CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR AGREEMENT THIS CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR AGREEMENT (“Agreement”) is made and entered into as of this 20th day of November, 2025 by and between the Boulder Valley School District RE-2 (hereinafter referred to as the “Owner” or “School District”) and AP Mountain States LLC dba Adolfson & Peterson Construction (hereinafter referred to as the “Construction Manager/General Contractor” or “CM/GC”), for services in connection with the following described Project: BVSD Request For Proposal (“RFP “) No 26-08 titled CM/GC Project Scope #3 – Eisenhower Elementary School (“Project”) This Agreement shall be performed in conjunction with the services of the Architect for the Project, RTA Architects. In consideration of the mutual covenants and provisions contained herein, the parties agree as follows: ARTICLE 1 1.1.

1.2.

1.3.

1.4.

Responsibility of CM/GC to Owner: The CM/GC accepts the relationship of trust and confidence established with the Owner by this Agreement. CM/GC covenants with the Owner to furnish its best skill and judgment and to cooperate with the Architect in furthering the interests of the Owner. CM/GC agrees to furnish efficient business administration and superintendence and to use its best efforts to perform the Work in the best and soundest way and in the most expeditious and economical manner consistent with the interests of the Owner. The Construction Team: The CM/GC, the Owner, and the Architect, collectively referred to as the “Construction Team,” shall work from the beginning of design through construction completion. The CM/GC shall provide leadership to the Construction Team on all matters relating to construction. Extent of Agreement: This Agreement together with the General Contract Conditions (“General Conditions”), incorporated herein by reference, RFP 26-08 CM/GC Project Scope #2 – Eisenhower Elementary School dated August 28, 2025, a copy of which is attached as Exhibit A and the Contractor’s proposal dated September 25, 2025, a copy of which is attached as Exhibit B, represent the entire agreement between the Owner and the CM/GC and supersede all prior negotiations, representations, or agreements. When plans and specifications are complete, they shall be identified as part of the Contract Documents (as defined in the General Contract Conditions). This Agreement shall not be superseded by any provisions of the documents for construction and may be amended only by written instrument executed by both the Owner and the CM/GC. Nothing contained herein shall be deemed to create any contractual relationship between the CM/GC and the Architect, or any of the contractors, subcontractors, or material suppliers on the Project; nor shall anything contained herein be deemed to give any third party any claim or right of action against the Owner or the CM/GC which does not otherwise exist without regard to this Agreement. Contract Documents: The provisions of the General Conditions and all of the “Contract Documents” for the Project as that term is defined therein are incorporated by this reference into this Construction Management/General Contractor Agreement. The intent of the Contract Documents is to include all items and services necessary for the proper execution and completion of the Work. The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all. Work not covered in the Contract Documents shall be required unless it is not consistent therewith and is not reasonably inferable therefrom as being necessary to produce the intended results. Words and abbreviations which have well known technical or trade meanings are used in the Contract Documents in accordance with such recognized meanings. If there are conflicting variances between the Drawings and Specifications, the requirements of the Specifications shall control unless the Architect/Engineer directs otherwise in writing. Numerous exhibits to be developed over a period of time are also to be attached to and made a part of the Contract Documents, some of which may be in

1.5.

conflict with other exhibits or portions of this Agreement. In the event of any conflict between any of them, the greater service, better quality or greater quantity shall be included in the Work, Contract Sum and Guaranteed Maximum Price without additional compensation, to be superseded by applicable Amendments and Change Orders. The Work: The CM/GC shall perform the services set forth in the Method of Payment Matrix attached hereto and incorporated by reference herein as Exhibit A. The initial Work of the CM/GC shall consist of its services in connection with the Design Phase, which shall be parallel and coincidental with the Schematic Design, Design Development, and Construction Document Phases of the Architect’s Services. As the bid packages are prepared and prices are established for the Work to be performed within each respective bid package, the parties contemplate that the work to be performed by the CM/GC shall be adjusted by Amendment or Change Order to this Agreement to place the Work contained within the various bid packages within the Work to be performed by the CM/GC with corresponding adjustments made to the Guaranteed Maximum Price and the Contract Time. ARTICLE 2 Construction Manager/General Contractor Services

The CM/GC’s basic services under this Agreement shall consist of the two (2) phases described below. 2.1. Pre-Construction Estimating Phase: As part of the Pre-Construction Estimating Phase, the CM/GC will: 2.1.1. Site Building, and Constructability Analysis. Perform site, building, and constructability analysis to assist the architectural/engineering team throughout all phases of design. Without limiting the foregoing services, the constructability analysis will include, but not be limited to the systematic evaluation of the design documents prepared by the Architect in each phase of design to identify and resolve potential issues that could (a) impact project cost, schedule, safety, or quality, (b) be in conflict with current code compliance in the building, or (c) interfere with the ability to efficiently construct the work. 2.1.2. Design Advisory Team. Participate in multiple design advisory team meetings with the District and Architect. 2.1.3. Communications with Architect. Communicate regularly with the architectural/engineering team and Owner for input and advice regarding cost and scope of project features, and regarding phasing and scheduling of the Project. 2.1.4.Cost Estimating. Conduct cost estimating of SD, DD, and CD Drawings. 2.2. Design Phase: As part of the Design Phase services, the CM/GC will: 2.2.1. Consultation During Project Development and Design – When applicable and only if this Agreement is executed prior to the completion of development and design, attend regularly scheduled meetings with the Architect during the development of conceptual and preliminary design to advise the Construction Team concerning site use and improvements, selection of materials, building systems, and equipment. Provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets, and possible economies. 2.2.2. Scheduling - Develop a Project Time Schedule at the end of each design phase that coordinates and integrates the Architect’s design efforts with construction schedules. Provide an electronic copy for the Owner’s review and approval. Update the Project Time Schedule, at intervals required by the Owner, incorporating a detailed schedule for the construction operations of the Project, including realistic activity sequences and durations, allocation of labor and materials, processing of shop drawings and samples, and delivery of products requiring long lead-time procurement. Include the Owner’s occupancy requirements showing portions of the Project having occupancy priority. Provide one hard copy and an electronic copy of the updates for the Owner’s review and approval. 2.2.3. Project Construction Budget –

2

2.2.3.1. Review the Owner’s established Project budget as soon as major program requirements have been identified and update the budget, at intervals required by the Owner, for the Owner’s approval. Prepare an estimate based on a quantity survey of drawings and specifications at the end of the Schematic Design Phase for approval by the Owner as the Project Construction Budget. Update and refine this estimate for Owner’s approval as the development of the drawings and specifications proceeds. Advise the Owner and the Architect if it appears that the Project Construction Budget will not be met and, in that event, make recommendations for corrective action. The Contractor shall submit cost estimates to the Owner for review and acceptance and shall provide copies to the Architect for review and verification. The amount of money appropriated by the Owner for the Project is equal to or in excess of the Project Construction Budget. 2.2.3.2. As the plans and specifications evolve through each design phase, the Contractor will perform cost studies and major estimates of the Cost of the Work using area, volume or similar estimating techniques for Owner’s approval. If the Contractor suggests alternative materials and systems, the Contractor shall provide cost evaluations of those alternative materials and systems. Any alternative materials or systems selected by the Owner, based on the cost evaluations provided by Contractor, shall then be incorporated into the updated budgets. 2.2.3.3. The Contractor’s estimating and budgeting systems and reports shall be flexible to allow comparisons of building systems and components. They shall include a means to provide a variance analysis throughout each budget update starting with the effective date and continuing through the Guaranteed Maximum Price. The format of the estimating system shall include detail sheets for each Work task that reflect unit prices, quantities, and extensions for labor and materials. The Contractor shall establish the estimate in a Construction Specifications Institute (CSI) format in a detailed open book collaborative manner that allows the Owner to make timely and informed decisions. Each budget shall also include a detailed list of relevant clarifications as they relate to the preparation of each budget update, and an updated Project Schedule. Allowances are to be clearly identified within each budget update on a separate summary level report at each design phase 2.2.4. Value Engineering – Provide technical review and analysis of systems and materials being considered in the design to produce the greatest value for the least cost. Contractor’s value engineering duties shall include, but not be limited to, formulating and evaluating alternative designs, systems, and materials; providing cost estimates of alternatives to be evaluated; evaluating alternatives on the basis of costs, time schedules, availability of labor and materials, and construction feasibility, etc.; and assisting the Architect in the preparation of any written report at the end of the Design Phase summarizing the value engineering activities. 2.2.5. Coordination of Contract Documents - Review the drawings and specifications as they are being prepared, identifying conflicts, errors, and omissions and recommending alternative solutions whenever design details affect construction feasibility or schedules without, however, assuming any of the Architect’s customary responsibilities for design. Forward all comments and recommendations in writing to the Architect for response/action. 2.2.6. Construction Planning - Recommend for purchase and expedite the procurement of long-lead items to ensure their delivery by the required dates. 2.2.7. Division of Work - Make recommendations to the Owner and the Architect regarding the division of the Work in the plans and specifications to facilitate the bidding and awarding of subcontractors and to allow for phased construction, taking into consideration such factors as time of performance, availability of labor, overlapping trade jurisdictions, provisions for temporary facilities, and other matters. 2.2.8. Construction Document Review - Perform final review of plans and specifications with the Architect and Owner to eliminate areas of conflict or misinterpretation and to assure proper coordination, accuracy, and completeness. 2.2.9. Labor - Analyze the types, quantity, and availability of appropriate categories of labor required for various phases of the Project.

3

2.2.10. Bidding – Develop and implement subcontractor pre-qualification criteria and a subcontractor prequalification process with the cooperation and approval of the Owner. As working drawings and specifications are completed, establish bidding schedules and conduct pre-bid conferences to familiarize bidders with bidding documents, management techniques, and any special systems, materials, or methods. Obtain a minimum of three (3) competitive subcontractor bids for each part of the Work, pursuant to bidding procedures acceptable to the Owner. If Contractor is unable to procure the minimum three proposals from subcontractors and suppliers, then Contractor shall submit to Owner reasonable data substantiating its efforts to solicit the minimum number along with whatever bids were obtained for Owner’s review. So long as Contractor, in Owner’s sole discretion, exercised commercially reasonable efforts to solicit the minimum number of bids, then Owner may relieve Contractor of the bid number required hereunder. Analyze all bids, review bids with the Owner and Architect, make recommendations for contract awards, and award subcontractors. The Owner anticipates multiple bid packages will be necessary for the Project phasing and scheduling. 2.2.11. Conferences - Conduct pre-construction conferences with successful subcontractors. 2.2.12. Equal Employment Opportunity - Determine applicable requirements for equal employment opportunity programs for inclusion in Project bidding documents. 2.2.13. Project Management Software – CM/GC shall use Trimble Unity Construct Software as the primary tool for Project control, communication, and documentation among the Project participants, including, but not limited to Owner, Architect, and CM/GC. CM/GC submittals made using e-Builder® Software shall accurately reflect the Schedule of Values and CM/GC’s cost accounting. 2.2.14. Analysis of Existing Improvements – Services related to investigation, appraisals or valuations of existing conditions, facilities or equipment; or verifying the accuracy of existing drawings or other Ownerfurnished information. Where necessary, make recommendation for selective demolition in order to uncover hidden existing conditions. When approved by Owner, and in accordance with other terms of this Agreement, perform necessary selective demolition and repair/restore affected conditions as needed to maintain a clean and safe environment. The CM/GC shall without exception maintain a safe environment for students, staff, teachers and public that may use the building prior to completion of the work described in the Construction Documents. 2.3. Cooperation with Architect: The Architect, by the terms of its agreement with the Owner, is obligated to provide reasonable cooperation to the CM/GC in the development of estimates of construction costs and the Guaranteed Maximum Price (“GMP”). Conversely, the CM/GC, by the terms of this Construction Agreement is obligated to provide reasonable cooperation to the Architect in the development of construction cost estimates and the GMP. Additionally, both Architect and CM/GC are obligated to reconcile their respective cost estimates at the completion of each design phase of the Work and in setting the GMP in a timely manner so as not to negatively impact the Project Schedule. 2.4. Construction Phase: As part of the Construction Phase services, the CM/GC will: 2.4.1. Project Control - Supervise the Work of the subcontractors and coordinate the Work with the activities and responsibilities of the Owner and Architect in order to complete the Project in accordance with the Owner’s objectives of cost, time, and quality. 2.4.2. Staffing - Maintain a competent full-time staff, approved by the Owner, at the Project site to coordinate, provide overall direction of the Work, and monitor progress of the subcontractors on the Project. 2.4.3. Organization - Establish, document, and communicate on-site organization and lines of authority in order to carry out the overall plans of the Construction Team. 2.4.4. Coordination - Establish and implement procedures for coordination among the Owner, Architect, subcontractors, and the CM/GC with respect to all aspects of the Project. 2.4.5. Scheduling - Schedule and conduct weekly progress meetings at which subcontractors, the Owner, Architect, and the CM/GC can discuss jointly such matters as procedures, progress, problems, and scheduling. Within twenty-one (21) days from acceptance of the Guaranteed Maximum Price, as defined below, submit three (3) copies of a detailed CPM Schedule for the operations of the CM/GC

4

and subcontractors on the Project, including realistic activity sequences and durations, allocation of labor, materials, and costs, processing of shop drawings and samples, delivery of products requiring long lead-time procurement for approval by the Owner, and a specific number of weather delay days per year for the duration of the Project. Include the Owner’s occupancy requirements in all schedules showing portions of the Project having occupancy priority, if any. The contents and format of the CPM Schedule shall be per the requirements stated in the General Contract Conditions. The schedule shall contain detail appropriate for the Project, including (1) the effective date of the Agreement, (2) each major design milestone, (3) timelines for Owner’s approvals, (4) the date of commencement of the Work, (5) interim schedule milestone dates, (6) an apportionment of the Work by construction activity; and (7) the time required for completion of each portion of the Work. Under no circumstance shall the date of substantial completion be adjusted without an executed Change Order. 2.4.6. Schedule Monitoring - Provide regular monitoring of the schedule as construction progresses. The Contractor shall prepare a three (3) week look ahead schedule each week for review with the Owner, focusing on the in-depth detail of the upcoming weeks activities in a manner that reflects the planned day-to-day activities. The Project Schedule shall be revised by the Contractor at least monthly or when directed to do so more frequently by the Owner. All revised Project Schedules must demonstrate updates and or changes from the previously approved Project Schedule. In the event that the Contractor ever presents a schedule that does not provide for substantial completion to be achieved within the Contract Time, the Contractor shall also present a recovery plan that will allow the Contractor to achieve substantial completion by the Contract Time. The Owner will determine if the recovery plan or the revised schedule shall be accepted. If the Owner elects to accept the revised schedule in writing, it shall become the approved Project Schedule that the Owner will rely upon to make commitments and obligations. Receiving revised schedules at a weekly Contractor meeting or in another format shall not be construed as an acceptance by the Owner. Any revision to the approved Project Schedule requires the Owner’s written approval. 2.4.7. Evaluation - Determine the adequacy of the subcontractors’ personnel and equipment and the availability of materials and supplies to meet the schedule. 2.4.8. Cost Control - Develop and implement an effective system of Project cost control, showing actual costs for activities in process and estimates for uncompleted tasks. Revise and refine the initially approved Project Construction Budget, incorporate approved changes as they occur, and develop cash flow reports and forecasts as needed. 2.4.9. Change Orders - Develop and implement a system for the expeditious review and processing of Change Orders as approved by the Owner. Initiate necessary or desirable changes to the Owner and the Architect, review requests for changes, submit recommendations to the Owner and the Architect, and assist in negotiating Change Orders. The Owner shall not issue any change order or other directive that causes its payment obligations to exceed lawful appropriations to cover the cost thereof. 2.4.10. Permits - Secure or assist the Owner in securing all necessary permits, licenses, and inspections for the proper completion and execution of the Work. 2.4.11. Owner’s Consultants - If required, assist the Owner in selecting, retaining, and coordinating professional services of a surveyor, testing laboratories, and any special consultants. 2.4.12. Superintendent - Keep on the Project, during the progress of the Work, a full-time, competent superintendent and any necessary assistants, all satisfactory to the Architect and the Owner. The superintendent shall not be changed except with the consent of the Architect and the Owner, unless the superintendent proves to be unsatisfactory to the CM/GC and ceases to be in its employ. The superintendent shall represent the CM/GC in its absence and all directions given to the superintendent shall be as binding as if given to the CM/GC. The superintendent shall remain on the Project full-time until all Work is complete, including the punch list. The Architect and the Owner shall not be responsible for the acts or omissions of the superintendent or their assistants. 2.4.12.1. The superintendent shall provide full-time, qualified, and efficient supervision of the Work, using their best skill and attention. Carefully study and compare all drawings, specifications, and other

5

instructions and immediately report to the Architect and the Owner any error, inconsistency, or omission which may be discovered. Inspect the Work of the subcontractors at all stages and at substantial completion and final completion and guard the Owner against defects and deficiencies in such Work. The CM/GC shall be responsible to the Owner for the acts and omissions of all his employees and of all subcontractors, their agents, and employees and all other persons performing any of the Work, for which the CM/GC has supervisory or inspection responsibility hereunder. 2.4.12.2. The superintendent shall see that the Work is carried out in accordance with the Contract Documents and in a thorough and first-class manner in every respect. The CM/GC’s superintendent shall establish all lines, levels, and marks necessary to facilitate the operations of all concerned in subcontract work. The superintendent shall lay out the Work in a manner satisfactory to the Architect, making permanent records of all lines and levels required for excavation, grading, and foundations and for all other portions of the Work. The superintendent shall, together with the Architect, authorize the commencement and certify the proper completion of the various stages of construction. The CM/GC shall be responsible for construction means, methods, techniques, sequences, and procedures and for carrying out the Work in accordance with the Contract Documents. 2.4.13. Safety Measures - Establish procedures and measures for the safety of persons and property at and around the site of the Work. Assure compliance with all federal, state, and local statutes, rules, regulations, and orders applicable to the conduct of the Work. 2.4.14. Contract Interpretations - Refer all questions relative to interpretation of design intent to the Architect in writing. Develop and implement an effective system of tracking the status of questions and responses. 2.4.15. Shop Drawings and Samples - In collaboration with the Architect, establish and implement procedures for expediting the processing and approval of shop drawings and samples. 2.4.16. Reports and Project Site Documents - Record the daily progress of the Project in a daily log available to the Owner and the Architect. Submit on a weekly basis written progress reports and summaries of meetings to the Owner and the Architect, including information on the subcontractors’ work and the percentage of completion. The Contractor shall keep detailed daily logs and submit these logs to the Architect and Owner each week at the O/A/C meetings. The detailed written daily logs shall include a description of the Work performed the previous week. Each such daily report shall be prepared and signed by the project manager or superintendent, on behalf of the Contractor. Each report shall at a minimum include the following information for that day concerning the Contractor and each Subcontractor (including each Sub-subcontractor): materials and equipment being installed, number of individuals working, the hours worked, the type and location of the work being performed by each trade and each item of major equipment being used. The report shall also include other information such as temperature and weather recorded during the work period and any significant events occurring on the job site with regard to the Work or the Project. 2.4.17. Record Sets - Maintain at the Project site, on a current basis, records of all necessary contracts, shop drawings, samples, purchases, materials, equipment, material safety data sheets, maintenance and operating manuals and instructions, and any other documents and revisions thereto which arise out of the Agreement or the Work in the format required by the Owner in its sole discretion. CM/GC shall obtain data from subcontractors and maintain a current set of record drawings, specifications, operating manuals, warranties, and guarantees. At the completion of the Project, submit all such documents to the Architect for delivery to the Owner. 2.4.18. Completion – Inspect and determine completion of the Work or designated portions by subcontractors thereof and prepare for the Architect a list of incomplete or unsatisfactory items together with a schedule for their completion in accordance with the General Conditions. 2.4.19. Start-Up and Training - With the Owner’s maintenance personnel and the Architect, direct the checkout of utilities, operating systems, and equipment for readiness and assist in their initial start-up and testing by the subcontractors. Facilitate all training of Owner’s personnel as required.

6

2.4.20. Substantial and Final Completion - Determine substantial and final completion and provide written notice to the Owner and Architect that the Work is ready for inspection. Include with the written notice a copy of the Architect’s punch list signed off by each responsible party. Secure and transmit to the Architect required guarantees, tax affidavits, certificates, releases, bonds, and waivers. Turn over to the Owner all keys and maintenance stocks. 2.4.21. Warranty - During the two (2) year warranty period at no additional cost to the Owner, perform warranty inspections with the Architect and Owner following provision of timely written notice to the Owner to schedule such inspections, and ensure that Work which proves defective or deficient during such time is corrected either by the subcontractors or such other means as shall be required, at no additional cost to the Owner. 2.4.22. Self-Performed Work – Contractor shall be eligible to self-perform work on the Project as established in the GMP. Contractor shall self-perform the work at Cost plus a mark-up of 10% in addition to the Contractor’s overall Fee. The Contractor shall competitively bid Scopes of Work to a minimum of three (3) Subcontractors for each subcontracted scope of Work unless the Owner agrees otherwise in advance in writing. Once bids are received, the Contractor shall share the results of the bidding process with the Owner and make recommendations on the selection of the Subcontractor or material supplier based on cost, schedule, and other factors that will maximize the success of the total Project. For specific major trades, the Contractor must notify the Owner in a timely fashion when it intends to conduct scope confirmation meetings with the final bidders. The Owner may at its sole discretion elect to participate in scope confirmation meetings with the Contractor and the key Subcontractor. For those trades in which the Contractor is qualified to self-perform the Work, bids from the Contractor for self-performed Work must be submitted to the Owner and Architect a minimum of twenty-four (24) hours prior to bid deadline for subcontractors to be considered for award. The subcontractor selected for an award will be the subcontractor whose bid, as presented in the response to the bidding documents, is the most advantageous to the Owner. The Owner is not bound to accept the lowest priced bid if that proposal is not in the best interests of the Owner as determined by the Owner. 2.5. Additional Services: Additional services shall be performed only upon the express, prior written authorization of the Owner and paid for as provided herein. Additional services shall include the following: 2.5.1. Owner-Furnished Equipment - Services related to Owner-furnished equipment, furniture, and furnishings which are not a part of the Work. 2.5.2. Expert Witness - Preparing to serve or serving as an expert witness in connection with any public hearing or legal proceeding. 2.5.3. After Completion - Inspections of and services related to the Project after completion of the services under this Agreement, other than the above-referenced warranty inspections. 2.5.4. Other - Providing any other service not otherwise included in this Agreement. ARTICLE 3 The Owner’s Responsibilities 3.1. 3.2.

Information: The Owner shall provide full information regarding its requirements for the Project. Owner’s Representative: The Owner shall designate a representative who shall be acquainted with the scope of the Work; has authority to approve budgets and adjustments thereto, as contemplated by Section 2.1.3 within the Project Cost Estimate as established by the Board of Education; render decisions; and otherwise furnish information. In addition, the Owner may hire an Owner’s Representative to assist the Owner with the performance of the Project. In the event that the Owner hires an Owner’s Representative, the Owner’s Representative’s duties and responsibilities will be described in a Consultant Agreement between the Owner and the Owner’s Representative, a copy of which will be furnished to the CM/GC.

7

3.3.

3.4. 3.5. 3.6.

3.7.

3.8. 3.9.

Architect: The Owner shall retain an Architect to provide design services and to prepare construction documents for the Project. The Architect’s services, duties, and responsibilities are described in the Agreement between the Owner and the Architect, a copy of which will be furnished to the CM/GC. Professional Services: The Owner shall furnish such legal services as may be necessary for the benefit of the Owner, and such auditing services as it may require. Documentation: The CM/GC will be furnished, without charge, all copies of drawings and specifications reasonably necessary for the execution of the Work. Defects: If the Owner becomes aware of any default or defect in the Project or non-conformance with the Contract Documents, it shall give prompt written notice thereof to the CM/GC. This provision shall not, however, charge the Owner with any obligation to make inspections and shall in no manner be construed to discharge or modify the CM/GC’s obligations to supervise, inspect, and to otherwise complete the Project in accordance with the Contract Documents. Surveys and Special Testing: So far as the Project contemplated by this Agreement may require, the CM/GC shall be entitled to information giving a complete and accurate survey of the building site and the existing grades and lines of streets, pavements, and adjoining properties; information as to the rights, restrictions, easements, surface water courses, boundaries, and contours of the building site; and full information as to existing sanitary sewer, storm sewer, water, gas, and electrical services. The Owner, at its expense, shall furnish all such data, upon request. The Owner likewise shall pay for all borings or test pits and for any mechanical, chemical, or other tests as well as professional verifications and inspections incident to proper appraisal of the site for the contemplated structure. A copy of all reports of such tests and borings shall be filed with the Owner and shall be available to the CM/GC, upon request. Owner’s Expenses: The services, information, surveys, and reports required by Sections 3.3 through 3.5 and 3.7 shall be furnished at the Owner’s expense. Project Management Software: Owner shall provide CM/GC with a license to access Owner’s web-based Trimble Unity Construct Software and shall provide CM/GC one day of training for same. ARTICLE 4 Subcontracts

4.1.

4.2.

4.3.

4.4.

Bidding: All Work, except that portion commonly referred to as “General Condition Costs” set forth in Section 8.2.1, shall be competitively bid pursuant to procedures acceptable to the Owner, except for Work performed by CM/GC as approved by Owner in accordance with Section 4.2. CM/GC shall include miscellaneous scopes of Work not being bid in periodic budget estimates, as well as the proposed GMP prepared by the CM/GC. Such scopes shall be approved by Owner at the time of GMP execution. Award: The CM/GC shall request and receive proposals from subcontractors and subcontracts will be awarded by the CM/GC after the proposals are reviewed by the CM/GC with the Architect and Owner. The CM/GC shall be authorized to submit proposals for portions of the Work only with the prior written consent of the Owner. Substitution: If the Owner refuses to accept a subcontractor recommended by the CM/GC, the CM/GC shall recommend an acceptable substitute. The Guaranteed Maximum Price (GMP), if applicable, shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate Change Order shall be issued. Forms: The form of the subcontract, including the General and Supplementary Conditions applicable thereto, shall be satisfactory to the Owner, Architect, and the CM/GC.

ARTICLE 5 Contract Time Schedule

8

5.1. 5.2. 5.3. 5.4.

5.5.

Schedule: The services and Work to be performed under this Contract shall be in general accordance with the Contract Time Schedule attached hereto as Schedule 1. Time of Completion: This date shall be established at the time the GMP is established or prior to the award of any subcontracts if a GMP is not established. Revision: At the time a GMP is fixed, as provided for in Article 6, a new Contract Time Schedule shall also be established. Delays and Extension of Time: If the CM/GC is delayed at any time in the progress of the Work by any act or neglect of the Owner or the Architect or by any employee of either; or by any separate contractor employed by the Owner; or by changes ordered in the Work; or by labor disputes, fire, unusual delay in transportation, unavoidable casualties, or any causes beyond the CM/GC’s control; or by delay authorized by the Owner, the Contract Time Schedule shall be extended by Change Order for such reasonable time as the Owner may determine. All requests for extension of time or claims for extra costs occasioned by delays or neglect shall be subject to the Owner’s approval and shall be made in writing to the Owner no more than seven (7) days after the occurrence of the delay or event causing the extra costs; otherwise they shall be waived and barred. Liquidated Damages: The CM/GC understands and agrees that the completion of the entire Project within the time specified is an essential feature of this Agreement and that the Owner will sustain substantial damages, the amount of which is not possible to accurately determine at the time of contracting and which may be difficult to prove, if the Work is not so completed. The CM/GC, therefore, agrees to proceed with due diligence, taking all precautions and making all necessary arrangements to ensure the completion of the Work within the prescribed time. The CM/GC further agrees that his failure to fully and finally complete the Work within the time allowed shall be considered a material breach of this Agreement and shall entitle the Owner to collect liquidated damages for the delay in completion in accordance with the General Conditions in the sum of one thousand dollars ($1000.00) per calendar day. ARTICLE 6 Guaranteed Maximum Price

6.1.

6.2. 6.3.

Establishment: When the design, plans, and specifications are sufficiently complete to make the final cost estimates and after subcontract bids have been received, the CM/GC shall prepare and submit for Owner’s review and approval a Guaranteed Maximum Price (“GMP”), guaranteeing the maximum cost to the Owner for the Cost of the Work and the CM/GC’s Fees. Such GMP will be guaranteed by the CM/GC, subject only to modification for Changes in the Work as provided in Article 9 and for additional costs arising from delays caused by the Owner or the Architect. Following acceptance of the GMP by the Owner, the Owner and CM/GC shall execute the Guaranteed Maximum Price Amendment, amending this Construction Agreement, a copy of which will be provided to the Architect. Execution of the Guaranteed Maximum Price Amendment by the CM/GC is a representation that the Contractor has visited the Project site, become generally familiar with local conditions under which the Work is to be performed including but not limited to climatic, geographical and topographic conditions, and correlated personal observations with requirements of the Contract Documents. The CM/GC has assessed and is satisfied with the qualifications, suitability and availability of potential subcontractors and labor, material and equipment suitability and availability to satisfy the requirements of the Contract Documents. Subcontracts: When the CM/GC provides a GMP, the subcontracts will contain the necessary provisions to allow the CM/GC to control the performance of the Work. Savings: To the extent that the final Cost of the Work, as herein defined, and the CM/GC’s Fees are less than the GMP, the savings shall accrue to the Owner.

9

6.4.

Option to Terminate: In the event that the CM/GC and the Owner do not agree on the GMP, then the Owner may terminate this Agreement without signing the GMP. In such event, Owner shall pay CM/GC the Design Phase Fee and Owner shall have no further obligation to CM/GC. 6.5. GMP Proposal: A GMP Proposal to Owner shall include the following, unless the parties mutually agree otherwise: 6.5.1. A proposed GMP; 6.5.2. An itemization of the GMP broken down by detail and accompanied by supporting documentation (including, for example, bid tabulations and estimating take off sheets) which includes but is not limited to the following: 6.5.2.1. All prices received for every item bid before the establishment of the GMP and a total of such bids; 6.5.2.2. The maximum cost of all work to be self-performed by the CM/GC; 6.5.2.3. The CM/GC’s Construction Phase Fee and Design Phase Fee; 6.5.2.4. The General Condition Costs, itemized and with supporting documentation and information in accordance with Section 8.2.1 of the Agreement; 6.5.2.5. The installation cost of items to be procured by Owner and assigned to CM/GC for installation; 6.5.2.6. Cost of Work performed by subcontractors and a list of subcontractors with their respective license numbers; 6.5.2.7. CM/GC GMP Contingency, in accordance with Section 8.2.4 of the Agreement. 6.5.3. A schedule of the list of drawing, specifications, and addenda, including a schedule of Requests for Information asked and answered; 6.5.4. A list of the assumptions and clarifications made by CM/GC in the preparation of the GMP; 6.5.5. A revised Contract Time Schedule, pursuant to Section 5.3 of the Agreement, listing delivery schedule with summary milestone delivery items, itemized breakdown of Work scope, and submittal due dates with responsible party; 6.5.6. The scheduled substantial completion date and final completion date upon which the proposed GMP is based, to the extent said date has not already been established under Section 2.2.20 hereof, and a schedule upon which the scheduled substantial completion date and final completion date are based; 6.5.7. CM/GC Insurance Certificates; 6.5.8. CM/GC Performance Bond; 6.5.9. CM/GC Labor and Materials Payment Bond; 6.5.10. Alternate Prices; 6.5.11. Unit Prices; 6.5.12. If applicable, a list of allowances and a statement of their basis and a statement that, to the best of CM/GC’s knowledge, the cost pertaining to such allowance item is a reasonable estimate taking into account (i) the Project plans and other Contract Documents existing at the time the allowance estimate is made; (ii) the labor and material standards and construction means, methods and techniques prevailing in the industry for projects similar to the Project; and (iii) the level of labor and material costs generally prevailing in the locality of the Project at the time the allowance estimate is made, and allowances shall include the CM/GC’s Fee; 6.5.13. Equipment Rental Rate Schedule; 6.5.14. General Conditions of the Contract with Safety Addendum; 6.5.15. Schedule of Values; 6.5.16. Boulder Valley School District Asbestos Management Plan Contractor Responsibility form; 6.5.17. List of all salaried staff to be assigned and charged to the Cost of the Work as established in the Agreement; 6.5.18. If applicable, a state of Additional Services; 6.5.19. A time limit for acceptance of the GMP Proposal; 6.5.20. A high level Budget Summary; 6.5.21. Approved Labor Burden Rates; 6.5.22. A list of the clarifications and qualifications;

10

6.5.23. A detailed critical path Project Schedule including the dates of substantial completion and final completion; 6.5.24. CM/GC provided equipment along with billable rates; and 6.5.25. All Owner Accepted Alternates. 6.6. Limitation: The GMP shall not exceed the Project Construction Budget with the exception of Ownerapproved changes in the Work. In fixing a GMP, Contractor shall use Value Engineering to identify cost effective changes in the Owner’s specifications that will reduce the GMP without impairing essential functions or characteristics, rebid certain trades, or work with the Architect to bring the Project within the Project Construction Budget. The CM/GC shall not receive any profit or additional fee for work performed to propose a GMP that is within the Project Construction Budget, subject to Owner-approved changes in the Work. ARTICLE 7 Construction Manager/General Contractor’s Fee 7.1.

Determination: In consideration of the performance of this Agreement, the Owner agrees to pay the CM/GC in current funds as compensation for his services a CM/GC’s Fee as set forth in Section 7.1.1 and, if applicable, in Section 7.1.2. 7.1.1. Design Phase Fee - For the performance of the Design Phase services, as defined in Section 2.1, a fee of seventeen thousand five hundred dollars ($17,500.00), which shall be paid monthly, in equal proportions, based on the scheduled Design Phase time. 7.1.2. Construction Phase Fee – After Owner’s approval and acceptance of the Guaranteed Maximum Price in accordance with Article 6, CM/GC shall be paid for Work or services performed during the Construction Phase, as defined in Section 2.3, a fee of four and seven tenths percent (4.70%) of the Cost of the Work. The Construction Phase Fee shall be due and payable in proportion to the ratio that the monthly payment for the Cost of the Work bears to the total Cost of the Work, subject to retainage as provided in the Contract Documents. Any balance of this fee shall be paid at the time of final payment. 7.1.3. Not Included in Fee. Contractor’s Fee shall not be calculated on the costs associated with insurance premiums, bonds, Subcontractor default insurance, if any, or any lump sum design or preconstruction services fee paid by Contractor. 7.2. Adjustments: Adjustments in Fee shall be made as follows: 7.2.1. Change Orders - For changes in the Work as provided for in Article 9, the CM/GC’s Fee shall not be adjusted unless the change involves a substantial change in the scope of the Work and unless the total accumulated cost of Change Orders exceeds three percent (3%) of the GMP. If changes involve a substantial scope of Work change and the total accumulated cost of Change Orders exceeds three percent (3%) of the GMP, a fee of three percent (3%) of the cost of the change shall be added to the Fee. A “substantial change in the scope of the Work” for purposes of this paragraph is defined as follows: 7.2.1.1. Change Orders involving the purchase of new or additional products of a type and nature not previously specified or contemplated for incorporation into the Work. 7.2.1.2. Change Orders involving the procurement of additional subcontractors, not previously contemplated by the Contract Documents. 7.2.1.3. Changes involving Work in different buildings or at different sites other than as specified in the Contract Documents. 7.2.2. Delays - For delays in the Work, other than for weather, in excess of seven (7) calendar days and which are not the responsibility of the CM/GC, there may be an equitable adjustment in the Fee to compensate the CM/GC for verified and documented increased expenses; provided, however, that CM/GC demonstrates to Owner that the delay in the performance of the portion of the Work had an impact on the Project schedule’s critical path.

11

7.2.3.

Additional Services - Additional services, as described in Section 2.4 shall be computed as follows: Labor: *Direct Personnel Expense (base wage) times 1.65. Expenses: Actual cost. 7.2.4 Adjustments to General Conditions Costs. Adjustments, if any, to General Conditions Costs in a Change Order shall be subject to the limitations set forth in Section 8.2.1.23. 7.3. Items Included in Fee: Included in the CM/GC’s Fee for the Construction Phase are the following: 7.3.1. Profit - Before tax profit. 7.3.2. Overhead - Off-site costs for general management of the Project including: 7.3.2.1. Salaries or other compensation of the CM/GC’s employees at the principal office and branch offices to provide support in scheduling the Work, cost estimating, cost accounting, processing payment requests, processing Change Orders, processing shop drawings/samples, etc. 7.3.2.2. General operating expenses of the CM/GC’s principal and branch offices other than the field office. 7.3.2.3. Any part of the CM/GC’s capital expenses, including interest on the CM/GC’s capital employed for the Work. 7.3.2.4. Costs due to any negligence, or the reckless or intentional act or omission of the CM/GC, any subcontractor, anyone directly or indirectly employed by any of them, or for whose acts any of them may be liable, including, but not limited to, the correction of defective or nonconforming Work, disposal of materials and equipment wrongly supplied, or making good any damage to property. 7.3.2.5. Overhead or general expenses of any kind, except as may be expressly included in Article 8. 7.3.2.6. Costs in excess of the GMP, if any, as set forth in Article 6 and adjusted pursuant to Article 9. 7.3.3. Discretionary Compensation – Bonuses and discretionary compensation paid by Contractor to its personnel. 7.3.4. Risks – Costs arising from unforeseen difficulties that may be encountered during the prosecution of the Work until the final acceptance by the Owner, including all risks of every description connected with the prosecution of the Work and loss or damage arising from the nature of the Work or from the action of the elements. ARTICLE 8 Cost of the Work 8.1.

Definition: The term Cost of the Work shall mean costs necessarily incurred in the proper performance of the Work during either the Design or Construction Phase, and paid by the CM/GC. Such costs shall be at the lowest responsible competitive rates not higher than the standard paid in the locality of the Work except with prior consent of the Owner, and shall include the items set forth below in this Article. The Owner agrees to pay the CM/GC for the Cost of the Work as defined in this Article 8. Such payment shall be in addition to the CM/GC’s Fee stipulated in Article 7. 8.2. Cost Items Included: On-site costs of the Work including General Conditions and the aggregate cost of subcontracts. 8.2.1. General Condition Costs - Those costs for Work outlined in the General Conditions of the Contract that are the responsibility of the CM/GC unless specific items of Work are included in subcontract work. 8.2.1.1. Wages paid for labor in the direct employ of the CM/GC in the performance of the Work as set forth in the GMP Proposal, except that wages paid for labor shall not include Contractor’s Fee, vehicle allowance, cell phones or administrative mark-ups directly within wages, salaries or hourly billing rates. The names, positions, and estimated costs of the individuals for the duration of the Work that are anticipated to be assigned to this Project shall also be specified in the GMP Proposal. 8.2.1.2. Cost of ordinary employee benefits and taxes, such as pension contributions, hospitalization, vacations, medical insurance, assessments, or taxes for such items as unemployment compensation and Social Security, insofar as such cost is based on wages, salaries, or other remuneration paid to employees of the CM/GC and included in the Cost of the Work.

12

8.2.1.3. The proportion of reasonable transportation, traveling, and hotel expenses of the CM/GC or of his officers or employees incurred in discharge of duties connected with the Work, when the necessity for such expenditures is approved in advance by the Owner. 8.2.1.4. Cost of all materials, supplies, and equipment incorporated in the Work, including costs of transportation thereof. 8.2.1.5. Cost, including transportation and maintenance, of all materials, supplies, equipment, and hand tools not owned by the workmen employed by the CM/GC, which are employed or consumed in the performance of the Work and cost less salvage value on such items used but not consumed which remain the property of the CM/GC. 8.2.1.6. Rental charges of all necessary construction machinery and equipment, exclusive of hand tools and other items customarily owned by CM/GC or workers, used at the site of the Work, whether rented from the CM/GC or other, including installation, repairs and replacements, dismantling, removal, costs of lubrication, transportation and delivery costs thereof, at rental charges consistent with those prevailing in the area. All equipment which the CM/GC intends to rent to the Owner and the rates therefor must be approved by the Owner in writing prior to use. 8.2.1.7. Intentionally deleted. 8.2.1.8. Unavoidable sales taxes, if approved in writing in advance by the Owner. 8.2.1.9. Permit fees, licenses, tests, and royalties. 8.2.1.10. Minor expenses such as long distance telephone calls, telephone service at the site, expressage, and similar petty cash items in connection with the Work. 8.2.1.11. Cost of removal of all debris, snow removal, interim and final cleaning. 8.2.1.12. Costs incurred due to an emergency affecting the safety of persons or property, to the extent not compensated by insurance or otherwise, and not attributable to the fault of the CM/GC or his subcontractor. 8.2.1.13. Cost of site security during construction, if requested by the Owner, and the cost of site safety measures, such as fences, signs, and barricades. 8.2.1.14. Cost of computer services as required at the field office. 8.2.1.15. Cost of construction support activities such as Work items included in the General Conditions of the Contract and in the specifications unless they are provided by subcontractors. 8.2.1.16. The cost of adequate, weatherproofed, heated, and well-lighted office space with telephone service at the site of the Work for the use of the CM/GC and the Architect and Owner representatives. 8.2.1.17. The cost of providing and maintaining neat, sanitary, and adequate temporary toilet facilities for all personnel at the construction site. 8.2.1.18. The cost of providing suitable temporary facilities and quarters for workmen when the necessity for such expenditures is approved in advance by the Owner, and of maintaining on premises water-tight storage sheds and tool houses for storage of building materials and tools. The Owner may use the storage sheds and tool houses for the reasonable storage of Owner-provided materials and equipment for the Project at no additional cost. 8.2.1.19. The cost of providing all temporary facilities required to supply all the power, light, water, and heat needed for the proper execution and completion of the Work. Unless provided by subcontractors, the cost of all power, light, water, and heat for the duration of the Work. 8.2.1.20. The cost of providing temporary weather protection and temporary heating as required for the expeditious prosecution of the Work. 8.2.1.21. Other costs incurred in the performance of the Work if and to the extent approved in advance in writing by the Owner. 8.2.1.22. All costs directly incurred in the performance of the Work and not included in the CM/GC Fee as defined in Article 7. 8.2.1.23. General Conditions Costs Limitations. General conditions costs shall be compensated at their direct cost based on documentation submitted by CM/GC substantiating such amounts claimed. The general conditions costs submitted in Contractor’s proposal are considered a “Not-to-Exceed” value and shall

13

be finalized as such in the GMP for each Project. Changes to the general conditions costs must be authorized by Change Order executed by the Owner and issued in accordance with the Contract Documents. Final general conditions/general requirements costs for a Project cannot be transferred to any other Project. 8.2.2. Subcontracts - The cost of Work performed by subcontractors. 8.2.3. Estimates - The CM/GC shall include a detailed and itemized estimate of General Condition costs as a part of each estimate for the Cost of the Work. After the Contract Documents have been completed and before Work is released for bidding, the CM/GC shall prepare an estimate of the Cost of the Work that provides a subtotal of costs for each subcontract package and includes the costs for General Conditions. 8.2.4. Contingency –The CM/GC shall include in the GMP proposal its contingency to cover those costs considered reimbursable as the Cost of the Work but not included in a Change Order. Cost overruns in excess of the amount of the CM/GC Contingency will be borne by the CM/GC, unless the GMP is adjusted pursuant to the terms of the Agreement. CM/GC’s Contingency shall not exceed three percent (3%) of the Guaranteed Maximum Price. 8.2.4.1. The CM/GC shall advise the Architect and the Owner in writing prior to applying a part of the CM/GC Contingency to an item within the Cost of Work. Owner shall issue written approval to CM/GC for application of the amount from the CM/GC Contingency. The CM/GC shall fully document the change on its copy of the Construction Documents that will become part of the record documents. 8.2.4.2. The Owner shall not unreasonably withhold approval of a zero dollar Change Order to utilize the CM/GC’s Contingency so long as (a) the contingency amount accessed does not cause the Guaranteed Maximum Price to be exceeded (b) the CM/GC utilizes the CM/GC’s Contingency for items required for the Project that are not otherwise recoverable as Costs of the Work under the Contract Documents, and (c) the CM/GC’s Contingency is used for any items outlined in clauses 8.2.4.2.1 through 8.2.4.2.3 below: 8.2.4.2.1. Scope of the Work that is unclear, incomplete or conflicting on the Contract Documents but is Work consistent with the Contract Documents and reasonably inferable as being necessary to produce the intended results for a complete Project. 8.2.4.2.2. Additional resources necessary to recover lost time. If overtime is required to maintain the schedule, the CM/GC shall obtain the Owner’s prior written approval before moving forward with such overtime. 8.2.4.2.3. Delays caused by market, labor, material or transportation conditions, labor disputes, abnormal weather or other causes which are costs of the Work but do not justify an increase in the GMP. 8.2.4.3. CM/GC’s Contingency is not available for use by the CM/GC for mistakes that result from Self-Perform Work secured through competitive bidding, mistakes of subcontractors or material suppliers, or any warranty work. The CM/GC’s Contingency is not available for use by the Owner for allowance overruns, changes in the Scope of Work, differing or changed site conditions. 8.2.4.4. The CM/GC shall maintain a complete CM/GC Contingency log acceptance detailing the expenditure of funds from the CM/GC Contingency. Upon final acceptance of Project by Owner, any amounts remaining in the CM/GC Contingency shall be deducted from final payment to, or any monies due, CM/GC. The CM/GC shall report and reconcile the CM/GC’s Contingency to the Owner on a monthly basis. 8.3. Additional Costs: 8.3.1. Cost of the premiums for all bonds and insurance which are required by the Contract Documents. 8.3.2. Payments to the Architect and CM/GC’s Consultants. 8.4. Allowance Log: The CM/GC shall separately track, on no less than a monthly basis, all materials and equipment provided under allowances including, but not limited to, (i) a description of the allowance; (ii) amounts actually spent for each allowance; and (iii) variances between allowance amounts in the Cost of the Work and amounts actually spent.

14

ARTICLE 9 Discounts All discounts for prompt payment shall accrue to the Owner to the extent the Costs of the Work are paid directly by the Owner or from a fund made available by the Owner to the CM/GC for such payments. To the extent the Costs of the Work are paid with funds of the CM/GC, all cash discounts shall accrue to the CM/GC; provided, however, that all costs claimed pursuant to Article 8, billed to the Owner, reflect such discounts. All trade discounts, rebates, and refunds, and all returns from sale of surplus materials and equipment, shall accrue to the Owner, and the CM/GC shall make provisions so that they can be secured. ARTICLE 10 Miscellaneous Provisions 10.1.

10.2.

10.3. 10.4. 10.5.

10.6.

10.7.

10.8.

Assignment: Neither party to this Agreement shall assign its interests herein in whole or in part without the written consent of the other; nor shall the CM/GC assign any moneys due or to become due to him hereunder, without the previous written consent of the Owner Independent Contractor: The CM/GC understands and acknowledges that an employee-employer relationship does not exist between the CM/GC and the Owner. The CM/GC shall perform all Work, using independent judgment and expertise, as an independent CM/GC and not as an employee of the Owner. Neither the CM/GC nor any agent, employee or subcontractor of the CM/GC shall be an agent or employee of the Owner nor shall any of them have any authority, express or implied, to bind the Owner to any agreement or incur any liability or obligation attributable to the Owner. The CM/GC acknowledges that it is not entitled to workers’ compensation or other benefits from the Owner and that the CM/GC is obligated to pay federal and state income tax on any moneys earned from the Owner pursuant to this Construction Agreement. Binding Effect: This Agreement shall be binding upon the heirs, personal representatives, successors, and assigns of the respective parties. Controlling Law: This Agreement is being executed and is to be performed in the State of Colorado, and shall be enforced and construed according to the laws of the State of Colorado. Waiver: No waiver of any breach of any one of the agreements, terms, conditions, or covenants of this Agreement by a party shall be deemed or imply or constitute a waiver of any other agreement, term, condition, or covenant of this Agreement. The failure of a party to insist on strict performance of any agreement, term, condition, or covenant, herein set forth, shall not constitute or be construed as a waiver of such party’s rights thereafter to enforce any other default; neither shall such failure to insist upon strict performance be deemed sufficient grounds to enable the other party to forego or subvert or otherwise disregard any other agreement, term, condition, or covenant of this Agreement. Severability: If any provisions of this Agreement are finally determined by a court of competent jurisdiction to be in violation of any statute or rule of law, then such provisions shall not apply in such instances, but the remaining provisions shall be given effect in accordance with their terms. Notices: Any notices required or permitted under this Agreement shall be deemed given when personally delivered or when deposited in the United States certified mail, postage prepaid and addressed to Owner: Attention: Chief Operations Officer, 6500 East Arapahoe Avenue, Boulder, Colorado 80301, or to the CM/GC at the address set forth below. Counterparts: This Agreement may be executed in several counterparts. Each counterpart shall be deemed an original but all counterparts together shall constitute one and the same instrument. For purposes of executing this Agreement, facsimile or scanned signatures shall be as valid as the original.

15

Kris D Stoppenhagen

Kris D Stoppenhagen (Dec 12, 2025 07:56:28 MST)

Kathleen Sullivan (Dec 11, 2025 16:42:00 MST)

EXHIBIT A The following 29 pages are the RFP and Addendums

17

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR SERVICES RFP 26-08 CM/GC Project Scope #3 - Heatherwood ES and Eisenhower ES August 28, 2025 I. Introduction Boulder Valley School District (District) seeks proposals from prequalified construction managers / general contractors (CMGCs) for CMGC services for the project identified in Attachment A (Project) to this Request for Proposal (RFP). Participation in this RFP shall be by District invitation only. This RFP is to award the two (2) projects to one (1) CMGC (see Attachment A) Please note: Each project will require a separate agreement and costs, budgeting, accounting, etc. must be tracked independently for each project. II. Acceptance of Terms and Conditions, including form CMGC Agreement and General Conditions The District is issuing this RFP to CMGCs who were prequalified in response to the District’s Request for Qualifications No. 23-23 Construction Manager / General Contractor (CMGC Services RFQ). By submitting a proposal in response to this RFP, CMGCs acknowledge and accept that they are still bound by the terms and conditions of the CMGC Services RFQ (except as modified by this RFP) and their statement of qualifications (except as modified in response to this RFP). In order to adhere to the estimated timelines set forth herein, and notwithstanding anything to the contrary in the CMGC Services RFQ and/or the CMGC’s statement of qualifications, the District will not accept modifications to its form CMGC Agreement or the accompanying General Conditions. By submitting a proposal in response to this RFP, CMGC agrees that, if it is selected for an award of contract, it will sign the District’s form CMGC Agreement. The District may reject proposals that do not comply with this requirement. If the successful CMGC and the District are not able to enter into the form CMGC Agreement, then the District may cancel the award and award the contract to another CMGC or exercise any of the rights available to it under this RFP. III. Project Description and Estimated Delivery Schedule A description of the Project, including the school, address, architect, construction budget, and other additional information, is set forth in Attachment A. The successful CMGC shall perform those items set forth in the CMGC Proposal Form (see Attachments B1 and B2) and CMGC Matrix (see Attachments C1 and C2). Using proceeds from the District Bond Program, the District will implement the Project in accordance with the District Educational Facilities Master Plan (Master Plan), the Requirement List Report By Priority created by VFA, Inc. (see Attachments D & E), and the Asbestos Hazard Emergency Response Act (AHERA) (will be sent with the Addendum) as applicable.

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

The RFP timeline and estimated delivery schedule for the Project is as follows: Date A) RFP Timeline RFP Issue Date August 28, 2025 A pre-proposal submission conference / Walk through / September 8, 2025 st Etc. will be held at 1 Location: Heatherwood ES (7750 2:30 PM MST – 1st Location Concord Drive, Boulder, CO 80301). 2nd Location: 3:15 PM MST – 2nd Location Eisenhower ES (1220 Eisenhower Drive, Boulder, CO 80303). Attendance at both locations is Mandatory. If you do not attend both locations your proposal will not be accepted. RFP Inquiries Due RFP Addendum Sent RFP Submission Deadline RFP Evaluation / Award (the team may want clarifying information during this review and may contact you at this time) RFP Finalists Interviews B) Project Milestones (Heatherwood ES) CMGC Contract Award Post-Award Meetings with Project Manager Design Advisory Team Meetings

September 12, 2025 @ 10:00 AM MST September 18, 2025 by 3:00 PM MST September 25, 2025 @ 10:00 AM MST October 8, 2025 @12:30 PM MST

TBD

October 2025 October 2025 December 2025 – April 2026 (estimated)

Schematic Design Complete Design Development Complete Design Advisory Team final meeting Construction Documents Complete GMP Amendment to District Board of Education (A complete and signed GMP Amendment is needed as least 10 business days prior to this date) Construction Commences Substantial Completion – Temporary Certificate of Occupancy Construction Final Completion

2

February 13, 2026 March 16, 2026 August/September 2026 September 14, 2026 October 2026

Spring 2027 August 1. 2027 September 2027

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

C) Project Milestones (Eisenhower ES) CMGC Contract Award Post-Award Meetings with Project Manager Design Advisory Team Meetings

October 2025 October 2025 December 2025 – April 2026 (estimated)

Schematic Design Complete Design Development Complete Design Advisory Team final meeting Construction Documents Complete GMP Amendment to District Board of Education (A complete and signed GMP Amendment is needed as least 10 business days prior to this date) Construction Commences Substantial Completion – Temporary Certificate of Occupancy Construction Final Completion

3

February 13, 2026 March 16, 2026 August/September 2026 September 14, 2026 October 2026

Spring 2027 August 1, 2027 September 2027

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

Scheduling Note: This schedule is the District’s best available estimation as of the date of this RFP. It is the District’s desire to accelerate design and construction schedules where reasonably possible, without adverse cost or safety impacts. Scheduling is subject to alternative proposals submitted by CMGC respondent and to joint decisions on phasing and/or accelerating the work. BVSD will consider alternate schedules for specific scopes of work based on the location of these schools. Contractors are encouraged to propose schedule options that support achieving substantial completion (school occupancy) for each project by August 1, 2027. For example, identify any scopes that could be completed ahead of summer 2027. The Project design will be guided by a site-based Design Advisory Team (DAT) that will meet with the selected CMGC, architectural firm (if applicable) and Bond project manager approximately bi-weekly through design development, except over the summer. Firms are requested to familiarize themselves with the revised version of the Bond Program’s Design Advisory Team Guidelines which can be found at: https://bond.bvsd.org/fs/resourcemanager/view/925e7d4a-74a9-43a6-bc90-04c82475c052. IV. Proposal Requirements A. Proposal Format Proposals shall be in the following format and shall adhere to the page limitations, if any: 1) General Information a) Front/Cover Page (1-3 pages) which shall include the following information: i) Firm’s name ii) Firm’s address iii) Date of the submittal iv) The name of the person(s) authorized to make representation for the firm and that person’s mailing address, email address, and telephone number v) Name and phone number of person(s) available to answer evaluation team questions (see Section III A) b) Table of Contents (1 page, optional). c) Completed and fully executed Declaration and Signature Page, see Attachment G (1 page) d) Cover Letter (1 page, optional) e) Material Changes to Prequalification in RFQ 23-23 (pages as needed): i) If material changes have occurred with respect to the information set forth in the Prequalification Statement, please identify all such changes. If there are none, please state “No material Changes to Prequalification” 2) Describe your company’s and team’s experience and approach with this type of project (1-8 pages). a) Describe your understanding of the work required for this project and how you will approach the schedule.

4

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

i) Schedule Development - Using the milestones Information from the RFP, project Information from Attachment A, and other information provided to as part of this RFP, describe your approach to meet the schedule and project specific required services ii) Provide a conceptual schedule and phasing plan for each project/school. b) Describe your methodology for the following: i) How to streamline communication to insure the education environment is not impacted ii) Establishing a Guaranteed Maximum Price Special note: Since the RFP is for two projects/schools awarded to the same CMGC please provide clarification in your response outlining how you will fulfill this requirement. 3) Composition of Proposed Team (1-4 pages plus resumes) for each school/project a) Identify the firm’s specific personnel proposed for the project and their participation through the project from pre-construction through completion. i) Indicate the title and assignment, role or area of responsibility of each individual, by name. ii) Identify the person(s) who would attend the Project’s DAT meetings for your firm. iii) Team members resumes (pages as needed but maximum of 1 page per individual) iv) Describe how the team member’s qualifications align with the anticipated services required for delivering the projects successfully. v) Three references per individual for similar type of projects b) The proposed team submitted with this proposal will remain intact for the duration of the project. Please state in your response “Unless a member of the proposed team submitted in this RFP leaves the employment of our company or a change in the team is approved by the BVSD Project Manager and BVSD Director of Bond Planning & Engineering in writing the team submitted remain intact for the duration of the project.” Special note: Since the RFP is for two projects/schools awarded to the same CMGC please provide clarification in your response on whether you will be proposing two teams (one for each school), a single team, or some combination. 4) A Please provide a written acknowledgement that you have reviewed Attachment I “Pay Application Requirement Checklist” and that you will: a) Include all applicable information and backup documentation listed in the Attachment I checklist and as required in the 2022 Bond General Contract Conditions when submitting Pay Applications. b) Submit in a timely manner and Invoices and / or costs submitted on pay applications that are greater than 90 days old may be deducted from payments and subject to independent audit at CM/GC expense.

5

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

5) Fee Proposal (Attachments B1, B2 & C1, C2) submitted on the excel files provided. Vendors shall not reference their fee proposal in their response: a) The CMGC Agreement will be a bonded contract with a Guaranteed Maximum Price to encompass all construction work for the Project. b) Vendor shall provide a Fee Proposal for the Project for which the vendor seeks award on the excel files provided. Submit a fully executed copy of Attachment B1, B2 (CMGC Proposal Form) and breakdown of General Condition costs - Attachment C1, C2 (CMGC Matrix). The Fee Proposal shall be a legally binding offer to perform the CMGC services for the Project for a period of no less than six (6) months from the date of the submission deadline. The District may reject Fee Proposals that exceed available funds, but reserves the right to negotiate a reasonable fee for services within the available funds. The District reserves the right to negotiate the final price for services. c) The Fee Proposal shall include all services requested in this RFP. The District may reject as nonresponsive Fee Proposals that exclude services required in the RFP and its attachments. Fee Proposals shall include all fees, costs and expenses as outlined in the CM/GC Proposal Form set forth in Attachment B1, B2 and CM/GC Matrix set forth in Attachment C1, C2. Estimated proposal prices are not acceptable. B. Submission Method and Deadline 1) Vendors shall submit proposals electronically to Derrell.Walton@bvsd.org. Proposals shall not exceed 25MB in size. To be considered, proposals must be received by the District on or before the time and date provided in Section III A) RFP Timeline. It is the CMGC’s responsibility to ensure that the proposal is received by the District on or before the submission deadline. The District will not consider proposals received after the submission deadline, regardless of the reason. 2) As email delivery issues can occur from time to time, the District strongly recommends that CMGCs attach a read receipt to their submission or send a separate email to request District confirmation of receipt. C. RFP Inquiries 1) CMGCs may submit written inquiries concerning this RFP via email to Derrell.Walton@bvsd.org. CMGCs shall clearly identify written inquiries as “BVSD RFP 26-08” in the subject of the email. To ensure a timely response, written inquiries must be received by the District on or before the time and date provided in Section III A) RFP Timeline. The District will not consider written inquiries received after the deadline, regardless of the reason. 2) Except as set forth above, CMGCs shall not contact District staff directly and may not rely on any verbal statements by District staff that alter the terms and conditions of this RFP. This RFP may be modified only in writing issued by the District’s Director of Procurement or their designee. D. RFP Mandatory Pre-Proposal Project Walk Through. A Mandatory pre-proposal submission conference will be held at the time, date and location provided in Section III A) RFP Timeline.

6

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

E. Evaluation Team Phone Calls (IF NEEDED) The Evaluation team may make calls to clarify and / or obtain additional information at the time and date provided in Section III A) RFP Timeline. F.

Finalist Interviews (IF HELD). If the district feels that it will be beneficial to hold interviews, the district will invite contractors to the BVSD bond office at the time and date provided in Section III A) RFP Timeline. We generally request the staff who will be assigned to the project attend if available (i.e. pre-construction manager, project manager, superintendent, project engineer)

V. Evaluation Process The District will use the following criteria (in no particular order) to evaluate proposals: A. Adherence to RFP instructions B. Experience of the company and the team proposed, including work on similar PK-12 projects C. Ability to meet the schedule and to provide the project specific required services D. Fee proposed VI. Selection of Proposal and Award of Contract A District evaluator or evaluation team will review proposals, conduct interviews (if necessary) and make a recommendation for an award of contract. The contract for the Project will be awarded to the CMGC whose proposal provides the greatest benefit to the District, as determined by the District in its sole discretion. An award of contract under this RFP is conditioned on approval by the Board of Education and/or District staff in accordance with District policy. VII. General Information A. Confidential/Proprietary Materials. As a reminder, proposals shall become the exclusive property of the District upon District receipt and shall be subject to public inspection and copying in accordance with the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. In issuing this RFP, the District is not seeking, and strongly discourages CMGCs from submitting, trade secrets or confidential commercial or financial information. If a CMGC nonetheless elects to submit trade secrets or confidential commercial or financial information, then such information shall be submitted as a separate electronic file that is clearly labeled “Confidential” or “Proprietary” (as applicable). CMGCs shall not label their proposals as “Confidential” or “Proprietary.” The District shall not be responsible for disclosing proposals or materials that do not comply with this provision in response to an open records request, even if such proposals are labeled “Confidential” or “Proprietary.” If a CMGC disputes the disclosure of its proposal or materials in response to an open records request, then CMGC, at its sole cost and expense, shall be solely responsible for defending against such disclosure. Neither a response in its entirety, nor a Fee Proposal will be considered confidential and proprietary. Any information that will be included in a resulting contract cannot be considered confidential. B. Reservation of Rights. The District reserves the right to:

7

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

1. Cancel, reissue, amend, close, or reopen this RFP at any time, without cause and without liability or penalty; 2. Request clarification or additional information with respect to one or more proposals; 3. Interview one or more CMGCs with respect to their proposals; 4. Accept or reject all or any part of a CMGC’s proposal; 5. Negotiate changes in the scope of services; 6. Waive formalities or requirements of the RFP with respect to one or more proposals; 7. Engage other vendors to perform additional services for the Project; 8. Schedule and conduct one or more site visits and/or Project meetings; 9. Award the contract, in whole or in part, to the CMGC or CMGCs whose proposal represents the best value to the District, in the District’s sole discretion. By submitting a proposal, CMGCs acknowledge and agree that the proposal with the lowest price will not necessarily be the proposal that represents the best value to the District because a number of factors other than price are relevant in determining the best value, including, without limitation, the factors set forth in Section IV of this RFP. C. News Releases. News releases pertaining to this RFP or any resulting contract shall NOT be made without prior written approval by the District. D. Incurring Costs. The District is not liable for any cost incurred by a firm prior to issuance of a legally executed contract, purchase order, or other authorized acquisition document. No property interest, of any nature, shall occur until a contract is awarded and signed by all concerned parties. E. Certification of Independent Pricing Determination. Except as otherwise disclosed with particularity, through its submission of a proposal, CMGC certifies that the prices and other terms in the proposal have been arrived at independently without any consultation, communication, agreement with, or knowledge of the contents of the proposals of a competing CMGC. For purposes of this paragraph, "consultation, communication, agreement with, or knowledge" does not include knowledge of prices or terms gained through availability of established price lists or catalogues made available to the public by the competing CMGC. No attempt has been made or will be made by the CMGC to induce any other CMGC to submit or not to submit a proposal for the purpose of restricting competition. F. Asbestos Management Plan. The successful CMGC shall be required to sign the Asbestos Management Plan Contractor Responsibility form set forth in Attachment F as a condition of an award of contract.

8

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENT A Project Information and Owner Requirements Project Name Heatherwood Elementary School 7750 Concord Drive, Boulder, CO 80301 Eisenhower Elementary School 1220 Eisenhower Drive, Boulder, CO 80303

Architect TBD The estimated design completion dates can be found in the Milestones section of the RFP. Project Schedule Ɣ Design (DAT) meetings and the estimated dates can be found in the RFP Milestones. Ɣ

We anticipate that the construction and renovation related to Heatherwood ES will be completed by August 1, 2027. Estimated construction dates, if available can be found in the RFP Milestones.

Ɣ

We anticipate that the construction and renovation related to Eisenhower ES will be completed by August 1, 2027. Estimated construction dates, if available can be found in the RFP Milestones.

Ɣ

Construction duration is estimated to be: o Heatherwood Elementary School - 6 months o Eisenhower Elementary School - 6 months (please use this for responding to Attachment B1, B2 and C1, C2).

*** Note: Staffing levels and project duration are based on the assumption that work will begin around spring break and continue outside of school hours until completion. Full-time staffing for the entire duration is not anticipated. ***

Project Construction Budget School Name - $2,558,858.00 School Name - $2,266,086.00

Liquidated Damages Liquidated damages for this project will be set at $1000/day.

9

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

Additional Information Ɣ Please see Critical Needs Plan information at: https://resources.finalsite.net/images/v1665782745/bvsdorg/zuqqioc7dydqf43sk9uv/2022BVSDFacilitiesCritic alNeeds.pdf Ɣ

Billable rates are NOT allowed as part of contract

Ɣ

Design Phase fee will be a fixed amount for the contract and this project

Ɣ

This project qualifies under items 3 through 9 in “Green Building Guiding Principles” https://bond.bvsd.org/green-building

10

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENTS B1 & B2 CM/GC Proposal Form - See attached Excel spreadsheet. ATTACHMENTS C1 & C2 CM/GC Matrix - See attached Excel spreadsheet. No changes to the matrix are allowed.

11

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENTS D & E Requirement List Report by Priority created by VFA, Inc.

See separately attached PDF’s.

12

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENT F Boulder Valley School District Asbestos Management Plan Contractor Responsibility It is the expectation of the Boulder Valley School District that contractors adhere to all AHERA, EPA, and Colorado Department of Public Health and Environment regulations regarding asbestos treatment and management before and during any construction, renovation or maintenance project. To that end, contractors are expected to review the asbestos management plan before the work begins. Any activity that could potentially disturb asbestos containing building materials must be brought to the attention of BVSD Environmental Services Department prior to the start of work, and if the scope of work changes during the course of the project. Environmental Services will identify all areas of concern and facilitate any necessary abatement in order to help make all projects successful. Therefore, contractors and their subcontractors must provide this signature sheet prior to the start of work to ensure they are aware of BVSD expectations and understand their responsibility. I have read and understand the BVSD Asbestos Management Plan for the buildings in which I will be working. I agree not to disturb or damage any asbestos containing building materials (ACBM), which have been identified in the Asbestos Management Plan. In the event the scope of work changes during the course of the project, or our work causes us to encounter building materials that may be ACBM, we agree to notify BVSD Environmental Services immediately. If any identified ACBM is disturbed or damaged as a result of the work, the contractor and/or their subcontractor may be held financially responsible for all related remediation. Company Name: ______________________________________________ Authorized Representative: ______________________________________ Print

______________________________________

Signature ______________________________________ Date: ____________ Drafted and Required by: BOULDER VALLEY SCHOOL DISTRICT ENVIRONMENTAL SERVICES DEPARTMENT

13

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENT G NOTE: THIS PAGE MUST BE COMPLETED AND INCLUDED WITH THE SUBMISSION BOND CONSTRUCTION MANAGER / GENERAL CONTRACTOR SERVICES DECLARATION & SIGNATURE PAGE DECLARATION: I hereby certify that the information provided in this submission made to Boulder Valley School District is true and correct and I am duly authorized to submit this response. No Board of Education member, member of a District board or committee, employee of the District, or any such person’s spouse, child, parent, brother, sister, dependent, or person assuming a relationship being the substantial equivalent of the above, has a direct or indirect financial or personal interest in the proposing firm or this Request except as follows [or state: NONE]: ________________________________________________________________________________________________ ________________________________________________________________________________________________ __________. I hereby certify that the firm has reviewed this Request, the Design Advisory Team Guidelines, and the District’s standard CMGC Agreement with General Conditions and other attachments and accepts the terms and conditions thereof. ____________________________________________ (FIRM NAME)

_____________________________________________ (TYPED NAME OF AUTHORIZED AGENT)

____________________________________________ (STREET ADDRESS)

______________________________________________ (SIGNATURE OF AUTHORIZED AGENT)

____________________________________________ (CITY, STATE AND ZIP CODE)

______________________________________________ (TITLE)

____________________________________________ (TELEPHONE NUMBER)

______________________________________________ (DATE)

____________________________________________ (COMPANY FAX NUMBER)

______________________________________________ (FEDERAL EMPLOYEE IDENTIFICATION NUMBER)

____________________________________________ (EMAIL ADDRESS)

v.2 090618

14

Eisenhower Elementary - 2023 List of Asbestos Containing Material (ACM) Contractors: Before doing any work on this building review the Asbestos Management Plan and the sampling data. A Certified Inspector must perform additional sampling if they decide it is necessary to confirm whether a material is Asbestos Containing Material (ACM). Additional sampling is required if the inspector identifies an area of unique homogenous material that had been included in a larger assessment area in the Management Plan. A separate, signed, ‘Contractor Responsibility form’ is required for each school you work in.

Asbestos Building Material Remaining BE AWARE: There may be asbestos material in pipe chases, behind walls, above ceilings, and in tunnels or crawl spaces that is not accessible and/or has not been identified. ACM floor tile has been identified where found throughout the building. Some floor tile will have black mastic which may be ACM or non-ACM. Call Environmental Services for positive identification. Some material is identified as a ‘homogeneous material’ throughout one or more additions of the building. Further sampling may be required for a more specific area. During school hours call 720-561-5930. For after hours or emergency response call security at 720-561-5051. Vinyl Asbestos Floor Tile (VAT). 105, 120A, 122, 160, 161, 162, 162A, 163, 164, 178, 181, 182, 183, 184, 188A, 189, 190.

Cement Asbestos Panels (Transite) - Above windows or other structure, most are exterior walls. Abated 2018. End encapsulant (insulation) on pipe systems fittings and joints. Sampled in the 1971 original building. May be in other areas – samples as needed. Sink undercoating – in the kitchen area. Black/silver coating on bottom of sinks. Exterior Caulk – brown. Sampled in the 1971 building. Sample other areas as needed.

Trace Level of Asbestos

The following materials are not regulated by AHERA but work done on this material is subject to OSHA/Worker Protection rules. Exterior drywall used on soffits or portico. Composite Drywall (layered construction of joint compound, tape, and drywall) throughout the 1971 original building. There are some walls that are not trace levels of asbestos and these are shown on the floorplans. Heavy spray-on texture on walls – room 145.

Material sampled and found non-detect (ND) for asbestos. Additional sampling may be required prior to any renovation. See Sampling Data section, sample description log, and photos for details of material. Photos may be shown if necessary to clearly identify the material. Composite drywall – Roof AHU air intake rooms Ceiling tile – 2’x4’, all Block Sealer on cement building block (CMU) Fibrous wall insulation in Gym walls – room 159. Black Mastic Room 191 Tan and White Mastic Room 159 gym floor adhesive. Tan Resilient/Vinyl Gym Floor Room 159

6T)W

$SSUR[/LQ )HHW

NLWFKHQ

$OOH[WHULRUDUHDVRIWKH RULJLQDOEXLOGLQJ H[FHSWWKRVHDEDWHGLQ 

(QG(QFDSVXODQWRQ ILEHUJODVV76,

6LQN8QGHUFRDWLQJ EODFNVLOYHU

([WHULRUFDXONGDUN EURZQJUD\

&RQFUHWH%ORFN &08 VHDOHU











6T)W



RULJLQDOEXLOGLQJDQG DGGLWLRQ

7KURXJKRXWHQWLUHEXLOGLQJ



&RPSRVLWH'U\ZDOO

+HDY\6SUD\RQ7H[WXUH :DOOV

&RYH%DVH$GKHVLYHRQ DQGEURZQFRYHEDVH

&RYH%DVHJUD\1HZ PDWHULDOLQ

&RYHEDVH\HOORZWDQ









1)0 1)0

$SSUR[ /OLQ)W

1)0

)6

1)0

1)0

1)6

1)0

1)6

1)7

1)0

1)0

$SSUR[ /LQ)W

$SSUR[ /LQ)W

6T)W

RULJLQDOEXLOGLQJDQG $SSUR[ DGGLWLRQ 6T)W

2ULJLQDOEOGJH[WHULRU ([WHULRU&RPSRVLWHGU\ZDOORQ RIURRPV& VRIILWV '(*





8QGHWHUPLQHG

$OODUHDVRIWKH 2ULJLQDO&RQVWUXFWLRQ 3RWHQWLDOXQGLVFRYHUHG $&0SLSHVHDODQWPD\ UHPDLQ

7UDQVLWHSDQHODERYH ZLQGRZVDQGGRRUV



6T)W

6T)W

%HWZHHQ&5$DQGFRUU 

 [ 9LQ\O$VEHVWRVIORRUWLOH YDULRXVFRORUV  %ODFN0DVWLF

OXQFKURRP

6T)W

$ $ $ 

0DWHULDO'HVFULSWLRQ

+RPRJHQ HRXV $UHD

1'

$UFKLWHFW/HWWHUFRQILUPVQRDVEHVWRVPDWHULDO VSHFLILHGIRUERQGZRUN

$GKHVLYH75 3W&RXQW

(,( (,($&%$ (,( (,(

(,( (,($&%$

0DWHULDOUHPRYHGFRPSOHWHO\LQ

753W&RXQW 

1R'

((6':7

1R'

1R'

1R'

$VVXPHDOO'U\ZDOOV\VWHPVLQWKHVHURRPVDUH WUDFHOHYHO9DULRXVZDOOVKDYHEHHQUHSODFHGLQ DQGEXWWKHVSHFLILFGHWDLOVDUHQRW QRWHG6DPSOHDVUHTXLUHGWRFKHFNVSHFLILFZRUN DUHDV

1R'

1R'

1R'

75 &RPSRVLWH &KU\VRWLOH

1R'

1R'

1R'

%9 %9 %9 (,( ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': ((6&': (,(

1$

1R'

1R'

/RZ

/RZ

/RZ

/

0RG

/RZ

$LU 9DQGDO $FFHVV $FFHVV WR 6HUYLFH LVP (URVLRQ 3XEOLF 3HUVRQQHO

75&RPSRVLWH 

3 &KU\VRWLOH

3 &KU\VRWLOH

1$

1$

,PSDFW

((6(': 

(,(

((6(& 

3 &KU\VRWLOH

3 &KU\VRWLOH

((6'6 (,( (,( 6/17 6/17 6/17 6/17 6/17

(,(

3 &KU\VRWLOH

3 %ODFN0DVWLF &KU\VRWLOH )7 &KU\VRWLOH

(,( (,(

%9 %9 %9 (,6 ((6)70 ((6)70 ((6)70 ((6)70

:DWHU

/RZ

/RZ

/RZ





/RZ



$EDWHG

/RZ

$EDWHG

/RZ

$LU 9LEUDWLRQ (URVLRQ

/RFDWLRQRI 5HVXOWV $+(5$  'DPDJHG 7\SHRI'DPDJH6LJQLILFDQW 6 VDPSOH 3RVLWLYH 3 (VWLPDWHG ) IULDEOH 'DPDJH FDWHJRU\IRU FDOL]HG /  'DPDJHG ' 1R'DPDJH 1R'  ) QRQIULDEOH 6DPSOH1XPEHUV 7DNHQLQ [ GLVWDQFH $VVXPHG $  /RFDWLRQURRPVDUHDV 4XDQWLW\WRWDO IULDEOH$&0 6 VXUIDFLQJ DVWDWLVWLFDOO\UDQGRP 'LVWULEXWHG '  ^([LVWLQJRUQHZO\IULDEOH WKUXSHU DERYHIORRU 7UDFH 75 FRUULGRUVHWF  VTXDUHRU 7 7KHUPDO GLVWULEXWHGPDQQHU 1RW$SSOLFDEOH PDWHULDOV` 5HJXODWLRQ \ GLVWDQFH 1RQGHWHFW /RZ / OLQHDU)HHW 0 0LVF ,9) 1$ *(1(5$/127(6 EHORZFHLOLQJ 1'

(LVHQKRZHU(OHPHQWDU\6FKRRO$+(5$5HLQVSHFWLRQ

1HHGVWREHRQ GUDZLQJ

/LQHDUIHHWRIH[WHULRU&DXONDEDWHGDWURRPV%&* )&(%1HHGVWREHRQ GUDZLQJ

3LSHVHDODQW(QG&DSDEDWHGLQURRPV DQGLQ7KLVPDWHULDOPD\UHPDLQDERYHFHLOLQJVEHKLQG ZDOOVRULQSLSHFKDVHVRUSOHQXPV1HHGVWREHRQGUDZLQJ

5RRPVOLVWHGVWLOOUHPDLQ

$&0)ORRU7LOHDQGPDVWLFDEDWHG LQURRPV%



)LEURXV:DOOSDQHOVVRPH PRYDEOH



+ $SSUR[6T :DOOJOD]HGWLOH[VROLG $ )W FRORUV 



)LEURXV:DOO,QVXODWLRQ

&RQFUHWH%ORFN &08 6HDOHU





&RPSRVLWHGU\ZDOO



 [ &HLOLQJ7LOH9DULRXV SDWWHUQV

-RLQW&RPSRXQGRQGU\ZDOO





5RRIWRS$+8DLULQWDNH

&RYHEDVHEODFN



/LQ)W

$SSUR[ 6T)W

%&'( )$%& $SSUR[6T)W '() 



$OODUHDVRIEXLOGLQJ

1)0

1)7

)0

(,( (,( (,( (,(

(,(

(,(&7

(,( (,( (,( (,( (,( (,( ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((6(&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7 ((66&7

(,( (,(

1'

1'

1'

1'

1'

(,(  ,.( ((6 (,( (,(

$ $ 6T)W

1'

((6&': ((6&': ((6&':

1'

DQG DGGLWLRQV

(,( (,( (,(

1'

1)0

1)0

(,(

6T)W

$%&' () $SSUR[/LQ $$ )W %& 

0DWHULDO'HVFULSWLRQ

+RPRJHQ HRXV $UHD

,PSDFW

$LU 9DQGDO $FFHVV $FFHVV WR 6HUYLFH LVP (URVLRQ 3XEOLF 3HUVRQQHO

&HLOLQJ7LOHVZHUHVDPSOHGRUKDG$UFKLWHFWV/HWWHU FRQILUPLQJQRDVEHVWRVVSHFLILHGIRUQHZHU UHQRYDWLRQV

1HZPDWHULDODQG

7KHUHPD\EH&08ZLWKVHDOHUKLGGHQEHKLQGRWKHU PDWHULDOV6DPSOLQJLQFOXGHVWKDWVHFWLRQRIURRP WKDWZDVDGGHGRQLQ

$UFKLWHFWV/HWWHUFRQILUPLQJQRDVEHVWRVPDWHULDO ZHUHVSHFLILHGIRUDQGDGGLWLRQV

:DWHU

$LU 9LEUDWLRQ (URVLRQ

/RFDWLRQRI 5HVXOWV $+(5$  'DPDJHG 7\SHRI'DPDJH6LJQLILFDQW 6 VDPSOH 3RVLWLYH 3 (VWLPDWHG ) IULDEOH 'DPDJH FDWHJRU\IRU FDOL]HG /  'DPDJHG ' 1R'DPDJH 1R'  ) QRQIULDEOH 6DPSOH1XPEHUV 7DNHQLQ [ GLVWDQFH $VVXPHG $  /RFDWLRQURRPVDUHDV 4XDQWLW\WRWDO IULDEOH$&0 6 VXUIDFLQJ DVWDWLVWLFDOO\UDQGRP 'LVWULEXWHG '  ^([LVWLQJRUQHZO\IULDEOH WKUXSHU DERYHIORRU 7UDFH 75 FRUULGRUVHWF  VTXDUHRU 7 7KHUPDO GLVWULEXWHGPDQQHU 1RW$SSOLFDEOH PDWHULDOV` 5HJXODWLRQ \ GLVWDQFH 1RQGHWHFW /RZ / OLQHDU)HHW 0 0LVF ,9) 1$ *(1(5$/127(6 EHORZFHLOLQJ 1'

(LVHQKRZHU(OHPHQWDU\6FKRRO$+(5$5HLQVSHFWLRQ



1)0

6T)W

6T)W

$



 ($

   

$%& '()* $ $%&' ()* $%& '()* $SSUR[ % 6T)W $%  $$ %&') $$ % 

$ $

$% 

[UHGFHUDPLFWLOHDQG JURXW

[&HUDPLFWLOHEURZQ \HOORZPRWWOH&HU)7

6KHHW9LQ\OIORRULQJJ\P

6KHHWYLQ\OIORRULQJ

3RXUHGUHVLQHSR[\IORRU

&DUSHWDQGDGKHVLYH

 [ 9LQ\O)ORRU7LOH

[9LQ\O)ORRU7LOH \HOORZEURZQPRWWOH)7















 6T)W

6T)W

1)0

6T)W



'XFWVHDODQW



1)0

1)6

1)0

1)0

1)0

1)7

%

0DWHULDO'HVFULSWLRQ

+RPRJHQ HRXV $UHD

1'

,.( ((6)70  ((6)70

1)0

1'

1'

1'

1'

1'

(,( (,( (,( (,( (,(

(,( (,( (,( (,($3) (,($3) (,($3) (,(

(,($*)$ (,($*)$ ((65) (,( (,($9*) (,($9*) (,($9*)

(,(

(,(': (,(

,PSDFW

$LU 9DQGDO $FFHVV $FFHVV WR 6HUYLFH LVP (URVLRQ 3XEOLF 3HUVRQQHO

1HZPDWHULDO

6DPSOHGRU1HZPDWHULDO

1HZPDWHULDODQG

6DPSOHV(,($3)DQG(,($3) FRQWDLQHGWLOHDQGPDVWLFUHVLGXHIURPDGMRLQLQJ FXVWRGLDOFORVHWVZLWK$&0IORRUWLOHDQGPDVWLF 6RPHURRPVQHZLQ

1HZPDWHULDO

1HZPDWHULDO

$OOUHSODFHG

:DWHU

$LU 9LEUDWLRQ (URVLRQ

/RFDWLRQRI 5HVXOWV $+(5$  'DPDJHG 7\SHRI'DPDJH6LJQLILFDQW 6 VDPSOH 3RVLWLYH 3 (VWLPDWHG ) IULDEOH 'DPDJH FDWHJRU\IRU FDOL]HG /  'DPDJHG ' 1R'DPDJH 1R'  ) QRQIULDEOH 6DPSOH1XPEHUV 7DNHQLQ [ GLVWDQFH $VVXPHG $  /RFDWLRQURRPVDUHDV 4XDQWLW\WRWDO IULDEOH$&0 6 VXUIDFLQJ DVWDWLVWLFDOO\UDQGRP 'LVWULEXWHG '  ^([LVWLQJRUQHZO\IULDEOH WKUXSHU DERYHIORRU 7UDFH 75 FRUULGRUVHWF  VTXDUHRU 7 7KHUPDO GLVWULEXWHGPDQQHU 1RW$SSOLFDEOH PDWHULDOV` 5HJXODWLRQ \ GLVWDQFH 1RQGHWHFW /RZ / OLQHDU)HHW 0 0LVF ,9) 1$ *(1(5$/127(6 EHORZFHLOLQJ 1'

(LVHQKRZHU(OHPHQWDU\6FKRRO$+(5$5HLQVSHFWLRQ



+$



*$ 

%



 DGGLWLRQ  %

SRUWDEOHWDEOHV

 [ &HUDPLF)ORRUWLOH JUD\ZKLWHSDWWHUQ&HU)7

[&HUDPLF)ORRU7LOH EURZQPRWWOH&HU)7

[&HUDPLF)ORRU7LOH UXVWEURZQ&HU)7

6LQNXQGHUFRDWOLJKW JUD\ZKLWH

6LQNXQGHUFRDWEODFNSDG

9LEUDWLRQGDPSHU)OH[ERRW

&OLPELQJ:DOO %ULFNDQGPRUWDU 6WDJHFXUWDLQEODFN <HOORZIRUPLFDFRXQWHUWRS

%ODFNVFLHQFHURRPWDEOHWRS























 

0DWHULDO'HVFULSWLRQ

+RPRJHQ HRXV $UHD

/LQ)W

6T)W

6T)W

6T)W

6T)W

6T)W

1)0

1)0 1)0 )0 1)0

1)7

1)6

1)6

1)0

1)0

1)0

(,(

1'

1' 1' 1' 1'

1'

(,($9,% (,( (,( (,( (,( (,(

1'

1'

(,($68&%

(,( (,( (,(

(,(

,PSDFW

$LU 9DQGDO $FFHVV $FFHVV WR 6HUYLFH LVP (URVLRQ 3XEOLF 3HUVRQQHO

5HPRYHG

1HZPDWHULDO

1HZPDWHULDO

1HZPDWHULDO

:DWHU

$LU 9LEUDWLRQ (URVLRQ

/RFDWLRQRI 5HVXOWV $+(5$  'DPDJHG 7\SHRI'DPDJH6LJQLILFDQW 6 VDPSOH 3RVLWLYH 3 (VWLPDWHG ) IULDEOH 'DPDJH FDWHJRU\IRU FDOL]HG /  'DPDJHG ' 1R'DPDJH 1R'  ) QRQIULDEOH 6DPSOH1XPEHUV 7DNHQLQ [ GLVWDQFH $VVXPHG $  /RFDWLRQURRPVDUHDV 4XDQWLW\WRWDO IULDEOH$&0 6 VXUIDFLQJ DVWDWLVWLFDOO\UDQGRP 'LVWULEXWHG '  ^([LVWLQJRUQHZO\IULDEOH WKUXSHU DERYHIORRU 7UDFH 75 FRUULGRUVHWF  VTXDUHRU 7 7KHUPDO GLVWULEXWHGPDQQHU 1RW$SSOLFDEOH PDWHULDOV` 5HJXODWLRQ \ GLVWDQFH 1RQGHWHFW /RZ / OLQHDU)HHW 0 0LVF ,9) 1$ *(1(5$/127(6 EHORZFHLOLQJ 1'

(LVHQKRZHU(OHPHQWDU\6FKRRO$+(5$5HLQVSHFWLRQ



RFP# 26-08 Addendum #1 - Inquiries and Responses 9/18/25

Inquiry #1 Please release a copy of the pre-proposal sign-in sheet. Response #1 A copy of the pre-proposal sign-in sheet will be sent out with Addendum #1.

EXHIBIT B The following 38 pages are CMGC response to the RFP

4919-9821-7592, v. 1

18

a.) Front/Cover Page

Response to Proposal for Construction Manager/ General Contractor Services | RFP 26-08 | CMGC Project Scope #3

HEATHERWOOD ELEMENTARY SCHOOL AND EISENHOWER ELEMENTARY SCHOOL (i.) Firm’s Name Adolfson & Peterson Construction (ii.) Firm’s Address 797 Ventura Street, Aurora CO 80011 (iii.) Date of Submittal September 25, 2025 (iv.) Firm Representation | (v.) Evaluation Team Contact Brandon Hill Vice President Operations Adolfson & Peterson Construction 797 Ventura Street Aurora, CO 80011 bhill@a-p.com | (303) 363-7101

Weld RE-4 School District Orchard Hill Elementary School Ribbon Cutting

1

01) GENERAL INFORMATION b. Table of Contents (1 page optional)

1. General Information

1-5

a.) Front/Cover Page b.) Table of Contents c.) Attachment G d.) Cover Letter e.) Material Changes to Prequal.

2. Experience & Approach

6-13

a.) AP’s Understanding of the Work and Approach to Schedule b.) Methodology

3. Composition of Proposed Team

14-20

a.) Proposed Project Personnel b.) Required Statement

4. Attachment I

21

5. Fee Proposal

22

a.) Submitted in Separate Excel Docs

Boulder Valley School District Angevine Middle School CTE & Misc. Renovations

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

2

01) GENERAL INFORMATION c. Completed and fully executed Declaration and Signature Page, see Attachment G (1 page)

BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-08 August 28, 2025

ATTACHMENT G NOTE: THIS PAGE MUST BE COMPLETED AND INCLUDED WITH THE SUBMISSION BOND CONSTRUCTION MANAGER / GENERAL CONTRACTOR SERVICES DECLARATION & SIGNATURE PAGE DECLARATION: I hereby certify that the information provided in this submission made to Boulder Valley School District is true and correct and I am duly authorized to submit this response. No Board of Education member, member of a District board or committee, employee of the District, or any such person’s spouse, child, parent, brother, sister, dependent, or person assuming a relationship being the substantial equivalent of the above, has a direct or indirect financial or personal interest in the proposing firm or this Request except as follows [or state: NONE]: None ________________________________________________________________________________________________ ________________________________________________________________________________________________ __________. I hereby certify that the firm has reviewed this Request, the Design Advisory Team Guidelines, and the District’s standard CMGC Agreement with General Conditions and other attachments and accepts the terms and conditions thereof.

AP Mountain States LLC dba ____________________________________________ Adolfson & Peterson Construction (FIRM NAME)

Brandon Hill _____________________________________________ (TYPED NAME OF AUTHORIZED AGENT)

797 Ventura Street ____________________________________________ (STREET ADDRESS)

______________________________________________ (SIGNATURE OF AUTHORIZED AGENT)

Aurora, CO 80011 ____________________________________________ (CITY, STATE AND ZIP CODE)

Vice President of Operations ______________________________________________ (TITLE)

(303) 363-7101 ____________________________________________ (TELEPHONE NUMBER)

September 25, 2025 ______________________________________________ (DATE)

(303) 363-9251 ____________________________________________ (COMPANY FAX NUMBER)

20-4445586 ______________________________________________ (FEDERAL EMPLOYEE IDENTIFICATION NUMBER)

bhill@a-p.com ____________________________________________ (EMAIL ADDRESS)

v.2 090618

14

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

3

01) GENERAL INFORMATION d. Cover Letter (1 page, optional) RE: Request for Proposal for Construction Manager/General Contractor Services RFP 26-06 CMGC Project Scope #3 Heatherwood Elementary School and Eisenhower Elementary School Dear Mr. Derrell Walton and members of the selection committee: Adolfson & Peterson Construction (AP) is excited to continue our partnership with Boulder Valley School District (BVSD) and to submit our proposal for Construction Services for Heatherwood Elementary School (Heatherwood) and Eisenhower Elementary School (Eisenhower). Having delivered nearly 60 successful projects with BVSD over the last 35 years, we bring not only proven experience but also a deep appreciation for the District’s expectations, culture, and community priorities. For these two schools, we are proposing a unified project team. Many of these individuals will be familiar to BVSD: Senior Superintendent Scott Bruce, who previously worked at Heatherwood, brings first-hand knowledge of the school and its operations. He recently partnered with Project Manager Matt Lewandowski on Centaurus High School and Angevine Middle School, and together they will apply that same collaborative approach and attention to detail to both Heatherwood and Eisenhower.

58

PROJECTS WITH BVSD

WHY AP IS THE RIGHT FIT FOR YOUR PROJECTS

» We prioritize consistent, open communication, working closely with principals, staff, and BVSD leadership while supporting transparent updates to the broader community. » Our proactive approach to site logistics minimizes disruption to school operations and ensures construction has zero impact on the learning environment.

$1.7B+

K12 FACILITIES COMPLETED BY THIS TEAM

» We are proposing a shared team across all four projects (RFP 26-06 & RFP 26-08). By aligning one shared team across all four schools, AP offers efficiencies in scheduling, resources, and coordination, helping BVSD maximize value. » This core team has successfully completed numerous BVSD projects, including Heatherwood, Centaurus High, Angevine, New Vista High School, and prior bond office renovations.

» Our relationship with BVSD, built over decades of successful collaboration, reflects a shared commitment to delivering safe, high-quality, and community-focused projects. AP understands that every project is more than just construction, it’s an opportunity to create spaces that reflect BVSD’s values and support student success. We look forward to the chance to once again work alongside your team to bring these visions to life. Thank you for your consideration.

AP Acknowledges the following Addendum: RFP# 26-08 Addendum #1 - 9/18/25

Sincerely,

Brandon Hill | Vice President Operations 303.598.1617 | bhill@a-p.com

4

01) GENERAL INFORMATION e. Material Changes to Prequalification in RFQ 23-23 (pages as needed): i) If material changes have occurred with respect to the information set forth in the Prequalification Statement, please identify all such changes No Material Changes to Prequalification.

Brandon Hill, Scott Bruce, Matt Lewandowski and BVSD team at Centaurus High School.

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

5

02) EXPERIENCE & APPROACH 2. Describe your company’s and team’s experience and approach with this type of project (1-8 pages). a. Describe your understanding of the work required for this project and how you will approach the schedule AP understands the diverse scope of summer renovations as outlined in the VFA scope lists, specifically listed for Heatherwood and Eisenhower. This expertise comes from years of building for BVSD and current projects such as Centaurus High School, Angevine Middle School, both in final stages of completion, and Fairview High School and Southern Hills Middle School, both in final stages of estimating. These projects provide direct experience with VFA budgets, construction planning, school operations integration, and project execution. Sr. Precon Manager Chris Henry, Project Manager Matt Lewandowski, and Superintendent Hugo Javalera have been selected to lead this effort due to their hands-on experience with multifaceted scopes and their ability to drive results under tight timelines. Hugo and Matt, who led the previous bond projects at Douglass ES and Fairview HS, bring valuable insight into similar facility conditions and scope integration, helping to streamline early planning and design collaboration. Additionally, Sr. Superintendent Scott Bruce completed past renovations and roof replacement at Heatherwood and brings in-depth understanding of the building and these areas of scope, ensuring smoother integration with the design phase to meet BVSD’s needs. This core team understands the VFA scope as listed needs to be validated through site investigation with AP, Trade partners, BVSD and the Design team. This early integration allows for scope to be designed and selected so AP can identify long lead items and create a path to make sure these do not delay schedule. i.) Using the milestones Information from the RFP, project information from Attachment A, and other information provided to you as part of this RFP, describe your approach to meet the schedule and project specific required services.

Schedule Development BVSD has provided the expected project duration dates as listed in the RFP, our team has reviewed those dates along side the VFA items and has created a schedule to provide the

LONG LEAD ITEMS AP has identified potential long lead material from the current scope in the VFA. AP will track these materials in dashboards to communicate current lead time and provide team milestones for design, subcontractor buyout, submittal creation and material release. This method of tracking potential long lead equipment is a proven method for the overall project success that has been demonstrated at Centaurus, Angevine and other BVSD renovations.

HEATHERWOOD ELEMENTARY

EISENHOWER ELEMENTARY

MEP Equipment

Mechanical Equipment

Exhaust Hood & Walk-In Refrigerator

Plumbing Equipment

Lighting Fixtures

Intercom Equipment Fire Alarm Equipment Lighting Fixtures

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

6

02) EXPERIENCE & APPROACH framework of a successful project AP has built a strong track record with the BVSD by aligning timelines and processes to meet both parties’ needs for a successful project. With extensive experience in school renovations, AP brings a higher level of estimating, scheduling, and project management to Heatherwood and Eisenhower. For example, AP reviews the project schedule early with trade partners to confirm that sequencing, durations, and timelines are accurate. This validation is essential to communicate realistic expectations to BVSD and to keep stakeholders such as students, staff, and facilities informed about activities in their buildings. Consistently verifying these elements is a standard practice on every project, ensuring the best outcomes for BVSD students, staff, and facilities. A key communication tool AP uses during estimating, planning, and construction is the project dashboard (example shown below). This tool has proven valuable for BVSD project managers, school stakeholders, and the design team by presenting milestones, budget updates, and other critical information in a clear and accessible way. Matt and Hugo will implement the dashboard throughout each project phase, highlighting the details that matter most. To complement this, a four-week look-ahead schedule will be updated weekly and reviewed during OAC meetings to track progress and coordinate renovation activities.

The renovation timelines for Heatherwood and Eisenhower are achievable within a single summer as described in the VFA as long as design milestones and procurement timelines are met. Following project award, the team will begin design OACs and site investigations. One way we plan to improve the schedule is for select construction activities to begin spring break of 2027. Early activities will be included in the dashboard and four-week look-ahead so BVSD remains informed. With BVSD’s input on school events and afterhours activities, designated AP personnel will coordinate work to avoid disruptions to the learning environment. AP will be on site whenever construction is underway to enforce safety protocols and ensure daily cleaning is completed.

Permitting Considerations State permitting timelines have become increasingly unpredictable. It is anticipated that permitting for this project will take place throughout Fall 2026 and Winter 2027. With reviews beginning mid-September, permits are expected to be approved by Spring Break 2027. AP actively monitors permitting timelines to anticipate and manage impacts to the overall project schedule during design. AP is fully confident in completing the VFA-defined scope in time for a successful turnover before the start of the Fall 2027 school year.

Project Dashboard Example This is an example of a dashboard that is currently being used at Fairview High School and Southern Hills Middle School. Upon award, AP will create a customized dashboard for Heatherwood and Eisenhower so the project team can track key high-level information such as, Board of Education meetings, PTO meetings, DAT meetings, subcontractor buyout statuses, design and pricing deliverable dates, and long-term milestone dates for the entire project. This single sheet contains information that is valuable for the entire team, so everyone is informed and updated on project progress.

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

7

G

&RQVWUXFWLRQ0LOHVWRQHV















6XEVWDQWLDO&RPSOHWLRQ

7&2

2ZQHU0RYHLQ&RPSOHWH







G

''(VWLPDWH5HYLHZ

(VWDEOLVK,*03







G

G

'LYLVLRQ

'LYLVLRQ









%DODQFH

Long Lead Item Procurement

3/31/26

2ZQHU0RYH,Q$FWLYLWLHV

)LQDO,QVSHFWLRQV

6XEVWDQWLDO&RPSOHWLRQ7&2

Design



G

3XQFK3XQFK&RUUHFWLRQV)LQDO

)LQDO,QVSHFWLRQV7&2

G

3XQFK2ZQHU:DON)LQDO













Final DAT Meeting

9/4/26





G

G





G







































































G

G

3XQFK3UH3XQFK)LQDO



G

G

G

G

G

G



)LQDO3URMHFW3XQFKOLVW

&RPPLVVLRQLQJ

6WDUWXS7$%6WDUWXS7HVW %DODQFH7DVNV

6WDUWXS7HVW

&RPPLVVLRQLQJ

&ORVHRXW





0(36WDUWXS

)LQDO,QVSHFWLRQV

G

G

,QWHULRUV0HFKDQLFDO(OHFWULFDO3OXPELQJ

6LWHZRUN

G

G

5RRILQJ

6XSHUVWUXFWXUH

G

G

%XLOGLQJ&RQVWUXFWLRQ

6XEVWUXFWXUH

G

)RXQGDWLRQ



G 

8WLOLWLHV ,)1(('('

(DUO\6LWH'HYHORSPHQW

G

'HPROLWLRQ







G

0RELOL]DWLRQ6WDUW 6XPPHU









G





G

$EDWHPHQW ,I1(('('





G

0RELOL]DWLRQ&RPSOHWH

G

0RELOL]DWLRQ6WDUW :HHN3ULRU















G 

G

G

'LYLVLRQ













G

G























G

'LYLVLRQ

6LWH0RELOL]DWLRQ





G

&RQVWUXFWLRQ





























G

'LYLVLRQ

3URFXUHPHQW

$ZDUG7UDGH3DUWQHUV



6XEPLWWDOV

$ZDUG(DUO\7UDGH3DUWQHUV



&RQWUDFWLQJ

$ZDUG

(VWDEOLVK)*03



G

G

&'(VWLPDWH5HYLHZ



3HUPLWWLQJ

G

&'&RVW(VWLPDWLQJ &RQVWUXFWDELOLW\5HYLHZ



G

&''UDZLQJV 'HVLJQ 3UHFRQ(VWLPDWLQJ 6HUYLFHV'HOLYHUDEOHV*03



G

G

''&RVW(VWLPDWLQJ &RQVWUXFWDELOLW\5HYLHZ



G

'''UDZLQJV 'HVLJQ 3UHFRQ(VWLPDWLQJ 6HUYLFHV'HOLYHUDEOHV

G

'HVLJQ'HYHORSPHQW



G



G 

6FKHPDWLF'HVLJQ

&RQVWUXFWLRQ'RFXPHQWV



G  



3URJUDPPLQJ'$7

'RFXPHQW'HYHORSPHQW

G





'HPR)LQLVK



5)35)4,QIRUPDWLRQ



5RXJKLQ)LQLVK









'HPR6WDUW









$EDWHPHQW)LQLVK



G





$EDWHPHQW6WDUW



'HVLJQ





5RXJKLQ6WDUW



3UHFRQVWUXFWLRQ





0RELOL]DWLRQ6WDUW



G

(DUO\,QYHVWLJDWLRQV









G

'$70HHWLQJV)LQDOV















'$70HHWLQJV







3RVW$ZDUG0HHWLQJV

G

1RWLFHWR3URFHHG





G 









)LQLVK



3UHFRQVWUXFWLRQ0LOHVWRQHV

G 



G





6WDUW

3URMHFW0LOHVWRQHV

G

G

'XUDWLRQ

6FKRRO0LOHVWRQHV

0LOHVWRQHV

%96'+HDWKHUZRRG(6

1DPH



/LQH

$XJXVW 







Begin Permitting

9/15/26





3RVW$ZDUG0HHWLQJV

1RWLFHWR3URFHHG

 6HSWHPEHU 2FWREHU 1RYHPEHU 'HFHPEHU         





$SULO  

0D\   

-XQH



$ZDUG(DUO\7UDGH3DUWQHUV

(VWDEOLVK,*03







'HFHPEHU  







5/25/27







-DQXDU\ 

Building Construction Begins (Summer Break)

$ZDUG7UDGH3DUWQHUV

(VWDEOLVK)*03

&'(VWLPDWH5HYLHZ

&'&RVW(VWLPDWLQJ &RQVWUXFWDELOLW\5HYLHZ

&''UDZLQJV 'HVLJQ 3UHFRQ(VWLPDWLQJ6HUYLFHV'HOLYHUDEOHV*03

(DUO\,QYHVWLJDWLRQV

'$70HHWLQJV)LQDOV

$XJXVW 6HSWHPEHU 2FWREHU 1RYHPEHU        

3/23/27





-XO\ 

Interiors/MEP (Spring Break)

''(VWLPDWH5HYLHZ

''&RVW(VWLPDWLQJ &RQVWUXFWDELOLW\5HYLHZ









'''UDZLQJV 'HVLJQ 3UHFRQ(VWLPDWLQJ6HUYLFHV'HOLYHUDEOHV



'$70HHWLQJV

3/15/27





)HEUXDU\ 0DUFK    

Site Mobilization (Week prior to Spring Break)

-DQXDU\  







0RELOL]DWLRQ&RPSOHWH

0RELOL]DWLRQ6WDUW :HHN3ULRU



5RXJKLQ6WDUW

Final Inspections

7/27/27









$SULO  

0RELOL]DWLRQ6WDUW

)HEUXDU\ 0DUFK    



 











0RELOL]DWLRQ6WDUW 6XPPHU

'HPR)LQLVK

5RXJKLQ)LQLVK

'HPR6WDUW

$EDWHPHQW)LQLVK

$EDWHPHQW6WDUW

 0D\ -XQH    

02) EXPERIENCE & APPROACH ii.) Provide a conceptual schedule and phasing plan for this project.



2ZQHU0RYHLQ&RPSOHWH

7&2

6WDUWXS7$%6WDUWXS7HVW %DODQFH7DVNV





$XJXVW 6HSWHPEHU 2FW     

6XEVWDQWLDO&RPSOHWLRQ



 

6XEVWDQWLDO&RPSOHWLRQ7&2

3XQFK3XQFK&RUUHFWLRQV)LQDO

3XQFK2ZQHU:DON)LQDO

3XQFK3UH3XQFK)LQDO





-XO\ 

7/30/27 Substantial Completion



HEATHERWOOD ELEMENTARY 8

3RVW$ZDUG0HHWLQJV

'$70HHWLQJV

'$70HHWLQJV)LQDOV





'HVLJQ

''(VWLPDWH5HYLHZ

(VWDEOLVK,*03



(VWDEOLVK)*03



G G G G G G G

'LYLVLRQ

'LYLVLRQ

'LYLVLRQ

'LYLVLRQ

'LYLVLRQ

'LYLVLRQ

'LYLVLRQ

6XEVWUXFWXUH

&ORVHRXW

3XQFK2ZQHU:DON)LQDO

3XQFK3XQFK&RUUHFWLRQV)LQDO



Long Lead Item Procurement

3/1/26

2ZQHU0RYH,Q$FWLYLWLHV

)LQDO,QVSHFWLRQV

6XEVWDQWLDO&RPSOHWLRQ7&2

)LQDO,QVSHFWLRQV7&2

3XQFK3UH3XQFK)LQDO



%DODQFH7DVNV



)LQDO3URMHFW3XQFKOLVW

&RPPLVVLRQLQJ

6WDUWXS7$%6WDUWXS7HVW

%DODQFH

&RPPLVVLRQLQJ

6WDUWXS7HVW

0(36WDUWXS

)LQDO,QVSHFWLRQV

Final DAT Meeting

9/4/26































 

 









Begin Permitting

9/15/26





G G







G







 











































































































 









G

G

G

G

G

G

G

G

G

G

G

G

,QWHULRUV0HFKDQLFDO(OHFWULFDO3OXPELQJ)LUH$ODUP

G

G

G

G

G

6LWHZRUN







 















G 

5RRILQJ

6XSHUVWUXFWXUH

)RXQGDWLRQ

%XLOGLQJ&RQVWUXFWLRQ

8WLOLWLHV ,)1(('('

(DUO\6LWH'HYHORSPHQW

G

G

G

G

G

0RELOL]DWLRQ6WDUW 6XPPHU



'HPROLWLRQ

0RELOL]DWLRQ&RPSOHWH



G

$EDWHPHQW ,I1(('('

0RELOL]DWLRQ6WDUW :HHN3ULRU



6LWH0RELOL]DWLRQ

 



G 

G

'LYLVLRQ

&RQVWUXFWLRQ

G

G

G

G

G

G

G

G

G

G

G

G

'LYLVLRQ

3URFXUHPHQW

$ZDUG7UDGH3DUWQHUV



6XEPLWWDOV

$ZDUG(DUO\7UDGH3DUWQHUV



&RQWUDFWLQJ

$ZDUG

&'(VWLPDWH5HYLHZ



3HUPLWWLQJ

&'&RVW(VWLPDWLQJ



3UHFRQ(VWLPDWLQJ

&RQVWUXFWDELOLW\5HYLHZ

&''UDZLQJV 'HVLJQ 6HUYLFHV'HOLYHUDEOHV*03



&RQVWUXFWLRQ'RFXPHQWV

&RQVWUXFWDELOLW\5HYLHZ

''&RVW(VWLPDWLQJ



G

G

'HVLJQ'HYHORSPHQW



G



Design





G 

G

G

G

G 

'''UDZLQJV 'HVLJQ







G

6FKHPDWLF'HVLJQ





















G

3URJUDPPLQJ'$7

'RFXPHQW'HYHORSPHQW

5)35)4,QIRUPDWLRQ

3UHFRQVWUXFWLRQ

&RQVWUXFWLRQ0LOHVWRQHV

1RWLFHWR3URFHHG













)LQLVK

G 

G 

3UHFRQVWUXFWLRQ0LOHVWRQHV







6WDUW

3URMHFW0LOHVWRQHV

G

G

'XUDWLRQ

G

3UHFRQ(VWLPDWLQJ6HUYLFHV'HOLYHUDEOHV

1DPH

6FKRRO0LOHVWRQHV

0LOHVWRQHV

%96'(LVHQKRZHU(6



/LQH



3/15/27







Site Mobilization (Week prior to Spring Break)





3RVW$ZDUG0HHWLQJV

1RWLFHWR3URFHHG

 









$ZDUG(DUO\7UDGH3DUWQHUV

(VWDEOLVK,*03

3/16/27











'$70HHWLQJV)LQDOV





$ZDUG7UDGH3DUWQHUV

5/25/27









(VWDEOLVK)*03









 

Final Inspections

7/27/27































%DODQFH7DVNV



7/30/27 Substantial Completion



6XEVWDQWLDO&RPSOHWLRQ7&2

3XQFK3XQFK&RUUHFWLRQV)LQDO

3XQFK2ZQHU:DON)LQDO

3XQFK3UH3XQFK)LQDO

6WDUWXS7$%6WDUWXS7HVW





0RELOL]DWLRQ6WDUW 6XPPHU

0RELOL]DWLRQ&RPSOHWH

0RELOL]DWLRQ6WDUW :HHN3ULRU



3UHFRQ(VWLPDWLQJ6HUYLFHV'HOLYHUDEOHV*03

&RQVWUXFWDELOLW\5HYLHZ

&'(VWLPDWH5HYLHZ

&'&RVW(VWLPDWLQJ

&''UDZLQJV 'HVLJQ

Roofing/Building Construction (Summer Break)







&RQVWUXFWDELOLW\5HYLHZ

3UHFRQ(VWLPDWLQJ6HUYLFHV'HOLYHUDEOHV

''(VWLPDWH5HYLHZ

''&RVW(VWLPDWLQJ

'''UDZLQJV 'HVLJQ

Demo/Interiors/ MEP/Fire Alarm (Spring Break)



'$70HHWLQJV



   -XO $XJ 6HS 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW 1RY 'HF -DQ )HE 0DU $SU 0D\ -XQ -XO $XJ 6HS 2FW 1RY 'HF                                                               

02) EXPERIENCE & APPROACH

EISENHOWER ELEMENTARY 9

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

AP proposes combining RFP #26-06 (Flatirons and Foothill) with RFP #26-08 (Heatherwood and Eisenhower) under a combined project approach (award and contract will remain separate). This approach offers BVSD meaningful cost savings by utilizing one core team, sharing project resources, and systems. The organization chart on page 16 illustrates how the proposed AP project teams integrate across both packages. Foothill will serve as the central hub due to its convenient location and larger site. The AP trailer will be positioned in the southeast corner, where better road access minimizes disruption to both school operations and the surrounding community. Each school will also have dedicated laydown areas, portable toilets, dumpsters, and other site infrastructure as shown in the attached site plans.

02) EXPERIENCE & APPROACH

10

02) EXPERIENCE & APPROACH AP understands the importance of balancing school, community, and construction needs. Our goal is to integrate seamlessly into each project, maintaining uninterrupted school operations. This will be achieved through clear, ongoing communication with BVSD and detailed logistics planning that ensures all areas of the schools remain functional throughout construction. Our project team has extensive experience coordinating with school staff to minimize impacts on daily activities. Deliveries will be scheduled to avoid pick-up and drop-off times, construction activities will be sequenced around after-school events, and parking will be managed so staff spaces remain available.

Site Investigations With the aggressive schedule at Heatherwood and Eisenhower, our team will launch site investigations immediately after award, coordinating with BVSD and the design team while managing long-lead procurement. Chris, Matt, and Hugo will lead partners in early site walks and 3D scanning to document existing conditions, scheduling work during or outside school hours to avoid disruption. By pairing investigations and 3D scans with early constructability reviews, our team can identify challenges before they become issues, giving the design team accurate, actionable information and keeps the summer window on track.

Anticipated Complexities and Mitigation Strategies Budget Alignment, Design, and Estimating

From day one, AP will facilitate early meetings with the District, architect, and VFA data to align budget, project documents, and estimates. By front-loading collaboration and validation, we ensure the VFA priorities translate seamlessly into design scope, preventing rework and keeping the GMP accurate and attainable.

Existing MEP System Integration

Leveraging our trade partners and coordination experience, AP will investigate existing conditions and integrate with BVSD’s maintenance team. This ensures the design team has complete and accurate information for scope definition, reducing unforeseen conflicts during construction and minimizing downtime for critical building systems.

Fire Alarm Replacement

Recognizing the complexity of full system replacement in an occupied school, AP will sequence work strategically. By beginning ceiling wire installation during evenings and school breaks (spring break and summer), we set the stage for a smooth installation and commissioning process, ensuring safety compliance and minimal disruption to operations.

Hazardous Materials Awareness

In accordance with BVSD’s Asbestos Management Plan, AP will proactively coordinate with Environmental Services to review all areas before work begins. Any scope changes will trigger immediate notification and alignment, ensuring abatement is handled safely and cost-effectively without delaying the project.

Schedule Certainty for Summer Completion

With substantial completion tied to August 1 occupancy, AP will develop a detailed phasing plan that sequences enabling work before summer and maximizes productivity during breaks. Our experience with tight summer schedules for K-12 projects gives us confidence to deliver both Flatirons and Foothill on time, without compromising safety or quality.

Construction Integration with School Operations

AP prioritizes constant communication with school stakeholders to ensure everyone knows what construction activities are planned. We encourage principals to participate in OAC meetings and dedicate time at the start of each meeting for them to share updates and concerns from the school community. By establishing this twoway communication, contractor to school and school to contractor, AP helps ensure operations run smoothly and the learning environment remains uninterrupted.

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

11

02) EXPERIENCE & APPROACH The AP team has successfully delivered projects with scopes similar to Heatherwood and Eisenhower, supported by a deep understanding of BVSD’s operations, expectations, and culture. At Heatherwood, replacing MEP equipment within the roof enclosure will require careful coordination, but with Scott’s prior roof experience and AP’s expertise in mechanical systems and phased implementation, we are well prepared to to collaborate with the design and develop effective solutions. Our long-standing collaboration with BVSD and its design partners has evolved into a trusted partnership that makes each project more efficient and forward-thinking. While the challenges at Heatherwood and Eisenhower may be familiar, our team approaches them with fresh eyes and a proactive mindset—drawing on lessons learned while tailoring solutions to each school. This ensures risks are anticipated, communication is clear, and outcomes align with BVSD’s goals for safety, quality, and schedule.

b. Describe your methodology for the following: i.) How to streamline communication to insure the education environment in not impacted Clear, consistent communication is central to AP’s project delivery. Matt and Hugo have been assigned to Heatherwood and Eisenhower specifically for their ability to coordinate effectively with BVSD, the design team, and school stakeholders. Strong communication prevents disruptions to the learning environment, and our team is committed to maintaining that focus throughout these projects. Matt and Hugo adapt their communication approach to suit each audience, ensuring stakeholders receive timely and relevant updates. In addition to standard project communications, AP is prepared to support the school environment through options such as:

» Safe, guided tours of construction areas » Morning announcements with fun facts or project

Our proposed team is familiar with BVSD’s VFA process through our recent work on Fairview High School. That experience sharpened our ability to align budgets, operational requirements, and preconstruction planning, making future projects like Heatherwood and Eisenhower smoother, more efficient, and more predictable.

These efforts keep the projects closely tied to BVSD’s educational mission. AP will work with District and school leadership to determine the appropriate level of involvement and provide opportunities that reinforce connection and transparency. ii.) Establishing a Guaranteed Maximum Price AP engages key stakeholders early in the budgeting process to lock in competitive pricing and reduce overall costs. Our GMP approach is fully transparent, providing open-book estimating and cost tracking. Drawing on experience with BVSD projects and cost data from similar scopes, AP develops an initial cost model within 2% of the FGMP. Establishing an IGMP at Design Development gives BVSD confidence that the budget is accurate and that the AP team, together with our trade partners, can deliver Heatherwood and Eisenhower on time and within budget.

updates » Classroom presentations to engage students and support learning

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

12

02) EXPERIENCE & APPROACH Engaging Trade Partners The Subcontractor Buy-Out Plan is a strategic on-boarding process which lets BVSD & the Design Team know when we need certain design iterations to allow for seamless material procurement and guarantees sub availability. Drawing from our extensive experience completing countless school renovation projects, our team possesses invaluable insights into the subcontractor market and capable partners for your project. Achieving the most competitive pricing hinges on subcontractors who not only offer competitive rates but also demonstrate the capability to meet project deadlines. This entails having sufficient manpower, expertise in complex sequencing, and a thorough understanding of resource and logistical requirements for success.

Bid Sheet Example Company Name: Contact's Name and Number: Scope of Work:

Building Concrete

Project Manual Section:

50% DD Specifications, 50% DD Drawings *Please Place a Breakout Cost on Cells Tagged with LS

Item

Description

*Please Circle Yes or No for Included or Not Included

Foundations (Including Pump, Material, & Reinforcing) LS EA EA EA EA LS LF



Pad Footings F4 F8 F11 F13



Continuous Footings FC? Continuous Footing

LS



Foundation Walls

Furthermore, subcontractors must serve as subject matter experts, providing insights to inform design decisions with regard to constructability. This collaborative approach ensures that the designed details align with quality expectations set by BVSD, AP, and the Design Team. Securing competitive subcontractor pricing is crucial for maximizing value for the BVSD community. Building on our past successful projects, we’re committed to enhancing our process for your project.

Stem Wall

LF

Foundation Wall

LF LS LF LS Tons LS LS



Elevator Pit Stem Wall Elevator Pit Stem Wall



Reinforcing Tonnage for Above Concrete Material

 

Concrete Pump

Circle Yes or No

Installation of Embeds

Circle Yes or No

Rebar Installation

Number of Hours

Anticipated manhours

Slabs (Including Pump, Material, & Reinforcing) LS SF LS SF LS SF EA LS SF LS Tons LS LS



SOG 5" SOG



SOD 5.5" SOD



Misc 4" Housekeeping & Equipment Pads Pan Stairs w/ Landings



Elevator Mat Slab and Pit Stem Wall 12" Elevator Pit Mat Slab



Reinforcing Tonnage for Above

Once the competitive pool is established and agreed upon with BVSD, and consultants, genuine competitive pricing can take place. Our goal is always to secure at least 3 to 5 bids per scope of work. To ensure alignment across all scopes and to facilitate applesto-apples comparisons among trade partners, we will utilize our comprehensive bid forms (example to the right) and scope matrices. These communication tools have been highly effective in eliminating scope BVSD and reducing subcontractor-initiated change orders. Our bid forms set clear expectations from day one on how the project will be executed successfully.

Concrete Material

 

Concrete Pump

Circle Yes or No

Rebar Installation

Number of Hours

Anticipated manhours

Not Required

% Tax Included:

Overall Total :



Preliminary Schedule Duration

Days for Completion of Scope

Long Lead Items:

Weeks

Long Lead Items:

Weeks

Voluntary Cost Savings Pricing: $ $

Please provide your company standard bid proposal with this bid form. 50% DD Construction Documents dated 08/01/2024

Circle Yes or No

50% DD Specifications Dated 08/02/24

Circle Yes or No

Addenda Acknowledged _____ thru _____

Circle Yes or No

Acceptance of Terms & Conditions of AP Subcontract Agreement

Circle Yes or No

If not, submit markups with proposal. Instructions to Bidders

Circle Yes or No

To Hold Base Bid for sixty (60) days after receipt of bids

Circle Yes or No

Textura Service Fee

Circle Yes or No

AP Insurance Requirements

Circle Yes or No Circle Yes or No

Current Prequalification with AP Proposal Submitted by Name and Title (please print):

Date Submitted:

Signature:

The sample above shows AP’s standard bid form. We will customize our bid forms to match the project Drawings and VFA lists, an approach our preconstruction team has effectively used on prior BVSD projects.

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

13

03) PROPOSED TEAM 3) Composition of Proposed Team (1-4 pages plus resumes) for each school/project. a.) Identify the firm’s specific personnel proposed for the project and their participation through the project from preconstruction through completion. This project team was hand selected based upon their decades of K-12 experience and most specifically BVSD experience. They bring extensive and unique knowledge to your project. We are proud of the accomplishments we’ve enjoyed with BVSD over the past decades. Likewise, we look forward to the success of the Heatherwood and Eisenhower projects. This success builds a block at a time and begins with our thorough preconstruction process. From the day that we are hired, to the day we cut the ribbon, our entire team (including all of our proposed field staff) will be dedicated to these projects. It is paramount that our Superintendents, led by Scott Bruce, guide and support the team during the design process when it comes to phasing, logistics, material procurement, and scheduling. These individuals will take part in our weekly design OACs, DAG meetings, job-walks, etc. during preconstruction. As we begin construction, they will also be executing the work along with taking care of any warranty items.

i.) Indicate the title and assignment, role or area of responsibility of each individual, by name. Our organizational chart, located on page 16, lists the team responsible for both Heatherwood Elementary School and Eisenhower Elementary School; indicating their assignments and role of our project team for both schools. ii.) Identify the person(s) who would attend the Project’s DAT meetings for your firm. All team members will participate in the project’s DAT meetings including Scott Bruce, Matt Lewandowski, Hugo Javalera, and Chris Henry. iii.) Team members resumes (pages as needed but maximum of 1 page per individual) Resumes for the project team follow this page. iv.) Describe how the team member’s qualifications align with the anticipated services required for delivering the projects successfully. Our project team’s qualifications align with your anticipated required services because our team worked on Heatherwood in the past, along with 58 projects worked on with BVSD. We understand the processes, the challenges and the unique approach that will ensure your projects are done with the highest quality and service.

Boulder Valley School District RE-2Heatherwood Elementary School

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

14

03) PROPOSED TEAM v.) Three references per individual for similar type of projects

Scott Bruce Sr. Superintendent

Matt Lewandowski Project Manager

Hugo Javalera Superintendent

Chris Henry Sr. Precon Mgr.

Reference 1

Reference 2

Reference 3

Mike Bailey | District Manager, Morgan County School District RE-3 mike.bailey@morgan.k12.co.us 970-768-7766

Emma Grogan | Planning & Design Construction, Denver Public Schools Emma_Grogan@dpsk12.org 720-423-1928

Gene Temanson | Boulder Valley School District RE-2 gene.temanson@bvsd.org 720-561-5951

Christoph Konradi | Boulder Valley School District RE-2 christoph.konradi@bvsd.org 443-472-6992

Tom Blahak | Boulder Valley School District RE-2 (retired) tomblahak@bvsd.org 303-994-3976

Kara Aylesworth | Principal, Hord Coplan Macht Kaylesworth@hcm2.com 303-222-0227

Renee T. Verspoor | Project Manager Design & Construction, Aurora Public Schools renee_verspoor@aurorak12.org 303-326-2115

Mike Lovic | Construction Project Manager, Denver Public Schools mike_lovick@dpsk12.net 720-423-1888

Heather Bock | Director of Construction, Denver Public Schools heather_bock@dpsk12.net 720-271-0470

Adam Baunstein | Principal, Treanor HL abraunstein@treanorhl.com 303-298-4700

Heather Bock | Director of Construction | Denver Public Schools heather_bock@dpsk12.net 720-423-1907

Audra Johnson | Sr. Project Manager, CBRE Audra.Johnson@cbre.com 312-636-6986

b.) The proposed team submitted with this proposal will remain intact for the duration of the project. Unless a member of the proposed team submitted in this RFP leaves the employment of our company or a change in the team is approved by the BVSD Project Manager and BVSD Director of Bond Planning & Engineering in writing the team submitted will remain intact for the duration of the project.

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

15

03) PROPOSED TEAM AP ORGANIZATIONAL CHART

1 TEAM 4 SCHOOLS

Design Team

Brandon Hill VP of Operations

Matt Lewandowski Project Manager Main Point of Contact

Chris Henry Sr. Precon. Manager

*resume and references included in RFP 26-06 response.

Scott Bruce Sr. Superintendent

Kyle Ekstrom Superintendent r

Hugo Javalera Superintendent

TBD Foreman

TBD Foreman

support team

Tanya Ranney Mgr. of Technology Intr.

DJ Grubbs MEP Manager

Legend All Four Schools

SPECIAL NOTE:

Flatirons & Foothill

AP is proposing a single team for all FOUR schools. Sharing resources, saving money, working hand in hand with our subcontractors for a seamless transition between the facilities.

Heatherwood & Eisenhower

Boulder Valley School District // CMGC Project Scope #3 - Heatherwood ES and Eisenhower ES

16

BOULDER VALLEY SCHOOL DISTRICT RE-2 FOOTHILL ELEMENTARY SCHOOL

BVSD Process & Procedures Familiarity

Renovations / Remodel

MEP Upgrades

MATT LEWANDOWSKI Project Manager

10 yrs. experience $234M / 10 K-12 School Projects

Matt will be involved from estimating into operations to make sure contracting, scope, and awarding is streamlined to optimize schedule opportunities as lined out by the Superintendents. He will be familiar with the project contracts, project plans and the owner’s goals, as well as manage project budgets and attend DAT and PTO meetings. Matt will be the main point of contact for BVSD.

EDUCATION & CERTIFICATION B.S., Construction Management, University of Nebraska-Lincoln Minor, Business, University of Nebraska-Lincoln OSHA 30 Corps QA/QC Stormwater NSTI - ICD 705

PROJECT HIGHLIGHTS Boulder Valley School District RE-2 - Foothill Elementary School Renovation Boulder, CO | $7,894,534 | 70,000 sf | MEP Upgrades, HVAC, Remodel/Renovation

Denver Public Schools - Reimagining Montbello High School Denver, CO | $151,182,050 | 277,694 sf | New Construction, Remodel/Renovation

Boulder Valley School District RE-2 - Fairview High School Addition and Renovation Boulder, CO | $18,325,822 | 264,007 sf | Maintenance/Repair Work, MEP Upgrades, HVAC, Remodel/Renovation

Boulder Valley School District RE-2 - Mapleton Early Childhood Center Renovation Boulder, CO | $1,984,698 | 18,375 sf | Remodel/Renovation

Boulder Valley School District RE-2 - BVSD 2024 - Pack 2 Angevine MS CTE and Mis. Renovation Lafayette, CO | $2,911,843 | 121,676 sf | MEP Upgrades, Remodel/Renovation, Fire Wall Derating Boulder Valley School District RE-2 - BVSD 2024 - Pack 2 Centaurus HS CTE and Misc. Renovations Lafayette, CO | $11,886,006 | 199,950 sf | MEP Upgrades, Addition, HVAC, New Construction, Remodel/Renovation, Site Work Boulder Valley School District RE-2 - Douglass Elementary School Bond Work Boulder, CO | $18,400,000 | 59,000 sf | New Construction

Boulder Valley School District RE-2 - Ryan Elementary School Modular Lafayette, CO | $341,890 | 1,959 sf | Addition Weld RE-3J School District - Weld Central Middle School Renovation Keenesburg, CO | $6,000,000 | 32,101 sf | Maintenance/Repair Work, MEP Upgrades, HVAC, Remodel/Renovation, Site Work Weld RE-3J School District - Hudson Elementary School Addition and Renovation Hudson, CO | $15,602,579 | 50,288 sf | Maintenance/Repair Work, MEP Upgrades, Addition, HVAC, Move Management, New Construction, Remodel/Renovation, Site Work

Boulder Valley School District // CMGC Project Scope #2 - Flatirons ES and Foothill ES

17

BOULDER VALLEY SCHOOL DISTRICT RE-2 HEATHERWOOD ELEMENTARY RENOVATIONS

BVSD Process & Procedures Familiarity

Renovations / Remodel

MEP Upgrades

In-depth Understanding of Exisiting Building Conditions

SCOTT BRUCE Sr. Superintendent

37 yrs. experience $408M / 39 K-12 School Projects

Scott will be the senior leader and main support for field management. He will work directly with the project teams to ensure quality construction, diligent schedule management and subcontractor coordination and control. Scott will attend DAT and PTO meetings. Scott’s success with BVSD is proven in the recent 2021 Fairview renovation and New Vista High School project. Overall, he has worked on over 20 BVSD projects in his career.

EDUCATION & CERTIFICATION LEED Accredited Professional Asbestos Certification OSHA 10-20-30

PROJECT HIGHLIGHTS Boulder Valley School District RE-2 - Heatherwood Elementary School Renovation and Roof Replacement Gunbarrel, CO | $5,638,259 | 60,797 sf | HVAC, MEP Upgrades, Remodel/Renovation, Site Work

Boulder Valley School District RE-2 - Mesa Elementary School Renovations and Addition Boulder, CO | $3,814,792 | 53,000 sf | Maintenance/Repair Work, Addition, Remodel/Renovation

Boulder Valley School District RE-2 - Mapleton Early Child Care Historic Renovations Boulder, CO | $4,836,990 | 17,700 sf | MEP Upgrades, Renovation, Addition

Boulder Valley School District RE-2 - Fairview High School Boulder, CO | $18,325,822 | 264,0007 sf | HVAC, Maintenance, MEP, Remodel/Renovation

Boulder Valley School District RE-2 - Foothill Elementary School Renovation Boulder, CO | $7,894,534 | 70,000 sf | MEP Upgrades, HVAC, Remodel/Renovation

Boulder Valley School District RE-2 - Ryan Elementary School Modular Lafayette, CO | $341,890 | 1,959 sf | Addition

Louisville, CO | $1,747,963 | 50,000 sf | HVAC