● ● ● ● ● ●
●
G-000
PKG No. 4 BID PRICING DOCUMENTS - 08.06.25
C B
20
PKG No. 4 CONSTRUCTION DOCs REVIEW - 06.26.25
'●' '◊' '○'
NUMBER NAME
A
11/24/2025 10:56 AM
PKG No. 4 DESIGN DEVELOPMENT - 06.06.25
D
DELIVERABLE KEY: ISSUED DISCONTINUED REFERENCE ONLY
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G000_Cover.dwg
DELIVERABLE
PROJECT DESCRIPTION
H
I
DRAWING PACKAGE
scale: none
E
scale: none
C
E
scale: none
overall ucb boulder campus
D
project site plan
B
area of work
University Colorado Boulder
F
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
J
K
(303) 431-6100
Sheet No.
G-000
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
20
19
18
17
15
16
13
14
12
11
9
10
7
8
6
5
4
3
2
1 STAMP
ATTACHMENT 'B'
GENERAL NOTES:
HWR HWS CHS CHR
VERIFY RES HALL 1 CHILLED WATER SUPPLY & RETURN PIPING AND THE EXISTING CONNECTION POINTS OF CHILLED WATER SUPPLY & RETURN PIPING.
RES HALL 1 BLDG A
RES HALL 1 ALIGNMENT
HEATING PLANT
2.
ALL EXISTING UTILITIES SHOWN ARE BASED ON SURVEY PROVIDED BY FLATIRONS SURVEYING, DATED JANUARY 2025. LOCATION OF UTILITIES ARE NOT PRECISE OR EXACT AND CONTRACTOR SHALL BE AWARE OF POTENTIAL CONFLICTS.
3.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
6" (CHS/R) OR 6" HDPE DR 9 HDPE DIRECT BURY TO RES HALL 1 PACKAGE 1 TIE-IN POINT.
(E) STEAM LINES.
CHS
K
11-24-2025
EXHIBIT 'B'
CHR
EXPECTED UTILITY CROSSING, TYP. BURIED CONDUIT WITH COPPER AND FIBER FOR MARINE COURT
(E) FIRE HYDRANT.
(303) 431-6100
K
L
RES HALL 1 BLDG B
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
L
1.
PHASE 1 PHASE 2
(E) STEAM VAULT (E) MANHOLE #404.
18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY
18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY
(E) FIRE HYDRANT.
J
J
(E) FIELD LIGHTS. APPROXIMATE LOCATION OF 25' WIDE CITY OF BOULDER EASEMENT FOR SANITARY SEWER & WATER MAINS AND 30' WIDE PUBLIC SERVICE COMPANY EASEMENT
EXPECTED UTILITY CROSSING, TYP. CHS
CHR (E) OVERHEAD ELECTRICAL. (E) FIRE HYDRANT. (E) ELECTRICAL TRANSFORMER.
EXISTING CITY OF BOULDER 30' SANITARY EASEMENT.
(E) CONDUIT WITH COPPER AND FIBER FOR NEWTON COURT & THE CHILDREN CENTER. (E) FIELD LIGHTS.
(E) SANITARY EASEMENT.
2&3 G204
(E) XCEL FIBER WITHOUT TRACER.
(E) BUILDING
(E) FIELD LIGHTS. 18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY. (E) FIBER VAULT.
PHASE 2 PHASE 3
CHR
(E) FIRE HYDRANT. CHR (E) IRRIGATION LINE
CHS EXPECTED UTILITY CROSSING, TYP.
(E) SIDEWALK EXISTING CITY OF BOULDER 30' SANITARY EASEMENT.
G
EXISTING STORM WATER RETENTION
20" HDPE CHS/R BORE (E) IRRIGATION VALVES. STORM MANHOLE RIM ELEV: 5,320.48' INV IN: 5,317.48' (S) 12" PVC INV OUT: 5,316.18' (NE) 12" PVC
AVOID WATER METER VAULT AND MAINTAIN WATER UTILITY CROSSING HORIZONTAL SEPARATION 10 FT; VERTICAL SEPARATION 18". (E) WATER MANHOLE
(E) WATER VALVES
(E) FO BOX COVER
SANITARY MANHOLE: RIM ELEV: 5,324.03' INV IN: 5,314.76' (W) 15" PVC (FROM BLDG) INV IN: 5,314.80' (SW) 15" CLAY (FROM BLDG) INV OUT: 5,314.70' (E) 15" CLAY
STORM MANHOLE RIM ELEV: 5,329.82 INV IN: 5,321.77 (W) 12" RCP INV IN: 5,324.62' (S) 30" RCP INV OUT: 5,319.95' (NE) 30" RCP
STORM MANHOLE: RIM ELEV: 5,323.09' INV IN: 5,316.54' (SW) 30" RCP INV OUT: 5,314.09' (NE) 30" RCP
STORM INLET RIM ELEV: 5,330.75' FLOWLINE ELEV: 5,330.53' INV OUT: 5,322.86' (E) 12" RCP
20" HDPE (CHS/R) BORE UNDER FOLSOM STORM UTILITY CROSSING. HORIZONTAL SEPARATION 5 FT; VERTICAL SEPARATION 18".
(E) OVERHEAD ELECTRICAL POLE.
AVOID (E) GAS LINE. ELECTRICAL UTILITY CROSSING. HORIZONTAL SEPARATION 10 FT; VERTICAL SEPARATION 18".
(E) SIDEWALK STORM MANHOLE: RIM ELEV: 5,338.38' INV IN: 5,331.37' (W) 18" RCP (FROM BLDG) INV IN: 5,332.19' (S) 30" RCP INV OUT: 5,327.38' (N) 30" RCP
E
RETAINING WALL ENDS.
STORM UTILITY CORSSING. HORIZONTAL SEPARATION 5 FT; VERTICAL SEPARATION 18". GAS UTILITY. HORIZONTAL SEPARATION 18"; VERTICAL SEPARATION 12".
NO STORM MANHOLE: RIM ELEV: 5,352.14' INV IN: 5,342.24' (E) 12" RCP INV IN: 5,339.90' (S) 30" RCP INV OUT: 5,338.58' (N) 30" RCP
LOCATION OF IRRIGATION VALVING AND CONTROL.
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
D
3 city of boulder tech doc review 07/09/25 20" HDPE CHS/R BORE UNDER FOLSOM
CITY ROW.
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25
SANITARY MANHOLE: RIM ELEV: 5,363.49' INV IN: 5,355.14' (S) 12" CLAY INV IN: 5,355.24' (SW) INV OUT: 5,355.09' (N) 15" CLAY
C
C
SANITARY MANHOLE: RIM ELEV: 5,364.45' INV IN: 5,355.56' (S) 15" PVC INV OUT: 5,355.36' (NE) 15" CLAY (E) FENCE SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION.
20" HDPE CHS/R BORE UNDER FOLSOM (E) FENCE
NEW PIPE CONNECTIONS TO EXISTING 20" CHILLED WATER SUPPLY AND RETURN PIPING. INSTALL FULL SIZED ISOLATION VALVES.
FIELD VERIFY THE EXISTING CHILLED WATER SUPPLY & RETURN PIPING IDENTIFICATIONS.
20" ID DIP, 18" SEPARATION B/W CHILLED WATER LINES.
4,5,6 G204
STORM INLET: RIM ELEV: 5,367.27' FLOWLINE ELEV: 5,366.22' INV IN: 5,352.52' (S) 30" RCP INV OUT: 5,352.39' (E) 30" RCP STORM MANHOLE: RIM ELEV: 5,367.15' INV IN: 5,354.94' (W) 42" RCP INV IN: 5,352.88' (S) 30" RCP INV OUT: 5,352.75' (N) 30" RCP
(E) 16" WATER WATER & STORM UTILITY CROSSINGS. HORIZONTAL SEPARATION 10 FT WATER, 5 FT STORM; VERTICAL SEPARATION 18" FOR WATER AND SEWER. (TYPICAL) STORM MANHOLE: RIM ELEV: 5,367.20' INV IN: 5,351.22' (W) 30" RCP INV OUT: 5,351.13' (N) 30" RCP
B
CHS
SECTION HDPE OR DUCTILE PIPING FROM HDSS IN COLORADO AVE.
B
(E) RETURN AS SHOWN ON EXISTING UTILITY PLANS
STORM MANHOLE: RIM ELEV: 5,369.92' INV IN: 5,365.83' (W) 42" RCP INV OUT: 5,356.95' (E) 42" RCP
(E) SIDEWALK
(E) 12"SS
CHR SANITARY MANHOLE: RIM ELEV: 5,367.71' INV IN: 5,356.59' (W) 15" CLAY INV OUT: 5,356.50' (N) 15" CLAY
SANITARY MANHOLE: RIM ELEV: 5,369.68' INV IN: 5,357.80' (W) 15" CLAY INV OUT: 5,357.76' (E) 15" CLAY
20 x 20 x 8 TEES, PIPING EXTENDED INTO LAWN OF SOUTH SIDE OF STREET, PROVIDE CAPPED VALVES.
20x20x20 TEE, CAPPED / PLUGGED FOR FUTURE EASTERN EXPANSION. SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION. SANITARY MANHOLE, RIM ELEV: 5368.90' INV IN: 12" (SE) 5362.72' INV OUT: 12" (N) 5362.66'
Sheet Name
811
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
A
1 G100
OVERALL SITE CHILLED WATER SYSTEM PLAN SCALE: 1" = 80'-0" 0
20
19
18
20'
80'
17
overall site chilled water system plan
CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES.
160'
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Sheet No.
G-100
2
1
A
(E) SUPPLY AS SHOWN ON EXISTING UTILITY PLANS
8" BRANCHES CAPPED & PLUGGED FOR FUTURE EXTENSION.
11/24/2025 10:35 AM
CITY ROW.
ST+B Project No.:
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G100_Utility.dwg
SANITARY MANHOLE: RIM ELEV: 5,351.11' INV IN: 5,343.74' (S) 15" CLAY INV OUT: 5,343.61' (N) 15" CLAY
D
F
SANITARY MANHOLE RIM ELEV: 5,328.11' INV IN: 5,317.62' (S) 15" CLAY INV OUT: 5,317.56' (NE) 15" CLAY
G
STREAM (BOULDER CREEK).
F
STORM INLET: GRATE ELEV: 5,296.96' INV IN: 5292.51' (NE) 15" CCP INV OUT: 5,293.09' (S) 18" CCP
H
STORM 18" RCP INV: 5292.43'
CHR
H
(E) SANITARY EASEMENT.
(E) ELECTRICAL TRANSFORMER.
E
CHS (E) RAW WATER IRRIGATION DITCH.
Regent Administrative Ctr. Boulder, CO 80309
18" (CHS/R) OR 20" IPS DR9 HDPE (TYPICAL) DIRECT BURY.
University Colorado Boulder
CHS PROPOSED UNDERGROUND BORE PATH XCEL AND COMCAST LINE RELOCATION FROM EXISTING OVERHEAD POLES.
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
SANITARY MANHOLE: RIM ELEV: 5,309.01' INV IN: 5,300.96' (W) 21" PVC INV OUT: 5,293.65 (SE) 21" PVC
I
(E) OVERHEAD UTILITY POLE.
20
19
18
17
15
16
14
13
12
11
10
9
7
8
5
6
4
3
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
2.
K
3.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
CONSTRUCTION FENCING, TYP.
(E) PLAYGROUND
LIMITS OF EXCAVATION, TYP.
PHASE 1
ST+B Project No.:
D
PHASE 2
STORM DRAIN.
NO
(E) FIRE HYDRANT.
SUBMISSION
G F
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
C
C
9 city of boulder corrections rev. 11/24/25
PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 1 0
5'
20'
B
SCALE: 1" = 20'-0"
B
1 G201
40'
partial site construction limits plan phase 1
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Sheet No.
G-201
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:39 AM
2815.02
3 city of boulder tech doc review 07/09/25
(E) MANHOLE #404.
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G201_Ph1.dwg
FLOOD LINE
H
I
E
CITY OF BOULDER 30' EASEMENT
30'-0" (FENCING)
12'-0" (EXCAVATION)
F
G
30'-0" (FENCING)
E
12'-0" (EXCAVATION)
D
CONSTRUCTION FENCING, TYP.
Regent Administrative Ctr. Boulder, CO 80309
H
LIMITS OF EXCAVATION, TYP.
University Colorado Boulder
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
J
HEATING PLANT
11-24-2025
L
1.
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
EXHIBIT 'B'
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
4
3
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
2.
K
3.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGINATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
J
PHASE 2
PHASE 1
12'-0" (EXCAVATION)
11-24-2025
L
1.
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
K
EXHIBIT 'B'
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
30'-0" (FENCING)
I
I
LIMITS OF EXCAVATION, TYP.
12'-0" (EXCAVATION)
E
30'-0" (FENCING)
(E) ELECTRICAL MANHOLE.
(E) CITY OF BOULDER 30' SANITARY EASEMENT.
CONSTRUCTION FENCING, TYP.
D
( E) C SA ITY NIT OF AR BO Y E UL A S DE EM R 3 EN 0' T.
NO
G F
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
3 city of boulder tech doc review 07/09/25
(E) OVERHEAD POWER POLE.
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25 (E) FIRE PARKING ISLAND WITH POLE LIGHTS AND SIGN.
PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2 SCALE: 1" = 20'-0" 0
5'
20'
B
B
1 G202
C
C
(E) ELECTRICAL VAULT.
40'
partial site construction limits plan phase 2
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Sheet No.
G-202
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:38 AM
H
ST+B Project No.:
LIMITS OF EXCAVATION, TYP.
(E) FIRE HYDRANT.
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G202_Ph2.dwg
(E) HIGH VOLTAGE ELECTRICAL.
E
(E) FENCED ELECTRICAL EQUIPMENT ENCLOSURE.
D
F
(E) WATER VALVES.
Regent Administrative Ctr. Boulder, CO 80309
ELECTRICAL TRANSFORMER.
University Colorado Boulder
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
CONSTRUCTION FENCING, TYP.
20
19
18
17
16
15
14
13
12
11
10
9
7
8
5
6
4
3
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
2.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
(E) FIBER VAULT.
D
(E) ELECTRICAL TRANSFORMER.
SUBMISSION
F
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
C B
B
C
9 city of boulder corrections rev. 11/24/25
1 G203
PARTIAL SITE CONSTRUCTION LIMITS PLAN - PHASE 2 SCALE: 1" = 20'-0" 0
5'
20'
40'
partial site construction limits plan phase 2
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Sheet No.
G-203
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:35 AM
2815.02
3 city of boulder tech doc review 07/09/25
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G203_Ph2.dwg
ST+B Project No.: NO
G
H
I PHASE 3
E
PHASE 2
E
LIMITS OF EXCAVATION, TYP.
D
CONSTRUCTION FENCING, TYP.
Regent Administrative Ctr. Boulder, CO 80309
30'-0" (FENCING)
F
12'-0" (EXCAVATION)
1 M-400
University Colorado Boulder
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
J
K
3.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
11-24-2025
L
1.
L
EXHIBIT 'B'
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
4
3
2
1 STAMP
ATTACHMENT 'B'
2&3 G-204
EXISTING UTILITIES:
5
2.
1
K
125'
3.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES. AT ALL OIT TELECOM PATHWAY CROSSINGS CONTRACTOR TO INCLUDE OIT IN MOP APPROVAL PROCESS, OITREVIEW@COLORADO.EDU INCLUDE OIT DESIGNATED EMERGENCY CONTACT IN MOP. THE MINIMUM VERTICAL SEPARATION IS 18 INCHES, MINIMUM HORIZONTAL SEPARATION IS 5 FEET. COORDINATE TELECOM TO BE ABOVE CHILLED WATER PIPING. HAND DIGGING REQUIRED 24 INCHES AROUND TELECOM LINES.
1.
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
PHASE 2
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
3
7
J
2
2 G204
PILOT & REAM PHASE - NORTH END OF BORE EQUIPMENT LAYOUT SCALE: 1" = 20'-0" 20'
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
40'
STREAM (BOULDER CREEK).
EXISTING STORM WATER RETENTION
G
100 '
40' DRILL SET BACK TO ACHIEVE 5' OF COVER IN PIT
DRILL RIG WEST ALIGNMENT 8' x 53'
F
DRILL RIG EAST ALIGNMENT 8' x 53'
8' CONSTRUCTION FENCE WORK AREA WILL BE MATTED TO PROTECT HARD SURFACES
11 '
11 '
TAG
TYPE
DIMENSIONS, W X L
1
AA DD240T 300 GPM MUD PUMP ATTACHED
8' x 70'
2
MUD PUMP
11' x 52'
3
TULSA 750 MIXING SYSTEM
11' x 52'
4
JOHN DEERE EXCAVATOR WITH DECKHAND
10' x 15'
5
FLOAT TRAILER / DRILL PIPE TRAILER
8' x 53'
6
FRACK TANK
9' x 50'
7
BORE ENTRY PIT / MUD CONTAINMENT PIT
10' x 10'
REMARKS
REMARKS
E
24 '
PIPE PULL PHASE - SOUTH END OF BORE EQUIPMENT LAYOUT
NO
SCALE: 1" = 20'-0" 0
5'
20'
40'
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
C CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF THE CHILLED WATER SUPPLY AND RETURN PIPING.
B
B
DIRECT BURY
HORIZONTAL BORE
C
9 city of boulder corrections rev. 11/24/25
Sheet Name
SANITARY SEWER REALIGNMENT, RE: CIVIL PLANS FOR FURTHER INFORMATION.
A
partial site plan - phase 3
A
8" CHS/R CAPPED & PLUGGED FOR FUTURE EXTENSION. 11/24/2025 10:36 AM
2815.02
3 city of boulder tech doc review 07/09/25
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G204_Ph3.dwg
ST+B Project No.: 3 G204
G
HDD EQUIPMENT LEGEND
DRILL BIT ENTRY
F
REMOVE ASPHALT FOR HDD SURFACE ENTRY 4' x 15'
E
HDD PIT 10' x 15'
D
H
HDD TO OPEN CUT TRANSITION
Regent Administrative Ctr. Boulder, CO 80309
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
EXHIBIT 'B'
University Colorado Boulder
SOUTH END - EQUIPMENT SET UP
H
I
5'
http://stb.engineering (303) 900-8782
I
0
engineering
(303) 431-6100
4 6
11-24-2025
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
L
1.
J
PILOT & REAM PHASE NORTH LOCATION
GENERAL NOTES:
PHASE 3
180'
Sheet No.
1 G204
SCALE: 1" = 50'-0" 0 10'
20
19
18
17
16
15
14
13
12
11
10
9
G-204
PARTIAL SITE PLAN - PHASE 3
8
50'
100'
7
6
5
4
3
2
1
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
3
4
2
1 STAMP
ATTACHMENT 'B' CROWN AT CENTERLINE. FIBER MESH REINFORCEMENT.
COMPACTED CRUSHED LIMESTONE BASE CA-10.
MATCH EXISTING BORDER IF EXISTS. IF NOT BROOM FINISH ENTIRE MODULE.
L
1/4" / FT
NEW CAST IN PLACE CONCRETE WALKWAY.
COMPACTED SUBGRADE.
4" COMPACTED CA-10 GRANULAR FILL ON COMPACTED SUBGRADE.
NOTE: IN EXCEPTION TO 1/4" / FT. SLOPE, MATCH ADJACENT SIDEWALK ELEVATIONS.
FIBER MESH REINFORCEMENT.
TYPICAL SIDEWALK-CURB SECTION
EXISTING CONCRETE WALKWAY.
6"
EXISTING BASE COURSE.
4" COMPACTED BASE COURSE CA-10.
EXISTING SUBGRADE.
COMPACTED SUBGRADE.
6 G500
1/2"
4" JOINT SEALANT TO MATCH PAVEMENT/WALK COLOR.
CONCRETE WALK. 6" FIBER MESH REINFORCEMENT.
1/4"R
1/2"
engineering
1-1/4"
BACKER ROD.
http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
1/4"R JOINT FILLER.
WALK TOOLED SCORE JOINT
NEW WALK TO EXISTING WALK
5 G500
SCALE: NONE
CONCRETE WALK CONTROL JOINTS
4 G500
SCALE: NONE
(303) 431-6100
JOINT SEALANT SECTION SCALE: NONE
J
SCALE: NONE
BROOM FINISH. 4"
11-24-2025
NOTE: JOINT SEALANT DETAIL APPLIES TO ALL PAVING DETAILS WHERE EXPANSION JOINT APPEARS.
J
K
7 G500
SCALE: NONE
TROWEL CUT 1/3" DEPTH OF WALK BEFORE TOOLING.
FIBER MESH REINFORCEMENT.
4"
TYPICAL SIDEWALK SECTION
NEW CAST IN PLACE CONCRETE WALKWAY.
RE: DETAIL 4/G500.
(N) OR (E) CURB.
6"
8 G500
4" SMOOTH FINISH TO COMPLETELY SURROUND EACH 5' x (MATCH EXISTING OF NEAREST ADJACENT SIDEWALK) MODULE; ONLY WHERE ADJACENT EXISTING WALK CONTAINS A SMOOTH FINISH AT CONTROL JOINTS.
BROOM FINISH PAVING.
L
℄
CONCRETE WALK.
MATERIAL VARIES (RE: PLANS).
EXHIBIT 'B'
K
BROOM FINISH.
42'' MINIMUM FINAL PAVEMENT WIDTH, ROTOMILLING IS AN ACCEPTABLE ALTERNATIVE TO MINIMUM PAVEMENT WIDTH
IN STREET
SEE BEDDING DETAIL DRAWING NO. C03
TYPICAL TRENCH SECTION TRENCH WIDTH NOTES: 1.
G
2.
3.
4.
PIPE DIAMETER
MINIMUM COVER TO BE BELOW OFFICIAL STREET GRADE. MINIMUM DISTANCE BETWEEN EDGE OF TRENCH AND EDGE OF ASPHALT, OR LIP OF CURBLINE, SHALL BE 3 FEET. REFER TO DRAWING NO. C.04 FOR PAVEMENT RESTORATION FOR PAVEMENT LESS THAN 3 YEARS OLD. ON STATE HIGHWAYS, REFER TO CDOT UTILITY REQUIREMENTS.
MINIMUM WIDTH
ORIENTING SUB.
MAXIMUM WIDTH
6''
1'-6''
2'-6''
8''
1'-8''
2'-8''
12''
2'-0''
3'-0''
16''
2'-4''
3'-4''
20''
2'-8''
3'-8''
24''
3'-0''
4'-0''
MUD MOTOR.
NON-MAGNETIC COLLAR.
STEERING TOOL.
HORIZONTAL THRUST BLOCK DETAIL
C4 G500
SCALE: NONE
VERTICAL THRUST BLOCK DETAIL
C2 G500
SCALE: NONE
UTILITY TRENCH WIDER THAN 16" DETAIL
2 G500
SCALE: NONE
BIT.
BENT MOTOR HOUSING.
BOTTOM HOLE ASSEMBLY DETAIL SCALE: NONE
F
C6 G500
ANGULAR OFFSET.
PILOT HOLE
HORIZONTAL DRILLING RIG. DRILLING FLUID RETURNS.
ENTRY POINT.
E
DRILL PIPE.
EXIT POINT.
TRENCH WIDTH SEE UTILITY TRENCH DWG
H
12''
G
SEE TABLE 1
F
1
o
E
COVER AS SPECIFIED
WIDTH
SAWCUT 6'' BEYOND TRENCH WALL EACH SIDE PRIOR TO PAVING
Regent Administrative Ctr. Boulder, CO 80309
COMPACTED BACKFILL AS SPECIFIED
FOR TRENCHES GREATER THAN 5 FEET IN DEPTH, SIDEWALLS SHALL BE SLOPED AT 45 ANGLE OR SUITABLY BRACED OR SHEETED AS NECESSARY FOR THE SAFETY OF THE WORKERS AND THE PROTECTION OF OTHER UTILITIES AS REQUIRED BY OSHA.
H
EXISTING STREET SURFACE
University Colorado Boulder
I
NEW STREET SURFACE AS SPECIFIED, 6'' MIN OR MATCH EXIST DEPTH
I
UNIFORM CUT LINE ASPHALT/CONCRETE
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
IN OPEN FIELD
ST+B Project No.: NO
UNDISTURBED SOIL
ANNULUS. DIRECTION OF PROGRESS.
BEDDING ZONE
D
DESIGNED DRILLED PATH.
GRANULAR EMBEDMENT MATERIAL SQUEEGEE SAND OR 1/4'' WASHED CHIPS
1/4 PIPE OD, 4'' MIN OR 2'' BELOW BELL WHICHEVER IS GREATER
DRILLING FLUID RETURNS. DRILL PIPE.
ALLOWED WITH RCP
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25
DRILL PIPE.
8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25
C
C
TRENCH WIDTH SEE UTILITY TRENCH DWG GRANULAR EMBEDMENT MATERIAL 3/8" - 3/4" WASHED ANGULAR CHIPS
12'' MIN
ANNULUS.
BEDDING ZONE
UNDISTURBED SOIL
TYPICAL DIRECTION OF PROGRESS.
PULLBACK
DRILL PIPE.
B
B
1/4 PIPE OD, 4'' MIN OR 2'' BELOW BELL WHICHEVER IS GREATER
PREFABRICATED PULL SECTION.
DRILLING FLUID RETURNS.
PIPE SUBGRADE FOUNDATION MATERIAL IF REQUIRED REQUIRED WITH ALL PIPE EXCEPT RCP
(MAY BE USED WITH RCP AT CONTRACTOR'S OPTION)
Sheet Name
general details A
A
ANNULUS. 11/24/2025 10:37 AM
SUBMISSION
3 city of boulder tech doc review 07/09/25
PREREAMING
PIPE SUBGRADE FOUNDATION MATERIAL IF REQUIRED
2815.02
D
HAND PLACED SELECT MATERIAL HAVING NO ROCKS GREATER THAN 2 INCHES IN SIZE
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\G500_Details.dwg
12'' MIN
DIRECTION OF PROGRESS.
C5 G500
20
CURB & GUTTER DETAIL
C3 G500
SCALE: NONE
19
18
17
16
CURB AND GUTTER JOINTS DETAIL
C1 G500
SCALE: NONE
15
14
13
12
PIPE BEDDING DETAIL
1 G500
SCALE: NONE
11
10
9
8
7
HDD PROCESS DETAILS
Sheet No.
SCALE: NONE
G-500
6
5
4
3
2
1
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
4
3
2
1 STAMP
1.
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
I
I
J
K
2.
11-24-2025
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
L
1.
K
EXHIBIT 'B'
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
4+80
5+00
5+20
5+40
5+60
5+80
6+00
6+20
6+40
6+60
6+80
7+00
7+20
7+40
FLOOD LINE
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
(E) FIRE HYDRANT. PROTECT DURING CONSTRUCTION.
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R
H
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
F
G
OIT BURIED FIER CONDUIT, HAND DIG WITHIN 24".
1 M202
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0" 5'
20'
40'
E
0
PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.
(E) STEAM B.O.P.
5315 GRADE
(E) TELECOM
3'-3" (3'-0" MIN.)
5315
(E) ELECTRICAL 5307.0'
(E) GAS, 30" BELOW GRADE. 5306.6'
ST+B Project No.:
(E) ELECTRICAL T.O.P.
NO
(E) GAS T.O.P.
5310
5310
D
18" DUCTILE IRON HD
5305 (E) MV DUCTBANK. 5307.9' (N) CHS/R
PE CHS/R
5305
(E) SANITARY 5309.5'
(E) ELECTRICAL
(E) SANITARY T.O.P.
(N) CHS/R
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
5300
(E) SANITARY 5303.0'
5300
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25
(E) STORM 5304.22'
(E) SANITARY T.O.P.
4 BID PRICING SET
7 city of boulder tech doc review 10/22/25
C
C
(E) STORM T.O.P.
3+20
3+40
3+60
3+80
4+00
4+20
4+40
4+60
0
5'
10'
4+80
5+00
5+20
5+40
5+60
5+80
6+00
6+20
6+40
6+60
6+80
7+00
7+20
7+40
2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M202 SCALE: 1" = 20'-0" HORIZONTAL
20'
40'
VERTICAL
B
5'
B
0
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
partial site mechanical plans & profiles Sheet No.
M-202
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:36 AM
2815.02
3 city of boulder tech doc review 07/09/25
SS OR 20" IPS DR9 HD
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M202_Plan Profile Ph1.dwg
(E) STEAM MAINS. 5311.72'
H
4+60
G
4+40
F
4+20
E
4+00
D
3+80
Regent Administrative Ctr. Boulder, CO 80309
3+60
University Colorado Boulder
3+40
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
3+20
20
19
18
17
15
16
14
13
12
11
10
9
7
8
5
6
3
4
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
I
I
J
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R
K
2.
11-24-2025
L
1.
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
EXHIBIT 'B'
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
8+40
8+60
8+80
9+00
9+20
9+40
9+60
9+80
10+00 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
H
OIT BURIED FIBER CONDUIT, HAND DIG WITHIN 24". 9+80
10+00
10+20
10+40
10+60
10+80
11+00
11+20
11+40
11+60
11+80
1 M203
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
PROTECT OVERHEAD ELECTRICAL DURING CONSTRUCTION. (E) ST MANHOLE. RIM ELEV: 5307.68' INV IN: 5302.33' (N) 12" CLAY INV OUT: 5302.30' (SE) 12" CLAY
(E) OVERHEAD POWER POLE, PROTECT DURING CONSTRUCTION.
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER
3 M203
SCALE: 1" = 20'-0" 5'
20'
0
5'
20'
40'
(E) OVERHEAD ELECTRICAL
(E) OVERHEAD ELECTRICAL (E) FIBER (2) 4", HAND DIG WITHIN 24". 5305.4'
5315
GRADE
5310
(E) ELECTRICAL DUCTBANK. 5304.85'
(E) WATER T.O.P.
ST+B Project No.:
5310
GRADE
(E) DUCTBANK T.O.P.
3'-0" MIN.
D
5310
5305
(E) DUCTBANK T.O.P.
(E) ELECTRICAL T.O.P.
5305
DR9 HDPE CHS/R 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R
(N) CHS/R
5300
C
7+60
7+80
8+00
8+20
8+40
8+60
8+80
9+00
20'
40'
VERTICAL
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
8 for construction set *
11/04/25
(E) SANITARY 5302.1' CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.
(E) SANITARY T.O.P.
9+20
9+40
9+60
9+80
10+00
9+80
10+00
10+20
10+40
10+60
10+80
11+00
11+20
11+40
11+60
4 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER M203 SCALE: 1" = 20'-0" 0
5'
HORIZONTAL
10'
0
5'
20'
40'
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
partial site mechanical plans & profiles Sheet No.
M-203
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:35 AM
06/27/25
B
5'
2 CONSTRUCTION DOCs REVIEW
B
0
06/06/25
(E) SANITARY T.O.P.
2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M203 SCALE: 1" = 20'-0" HORIZONTAL
1 DESIGN DEVELOPMENT
9 city of boulder corrections rev. 11/24/25
(E) SANITARY 5302.1'
(E) STORM T.O.P.
7+40
(E) 8" GAS, 61" BELOW GRADE. 5303.1' (E) FIBER T.O.P.
(E) 12" STORM, 60" BELOW GRADE. 5303.0'
7+20
5300 (N) CHS/R
DATE
7 city of boulder tech doc review 10/22/25
5300
(N) CHS/R
CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.
SUBMISSION
C
5300
2815.02
3 city of boulder tech doc review 07/09/25
(E) DUCTBANK T.O.P.
5305
NO
5310
(E) ELECTRICAL, (5) 1-1/2", 30" BELOW GRADE. 5304.9'
(E) ELECTRICAL DUCTBANK. 5304.7'
(E) ELECTRICAL DUCTBANK. 5304.7'
18" DUCTILE IRON HDSS OR 20" IPS
5315 PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.
(E) 2" WATER, 50" BELOW GRADE. 5303.8'
(E) GAS T.O.P.
5305
5315
(E) FIBER T.O.P.
PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES, TYP RE: 4/M-600.
(E) 8" GAS, 32" BELOW GRADE. 5305.4'
5315
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M203_Plan Profile Ph1.dwg
SCALE: 1" = 20'-0"
40'
E
0
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER
5'-8" (3'-0" MIN)
F
G
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS/R
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
G
8+20
F
8+00
E
7+80
D
7+60
Regent Administrative Ctr. Boulder, CO 80309
7+40
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
7+20
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
University Colorado Boulder
(E) SANITARY MANHOLE. RIM ELEV: 5309.01' INV IN: 5300.96' (W) 24" PVC INV OUT: 5300.65' (SE) 24" PVC
H
PROTECT OVERHEAD ELECTRICAL DURING CONSTRUCTION.
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
4
3
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
J
K
2.
11+80
12+00
12+20
12+40
12+60
12+80
13+00
13+20
13+40
13+60
13+80
14+00
14+20
14+40
14+60
14+80
15+00
15+20
15+40
15+60
15+80
16+00
16+20
16+40
16+60
16+80
17+00
17+20
17+40
http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
17+60
I
11+60
engineering
I
11+40
11-24-2025
L
1.
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
EXHIBIT 'B'
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
F
1 M204
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0" 5'
20'
40'
5315
5315 CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.
5310
(E) ELECTRICAL
(E) FIBER (2) 1" LINES, HAND DIG WITHIN 24". 5305.3'
(E) ELECTRICAL (2) 1" LINES, 24" BELOW GRADE. 5303.7'
(E) FIBER
5304.7' (E) ELECTRICAL T.O.P.
PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES TYPICAL. RE: 4/M-600.
(E) FIBER (2) 1" LINES, HAND DIG WITHIN 24". 5303.4'
D
(E) ELECTRICAL T.O.P.
5'-6" (3'-0" MIN)
NO
5310
(E) ELECTRICAL
(E) ELECTRICAL DUCTBANK. 40" BELOW GRADE. 5300.05'
GRADE
(E) FIBER T.O.P.
5305
ST+B Project No.:
(E) ELECTRICAL DUCTBANK. 36" BELOW GRADE. 5300.2'
(E) ELECTRICAL
(E) ST 5303.7'
(E) IRR 5303.8'
(E) STORM
(E) FIBER, HAND DIG WITHIN 24". (2) 2" LINES. 28" BELOW GRADE. 5300.3'
(E) FIBER (2) 2" LINES, HAND DIG WITHIN 24". 21" BELOW GRADE. 5300.4'
(E) FIBER
5305
(E) FIBER T.O.P.
(E) GAS 53##.#'
(E) IRR T.O.P.
5300
CHS/R 18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
11/04/25
9 city of boulder corrections rev. 11/24/25
CHS/R (E) ELECTRICAL (STREET LIGHTING)
(E) 8" GAS, 63" BELOW GRADE. 5301.2'
C
1 DESIGN DEVELOPMENT
8 for construction set *
(E) STORM, 36" BELOW GRADE ( PRIVATE STORM LINE ) 9 5300.3'
(E) GAS T.O.P.
(E) STORM T.O.P.
11+40
11+60
11+80
12+00
12+20
12+40
12+60
12+80
13+00
13+20
13+40
13+60
13+80
14+00
14+20
14+40
14+60
14+80
15+00
15+20
15+40
15+60
15+80
16+00
16+20
16+40
16+60
16+80
17+00
17+20
17+40
17+60
2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M204 SCALE: 1" = 20'-0" 40'
VERTICAL
0
5'
10'
B
20'
B
0 HORIZONTAL 5'
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
partial site mechanical plans & profiles Sheet No.
M-204
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:37 AM
DATE
C
5300
SUBMISSION
7 city of boulder tech doc review 10/22/25
(E) GAS T.O.P.
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE
2815.02
3 city of boulder tech doc review 07/09/25
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M204_Plan Profile Ph2.dwg
E
0
G
G
(E) ELECTRICAL VAULT.
F
(E) FIRE PARKING ISLAND WITH POLE LIGHTS.
E
(E) PARKING LIGHT POLE, PROTECT DURING CONSTRUCTION.
D
H
(E) OVERHEAD POWER POLE, PROTECT DURING CONSTRUCTION.
Regent Administrative Ctr. Boulder, CO 80309
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
University Colorado Boulder
(E) FIBER VAULT. PROTECT DURING CONSTRUCTION.
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
H
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
(E) FIRE HYDRANT. PROTECT DURING CONSTRUCTION.
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
4
3
2
1 STAMP
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
J
K
2.
17+80
18+00
18+20
18+40
18+60
18+80
19+00
19+20
19+40
19+60
19+80
http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
20+00
I
17+60
engineering
I
17+40
11-24-2025
L
1.
L
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
K
EXHIBIT 'B'
1.
GENERAL NOTES:
J
ATTACHMENT 'B'
EXISTING UTILITIES:
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHR
2&3 G204
SCALE: 1" = 20'-0" 5'
20'
40'
5315
5315
5310
NO
5310 CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.
D
5305
5305
PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.
(E) 16"ST ( PRIVATE STORM LINE ) 5295.0' 9
GRADE
5300
SUBMISSION
G
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25
5300
(E) STORM T.O.P.
8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25
(E) IRR T.O.P.
5295 18" DUCTILE IRON HDSS OR
PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.
20" IPS DR9 HDPE CHS/R
5295
C
3'-0" MIN.
(E) IRR 5299.3'
C
F
2815.02
3 city of boulder tech doc review 07/09/25
(E) STORM, 36" BELOW GRADE. 5297.5' (E) STORM
17+60
17+80
18+00
18+20
18+40
18+60
18+80
19+00
19+20
19+40
19+60
19+80
20+00
2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M205 SCALE: 1" = 20'-0" HORIZONTAL
20'
40'
VERTICAL
0
5'
10'
B
5'
B
0
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
partial site mechanical plans & profiles Sheet No.
M-205
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:37 AM
H
ST+B Project No.:
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M205_Plan Profile Ph2.dwg
E
0
E
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER
D
1 M205
Regent Administrative Ctr. Boulder, CO 80309
F
G
PROVIDE CONCRETE ANCHOR BLOCKS ON HDPE WITH FUSED / FLEXIBLE RESTRAINT ANCHOR PLATES.
University Colorado Boulder
PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.
TRANSITION FROM DUCTILE IRON TO HDPE. SEE DETAIL 12/M600. ISP X DIPS RESTRAINED MECHANICAL JOINT ADAPTER WITH STEEL PIPE INTERNAL STIFFER. HDPE SECTION ANCHOR FLEX RESTRAINT WITH CONCRETE BLOCKING.
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
18" DUCTILE IRON HDSS OR 20" IPS DR9 HDPE CHS
20
19
18
17
15
16
13
14
12
11
10
9
8
7
5
6
3
4
2
1 STAMP
ATTACHMENT 'B'
EXISTING UTILITIES:
EXHIBIT 'B'
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
L
11-24-2025
L
1.
2.
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K J
J
K
(303) 431-6100
(E) SANITARY MANHOLE, RIM ELEV: 5363.49' INV IN: 5355.15' INV IN: 5355.24' INV OUT: 5355.09'
I
I
CONSTRUCTION FENCING. PROVIDE PIPING TRANSITIONS AS REQUIRED TO ENSURE 90 DEGREE ELBOW FROM DIP TO HDPE PIPING.
1 M206
PARTIAL SITE PLAN SCALE: 1" = 40'-0" 10'
40'
80'
F
0
3'-0" MIN. (DIRECT BURIED)
(E) 16" CW
(E) 8" GAS, 35" BELOW GRADE. 5360.5' EXIT ANGLE, 10° MIN, 14° MAX. 12°
(E) GAS
APPROX. TOTAL LENGTH OF DRY BORE: 1185' 4-1/2"
(E) SANITARY MANHOLE, RIM ELEV: 5363.49'
NO
EXCAVATED PIT. (20'x14'x7' DEEP)
(E) 8" WATER, 55" BELOW GRADE. 5361.8'
EXIT RADIUS 1400 FT
14'-0"
DRILL RIG.
D
(E) WATER
(E) 12" SANITARY, 87" BELOW GRADE. 5357.1'
(E) 12" SANITARY, 76" BELOW GRADE. 5360.1'
ENTRY RADIUS 1400 - 1600 FT
431'-4 3/4"
BOULDER CREEK EXTENTS
24'-3 1/4"
60'-0" ENTRY ANGLE, 14°
SUBMISSION
G
DATE
1 DESIGN DEVELOPMENT
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
9 city of boulder corrections rev. 11/24/25 342'-2"
293'-2 1/2"
C
C
60'-0"
CROSS SECTION SCALE: 1" = 40'-0"
B
0
10'
40'
80'
B
2 M206
partial site chilled water system plan & cross section
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
Sheet No.
M-206
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:34 AM
2815.02
3 city of boulder tech doc review 07/09/25 5292.00' BO CREEK
(E) SANITARY
(E) SANITARY
H
ST+B Project No.:
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M206_Plan Profile Ph3.dwg
E
LINE REPRESENTS 100 FT TO THE NORTH OF INTERSECTION.
F
G
H
CHR
E
CHS
D
EXCAVATED PIT. (20'x14'x7' DEEP)
Regent Administrative Ctr. Boulder, CO 80309
DRILL RIG.
University Colorado Boulder
CHR
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
CHS
CHS CHR
20
19
18
17
15
16
14
13
12
11
9
10
7
8
5
6
3
4
2
1 STAMP
CONTRACTOR TO FACILITATE MOVEMENT, CONNECTION, MODIFICATION, AND ADJUSTMENT OF ALL EXISTING AND PROPOSED UTILITIES IN ORDER TO PROPERLY ACCOMPLISH DESIGN INTENT SHOWN. THIS INCLUDES, BUT IS NOT LIMITED TO, MATERIAL, ALIGNMENT, SIZE, CONDITION OF EXISTING UTILITIES.
SEE G SHEETS FOR SITE COORDINATION.
2.
CONTRACTOR TO PROVIDE AT LEAST ONE UNOBSTRUCTED PATH BETWEEN BUILDINGS AT ALL TIMES. CONTRACTOR TO ADJUST WORK LIMITS WITHIN EACH PHASE ACCORDINGLY. IF THIS IS NOT POSSIBLE, CONTRACTOR TO CONTACT A/E, AND OWNER FOR DIRECTION.
3.
GENERAL CONTRACTOR SHALL FOLLOW "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" AS A GUIDE FOR PROPER PLACEMENT OF TRAFFIC CONTROL DEVICES; IN ADDITION, COORDINATE SPECIFIC TRAFFIC CONTROL WITH THE OWNER.
4.
THE CONTRACTOR SHALL CONTACT THE OWNER & A/E FOUR WEEKS IN ADVANCE BEFORE TRAFFIC (INCLUDING PEDESTRIAN TRAFFIC) IS IMPACTED IN ANY WAY. THE OWNER SHALL ASSIST CONTRACTOR IN COORDINATION WITH LOCAL MEDIA AND AFFECTED SERVICES.
5.
CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLANS TO THE A/E AND OWNER A MINIMUM OF THREE WEEKS PRIOR TO START OF WORK IN ANY PHASE OF THE PROJECT. THE TRAFFIC CONTROL PLANS SHALL CLEARLY INDICATE THE CONTROL DEVICES AND THEIR LOCATION FOR THE SPECIFIC CONSTRUCTION PHASE. THE PLANS SHALL BE REVIEWED BY THE A/E.
6.
THE CONTRACTOR SHALL ATTACH ALL TRAFFIC CONTROL DEVICES TO THE PAVEMENT/ GROUND AND IS REQUIRED TO PREVENT THEIR DISPLACEMENT DURING CONSTRUCTION. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
7.
CONTRACTOR SHALL INSTALL CONSTRUCTION FENCING AROUND THE PERIMETER OF THE WORK AREA TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON APPROVAL BY THE CDB AND OWNER AND REPAIR ANY DAMAGE TO EXISTING GROUND/ PAVEMENT.
8.
CONTRACTOR TO INSTALL CONSTRUCTION FENCING AROUND PERIMETER OF STAGING AREAS TO PREVENT UNAUTHORIZED ACCESS. FENCING SHALL BE SIX FOOT CHAIN LINK ON METAL POLE. CONTRACTOR TO REMOVE FENCING UPON COMPLETION OF THE PROJECT AND RESTORE AREA TO ORIGINAL CONDITION. CONTRACTOR TO CONSULT OWNER ON EXACT LOCATION OF STAGING AREAS PRIOR TO COMMENCING CONSTRUCTION.
9.
CONTRACTOR TO COORDINATE ACCESS POINT TO STAGING AREA WITH OWNER. VEHICLE PARKING IS PERMITTED IN THIS AREA ONLY. NO OTHER PARKING SHALL BE PROVIDED BY THE PROJECT OR OWNER. CONTRACTOR TO REPAIR ANY DAMAGE TO EXISTING LANDSCAPING, SOD, PAVEMENT, AND CURBING THAT RESULTS FROM VEHICULAR ACCESS TO THE AREA.
10.
THE CONTRACTOR IS TO MAINTAIN ACCESS TO THE BUILDING ENTRANCES AT ALL TIMES. WHEN THE NORMAL ACCESSIBLE ENTRANCE IS RESTRICTED, AN ALTERNATIVE ACCESS WAY MEETING ADA REQUIREMENTS AND ACCEPTABLE TO THE OWNER SHALL BE PROVIDED.
11.
ACCESS TO FIRE HYDRANTS TO BE MAINTAINED AT ALL TIMES. IF FOR ANY REASON THIS IS NOT POSSIBLE, CONTRACTOR TO COORDINATE WITH THE OWNER.
12.
THE LINES OF EXCAVATION SHOWN ARE ESTIMATES. THE CONTRACTOR SHALL EXCAVATE AS REQUIRED TO INSTALL UTILITIES AND EXTEND OR REDUCE LIMITS BASED ON SITE CONDITIONS. ADJUSTMENTS OF LIMITS REQUIRE SITE RESTORATION BACK TO ORIGINAL CONDITIONS.
SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.
J
PROVIDE CONCRETE ANCHOR BLOCKS ON HDPE WITH FUSED / FLEXIBLE RESTRAINT ANCHOR PLATES.
TRANSITION FROM DUCTILE IRON TO HDPE. RE: DETAIL 12/M600. ISP X DIPS RESTRAINED MECHANICAL JOINT ADAPTER WITH STEEL PIPE INTERNAL STIFFER. HDPE SECTION ANCHOR FLEX RESTRAINT WITH CONCRETE BLOCKING.
CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF EXISTING CHILLED WATER SUPPLY AND RETURN PIPING.
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
(303) 431-6100
1+20
1+40
1+60
1+80
2+00
2+20
2+40
2+60
2+80
3+00
3+20
3+40
3+60
3+80
4+00
4+20
4+40
4+00
4+20
4+40
4+60
4+80
5+00
SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.
F
G
8" CHS/R PIPING w/ CAPPED VALVES
5 M207
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER
1 M207
SCALE: 1" = 20'-0" 5'
20'
3 M207
SCALE: 1" = 20'-0"
40'
0
5'
20'
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER SCALE: 1" = 20'-0"
40'
0
5'
20'
40'
5375
5375 GRADE (COLORADO AVE)
(E) IRR T.O.P.
(E) WATER T.O.P.
5365
20" CHS/R (DUCTILE IRON)
(E) GAS T.O.P.
20" CHS/R 5365.6'
5360
5360
5360
16" MIN. SEPARATION BETWEEN CHS/R & (E) WATER CROSSING.
C
5365
5361.8'
5365
20" CHS/R (DUC
TILE IRON)
20" CHS/R 5364.4'
(N) CHS/R T.O.P.
5360
5360
20" CHS/R 5364.4'
(E) ST 5352.88'
5360
5355
(E) ST T.O.P.
EXCAVATED PIT. (20'x14'x7' DEEP)
5355
06/06/25
2 CONSTRUCTION DOCs REVIEW
06/27/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
11/04/25
5355
(E) ST 5351.1' (E) ST T.O.P.
4+20
4+40
4+60
4+80
1+00
5+00
B
6 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" HORIZONTAL
0
5'
20'
40'
VERTICAL
1+20
1+40
1+60
1+80
2+00
2+20
2+40
2+60
2+80
3+00
3+20
3+40
3+60
3+80
4+00
4+20
4+40
2 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" 0
5'
HORIZONTAL
10'
0
5'
20'
40'
VERTICAL
4+00
4+20
4+40
4+60
4+80
5+00
4 PROFILE - PARTIAL NEW CONSTRUCTION - CHILLED WATER SCALE: 1" = 5'-0" M207 SCALE: 1" = 20'-0" 0
5'
HORIZONTAL
10'
0
5'
20'
40'
VERTICAL
0
5'
10'
B
4+00
811
A
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
partial site mechanical plans & profiles Sheet No.
M-207
2
1
A
Sheet Name
CALL 10-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR MARKING OF UNDERGROUND MEMBER UTILITIES. 11/24/2025 10:38 AM
1 DESIGN DEVELOPMENT
9 city of boulder corrections rev. 11/24/25
18" MIN. SEPARATION BETWEEN CHS/R & (E) WATER CROSSING.
5355
DATE
8 for construction set *
(N) CHS/R T.O.P.
(E) SANITARY, 36" BELOW GRADE. 5361.0' (E) SANITARY T.O.P.
SUBMISSION
7 city of boulder tech doc review 10/22/25
(N) CHS/R T.O.P.
CURRENT EXISTING UTILITIES DEPTHS BASED ON SEPTEMBER 2025 POT HOLING.
LOWER WATER HYDRANT FEED BELOW (N) CHS/R. 18" MIN SEPARATION.
5355
5365
20" CHS/R (DUCTILE IRON)
(E) ST, ±9'-2" BELOW GRADE.
5355
NO
2815.02
3 city of boulder tech doc review 07/09/25
(E) 8" WATER, 55" BELOW GRADE. 5362.6' (E) WATER T.O.P.
8" CHS/R PIPING w/ CAPPED VALVES. 5364.75'
(N) CHS/R T.O.P.
5370
GRADE (FOLSOM STREET)
(E) GAS 5363.5'
(E) WATER T.O.P.
20" CHS/R (DUCTILE IRON)
(E) CHS/R
5370
(E) ELECTRICAL T.O.P.
(E) 8" WATER, 54" BELOW GRADE. 5364.5'
5365
(E) W, ±10'-7" BELOW GRADE.
5370
18"
5365
(E) 2" ELECTRICAL, 33" BELOW GRADE. 5365.0'
ST+B Project No.:
C
(E) WATER, 44" BELOW GRADE. 5367.4'
PROVIDE AIR VENTS FOR CHILLED WATER PIPING AT ALL PIPING LOWERING / CROSSES. RE: 4/M-600.
GRADE (COLORADO AVE)
(E) IRR 5367.3'
1'-6"
D
6'-0"
(E) WATER, ±3'-7" BELOW GRADE.
5370
5375
3'-0" MIN
5370
3'-0" MIN
5370
6'-0" 6'-0" (3'-0" MIN)
GRADE
5375
18"
5375
3'-0" MIN
5375
30x42
Z:\Box\STB Projects\2815.02 - CUB - North of Boulder Creek Utilities\600.Drawings\Package 4\M207_Plan Profile Ph2.dwg
E
0
PARTIAL NEW CONSTRUCTION PLAN - CHILLED WATER
G
(E) SANITARY MANHOLE, RIM ELEV: 5368.90' INV IN: 12" (SE) 5362.72' INV OUT: 12" (N) 5362.66'
F
H
MAINTAIN 10' OR MORE SEPARATION BETWEEN (E) SANITARY & (N) CHS/R.
E
20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)
10' MIN. SEPARATION.
D
10' MIN.
LOWER 6" HYDRANT FEED BELOW CHILLED WATER.
10'-0"
Regent Administrative Ctr. Boulder, CO 80309
1'-6"
(E) SANITARY MANHOLE, RIM ELEV: 5367.71' INV IN: 15" (W) 5356.59' INV OUT: 15" (N) 5356.50'
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)
20" CHS (DUCTILE IRON) 20" CHR (DUCTILE IRON)
20" CHR (DUCTILE IRON)
University Colorado Boulder
20" CHS (DUCTILE IRON)
H
8'-9"
1+00
I
SANITARY SEWER RE-ALIGNMENT. RE: CIVIL PLANS FOR FURTHER INFORMATION.
CONNECT TO (E) CHS/R. FIELD VERIFY IDENTIFICATION OF EXISTING CHILLED WATER SUPPLY AND RETURN PIPING.
I
11-24-2025
L
(E) SANITARY MANHOLE, RIM ELEV: 5364.45' INV IN: 15" (S) 5355.56' INV OUT: 15" (NE) 5355.36'
1.
K
2.
(E) SANITARY MANHOLE, RIM ELEV: 5363.49' INV IN: 12" (S) 5355.14' INV IN: 15" (SW) 5355.24' INV OUT: 15" (N) 5355.09'
K
ST+B ENGINEERING ASSUMES NO RESPONSIBILITY FOR UTILITY LOCATIONS. THE UTILITIES SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION TO INCLUDE FACILITY AS-BUILTS. SITE DRAWINGS, AND SKETCHES AS PROVIDED BY THE OWNER. ADDITIONALLY, AERIAL IMAGERY WAS UTILIZED TO SUPPLEMENT UTILITY INFORMATION. HOWEVER, IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE LOCATION. HORIZONTAL AND VERTICAL OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION AND NOTIFY THE ENGINEER AND OWNER OF ANY DISCREPANCIES.
L
1.
GENERAL NOTES:
J
EXHIBIT 'B'
ATTACHMENT 'B'
EXISTING UTILITIES:
20
19
18
17
16
15
14
13
12
11
10
9
8
7
5
6
4
3
2
1 STAMP
ATTACHMENT 'B'
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K
K
(303) 431-6100
L
L
EXHIBIT 'B'
NO
G F E
Regent Administrative Ctr. Boulder, CO 80309
H
University Colorado Boulder
ST+B Project No.:
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
D
3 city of boulder tech doc review 07/09/25 4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
2 CONSTRUCTION DOCs REVIEW 06/27/25
7 city of boulder tech doc review 10/22/25 8 for construction set *
11/04/25
9
11/24/25
CITY OF BOULDER CORRECTIONS REV.
C
C
811
B
B
30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\EXISTING CONDITIONS & DEMOLITION PLAN.dwg
E
F
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
I
J
THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.
J
11/24/2025
Sheet Name
A
A
11/24/2025 9:01 AM
EXISTING CONDITIONS & DEMOLITION PLAN
Sheet No.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
C-110 1
20
19
18
17
16
15
14
13
12
11
10
9
8
7
5
6
4
3
2
1 STAMP
ATTACHMENT 'B'
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K
K
(303) 431-6100
L
L
EXHIBIT 'B'
G F
Regent Administrative Ctr. Boulder, CO 80309
ST+B Project No.: NO
H
University Colorado Boulder
E
E
F
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
I
J
THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.
J
11/24/2025
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
D
3 city of boulder tech doc review 07/09/25
8 for construction set *
11/04/25
9
11/24/25
CITY OF BOULDER CORRECTIONS REV.
C
C
7 city of boulder tech doc review 10/22/25
811
B
B
30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\SITE PLAN.dwg
2 CONSTRUCTION DOCs REVIEW 06/27/25
Sheet Name
A
A
11/24/2025 9:01 AM
SITE PLAN
Sheet No.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
C-200 1
20
19
18
17
16
15
14
13
12
11
10
9
8
7
5
6
4
3
1
2 STAMP
ATTACHMENT 'B'
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K
K
(303) 431-6100
L
L
EXHIBIT 'B'
I G F
Regent Administrative Ctr. Boulder, CO 80309
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
D
3 city of boulder tech doc review 07/09/25 4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
2 CONSTRUCTION DOCs REVIEW 06/27/25
8 for construction set *
11/04/25
9
11/24/25
CITY OF BOULDER CORRECTIONS REV.
C
C
7 city of boulder tech doc review 10/22/25
B
811
B
30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\EROSION CONTROL PLAN.dwg
ST+B Project No.: NO
H
University Colorado Boulder
E
E
F
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
J
THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.
J
11/24/2025
Sheet Name
A
A
11/24/2025 9:01 AM
EROSION CONTROL PLAN
Sheet No.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
C-300 1
20
19
18
17
16
15
14
13
12
11
10
9
8
7
5
6
4
3
2
1 STAMP
ATTACHMENT 'B'
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K
K
(303) 431-6100
L
L
EXHIBIT 'B'
H G
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
D
3 city of boulder tech doc review 07/09/25
4'Ø SSWR MH 2
4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
2 CONSTRUCTION DOCs REVIEW 06/27/25
8 for construction set *
11/04/25
9
11/24/25
CITY OF BOULDER CORRECTIONS REV.
C
C
7 city of boulder tech doc review 10/22/25
811
B
B
30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\OVERALL UTILITY PLAN.dwg
ST+B Project No.: NO
F
Regent Administrative Ctr. Boulder, CO 80309
E
E
F
4'Ø SSWR MH 1
University Colorado Boulder
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
I
J
THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.
J
11/24/2025
Sheet Name
A
A
11/24/2025 9:01 AM
OVERALL UTILITY PLAN
Sheet No.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
C-400 1
20
19
18
17
16
15
14
13
12
11
10
9
8
7
5
6
4
3
2
1 STAMP
ATTACHMENT 'B'
engineering http://stb.engineering (303) 900-8782
25188 genesee trail rd suite 120 golden, co 80401
http://martinmartin.com
12499 west colfax ave lakewood, co 80215
K
K
(303) 431-6100
L
L
EXHIBIT 'B'
4'Ø SSWR MH 1 STA: 10+80.06
J
THIS PLAN SET SEALED ON THE FOR PERMITTING ONLY COVER SHEET.
J
A
4'Ø SSWR MH 2 STA: 11+97.18
11/24/2025
NO
H G F
Regent Administrative Ctr. Boulder, CO 80309
E
4'Ø SSWR MH
4'Ø SSWR MH 1
4'Ø SSWR MH 2
4'Ø SSWR MH
F E
ST+B Project No.:
2815.02
SUBMISSION
DATE
1 DESIGN DEVELOPMENT
06/06/25
D
3 city of boulder tech doc review 07/09/25 4 BID PRICING SET
08/06/25
5 bid pricing set - addendum 2
09/05/25
6 bid pricing set - addendum 4
09/09/25
D
2 CONSTRUCTION DOCs REVIEW 06/27/25
8 for construction set *
11/04/25
9
11/24/25
CITY OF BOULDER CORRECTIONS REV.
C
C
7 city of boulder tech doc review 10/22/25
811
B
B
30x42 G:\Thornbrough\25.1408-UCB001213 NBC Site Utilities ST+B\PLANS\CDs\SANITARY SEWER PLAN & PROFILE.dwg
University Colorado Boulder
G
H
UCB Project No: UCB001213 Project Title: Site - North of Boulder Creek - util expansion - package four
I
I
A
FOLSOM ST SANITARY REALIGNMENT
Sheet Name
A
A
11/24/2025 9:02 AM
SANITARY SEWER PLAN & PROFILE
Sheet No.
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
C-450 1