CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR AGREEMENT THIS CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR AGREEMENT (“Agreement”) is made and entered into as of this 24th day of November, 2025 by and between the Boulder Valley School District RE-2 (hereinafter referred to as the “Owner” or “School District”) and Fransen Pittman Construction (hereinafter referred to as the “Construction Manager/General Contractor” or “CM/GC”), for services in connection with the following described Project: BVSD Request For Proposal (“RFP “) No 26-10 titled CM/GC Project Scope #4 – Bear Creek Elementary School (“Project”) This Agreement shall be performed in conjunction with the services of the Architect for the Project, RTA Architects. In consideration of the mutual covenants and provisions contained herein, the parties agree as follows: ARTICLE 1 1.1.
1.2.
1.3.
1.4.
Responsibility of CM/GC to Owner: The CM/GC accepts the relationship of trust and confidence established with the Owner by this Agreement. CM/GC covenants with the Owner to furnish its best skill and judgment and to cooperate with the Architect in furthering the interests of the Owner. CM/GC agrees to furnish efficient business administration and superintendence and to use its best efforts to perform the Work in the best and soundest way and in the most expeditious and economical manner consistent with the interests of the Owner. The Construction Team: The CM/GC, the Owner, and the Architect, collectively referred to as the “Construction Team,” shall work from the beginning of design through construction completion. The CM/GC shall provide leadership to the Construction Team on all matters relating to construction. Extent of Agreement: This Agreement together with the General Contract Conditions (“General Conditions”), incorporated herein by reference, RFP 26-10 CM/GC Project Scope #4 – Bear Creek Elementary School dated September 4, 2025, a copy of which is attached as Exhibit A and the Contractor’s proposal dated October 3, 2025, a copy of which is attached as Exhibit B, represent the entire agreement between the Owner and the CM/GC and supersede all prior negotiations, representations, or agreements. When plans and specifications are complete, they shall be identified as part of the Contract Documents (as defined in the General Contract Conditions). This Agreement shall not be superseded by any provisions of the documents for construction and may be amended only by written instrument executed by both the Owner and the CM/GC. Nothing contained herein shall be deemed to create any contractual relationship between the CM/GC and the Architect, or any of the contractors, subcontractors, or material suppliers on the Project; nor shall anything contained herein be deemed to give any third party any claim or right of action against the Owner or the CM/GC which does not otherwise exist without regard to this Agreement. Contract Documents: The provisions of the General Conditions and all of the “Contract Documents” for the Project as that term is defined therein are incorporated by this reference into this Construction Management/General Contractor Agreement. The intent of the Contract Documents is to include all items and services necessary for the proper execution and completion of the Work. The Contract Documents are complementary, and what is required by any one shall be as binding as if required by all. Work not covered in the Contract Documents shall be required unless it is not consistent therewith and is not reasonably inferable therefrom as being necessary to produce the intended results. Words and abbreviations which have well known technical or trade meanings are used in the Contract Documents in accordance with such recognized meanings. If there are conflicting variances between the Drawings and Specifications, the requirements of the Specifications shall control unless the Architect/Engineer directs otherwise in writing. Numerous exhibits to be developed over a period of time are also to be attached to and made a part of the Contract Documents, some of which may be in
1.5.
conflict with other exhibits or portions of this Agreement. In the event of any conflict between any of them, the greater service, better quality or greater quantity shall be included in the Work, Contract Sum and Guaranteed Maximum Price without additional compensation, to be superseded by applicable Amendments and Change Orders. The Work: The CM/GC shall perform the services set forth in the Method of Payment Matrix attached hereto and incorporated by reference herein as Exhibit A. The initial Work of the CM/GC shall consist of its services in connection with the Design Phase, which shall be parallel and coincidental with the Schematic Design, Design Development, and Construction Document Phases of the Architect’s Services. As the bid packages are prepared and prices are established for the Work to be performed within each respective bid package, the parties contemplate that the work to be performed by the CM/GC shall be adjusted by Amendment or Change Order to this Agreement to place the Work contained within the various bid packages within the Work to be performed by the CM/GC with corresponding adjustments made to the Guaranteed Maximum Price and the Contract Time. ARTICLE 2 Construction Manager/General Contractor Services
The CM/GC’s basic services under this Agreement shall consist of the two (2) phases described below. 2.1. Pre-Construction Estimating Phase: As part of the Pre-Construction Estimating Phase, the CM/GC will: 2.1.1. Site Building, and Constructability Analysis. Perform site, building, and constructability analysis to assist the architectural/engineering team throughout all phases of design. Without limiting the foregoing services, the constructability analysis will include, but not be limited to the systematic evaluation of the design documents prepared by the Architect in each phase of design to identify and resolve potential issues that could (a) impact project cost, schedule, safety, or quality, (b) be in conflict with current code compliance in the building, or (c) interfere with the ability to efficiently construct the work. 2.1.2. Design Advisory Team. Participate in multiple design advisory team meetings with the District and Architect. 2.1.3. Communications with Architect. Communicate regularly with the architectural/engineering team and Owner for input and advice regarding cost and scope of project features, and regarding phasing and scheduling of the Project. 2.1.4.Cost Estimating. Conduct cost estimating of SD, DD, and CD Drawings. 2.2. Design Phase: As part of the Design Phase services, the CM/GC will: 2.2.1. Consultation During Project Development and Design – When applicable and only if this Agreement is executed prior to the completion of development and design, attend regularly scheduled meetings with the Architect during the development of conceptual and preliminary design to advise the Construction Team concerning site use and improvements, selection of materials, building systems, and equipment. Provide recommendations on construction feasibility, availability of materials and labor, time requirements for installation and construction, and factors related to cost including costs of alternative designs or materials, preliminary budgets, and possible economies. 2.2.2. Scheduling - Develop a Project Time Schedule at the end of each design phase that coordinates and integrates the Architect’s design efforts with construction schedules. Provide an electronic copy for the Owner’s review and approval. Update the Project Time Schedule, at intervals required by the Owner, incorporating a detailed schedule for the construction operations of the Project, including realistic activity sequences and durations, allocation of labor and materials, processing of shop drawings and samples, and delivery of products requiring long lead-time procurement. Include the Owner’s occupancy requirements showing portions of the Project having occupancy priority. Provide one hard copy and an electronic copy of the updates for the Owner’s review and approval. 2.2.3. Project Construction Budget –
2
2.2.3.1. Review the Owner’s established Project budget as soon as major program requirements have been identified and update the budget, at intervals required by the Owner, for the Owner’s approval. Prepare an estimate based on a quantity survey of drawings and specifications at the end of the Schematic Design Phase for approval by the Owner as the Project Construction Budget. Update and refine this estimate for Owner’s approval as the development of the drawings and specifications proceeds. Advise the Owner and the Architect if it appears that the Project Construction Budget will not be met and, in that event, make recommendations for corrective action. The Contractor shall submit cost estimates to the Owner for review and acceptance and shall provide copies to the Architect for review and verification. The amount of money appropriated by the Owner for the Project is equal to or in excess of the Project Construction Budget. 2.2.3.2. As the plans and specifications evolve through each design phase, the Contractor will perform cost studies and major estimates of the Cost of the Work using area, volume or similar estimating techniques for Owner’s approval. If the Contractor suggests alternative materials and systems, the Contractor shall provide cost evaluations of those alternative materials and systems. Any alternative materials or systems selected by the Owner, based on the cost evaluations provided by Contractor, shall then be incorporated into the updated budgets. 2.2.3.3. The Contractor’s estimating and budgeting systems and reports shall be flexible to allow comparisons of building systems and components. They shall include a means to provide a variance analysis throughout each budget update starting with the effective date and continuing through the Guaranteed Maximum Price. The format of the estimating system shall include detail sheets for each Work task that reflect unit prices, quantities, and extensions for labor and materials. The Contractor shall establish the estimate in a Construction Specifications Institute (CSI) format in a detailed open book collaborative manner that allows the Owner to make timely and informed decisions. Each budget shall also include a detailed list of relevant clarifications as they relate to the preparation of each budget update, and an updated Project Schedule. Allowances are to be clearly identified within each budget update on a separate summary level report at each design phase 2.2.4. Value Engineering – Provide technical review and analysis of systems and materials being considered in the design to produce the greatest value for the least cost. Contractor’s value engineering duties shall include, but not be limited to, formulating and evaluating alternative designs, systems, and materials; providing cost estimates of alternatives to be evaluated; evaluating alternatives on the basis of costs, time schedules, availability of labor and materials, and construction feasibility, etc.; and assisting the Architect in the preparation of any written report at the end of the Design Phase summarizing the value engineering activities. 2.2.5. Coordination of Contract Documents - Review the drawings and specifications as they are being prepared, identifying conflicts, errors, and omissions and recommending alternative solutions whenever design details affect construction feasibility or schedules without, however, assuming any of the Architect’s customary responsibilities for design. Forward all comments and recommendations in writing to the Architect for response/action. 2.2.6. Construction Planning - Recommend for purchase and expedite the procurement of long-lead items to ensure their delivery by the required dates. 2.2.7. Division of Work - Make recommendations to the Owner and the Architect regarding the division of the Work in the plans and specifications to facilitate the bidding and awarding of subcontractors and to allow for phased construction, taking into consideration such factors as time of performance, availability of labor, overlapping trade jurisdictions, provisions for temporary facilities, and other matters. 2.2.8. Construction Document Review - Perform final review of plans and specifications with the Architect and Owner to eliminate areas of conflict or misinterpretation and to assure proper coordination, accuracy, and completeness. 2.2.9. Labor - Analyze the types, quantity, and availability of appropriate categories of labor required for various phases of the Project.
3
2.2.10. Bidding – Develop and implement subcontractor pre-qualification criteria and a subcontractor prequalification process with the cooperation and approval of the Owner. As working drawings and specifications are completed, establish bidding schedules and conduct pre-bid conferences to familiarize bidders with bidding documents, management techniques, and any special systems, materials, or methods. Obtain a minimum of three (3) competitive subcontractor bids for each part of the Work, pursuant to bidding procedures acceptable to the Owner. If Contractor is unable to procure the minimum three proposals from subcontractors and suppliers, then Contractor shall submit to Owner reasonable data substantiating its efforts to solicit the minimum number along with whatever bids were obtained for Owner’s review. So long as Contractor, in Owner’s sole discretion, exercised commercially reasonable efforts to solicit the minimum number of bids, then Owner may relieve Contractor of the bid number required hereunder. Analyze all bids, review bids with the Owner and Architect, make recommendations for contract awards, and award subcontractors. The Owner anticipates multiple bid packages will be necessary for the Project phasing and scheduling. 2.2.11. Conferences - Conduct pre-construction conferences with successful subcontractors. 2.2.12. Equal Employment Opportunity - Determine applicable requirements for equal employment opportunity programs for inclusion in Project bidding documents. 2.2.13. Project Management Software – CM/GC shall use Trimble Unity Construct Software as the primary tool for Project control, communication, and documentation among the Project participants, including, but not limited to Owner, Architect, and CM/GC. CM/GC submittals made using e-Builder® Software shall accurately reflect the Schedule of Values and CM/GC’s cost accounting. 2.2.14. Analysis of Existing Improvements – Services related to investigation, appraisals or valuations of existing conditions, facilities or equipment; or verifying the accuracy of existing drawings or other Ownerfurnished information. Where necessary, make recommendation for selective demolition in order to uncover hidden existing conditions. When approved by Owner, and in accordance with other terms of this Agreement, perform necessary selective demolition and repair/restore affected conditions as needed to maintain a clean and safe environment. The CM/GC shall without exception maintain a safe environment for students, staff, teachers and public that may use the building prior to completion of the work described in the Construction Documents. 2.3. Cooperation with Architect: The Architect, by the terms of its agreement with the Owner, is obligated to provide reasonable cooperation to the CM/GC in the development of estimates of construction costs and the Guaranteed Maximum Price (“GMP”). Conversely, the CM/GC, by the terms of this Construction Agreement is obligated to provide reasonable cooperation to the Architect in the development of construction cost estimates and the GMP. Additionally, both Architect and CM/GC are obligated to reconcile their respective cost estimates at the completion of each design phase of the Work and in setting the GMP in a timely manner so as not to negatively impact the Project Schedule. 2.4. Construction Phase: As part of the Construction Phase services, the CM/GC will: 2.4.1. Project Control - Supervise the Work of the subcontractors and coordinate the Work with the activities and responsibilities of the Owner and Architect in order to complete the Project in accordance with the Owner’s objectives of cost, time, and quality. 2.4.2. Staffing - Maintain a competent full-time staff, approved by the Owner, at the Project site to coordinate, provide overall direction of the Work, and monitor progress of the subcontractors on the Project. 2.4.3. Organization - Establish, document, and communicate on-site organization and lines of authority in order to carry out the overall plans of the Construction Team. 2.4.4. Coordination - Establish and implement procedures for coordination among the Owner, Architect, subcontractors, and the CM/GC with respect to all aspects of the Project. 2.4.5. Scheduling - Schedule and conduct weekly progress meetings at which subcontractors, the Owner, Architect, and the CM/GC can discuss jointly such matters as procedures, progress, problems, and scheduling. Within twenty-one (21) days from acceptance of the Guaranteed Maximum Price, as defined below, submit three (3) copies of a detailed CPM Schedule for the operations of the CM/GC
4
and subcontractors on the Project, including realistic activity sequences and durations, allocation of labor, materials, and costs, processing of shop drawings and samples, delivery of products requiring long lead-time procurement for approval by the Owner, and a specific number of weather delay days per year for the duration of the Project. Include the Owner’s occupancy requirements in all schedules showing portions of the Project having occupancy priority, if any. The contents and format of the CPM Schedule shall be per the requirements stated in the General Contract Conditions. The schedule shall contain detail appropriate for the Project, including (1) the effective date of the Agreement, (2) each major design milestone, (3) timelines for Owner’s approvals, (4) the date of commencement of the Work, (5) interim schedule milestone dates, (6) an apportionment of the Work by construction activity; and (7) the time required for completion of each portion of the Work. Under no circumstance shall the date of substantial completion be adjusted without an executed Change Order. 2.4.6. Schedule Monitoring - Provide regular monitoring of the schedule as construction progresses. The Contractor shall prepare a three (3) week look ahead schedule each week for review with the Owner, focusing on the in-depth detail of the upcoming weeks activities in a manner that reflects the planned day-to-day activities. The Project Schedule shall be revised by the Contractor at least monthly or when directed to do so more frequently by the Owner. All revised Project Schedules must demonstrate updates and or changes from the previously approved Project Schedule. In the event that the Contractor ever presents a schedule that does not provide for substantial completion to be achieved within the Contract Time, the Contractor shall also present a recovery plan that will allow the Contractor to achieve substantial completion by the Contract Time. The Owner will determine if the recovery plan or the revised schedule shall be accepted. If the Owner elects to accept the revised schedule in writing, it shall become the approved Project Schedule that the Owner will rely upon to make commitments and obligations. Receiving revised schedules at a weekly Contractor meeting or in another format shall not be construed as an acceptance by the Owner. Any revision to the approved Project Schedule requires the Owner’s written approval. 2.4.7. Evaluation - Determine the adequacy of the subcontractors’ personnel and equipment and the availability of materials and supplies to meet the schedule. 2.4.8. Cost Control - Develop and implement an effective system of Project cost control, showing actual costs for activities in process and estimates for uncompleted tasks. Revise and refine the initially approved Project Construction Budget, incorporate approved changes as they occur, and develop cash flow reports and forecasts as needed. 2.4.9. Change Orders - Develop and implement a system for the expeditious review and processing of Change Orders as approved by the Owner. Initiate necessary or desirable changes to the Owner and the Architect, review requests for changes, submit recommendations to the Owner and the Architect, and assist in negotiating Change Orders. The Owner shall not issue any change order or other directive that causes its payment obligations to exceed lawful appropriations to cover the cost thereof. 2.4.10. Permits - Secure or assist the Owner in securing all necessary permits, licenses, and inspections for the proper completion and execution of the Work. 2.4.11. Owner’s Consultants - If required, assist the Owner in selecting, retaining, and coordinating professional services of a surveyor, testing laboratories, and any special consultants. 2.4.12. Superintendent - Keep on the Project, during the progress of the Work, a full-time, competent superintendent and any necessary assistants, all satisfactory to the Architect and the Owner. The superintendent shall not be changed except with the consent of the Architect and the Owner, unless the superintendent proves to be unsatisfactory to the CM/GC and ceases to be in its employ. The superintendent shall represent the CM/GC in its absence and all directions given to the superintendent shall be as binding as if given to the CM/GC. The superintendent shall remain on the Project full-time until all Work is complete, including the punch list. The Architect and the Owner shall not be responsible for the acts or omissions of the superintendent or their assistants. 2.4.12.1. The superintendent shall provide full-time, qualified, and efficient supervision of the Work, using their best skill and attention. Carefully study and compare all drawings, specifications, and other
5
instructions and immediately report to the Architect and the Owner any error, inconsistency, or omission which may be discovered. Inspect the Work of the subcontractors at all stages and at substantial completion and final completion and guard the Owner against defects and deficiencies in such Work. The CM/GC shall be responsible to the Owner for the acts and omissions of all his employees and of all subcontractors, their agents, and employees and all other persons performing any of the Work, for which the CM/GC has supervisory or inspection responsibility hereunder. 2.4.12.2. The superintendent shall see that the Work is carried out in accordance with the Contract Documents and in a thorough and first-class manner in every respect. The CM/GC’s superintendent shall establish all lines, levels, and marks necessary to facilitate the operations of all concerned in subcontract work. The superintendent shall lay out the Work in a manner satisfactory to the Architect, making permanent records of all lines and levels required for excavation, grading, and foundations and for all other portions of the Work. The superintendent shall, together with the Architect, authorize the commencement and certify the proper completion of the various stages of construction. The CM/GC shall be responsible for construction means, methods, techniques, sequences, and procedures and for carrying out the Work in accordance with the Contract Documents. 2.4.13. Safety Measures - Establish procedures and measures for the safety of persons and property at and around the site of the Work. Assure compliance with all federal, state, and local statutes, rules, regulations, and orders applicable to the conduct of the Work. 2.4.14. Contract Interpretations - Refer all questions relative to interpretation of design intent to the Architect in writing. Develop and implement an effective system of tracking the status of questions and responses. 2.4.15. Shop Drawings and Samples - In collaboration with the Architect, establish and implement procedures for expediting the processing and approval of shop drawings and samples. 2.4.16. Reports and Project Site Documents - Record the daily progress of the Project in a daily log available to the Owner and the Architect. Submit on a weekly basis written progress reports and summaries of meetings to the Owner and the Architect, including information on the subcontractors’ work and the percentage of completion. The Contractor shall keep detailed daily logs and submit these logs to the Architect and Owner each week at the O/A/C meetings. The detailed written daily logs shall include a description of the Work performed the previous week. Each such daily report shall be prepared and signed by the project manager or superintendent, on behalf of the Contractor. Each report shall at a minimum include the following information for that day concerning the Contractor and each Subcontractor (including each Sub-subcontractor): materials and equipment being installed, number of individuals working, the hours worked, the type and location of the work being performed by each trade and each item of major equipment being used. The report shall also include other information such as temperature and weather recorded during the work period and any significant events occurring on the job site with regard to the Work or the Project. 2.4.17. Record Sets - Maintain at the Project site, on a current basis, records of all necessary contracts, shop drawings, samples, purchases, materials, equipment, material safety data sheets, maintenance and operating manuals and instructions, and any other documents and revisions thereto which arise out of the Agreement or the Work in the format required by the Owner in its sole discretion. CM/GC shall obtain data from subcontractors and maintain a current set of record drawings, specifications, operating manuals, warranties, and guarantees. At the completion of the Project, submit all such documents to the Architect for delivery to the Owner. 2.4.18. Completion – Inspect and determine completion of the Work or designated portions by subcontractors thereof and prepare for the Architect a list of incomplete or unsatisfactory items together with a schedule for their completion in accordance with the General Conditions. 2.4.19. Start-Up and Training - With the Owner’s maintenance personnel and the Architect, direct the checkout of utilities, operating systems, and equipment for readiness and assist in their initial start-up and testing by the subcontractors. Facilitate all training of Owner’s personnel as required.
6
2.4.20. Substantial and Final Completion - Determine substantial and final completion and provide written notice to the Owner and Architect that the Work is ready for inspection. Include with the written notice a copy of the Architect’s punch list signed off by each responsible party. Secure and transmit to the Architect required guarantees, tax affidavits, certificates, releases, bonds, and waivers. Turn over to the Owner all keys and maintenance stocks. 2.4.21. Warranty - During the two (2) year warranty period at no additional cost to the Owner, perform warranty inspections with the Architect and Owner following provision of timely written notice to the Owner to schedule such inspections, and ensure that Work which proves defective or deficient during such time is corrected either by the subcontractors or such other means as shall be required, at no additional cost to the Owner. 2.4.22. Self-Performed Work – Contractor shall be eligible to self-perform work on the Project as established in the GMP. Contractor shall self-perform the work at Cost plus a mark-up of 10% in addition to the Contractor’s overall Fee. The Contractor shall competitively bid Scopes of Work to a minimum of three (3) Subcontractors for each subcontracted scope of Work unless the Owner agrees otherwise in advance in writing. Once bids are received, the Contractor shall share the results of the bidding process with the Owner and make recommendations on the selection of the Subcontractor or material supplier based on cost, schedule, and other factors that will maximize the success of the total Project. For specific major trades, the Contractor must notify the Owner in a timely fashion when it intends to conduct scope confirmation meetings with the final bidders. The Owner may at its sole discretion elect to participate in scope confirmation meetings with the Contractor and the key Subcontractor. For those trades in which the Contractor is qualified to self-perform the Work, bids from the Contractor for self-performed Work must be submitted to the Owner and Architect a minimum of twenty-four (24) hours prior to bid deadline for subcontractors to be considered for award. The subcontractor selected for an award will be the subcontractor whose bid, as presented in the response to the bidding documents, is the most advantageous to the Owner. The Owner is not bound to accept the lowest priced bid if that proposal is not in the best interests of the Owner as determined by the Owner. 2.5. Additional Services: Additional services shall be performed only upon the express, prior written authorization of the Owner and paid for as provided herein. Additional services shall include the following: 2.5.1. Owner-Furnished Equipment - Services related to Owner-furnished equipment, furniture, and furnishings which are not a part of the Work. 2.5.2. Expert Witness - Preparing to serve or serving as an expert witness in connection with any public hearing or legal proceeding. 2.5.3. After Completion - Inspections of and services related to the Project after completion of the services under this Agreement, other than the above-referenced warranty inspections. 2.5.4. Other - Providing any other service not otherwise included in this Agreement. ARTICLE 3 The Owner’s Responsibilities 3.1. 3.2.
Information: The Owner shall provide full information regarding its requirements for the Project. Owner’s Representative: The Owner shall designate a representative who shall be acquainted with the scope of the Work; has authority to approve budgets and adjustments thereto, as contemplated by Section 2.1.3 within the Project Cost Estimate as established by the Board of Education; render decisions; and otherwise furnish information. In addition, the Owner may hire an Owner’s Representative to assist the Owner with the performance of the Project. In the event that the Owner hires an Owner’s Representative, the Owner’s Representative’s duties and responsibilities will be described in a Consultant Agreement between the Owner and the Owner’s Representative, a copy of which will be furnished to the CM/GC.
7
3.3.
3.4. 3.5. 3.6.
3.7.
3.8. 3.9.
Architect: The Owner shall retain an Architect to provide design services and to prepare construction documents for the Project. The Architect’s services, duties, and responsibilities are described in the Agreement between the Owner and the Architect, a copy of which will be furnished to the CM/GC. Professional Services: The Owner shall furnish such legal services as may be necessary for the benefit of the Owner, and such auditing services as it may require. Documentation: The CM/GC will be furnished, without charge, all copies of drawings and specifications reasonably necessary for the execution of the Work. Defects: If the Owner becomes aware of any default or defect in the Project or non-conformance with the Contract Documents, it shall give prompt written notice thereof to the CM/GC. This provision shall not, however, charge the Owner with any obligation to make inspections and shall in no manner be construed to discharge or modify the CM/GC’s obligations to supervise, inspect, and to otherwise complete the Project in accordance with the Contract Documents. Surveys and Special Testing: So far as the Project contemplated by this Agreement may require, the CM/GC shall be entitled to information giving a complete and accurate survey of the building site and the existing grades and lines of streets, pavements, and adjoining properties; information as to the rights, restrictions, easements, surface water courses, boundaries, and contours of the building site; and full information as to existing sanitary sewer, storm sewer, water, gas, and electrical services. The Owner, at its expense, shall furnish all such data, upon request. The Owner likewise shall pay for all borings or test pits and for any mechanical, chemical, or other tests as well as professional verifications and inspections incident to proper appraisal of the site for the contemplated structure. A copy of all reports of such tests and borings shall be filed with the Owner and shall be available to the CM/GC, upon request. Owner’s Expenses: The services, information, surveys, and reports required by Sections 3.3 through 3.5 and 3.7 shall be furnished at the Owner’s expense. Project Management Software: Owner shall provide CM/GC with a license to access Owner’s web-based Trimble Unity Construct Software and shall provide CM/GC one day of training for same. ARTICLE 4 Subcontracts
4.1.
4.2.
4.3.
4.4.
Bidding: All Work, except that portion commonly referred to as “General Condition Costs” set forth in Section 8.2.1, shall be competitively bid pursuant to procedures acceptable to the Owner, except for Work performed by CM/GC as approved by Owner in accordance with Section 4.2. CM/GC shall include miscellaneous scopes of Work not being bid in periodic budget estimates, as well as the proposed GMP prepared by the CM/GC. Such scopes shall be approved by Owner at the time of GMP execution. Award: The CM/GC shall request and receive proposals from subcontractors and subcontracts will be awarded by the CM/GC after the proposals are reviewed by the CM/GC with the Architect and Owner. The CM/GC shall be authorized to submit proposals for portions of the Work only with the prior written consent of the Owner. Substitution: If the Owner refuses to accept a subcontractor recommended by the CM/GC, the CM/GC shall recommend an acceptable substitute. The Guaranteed Maximum Price (GMP), if applicable, shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate Change Order shall be issued. Forms: The form of the subcontract, including the General and Supplementary Conditions applicable thereto, shall be satisfactory to the Owner, Architect, and the CM/GC.
ARTICLE 5 Contract Time Schedule
8
5.1. 5.2. 5.3. 5.4.
5.5.
Schedule: The services and Work to be performed under this Contract shall be in general accordance with the Contract Time Schedule attached hereto as Schedule 1. Time of Completion: This date shall be established at the time the GMP is established or prior to the award of any subcontracts if a GMP is not established. Revision: At the time a GMP is fixed, as provided for in Article 6, a new Contract Time Schedule shall also be established. Delays and Extension of Time: If the CM/GC is delayed at any time in the progress of the Work by any act or neglect of the Owner or the Architect or by any employee of either; or by any separate contractor employed by the Owner; or by changes ordered in the Work; or by labor disputes, fire, unusual delay in transportation, unavoidable casualties, or any causes beyond the CM/GC’s control; or by delay authorized by the Owner, the Contract Time Schedule shall be extended by Change Order for such reasonable time as the Owner may determine. All requests for extension of time or claims for extra costs occasioned by delays or neglect shall be subject to the Owner’s approval and shall be made in writing to the Owner no more than seven (7) days after the occurrence of the delay or event causing the extra costs; otherwise they shall be waived and barred. Liquidated Damages: The CM/GC understands and agrees that the completion of the entire Project within the time specified is an essential feature of this Agreement and that the Owner will sustain substantial damages, the amount of which is not possible to accurately determine at the time of contracting and which may be difficult to prove, if the Work is not so completed. The CM/GC, therefore, agrees to proceed with due diligence, taking all precautions and making all necessary arrangements to ensure the completion of the Work within the prescribed time. The CM/GC further agrees that his failure to fully and finally complete the Work within the time allowed shall be considered a material breach of this Agreement and shall entitle the Owner to collect liquidated damages for the delay in completion in accordance with the General Conditions in the sum of one thousand dollars ($1000.00) per calendar day. ARTICLE 6 Guaranteed Maximum Price
6.1.
6.2. 6.3.
Establishment: When the design, plans, and specifications are sufficiently complete to make the final cost estimates and after subcontract bids have been received, the CM/GC shall prepare and submit for Owner’s review and approval a Guaranteed Maximum Price (“GMP”), guaranteeing the maximum cost to the Owner for the Cost of the Work and the CM/GC’s Fees. Such GMP will be guaranteed by the CM/GC, subject only to modification for Changes in the Work as provided in Article 9 and for additional costs arising from delays caused by the Owner or the Architect. Following acceptance of the GMP by the Owner, the Owner and CM/GC shall execute the Guaranteed Maximum Price Amendment, amending this Construction Agreement, a copy of which will be provided to the Architect. Execution of the Guaranteed Maximum Price Amendment by the CM/GC is a representation that the Contractor has visited the Project site, become generally familiar with local conditions under which the Work is to be performed including but not limited to climatic, geographical and topographic conditions, and correlated personal observations with requirements of the Contract Documents. The CM/GC has assessed and is satisfied with the qualifications, suitability and availability of potential subcontractors and labor, material and equipment suitability and availability to satisfy the requirements of the Contract Documents. Subcontracts: When the CM/GC provides a GMP, the subcontracts will contain the necessary provisions to allow the CM/GC to control the performance of the Work. Savings: To the extent that the final Cost of the Work, as herein defined, and the CM/GC’s Fees are less than the GMP, the savings shall accrue to the Owner.
9
6.4.
Option to Terminate: In the event that the CM/GC and the Owner do not agree on the GMP, then the Owner may terminate this Agreement without signing the GMP. In such event, Owner shall pay CM/GC the Design Phase Fee and Owner shall have no further obligation to CM/GC. 6.5. GMP Proposal: A GMP Proposal to Owner shall include the following, unless the parties mutually agree otherwise: 6.5.1. A proposed GMP; 6.5.2. An itemization of the GMP broken down by detail and accompanied by supporting documentation (including, for example, bid tabulations and estimating take off sheets) which includes but is not limited to the following: 6.5.2.1. All prices received for every item bid before the establishment of the GMP and a total of such bids; 6.5.2.2. The maximum cost of all work to be self-performed by the CM/GC; 6.5.2.3. The CM/GC’s Construction Phase Fee and Design Phase Fee; 6.5.2.4. The General Condition Costs, itemized and with supporting documentation and information in accordance with Section 8.2.1 of the Agreement; 6.5.2.5. The installation cost of items to be procured by Owner and assigned to CM/GC for installation; 6.5.2.6. Cost of Work performed by subcontractors and a list of subcontractors with their respective license numbers; 6.5.2.7. CM/GC GMP Contingency, in accordance with Section 8.2.4 of the Agreement. 6.5.3. A schedule of the list of drawing, specifications, and addenda, including a schedule of Requests for Information asked and answered; 6.5.4. A list of the assumptions and clarifications made by CM/GC in the preparation of the GMP; 6.5.5. A revised Contract Time Schedule, pursuant to Section 5.3 of the Agreement, listing delivery schedule with summary milestone delivery items, itemized breakdown of Work scope, and submittal due dates with responsible party; 6.5.6. The scheduled substantial completion date and final completion date upon which the proposed GMP is based, to the extent said date has not already been established under Section 2.2.20 hereof, and a schedule upon which the scheduled substantial completion date and final completion date are based; 6.5.7. CM/GC Insurance Certificates; 6.5.8. CM/GC Performance Bond; 6.5.9. CM/GC Labor and Materials Payment Bond; 6.5.10. Alternate Prices; 6.5.11. Unit Prices; 6.5.12. If applicable, a list of allowances and a statement of their basis and a statement that, to the best of CM/GC’s knowledge, the cost pertaining to such allowance item is a reasonable estimate taking into account (i) the Project plans and other Contract Documents existing at the time the allowance estimate is made; (ii) the labor and material standards and construction means, methods and techniques prevailing in the industry for projects similar to the Project; and (iii) the level of labor and material costs generally prevailing in the locality of the Project at the time the allowance estimate is made, and allowances shall include the CM/GC’s Fee; 6.5.13. Equipment Rental Rate Schedule; 6.5.14. General Conditions of the Contract with Safety Addendum; 6.5.15. Schedule of Values; 6.5.16. Boulder Valley School District Asbestos Management Plan Contractor Responsibility form; 6.5.17. List of all salaried staff to be assigned and charged to the Cost of the Work as established in the Agreement; 6.5.18. If applicable, a state of Additional Services; 6.5.19. A time limit for acceptance of the GMP Proposal; 6.5.20. A high level Budget Summary; 6.5.21. Approved Labor Burden Rates; 6.5.22. A list of the clarifications and qualifications;
10
6.5.23. A detailed critical path Project Schedule including the dates of substantial completion and final completion; 6.5.24. CM/GC provided equipment along with billable rates; and 6.5.25. All Owner Accepted Alternates. 6.6. Limitation: The GMP shall not exceed the Project Construction Budget with the exception of Ownerapproved changes in the Work. In fixing a GMP, Contractor shall use Value Engineering to identify cost effective changes in the Owner’s specifications that will reduce the GMP without impairing essential functions or characteristics, rebid certain trades, or work with the Architect to bring the Project within the Project Construction Budget. The CM/GC shall not receive any profit or additional fee for work performed to propose a GMP that is within the Project Construction Budget, subject to Owner-approved changes in the Work. ARTICLE 7 Construction Manager/General Contractor’s Fee 7.1.
Determination: In consideration of the performance of this Agreement, the Owner agrees to pay the CM/GC in current funds as compensation for his services a CM/GC’s Fee as set forth in Section 7.1.1 and, if applicable, in Section 7.1.2. 7.1.1. Design Phase Fee - For the performance of the Design Phase services, as defined in Section 2.1, a fee of five thousand two hundred fifty-six dollars ($5,256.00), which shall be paid monthly, in equal proportions, based on the scheduled Design Phase time. 7.1.2. Construction Phase Fee – After Owner’s approval and acceptance of the Guaranteed Maximum Price in accordance with Article 6, CM/GC shall be paid for Work or services performed during the Construction Phase, as defined in Section 2.3, a fee of five percent (5.00%) of the Cost of the Work. The Construction Phase Fee shall be due and payable in proportion to the ratio that the monthly payment for the Cost of the Work bears to the total Cost of the Work, subject to retainage as provided in the Contract Documents. Any balance of this fee shall be paid at the time of final payment. 7.1.3. Not Included in Fee. Contractor’s Fee shall not be calculated on the costs associated with insurance premiums, bonds, Subcontractor default insurance, if any, or any lump sum design or preconstruction services fee paid by Contractor. 7.2. Adjustments: Adjustments in Fee shall be made as follows: 7.2.1. Change Orders - For changes in the Work as provided for in Article 9, the CM/GC’s Fee shall not be adjusted unless the change involves a substantial change in the scope of the Work and unless the total accumulated cost of Change Orders exceeds three percent (3%) of the GMP. If changes involve a substantial scope of Work change and the total accumulated cost of Change Orders exceeds three percent (3%) of the GMP, a fee of three percent (3%) of the cost of the change shall be added to the Fee. A “substantial change in the scope of the Work” for purposes of this paragraph is defined as follows: 7.2.1.1. Change Orders involving the purchase of new or additional products of a type and nature not previously specified or contemplated for incorporation into the Work. 7.2.1.2. Change Orders involving the procurement of additional subcontractors, not previously contemplated by the Contract Documents. 7.2.1.3. Changes involving Work in different buildings or at different sites other than as specified in the Contract Documents. 7.2.2. Delays - For delays in the Work, other than for weather, in excess of seven (7) calendar days and which are not the responsibility of the CM/GC, there may be an equitable adjustment in the Fee to compensate the CM/GC for verified and documented increased expenses; provided, however, that CM/GC demonstrates to Owner that the delay in the performance of the portion of the Work had an impact on the Project schedule’s critical path. 7.2.3. Additional Services - Additional services, as described in Section 2.4 shall be computed as follows:
11
Labor: *Direct Personnel Expense (base wage) times 1.49. Expenses: Actual cost. 7.2.4 Adjustments to General Conditions Costs. Adjustments, if any, to General Conditions Costs in a Change Order shall be subject to the limitations set forth in Section 8.2.1.23. 7.3. Items Included in Fee: Included in the CM/GC’s Fee for the Construction Phase are the following: 7.3.1. Profit - Before tax profit. 7.3.2. Overhead - Off-site costs for general management of the Project including: 7.3.2.1. Salaries or other compensation of the CM/GC’s employees at the principal office and branch offices to provide support in scheduling the Work, cost estimating, cost accounting, processing payment requests, processing Change Orders, processing shop drawings/samples, etc. 7.3.2.2. General operating expenses of the CM/GC’s principal and branch offices other than the field office. 7.3.2.3. Any part of the CM/GC’s capital expenses, including interest on the CM/GC’s capital employed for the Work. 7.3.2.4. Costs due to any negligence, or the reckless or intentional act or omission of the CM/GC, any subcontractor, anyone directly or indirectly employed by any of them, or for whose acts any of them may be liable, including, but not limited to, the correction of defective or nonconforming Work, disposal of materials and equipment wrongly supplied, or making good any damage to property. 7.3.2.5. Overhead or general expenses of any kind, except as may be expressly included in Article 8. 7.3.2.6. Costs in excess of the GMP, if any, as set forth in Article 6 and adjusted pursuant to Article 9. 7.3.3. Discretionary Compensation – Bonuses and discretionary compensation paid by Contractor to its personnel. 7.3.4. Risks – Costs arising from unforeseen difficulties that may be encountered during the prosecution of the Work until the final acceptance by the Owner, including all risks of every description connected with the prosecution of the Work and loss or damage arising from the nature of the Work or from the action of the elements. ARTICLE 8 Cost of the Work 8.1.
Definition: The term Cost of the Work shall mean costs necessarily incurred in the proper performance of the Work during either the Design or Construction Phase, and paid by the CM/GC. Such costs shall be at the lowest responsible competitive rates not higher than the standard paid in the locality of the Work except with prior consent of the Owner, and shall include the items set forth below in this Article. The Owner agrees to pay the CM/GC for the Cost of the Work as defined in this Article 8. Such payment shall be in addition to the CM/GC’s Fee stipulated in Article 7. 8.2. Cost Items Included: On-site costs of the Work including General Conditions and the aggregate cost of subcontracts. 8.2.1. General Condition Costs - Those costs for Work outlined in the General Conditions of the Contract that are the responsibility of the CM/GC unless specific items of Work are included in subcontract work. 8.2.1.1. Wages paid for labor in the direct employ of the CM/GC in the performance of the Work as set forth in the GMP Proposal, except that wages paid for labor shall not include Contractor’s Fee, vehicle allowance, cell phones or administrative mark-ups directly within wages, salaries or hourly billing rates. The names, positions, and estimated costs of the individuals for the duration of the Work that are anticipated to be assigned to this Project shall also be specified in the GMP Proposal. 8.2.1.2. Cost of ordinary employee benefits and taxes, such as pension contributions, hospitalization, vacations, medical insurance, assessments, or taxes for such items as unemployment compensation and Social Security, insofar as such cost is based on wages, salaries, or other remuneration paid to employees of the CM/GC and included in the Cost of the Work.
12
8.2.1.3. The proportion of reasonable transportation, traveling, and hotel expenses of the CM/GC or of his officers or employees incurred in discharge of duties connected with the Work, when the necessity for such expenditures is approved in advance by the Owner. 8.2.1.4. Cost of all materials, supplies, and equipment incorporated in the Work, including costs of transportation thereof. 8.2.1.5. Cost, including transportation and maintenance, of all materials, supplies, equipment, and hand tools not owned by the workmen employed by the CM/GC, which are employed or consumed in the performance of the Work and cost less salvage value on such items used but not consumed which remain the property of the CM/GC. 8.2.1.6. Rental charges of all necessary construction machinery and equipment, exclusive of hand tools and other items customarily owned by CM/GC or workers, used at the site of the Work, whether rented from the CM/GC or other, including installation, repairs and replacements, dismantling, removal, costs of lubrication, transportation and delivery costs thereof, at rental charges consistent with those prevailing in the area. All equipment which the CM/GC intends to rent to the Owner and the rates therefor must be approved by the Owner in writing prior to use. 8.2.1.7. Intentionally deleted. 8.2.1.8. Unavoidable sales taxes, if approved in writing in advance by the Owner. 8.2.1.9. Permit fees, licenses, tests, and royalties. 8.2.1.10. Minor expenses such as long distance telephone calls, telephone service at the site, expressage, and similar petty cash items in connection with the Work. 8.2.1.11. Cost of removal of all debris, snow removal, interim and final cleaning. 8.2.1.12. Costs incurred due to an emergency affecting the safety of persons or property, to the extent not compensated by insurance or otherwise, and not attributable to the fault of the CM/GC or his subcontractor. 8.2.1.13. Cost of site security during construction, if requested by the Owner, and the cost of site safety measures, such as fences, signs, and barricades. 8.2.1.14. Cost of computer services as required at the field office. 8.2.1.15. Cost of construction support activities such as Work items included in the General Conditions of the Contract and in the specifications unless they are provided by subcontractors. 8.2.1.16. The cost of adequate, weatherproofed, heated, and well-lighted office space with telephone service at the site of the Work for the use of the CM/GC and the Architect and Owner representatives. 8.2.1.17. The cost of providing and maintaining neat, sanitary, and adequate temporary toilet facilities for all personnel at the construction site. 8.2.1.18. The cost of providing suitable temporary facilities and quarters for workmen when the necessity for such expenditures is approved in advance by the Owner, and of maintaining on premises water-tight storage sheds and tool houses for storage of building materials and tools. The Owner may use the storage sheds and tool houses for the reasonable storage of Owner-provided materials and equipment for the Project at no additional cost. 8.2.1.19. The cost of providing all temporary facilities required to supply all the power, light, water, and heat needed for the proper execution and completion of the Work. Unless provided by subcontractors, the cost of all power, light, water, and heat for the duration of the Work. 8.2.1.20. The cost of providing temporary weather protection and temporary heating as required for the expeditious prosecution of the Work. 8.2.1.21. Other costs incurred in the performance of the Work if and to the extent approved in advance in writing by the Owner. 8.2.1.22. All costs directly incurred in the performance of the Work and not included in the CM/GC Fee as defined in Article 7. 8.2.1.23. General Conditions Costs Limitations. General conditions costs shall be compensated at their direct cost based on documentation submitted by CM/GC substantiating such amounts claimed. The general conditions costs submitted in Contractor’s proposal are considered a “Not-to-Exceed” value and shall
13
be finalized as such in the GMP for each Project. Changes to the general conditions costs must be authorized by Change Order executed by the Owner and issued in accordance with the Contract Documents. Final general conditions/general requirements costs for a Project cannot be transferred to any other Project. 8.2.2. Subcontracts - The cost of Work performed by subcontractors. 8.2.3. Estimates - The CM/GC shall include a detailed and itemized estimate of General Condition costs as a part of each estimate for the Cost of the Work. After the Contract Documents have been completed and before Work is released for bidding, the CM/GC shall prepare an estimate of the Cost of the Work that provides a subtotal of costs for each subcontract package and includes the costs for General Conditions. 8.2.4. Contingency –The CM/GC shall include in the GMP proposal its contingency to cover those costs considered reimbursable as the Cost of the Work but not included in a Change Order. Cost overruns in excess of the amount of the CM/GC Contingency will be borne by the CM/GC, unless the GMP is adjusted pursuant to the terms of the Agreement. CM/GC’s Contingency shall not exceed three percent (3%) of the Guaranteed Maximum Price. 8.2.4.1. The CM/GC shall advise the Architect and the Owner in writing prior to applying a part of the CM/GC Contingency to an item within the Cost of Work. Owner shall issue written approval to CM/GC for application of the amount from the CM/GC Contingency. The CM/GC shall fully document the change on its copy of the Construction Documents that will become part of the record documents. 8.2.4.2. The Owner shall not unreasonably withhold approval of a zero dollar Change Order to utilize the CM/GC’s Contingency so long as (a) the contingency amount accessed does not cause the Guaranteed Maximum Price to be exceeded (b) the CM/GC utilizes the CM/GC’s Contingency for items required for the Project that are not otherwise recoverable as Costs of the Work under the Contract Documents, and (c) the CM/GC’s Contingency is used for any items outlined in clauses 8.2.4.2.1 through 8.2.4.2.3 below: 8.2.4.2.1. Scope of the Work that is unclear, incomplete or conflicting on the Contract Documents but is Work consistent with the Contract Documents and reasonably inferable as being necessary to produce the intended results for a complete Project. 8.2.4.2.2. Additional resources necessary to recover lost time. If overtime is required to maintain the schedule, the CM/GC shall obtain the Owner’s prior written approval before moving forward with such overtime. 8.2.4.2.3. Delays caused by market, labor, material or transportation conditions, labor disputes, abnormal weather or other causes which are costs of the Work but do not justify an increase in the GMP. 8.2.4.3. CM/GC’s Contingency is not available for use by the CM/GC for mistakes that result from Self-Perform Work secured through competitive bidding, mistakes of subcontractors or material suppliers, or any warranty work. The CM/GC’s Contingency is not available for use by the Owner for allowance overruns, changes in the Scope of Work, differing or changed site conditions. 8.2.4.4. The CM/GC shall maintain a complete CM/GC Contingency log acceptance detailing the expenditure of funds from the CM/GC Contingency. Upon final acceptance of Project by Owner, any amounts remaining in the CM/GC Contingency shall be deducted from final payment to, or any monies due, CM/GC. The CM/GC shall report and reconcile the CM/GC’s Contingency to the Owner on a monthly basis. 8.3. Additional Costs: 8.3.1. Cost of the premiums for all bonds and insurance which are required by the Contract Documents. 8.3.2. Payments to the Architect and CM/GC’s Consultants. 8.4. Allowance Log: The CM/GC shall separately track, on no less than a monthly basis, all materials and equipment provided under allowances including, but not limited to, (i) a description of the allowance; (ii) amounts actually spent for each allowance; and (iii) variances between allowance amounts in the Cost of the Work and amounts actually spent.
14
ARTICLE 9 Discounts All discounts for prompt payment shall accrue to the Owner to the extent the Costs of the Work are paid directly by the Owner or from a fund made available by the Owner to the CM/GC for such payments. To the extent the Costs of the Work are paid with funds of the CM/GC, all cash discounts shall accrue to the CM/GC; provided, however, that all costs claimed pursuant to Article 8, billed to the Owner, reflect such discounts. All trade discounts, rebates, and refunds, and all returns from sale of surplus materials and equipment, shall accrue to the Owner, and the CM/GC shall make provisions so that they can be secured. ARTICLE 10 Miscellaneous Provisions 10.1.
10.2.
10.3. 10.4. 10.5.
10.6.
10.7.
10.8.
Assignment: Neither party to this Agreement shall assign its interests herein in whole or in part without the written consent of the other; nor shall the CM/GC assign any moneys due or to become due to him hereunder, without the previous written consent of the Owner Independent Contractor: The CM/GC understands and acknowledges that an employee-employer relationship does not exist between the CM/GC and the Owner. The CM/GC shall perform all Work, using independent judgment and expertise, as an independent CM/GC and not as an employee of the Owner. Neither the CM/GC nor any agent, employee or subcontractor of the CM/GC shall be an agent or employee of the Owner nor shall any of them have any authority, express or implied, to bind the Owner to any agreement or incur any liability or obligation attributable to the Owner. The CM/GC acknowledges that it is not entitled to workers’ compensation or other benefits from the Owner and that the CM/GC is obligated to pay federal and state income tax on any moneys earned from the Owner pursuant to this Construction Agreement. Binding Effect: This Agreement shall be binding upon the heirs, personal representatives, successors, and assigns of the respective parties. Controlling Law: This Agreement is being executed and is to be performed in the State of Colorado, and shall be enforced and construed according to the laws of the State of Colorado. Waiver: No waiver of any breach of any one of the agreements, terms, conditions, or covenants of this Agreement by a party shall be deemed or imply or constitute a waiver of any other agreement, term, condition, or covenant of this Agreement. The failure of a party to insist on strict performance of any agreement, term, condition, or covenant, herein set forth, shall not constitute or be construed as a waiver of such party’s rights thereafter to enforce any other default; neither shall such failure to insist upon strict performance be deemed sufficient grounds to enable the other party to forego or subvert or otherwise disregard any other agreement, term, condition, or covenant of this Agreement. Severability: If any provisions of this Agreement are finally determined by a court of competent jurisdiction to be in violation of any statute or rule of law, then such provisions shall not apply in such instances, but the remaining provisions shall be given effect in accordance with their terms. Notices: Any notices required or permitted under this Agreement shall be deemed given when personally delivered or when deposited in the United States certified mail, postage prepaid and addressed to Owner: Attention: Chief Operations Officer, 6500 East Arapahoe Avenue, Boulder, Colorado 80301, or to the CM/GC at the address set forth below. Counterparts: This Agreement may be executed in several counterparts. Each counterpart shall be deemed an original but all counterparts together shall constitute one and the same instrument. For purposes of executing this Agreement, facsimile or scanned signatures shall be as valid as the original.
15
Kris D Stoppenhagen
Kris D Stoppenhagen (Jan 13, 2026 11:50:41 MST)
Kathleen Sullivan (Jan 13, 2026 11:32:43 MST)
EXHIBIT A The following 37 pages are the RFP and Addendums
17
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR SERVICES RFP 26-10 CM/GC Project Scope #4 – Mesa ES, Bear Creek ES, and Community Montessori September 4, 2025 I. Introduction Boulder Valley School District (District) seeks proposals from prequalified construction managers / general contractors (CMGCs) for CMGC services for the project identified in Attachment A (Project) to this Request for Proposal (RFP). Participation in this RFP shall be by District invitation only. This RFP is to award the three (3) projects to one (1) CMGC (see Attachment A) Please note: Each project will require a separate agreement and costs, budgeting, accounting, etc. must be tracked independently for each project. II. Acceptance of Terms and Conditions, including form CMGC Agreement and General Conditions The District is issuing this RFP to CMGCs who were prequalified in response to the District’s Request for Qualifications No. 23-23 Construction Manager / General Contractor (CMGC Services RFQ). By submitting a proposal in response to this RFP, CMGCs acknowledge and accept that they are still bound by the terms and conditions of the CMGC Services RFQ (except as modified by this RFP) and their statement of qualifications (except as modified in response to this RFP). In order to adhere to the estimated timelines set forth herein, and notwithstanding anything to the contrary in the CMGC Services RFQ and/or the CMGC’s statement of qualifications, the District will not accept modifications to its form CMGC Agreement or the accompanying General Conditions. By submitting a proposal in response to this RFP, CMGC agrees that, if it is selected for an award of contract, it will sign the District’s form CMGC Agreement. The District may reject proposals that do not comply with this requirement. If the successful CMGC and the District are not able to enter into the form CMGC Agreement, then the District may cancel the award and award the contract to another CMGC or exercise any of the rights available to it under this RFP. III. Project Description and Estimated Delivery Schedule A description of the Project, including the school, address, architect, construction budget, and other additional information, is set forth in Attachment A. The successful CMGC shall perform those items set forth in the CMGC Proposal Form (see Attachments B1, B2, and B3) and CMGC Matrix (see Attachments C1, C2, and C3). Using proceeds from the District Bond Program, the District will implement the Project in accordance with the District Educational Facilities Master Plan (Master Plan), the Requirement List Report By Priority created by VFA, Inc. (see Attachments D, E, & F), and the Asbestos Hazard Emergency Response Act (AHERA) (will be sent with the Addendum) as applicable.
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
The RFP timeline and estimated delivery schedule for the Project is as follows: Date A) RFP Timeline RFP Issue Date September 4, 2025 September 17, 2025 A pre-proposal submission conference / Walk through / st 3:00 PM MST – 1st Location Etc. will be held at 1 Location: Community Montessori (805 Gillaspie Drive, Boulder, CO 80305). 2nd Location: 3:45 PM MST – 2nd Location Bear Creek ES (2500 Table Mesa Drive, Boulder, CO 4:30 PM MST – 3rd Location 80305). 3rd Location: Mesa ES (1575 Lehigh Street, Boulder, CO 80305) Attendance at all three locations is Mandatory. If you do not attend all three locations your proposal will not be accepted. RFP Inquiries Due RFP Addendum Sent RFP Submission Deadline RFP Evaluation / Award (the team may want clarifying information during this review and may contact you at this time) RFP Finalists Interviews B) Project Milestones (Mesa ES) CMGC Contract Award Post-Award Meetings with Project Manager Design Advisory Team Meetings
September 19, 2025 @ 10:00 AM MST September 24, 2025 by 3:00 PM MST October 3, 2025 @ 10:00 AM MST October 22, 2025 @ 11:30 AM MST
TBD
October 2025 October 2025 December 2025 – April 2026 (estimated)
Schematic Design Complete Design Development Complete Design Advisory Team final meeting Construction Documents Complete GMP Amendment to District Board of Education (A complete and signed GMP Amendment is needed as least 10 business days prior to this date) Construction Commences Substantial Completion – Temporary Certificate of Occupancy Construction Final Completion
2
February 13, 2026 March 16, 2026 August/September 2026 September 14, 2026 October 2026
Spring 2027 August 1, 2027 September 2027
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
B) Project Milestones (Bear Creek ES) CMGC Contract Award Post-Award Meetings with Project Manager Design Advisory Team Meetings
October 2025 October 2025 December 2025 – April 2026 (estimated)
Schematic Design Complete Design Development Complete Design Advisory Team final meeting Construction Documents Complete GMP Amendment to District Board of Education (A complete and signed GMP Amendment is needed as least 10 business days prior to this date) Construction Commences Substantial Completion – Temporary Certificate of Occupancy Construction Final Completion
B) Project Milestones (Community Montessori) CMGC Contract Award Post-Award Meetings with Project Manager Design Advisory Team Meetings
Schematic Design Complete Design Development Complete Design Advisory Team final meeting Construction Documents Complete GMP Amendment to District Board of Education (A complete and signed GMP Amendment is needed as least 10 business days prior to this date) Construction Commences Substantial Completion – Temporary Certificate of Occupancy Construction Final Completion
3
February 13, 2026 March 16, 2026 August/September 2026 September 14, 2026 October 2026
Spring 2027 August 1, 2027 September 2027
October 2025 October 2025 December 2025 – April 2026 (estimated) February 13, 2026 March 16, 2026 August/September 2026 September 14, 2026 October 2026
Spring 2027 August 1, 2027 September 2027
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
Scheduling Note: This schedule is the District’s best available estimation as of the date of this RFP. It is the District’s desire to accelerate design and construction schedules where reasonably possible, without adverse cost or safety impacts. Scheduling is subject to alternative proposals submitted by CMGC respondent and to joint decisions on phasing and/or accelerating the work. BVSD will consider alternate schedules for specific scopes of work based on the location of these schools. Contractors are encouraged to propose schedule options that support achieving substantial completion (school occupancy) for each project by August 1, 2027. For example, identify any scopes that could be completed ahead of summer 2027. The Project design will be guided by a site-based Design Advisory Team (DAT) that will meet with the selected CMGC, architectural firm (if applicable) and Bond project manager approximately bi-weekly through design development, except over the summer. Firms are requested to familiarize themselves with the revised version of the Bond Program’s Design Advisory Team Guidelines which can be found at: https://bond.bvsd.org/fs/resourcemanager/view/925e7d4a-74a9-43a6-bc90-04c82475c052. IV. Proposal Requirements A. Proposal Format Proposals shall be in the following format and shall adhere to the page limitations, if any: 1) General Information a) Front/Cover Page (1-3 pages) which shall include the following information: i) Firm’s name ii) Firm’s address iii) Date of the submittal iv) The name of the person(s) authorized to make representation for the firm and that person’s mailing address, email address, and telephone number v) Name and phone number of person(s) available to answer evaluation team questions (see Section III A) b) Table of Contents (1 page, optional). c) Completed and fully executed Declaration and Signature Page, see Attachment G (1 page) d) Cover Letter (1 page, optional) e) Material Changes to Prequalification in RFQ 23-23 (pages as needed): i) If material changes have occurred with respect to the information set forth in the Prequalification Statement, please identify all such changes. If there are none, please state “No material Changes to Prequalification” 2) Describe your company’s and team’s experience and approach with this type of project (1-8 pages). a) Describe your understanding of the work required for this project and how you will approach the schedule.
4
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
i) Schedule Development - Using the milestones Information from the RFP, project Information from Attachment A, and other information provided to as part of this RFP, describe your approach to meet the schedule and project specific required services ii) Provide a conceptual schedule and phasing plan for each project/school. b) Describe your methodology for the following: i) How to streamline communication to insure the education environment is not impacted ii) Establishing a Guaranteed Maximum Price Special note: Since the RFP is for three projects/schools awarded to the same CMGC please provide clarification in your response outlining how you will fulfill this requirement. 3) Composition of Proposed Team (1-4 pages plus resumes) for each school/project a) Identify the firm’s specific personnel proposed for the project and their participation through the project from pre-construction through completion. i) Indicate the title and assignment, role or area of responsibility of each individual, by name. ii) Identify the person(s) who would attend the Project’s DAT meetings for your firm. iii) Team members resumes (pages as needed but maximum of 1 page per individual) iv) Describe how the team member’s qualifications align with the anticipated services required for delivering the projects successfully. v) Three references per individual for similar type of projects b) The proposed team submitted with this proposal will remain intact for the duration of the project. Please state in your response “Unless a member of the proposed team submitted in this RFP leaves the employment of our company or a change in the team is approved by the BVSD Project Manager and BVSD Director of Bond Planning & Engineering in writing the team submitted remain intact for the duration of the project.” Special note: Since the RFP is for three projects/schools awarded to the same CMGC please provide clarification in your response on whether you will be proposing two teams (one for each school), a single team, or some combination. 4) A Please provide a written acknowledgement that you have reviewed Attachment I “Pay Application Requirement Checklist” and that you will: a) Include all applicable information and backup documentation listed in the Attachment I checklist and as required in the 2022 Bond General Contract Conditions when submitting Pay Applications. b) Submit in a timely manner and Invoices and / or costs submitted on pay applications that are greater than 90 days old may be deducted from payments and subject to independent audit at CM/GC expense.
5
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
5) Fee Proposal (Attachments B1, B2, & B3 & C1, C2, & C3) submitted on the excel files provided. Vendors shall not reference their fee proposal in their response: a) The CMGC Agreement will be a bonded contract with a Guaranteed Maximum Price to encompass all construction work for the Project. b) Vendor shall provide a Fee Proposal for the Project for which the vendor seeks award on the excel files provided. Submit a fully executed copy of Attachments B1, B2, & B3 (CMGC Proposal Form) and breakdown of General Condition costs – Attachments C1, C2, & C3 (CMGC Matrix). The Fee Proposal shall be a legally binding offer to perform the CMGC services for the Project for a period of no less than six (6) months from the date of the submission deadline. The District may reject Fee Proposals that exceed available funds, but reserves the right to negotiate a reasonable fee for services within the available funds. The District reserves the right to negotiate the final price for services. c) The Fee Proposal shall include all services requested in this RFP. The District may reject as nonresponsive Fee Proposals that exclude services required in the RFP and its attachments. Fee Proposals shall include all fees, costs and expenses as outlined in the CM/GC Proposal Form set forth in Attachments B1, B2, & B3 and CM/GC Matrix set forth in Attachments C1, C2, and C3. Estimated proposal prices are not acceptable. B. Submission Method and Deadline 1) Vendors shall submit proposals electronically to Derrell.Walton@bvsd.org. Proposals shall not exceed 25MB in size. To be considered, proposals must be received by the District on or before the time and date provided in Section III A) RFP Timeline. It is the CMGC’s responsibility to ensure that the proposal is received by the District on or before the submission deadline. The District will not consider proposals received after the submission deadline, regardless of the reason. 2) As email delivery issues can occur from time to time, the District strongly recommends that CMGCs attach a read receipt to their submission or send a separate email to request District confirmation of receipt. C. RFP Inquiries 1) CMGCs may submit written inquiries concerning this RFP via email to Derrell.Walton@bvsd.org. CMGCs shall clearly identify written inquiries as “BVSD RFP 26-10” in the subject of the email. To ensure a timely response, written inquiries must be received by the District on or before the time and date provided in Section III A) RFP Timeline. The District will not consider written inquiries received after the deadline, regardless of the reason. 2) Except as set forth above, CMGCs shall not contact District staff directly and may not rely on any verbal statements by District staff that alter the terms and conditions of this RFP. This RFP may be modified only in writing issued by the District’s Director of Procurement or their designee. D. RFP Mandatory Pre-Proposal Project Walk Through. A Mandatory pre-proposal submission conference will be held at the time, date and location provided in Section III A) RFP Timeline.
6
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
E. Evaluation Team Phone Calls (IF NEEDED) The Evaluation team may make calls to clarify and / or obtain additional information at the time and date provided in Section III A) RFP Timeline. F.
Finalist Interviews (IF HELD). If the district feels that it will be beneficial to hold interviews, the district will invite contractors to the BVSD bond office at the time and date provided in Section III A) RFP Timeline. We generally request the staff who will be assigned to the project attend if available (i.e. pre-construction manager, project manager, superintendent, project engineer)
V. Evaluation Process The District will use the following criteria (in no particular order) to evaluate proposals: A. Adherence to RFP instructions B. Experience of the company and the team proposed, including work on similar PK-12 projects C. Ability to meet the schedule and to provide the project specific required services D. Fee proposed VI. Selection of Proposal and Award of Contract A District evaluator or evaluation team will review proposals, conduct interviews (if necessary) and make a recommendation for an award of contract. The contract for the Project will be awarded to the CMGC whose proposal provides the greatest benefit to the District, as determined by the District in its sole discretion. An award of contract under this RFP is conditioned on approval by the Board of Education and/or District staff in accordance with District policy. VII. General Information A. Confidential/Proprietary Materials. As a reminder, proposals shall become the exclusive property of the District upon District receipt and shall be subject to public inspection and copying in accordance with the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. In issuing this RFP, the District is not seeking, and strongly discourages CMGCs from submitting, trade secrets or confidential commercial or financial information. If a CMGC nonetheless elects to submit trade secrets or confidential commercial or financial information, then such information shall be submitted as a separate electronic file that is clearly labeled “Confidential” or “Proprietary” (as applicable). CMGCs shall not label their proposals as “Confidential” or “Proprietary.” The District shall not be responsible for disclosing proposals or materials that do not comply with this provision in response to an open records request, even if such proposals are labeled “Confidential” or “Proprietary.” If a CMGC disputes the disclosure of its proposal or materials in response to an open records request, then CMGC, at its sole cost and expense, shall be solely responsible for defending against such disclosure. Neither a response in its entirety, nor a Fee Proposal will be considered confidential and proprietary. Any information that will be included in a resulting contract cannot be considered confidential. B. Reservation of Rights. The District reserves the right to:
7
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
1. Cancel, reissue, amend, close, or reopen this RFP at any time, without cause and without liability or penalty; 2. Request clarification or additional information with respect to one or more proposals; 3. Interview one or more CMGCs with respect to their proposals; 4. Accept or reject all or any part of a CMGC’s proposal; 5. Negotiate changes in the scope of services; 6. Waive formalities or requirements of the RFP with respect to one or more proposals; 7. Engage other vendors to perform additional services for the Project; 8. Schedule and conduct one or more site visits and/or Project meetings; 9. Award the contract, in whole or in part, to the CMGC or CMGCs whose proposal represents the best value to the District, in the District’s sole discretion. By submitting a proposal, CMGCs acknowledge and agree that the proposal with the lowest price will not necessarily be the proposal that represents the best value to the District because a number of factors other than price are relevant in determining the best value, including, without limitation, the factors set forth in Section IV of this RFP. C. News Releases. News releases pertaining to this RFP or any resulting contract shall NOT be made without prior written approval by the District. D. Incurring Costs. The District is not liable for any cost incurred by a firm prior to issuance of a legally executed contract, purchase order, or other authorized acquisition document. No property interest, of any nature, shall occur until a contract is awarded and signed by all concerned parties. E. Certification of Independent Pricing Determination. Except as otherwise disclosed with particularity, through its submission of a proposal, CMGC certifies that the prices and other terms in the proposal have been arrived at independently without any consultation, communication, agreement with, or knowledge of the contents of the proposals of a competing CMGC. For purposes of this paragraph, "consultation, communication, agreement with, or knowledge" does not include knowledge of prices or terms gained through availability of established price lists or catalogues made available to the public by the competing CMGC. No attempt has been made or will be made by the CMGC to induce any other CMGC to submit or not to submit a proposal for the purpose of restricting competition. F. Asbestos Management Plan. The successful CMGC shall be required to sign the Asbestos Management Plan Contractor Responsibility form set forth in Attachment H as a condition of an award of contract.
8
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
ATTACHMENT A Project Information and Owner Requirements Project Name Community Montessori School 805 Gillaspie Drive, Boulder, CO 80305 Bear Creek Elementary School 2500 Table Mesa Drive, Boulder, CO 80305 Mesa Elementary School 1575 Lehigh Street, Boulder, CO 80305
Architect TBD The estimated design completion dates can be found in the Milestones section of the RFP. Project Schedule Ɣ Design (DAT) meetings and the estimated dates can be found in the RFP Milestones. Ɣ
We anticipate that the construction and renovation related to Community Montessori School will be completed by August 1, 2027. Estimated construction dates, if available can be found in the RFP Milestones.
Ɣ
We anticipate that the construction and renovation related to Bear Creek Elementary School will be completed by August 1, 2027. Estimated construction dates, if available can be found in the RFP Milestones.
Ɣ
We anticipate that the construction and renovation related to Mesa Elementary School will be completed by August 1, 2027. Estimated construction dates, if available can be found in the RFP Milestones.
Ɣ
Construction duration is estimated to be: o Community Montessori School - 6 months o Bear Creek Elementary School - 6 months o Mesa Elementary School - 6 months (please use this for responding to Attachments B1, B2, & B3 and C1, C2, & C3).
*** Note: Staffing levels and project duration are based on the assumption that work will begin around spring break and continue outside of school hours until completion. Full-time staffing for the entire duration is not anticipated. ***
9
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
Project Construction Budget Community Montessori School - $1,935,652.00 Bear Creek Elementary School - $1,501,707.00 Mesa Elementary School - $681,065.00 Liquidated Damages Liquidated damages for this project will be set at $1000/day. Additional Information Ɣ Please see Critical Needs Plan information at: https://resources.finalsite.net/images/v1665782745/bvsdorg/zuqqioc7dydqf43sk9uv/2022BVSDFacilitiesCritic alNeeds.pdf Ɣ
Billable rates are NOT allowed as part of contract
Ɣ
Design Phase fee will be a fixed amount for the contract and this project
Ɣ
This project qualifies under items 3 through 9 in “Green Building Guiding Principles” https://bond.bvsd.org/green-building
10
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
ATTACHMENT B1, B2, & B3 CM/GC Proposal Form - See attached Excel spreadsheet. ATTACHMENT C1, C2, & C3 CM/GC Matrix - See attached Excel spreadsheet. No changes to the matrix are allowed.
11
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
ATTACHMENTS D, E, & F Requirement List Report by Priority created by VFA, Inc.
See separately attached PDF’s.
12
Bear Creek Elementary School Asbestos Building Material Remaining– 2022 Contractors: Before doing any work on this building review the Asbestos Management Plan and the sampling data. A Certified Inspector must perform additional sampling if they decide that is necessary to confirm whether a material is Asbestos Containing Material (ACM). Additional sampling is required if the inspector identifies an area of unique homogenous material that had been included in a larger assessment area in the Management Plan. A separate, signed, ‘Contractor Responsibility form’ is required for each school you work in.
BE AWARE: There may be asbestos material in pipe chases, behind walls, above ceilings, and in tunnels or crawl spaces that is not accessible and/or has not been identified. In particular watch for acoustical or fire retardant spray-on texture and for Thermal System Insulation (TSI), which is insulation on pipe fittings, boilers, exhaust stacks, etc. Call Environmental Services for positive identification. Further sampling and testing may be required. During school hours call 720-561-5937. For after hours or emergency response call security at 720-561-5051.
See Floor Plans showing each addition of the building if needed to identify areas of asbestos containing materials. Thermal System Insulation (Pipe and pipe fitting insulation). There may be insulation on pipe fittings, pipe hangers, and roof drains throughout the building. Some of this material was abated during the 2020 Bond Abatement. See Asbestos Abatement Summary for details. Caulking in Expansion Joints, 1970 building – this will be exterior joints between building sections. Gray caulk or glaze around windows or doors – 1970 original building and 1983 addition. Some of this material was abated during the 2020 Bond Abatement. See Asbestos Abatement Summary for details. 1
1’ x 1’ floor tile- Entry way room 133 only. Floor tile with white streaks on an aqua-blue tile. This material was abated during the 2020 Bond Renovation. Fire Doors – As a precaution fire doors are assumed to contain asbestos filler until tested. Joint Compound on drywall – Entire 1970 building. This material has ‘Trace’ level of asbestos which is not regulated but work on this material is subject to OSHA rules. Some of this material was abated during the 2020 Bond Abatement. See Asbestos Abatement Summary for details.
Sampled Non-Asbestos Building Material All materials used in the 2011 addition/renovation are certified by the architect that no asbestos materials were specified in building. Sealant on CMU (building block) – Entire building Wall Texture – Entire building Joint compound and drywall – 1983 addition Brown Caulk around windows and doors Silicone caulk around windows or doors Mortar on brick walls Cove base adhesive – Entire building Plaster on soffits over doors and windows – Entire building Aspen fiberboard ceilings (Tectum or ‘tech’ ceiling) – Entire building 2’ x 4’ Ceiling Tile – All patterns are non-asbestos 2’ x 2’ Ceiling Tile – all patterns are non-asbestos Carpet and mastic – all are non-asbestos
2
1’ x 1’ floor tile and mastic – all are non-asbestos except for room 133 Black ‘Vibration Collar’ (flex boot) on Air Handling Units Sink Undercoat – Gray White End Cap Sealant – on fiberglass pipe insulation in Upper Mezzanine.
3
:LQGRZ*OD]H %HLJH
9LEUDWLRQ&ROODU
:DOO7H[WXUH
)LUH'RRUV
-RLQW&RPSRXQG RQ'U\ZDOO
;9$79DULRXV&RORUV Z%ODFN0DVWLF
%XLOGLQJ&DXON 'RRUV:LQGRZV %HLJH
%XLOGLQJ&DXON ([SDQVLRQ-RLQW
5RRP
1)0
1)6
1)0
2&
1)6
2& SOXVDOODGGLWLRQV
1)0
1)0
2&
&RUULGRUV
5RRP
&RUULGRU 2XWVLGH
1)0
1)0
6WUXFWXUDO:DOOV 2&
)6
)6
)7
5RRP:HVW:DOO 1H[WWROLJKWVZLWFK
76,3LSH+DQJHU ,QVXODWLRQ
(QG6HDODQW
$LU3OHQXP 0H]]DQLQH
76, 5RRI'UDLQV 3LSH)LWWLQJV
%RLOHU5RRP DQG$LU3OHQXP
%RLOHU5RRP 2&$LU 3OHQXP %HKLQG:DOOV
+RPR JHQRXV $UHD
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%& %&
%&(
%&(
%&(
%&(('& %&(('&
%&(('& %&( %&(
%&(
%&(('&
%&(
%9 %9 %9 %9 %9
%&(
%& 8QGHWHUPLQHG %&
%9 8QGHWHUPLQHG %9 %9
$SSUR[
%& %& %& %& %& %& %& 8QGHWHUPLQHG %&
$SSUR[ VI
%&(
1'
7UDFH
$VVXPHG
3 &KU\ &RPSRVLWH
7LOH&KU\
3 %ODFN0DVWLF &KU\
3 &KU\
3 &KU\
1$
1RQH
1RQH
1RQH
1$
1$
1RQH
1RQH
1RQH
3 $PRVLWH
3 &KU\
1RQH
1RQH
3 $PRVLWH
3 $PRVLWH
7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
7KLVPDWHULDOZDVUHPRYHG'XULQJWKH %RQG5HQRYDWLRQ
6RPHRIWKLVPDWHULDOZDVDEDWHG GXULQJWKH%RQG5HQRYDWLRQ
7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
$EDWHG%RQG5HQRYDWLRQ
7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
$EDWHG%RQG5HQRYDWLRQ
6HH%RQG$EDWHPHQW6XPPDU\IRUGHWDLOV
6RPHH[WHULRUGRRUVDQGZLQGRZVZHUHDEDWHG DQGUHSODFHGGXULQJWKH%RQG5HQRYDWLRQ
6RPHRIWKLVPDWHULDOZDVDEDWHGGXULQJWKH %RQG5HQRYDWLRQ
7KLVLVORFDWHGDWWKHWRSRIWKHVWDLUV OHDGLQJLQWRWKHPH]]DQLQH
6HH%RQG$EDWHPHQW6XPPDU\IRUGHWDLOV
$SSUR[LPDWHO\3LSH)LWWLQJV ZHUHDEDWHGGXULQJWKH %RQG5HQRYDWLRQ
2ULJLQDO&RQVWUXFWLRQ
8QGHWHUPLQHG %&(:*/
$SSUR[
$SSUR[
$SSUR[ VI
$SSUR[ VI
$SSUR[
4XDQWLW\
/
/
/
0
0
0
/
/
/
/
/
/
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
+RPR JHQRXV $UHD
5RRP
3ODVWHU
3ODVWHU6RIILW([WHULRU
7HFWXP :KLWH5HVLQRXV0DWHULDO
2& SOXVDOODGGLWLRQV
5RRPV$ $
&RUU
; &HLOLQJ7LOH 6FDWWHUHG+ROHV/DUJH3RFNV 5RRPV+
; &HLOLQJ7LOH 7H[WXUHGORRNQRKROHV
)0
)0
1)6
1)6
1)0
4XDQWLW\
%&( %&( %&( %&( %&( 8QGHWHUPLQHG %&(
%9 %9 %9 %9 %9 %9
%&( %&( %&( %&( %&( %&( %&( 8QGHWHUPLQHG %&(
%&(
%9
%&( %&( 8QGHWHUPLQHG %&(
1'
1'
1'
1'
1'
1$
1$
1$
1RQH
1$ 7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
7KLVPDWHULDOZDVUHPRYHG'XULQJWKH %RQG5HQRYDWLRQ
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%&( 8QGHWHUPLQHG %&(
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
""
:DOO3DQHO 3UHIDEIDEULFW\SH
&RUU/ &RYHULQJ:DOO
$
2& SOXVDOODGGLWLRQV
2&([WHULRU SOXVDOODGGLWLRQV 'RRUV:LQGRZV 5RRPV
2& SOXVDOODGGLWLRQV
([WHULRU([SDQVLRQ-RLQW *UD\5HVLQRXV0DWHULDO :KLWH)RDP
0RWDURQ%ULFN
%XLOGLQJ&DXON *UD\
&086HDODQW RQ&RQFUHWH%ORFN
&DXON:LQGRZ)UDPH*UD\
+RPR JHQRXV $UHD
1)0
1)0
1)6
1)6
1)6
1)6
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%&(
%&(
%&(
%& %& %&
%5&5. %5&5. %5&5.
%&( %&( %&( %&( %&( %&( %&(
%&(&08 %&(&08 %&(&08 %&(&08 %&(&08 %&(&08 %&(&08
%&( %&( %&( %&( %&(
%&( 8QGHWHUPLQHG %&(
%&( 8QGHWHUPLQHG %&(
8QGHWHUPLQHG
%&(:&/. %&(:&/.
%&( %&( 8QGHWHUPLQHG %&( %&( %&( %&( %&( %&(
%&('&/. %&('&/. %&(:&/. 8QGHWHUPLQHG %&(:&/.
8QGHWHUPLQHG
4XDQWLW\
1'
1'
1'
1'
1'
1'
1$
1$
1$
1$
1$
1$
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
+RPR JHQRXV $UHD
6XVSHFW76,3RZGHU
9LQ\O&RPSRVLWH7LOH 0XOWL&RORUV Z%ODFN0DVWLF DQG<HOORZ0DVWLF
&DUSHW0DVWLF
5HG&HUDPLF7LOH 0RUWDU)ORRU
&RYH%DVH$GKHVLYH %ODFN%URZQ
'U\ZDOO
:KLWH:DOO&RYHULQJ
6LQN8QGHUFRDWLQJ*UD\
([WHULRU:LQGRZ*OD]H %URZQ
%RLOHU5RRP
5RRPV
&RUU
5RRPV
.LWFKHQ5RRP
2&
5RRP+
5RRP+
5RRP
5RRP
)6
1)0
1)0
1)0
1)6
1)0
1)0
1)6
1)6
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%& %& %& %& %& %&
%&(&(57 %&(&(57
%&( %&( 8QGHWHUPLQHG %&(
%&()7 8QGHWHUPLQHG %&()7
%&( %&( %&( %&(
%&( %&( 8QGHWHUPLQHG %&(
$SSUR[ VI
8QGHWHUPLQHG %&(
%&( %&(
%& %& %&
8QGHWHUPLQHG %5&5.
8QGHWHUPLQHG %5&5.
8QGHWHUPLQHG ('&68
8QGHWHUPLQHG %&(
4XDQWLW\
1$
1$
1$
1$
1$
1$
1$
1$
1$
$GGLWLRQ
1'
1'
1'
1'
1'
1'
1'
1'
1'
7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
7KLVPDWHULDOZDVUHPRYHG'XULQJWKH %RQG5HQRYDWLRQ
6RPHRIWKLVPDWHULDOZDVDEDWHG GXULQJWKH%RQG5HQRYDWLRQ
7KLVPDWHULDOZLOOQRWDSSHDU LQIXWXUHUHLQVSHFWLRQUHSRUWV
7KLVPDWHULDOZDVUHPRYHG'XULQJWKH %RQG5HQRYDWLRQ
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
+RPR JHQRXV $UHD
(QG&DS6HDODQW
6LQN8QGHUFRDW*UD\
; 9&7Z0DVWLF 9DULRXV&RORUVZLWK YDULRXVPRWWOH VWUHDNV
&08%ORFN)LOOHUZ&RDWLQJ
&08%ORFN)LOOHU
2&5P 2& 0H]]DQLQH
2& SOXVDOODGGLWLRQV
5RRP
5RRP
5RRPV%& +
;&HLOLQJ7LOH 6FDWWHUHG+ROHVZLWK /DUJH3RFNV 6FDWWHUHG)LVVXUHV+ROHV 6FDWWHUHG+ROHV
-RLQW&RPSRXQG RQ'U\ZDOO
2& SOXVDOODGGLWLRQV
; &HLOLQJ7LOH /RQJ)LVVXUHV ZVFDWWHUHGKROHV &URVV)LVVXUHVZKROHV 3RFNVZ6PDOO+ROHV 7H[WXUHGZQRKROHV ;5LEEHG7H[WXUH
1)6
1)6
1)0
1)6
1)6
1)6
)0
)0
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%9 %9 %9 %9 %9 %9 %9 %9
1'
%&(('& 8QGHWHUPLQHG %&(('&
$GGLWLRQ
1'
1'
1'
1'
1'
1'
1'
('& 8QGHWHUPLQHG 68
%&()7 8QGHWHUPLQHG %&()7
%&( %&(
%&( %&( %&( %&(
%5&5. %5&5. 8QGHWHUPLQHG %5&5.
%&( %&( 8QGHWHUPLQHG %&(
%&( %&( 8QGHWHUPLQHG %&(
%&( %&( 8QGHWHUPLQHG %&(
%&( %&( %&( %&( %&( %&( %&( 8QGHWHUPLQHG %&(
4XDQWLW\
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
&DXONLQJ:KLWH
&DXONLQJ'DUN*UD\
5RRI
5RRI
5RRI
&DXONLQJ%ODFN
5RRI
)ODVKLQJ6KHHWLQJ $VSKDOWLF0DWHULDO
5RRI3HQLWUDWLRQV
5RRI(GJHV DQG)ODVKLQJ
&RUU
6LOYHU3DLQW )ODVKLQJ6KHHW0DWHULDO
%XLOGLQJ&DXON*UD\
6LOYHU3DLQW7DU0DWHULDO
+RPR JHQRXV $UHD
1)0
1)0
1)6
/RFDWLRQDQG 4XDQWLW\/RFDWLRQ 7\SHRI URRPVDUHDV 0DWHULDO ) IULDEOH FRUULGRUV 0DWHULDO'HVFULSWLRQ'HWDLOV DGGLWLRQVHWF ) QRQIULDEOH RIWKHPDWHULDOZKDWLVLW 7RWDODUHDRU 6 VXUIDFLQJ ZKDWGRHVLWORRNOLNH TXDQWLW\RI 7 7KHUPDO FRORUVWH[WXUHSDWWHUQHWF PDWHULDO 0 0LVF
%&(50 %&(50 %&(5&/. %&(5&/. %&(5&/. %&(5&/. %&(5&/. %&(5&/.
$SSUR[ VI $SSUR[ VI $SSUR[ VI
%&(50 %&(50
%&(50 %&(50
$SSUR[ VI
$SSUR[ VI
$SSUR[ VI
XQGHWHUPLQHG %&(
4XDQWLW\
1'
1'
1'
1$
1$
1$
1$
1$
3DLQW1' 7DU&KU\ 1'
1$
3DLQW1' 7DU&KU\
6FKRRO5RRI
1'
$VVHVVPHQW 5HVXOWV 3HUFHQW 3RVLWLYH 3 'DPDJHG $+(5$ 1RQGHWHFW /RFDOL]HG / FDWHJRU\IRU 1' /RFDWLRQ IULDEOH$&0 7UDFH 75 'LVWULEXWHG 7\SHRI'DPDJH 3RWHQWLDOIRU'DPDJH WKUX 6DPSOH1XPEHUV 1RQGHWHFW ' 1RW SHU 6LJQLILFDQW 6 +LJK + 7DNHQLQD $SSOLFDEOH 1' 'DPDJHG ' 0RGHUDWH 0 5HJXODWLRQ VWDWLVWLFDOO\UDQGRP 1$ ,9) 1R'DPDJH 1R' /RZ / GLVWULEXWHGPDQQHU $FFHVVWR $LU 9DQGDO $FFHVVWR 6HUYLFH :DWHU ,PSDFW (URVLRQ LVP 3XEOLF 3HUVRQQHO $LU(URVLRQ 9LEUDWLRQ
%HDU&UHHN(OHPHQWDU\7DEOH0HVD'ULYH%RXOGHU&2 $+(5$5HLQVSWHFWLRQDQG$VEHVWRV+RPRJHQHRXV$UHD
Abated 5/12/20
Figure 1. Asbestos abatement locations, Non-mechanical, Bear Creek Elementary School, Boulder, Colorado. CTL Project No. FC09108.000-222
Abated 5/7/20
OSHA DW ceiling
Abated 4/27/20
Abated 4/27/20
Abated 5/1/20
Abated 3/22/20
Windows abated
OSHA DW ceiling
OSHA DW ceiling
OSHA DW ceiling
Floor tile/mastic
Abated 4/29/20 and 5/4/20
OSHA DW ceiling
Abated 5/12/20
Remove ACM-containing window
Remove OSHA drywall ceiling
Abate ACM floor tile/mastic
Abated 5/1/20
OSHA DW ceiling
Abated 5/12/20
Windows abated
Windows abated
Abated 4/28/20
OSHA DW ceiling
A
Abated 3/22/20 (15 fittings) CH/UV Abated 4/30/20
CH/UV Abated 4/28/20 in same containment as CH/UV outside 125A
5
2
8
8 3
4 2
CH/UV Abated 4/29/20 No fittings (verified)
4
1
Abate fittings associated with Unit Ventilator (no. of fittings in italics inside red rectangle)
4
2
Abate fittings associated with Cabinet Heater (no. of fittings in italics inside red rectangle)
A
Abate fittings associated with Air Handling Unit (15 fittings)
Figure 2. Asbestos abatement locations, Mechanical, Area 1, Bear Creek Elementary School, Boulder, Colorado. CTL Project No. FC09108.000-222
Abated 3/22/20 9
8
No ACM
No ACM
Count not locate (verified 4/27/20) 8
Abated 4/28/20 In same containment as CH/UV outside 137E No fittings (verified 4/28/20) 4
8
1
Abate fittings associated with Cabinet Heater (no. of fittings in italics inside red rectangle)
Figure 3. Asbestos abatement locations, Mechanical, Area 2, Bear Creek Elementary School, Boulder, Colorado. CTL Project No. FC09108.000-222
5
No fittings (verified)
0
6 fittings Abated 6/3/20
Figure 4. Asbestos abatement locations, Mechanical, Area 3, Bear Creek Elementary School, Boulder, Colorado. CTL Project No. FC09108.000-222
3
Abated 5/8/20
Abated 5/7/20
3
Abated 5/8/20
No ACM
2 fittings Abated 6/3/20
No ACM
Roof drain fitting Abated 6/3/20 (1 LF (no clearance)
No ACM
4
8
8
No ACM
8
Abated 5/7/20
No ACM
2
Abate fittings associated with Cabinet Heater (no. of fittings in italics inside red rectangle)
1 Abate fittings associated with Unit Ventilator (no. of fittings in italics inside red rectangle)
4 areas in one containment – abated 5/4/20
4
4
#*"#&*'(#(%$#((
#&*'- #)$# $)'$%$(!&*'"#)($))'$#%)*!(*!(%(#%!#( $*#))$+') %!") (%$#( +!!!!$+)+$)$#!%($')(()$#*()'()'($$!#!*# )(% ","*"$%(
EXHIBIT B The following 46 pages are CMGC response to the RFP
4919-9821-7592, v. 1
18
BVSD RFP 26-10 CM/GC Project Scope #4
Mesa ES, Bear Creek ES, Community Montessori Firm Name: Fransen Pittman Construction
Firm Address: 9563 South Kingston Court Englewood, CO 80112
Date of Submittal: October 3rd, 2025
Authorized Representative: Jeff Pittman, Project Executive 9563 South Kingston Court, Englewood, CO 80112 jeffpittman@fransenpittman.com ; (720) 724-0090 * Jeff is available to answer evaluation team questions
Bear Creek Elementary
SECTION 1: GENERAL INFORMATION
TABLE OF CONTENTS SECTION 1
General Information
SECTION 2
Experience & Approach
SECTION 3
Proposed Team
SECTION 4
Attachment I
This PDF is bookmarked and linked. Select any Table of Contents item to jump to the corresponding section.
Bennett Middle School
BOULDER VALLEY SCHOOL DISTRICT RE-2 REQUEST FOR PROPOSALS NO. 26-10 September 4, 2025
ATTACHMENT G NOTE: THIS PAGE MUST BE COMPLETED AND INCLUDED WITH THE SUBMISSION BOND CONSTRUCTION MANAGER / GENERAL CONTRACTOR SERVICES DECLARATION & SIGNATURE PAGE DECLARATION: I hereby certify that the information provided in this submission made to Boulder Valley School District is true and correct and I am duly authorized to submit this response. No Board of Education member, member of a District board or committee, employee of the District, or any such person’s spouse, child, parent, brother, sister, dependent, or person assuming a relationship being the substantial equivalent of the above, has a direct or indirect financial or personal interest in the proposing firm or this Request except as follows [or state: NONE]: None ________________________________________________________________________________________________ ________________________________________________________________________________________________ __________. I hereby certify that the firm has reviewed this Request, the Design Advisory Team Guidelines, and the District’s standard CMGC Agreement with General Conditions and other attachments and accepts the terms and conditions thereof.
Fransen Pittman Construction ____________________________________________ (FIRM NAME)
Jeff Pittman _____________________________________________ (TYPED NAME OF AUTHORIZED AGENT)
9563 South Kingston Court ____________________________________________ (STREET ADDRESS)
______________________________________________ S (SIGNATURE OF AUTHORIZED AGENT)
Englewood, CO 80112 ____________________________________________ (CITY, STATE AND ZIP CODE)
Project Executive ______________________________________________ (TITLE)
(720) 724-0090 ____________________________________________ (TELEPHONE NUMBER)
10/03/2025 ______________________________________________ (DATE)
(303) 783-3939 ____________________________________________ (COMPANY FAX NUMBER)
84-1274685 ______________________________________________ (FEDERAL EMPLOYEE IDENTIFICATION NUMBER)
jeffpittman@fransenpittman.com ____________________________________________ (EMAIL ADDRESS)
v.2 090618
14
1
October 3, 2025 Dear Mr. Derrell Walton and Members of the Selection Committee, 0˧úĝÄúoÝĦĦù§úÝĝĦÙĖÝòòĽĦăĝĬ¶ùÝĦăĬĖĕĬ§òÝŌ·§ĦÝăúĝÒăĖĦÙÄyUÄĝ§"òÄùÄúĦ§ĖŁƕħĖĖÄÄï "òÄùÄúĦ§ĖŁƕ§ú½ăùùĬúÝĦŁUăúĦÄĝĝăĖÝēĖăìÄ·Ħĝƚ_ĬĖĦħùĖÄ·ăÓúÝŇÄĝĦÙÄĝÝÓúÝŌ·§úĦÝùē§·ĦĦÙ§Ħ§ú inspiring learning environment has on student success. Each of these three schools bring a unique and ÝúĦÄúĦÝăú§ò§ēēĖă§·ÙĦăĽĬ·§ĦÝăúƕĻÙÝòÄĬēÙăò½ÝúÓyƴĝĺ§òĬÄĝ¶ŁÒăĝĦÄĖÝúÓ·ĬĖÝăĝÝĦŁƕ·ăúŌ½Äú·Äƕ§ú½ Ýúúăĺ§ĦÝăúƚĝĦĖăúÓĝÄúĝÄăÒ·ăùùĬúÝĦŁÝĝăúÄăÒĦÙÄù§ìăĖÒ§·ĦăĖĝĦÙ§ĦĝÄē§Ė§ĦÄĝŁăĬ˽ÝĝĦĖÝ·ĦÒĖăù ăĦÙÄĖĝƚyÝùÝò§ĖòŁƕ0˧úĝÄúoÝĦĦù§úƴĝē§ĝĝÝăúĦăĝĦĖÄúÓĦÙÄú·ăùùĬúÝĦÝÄĝ§ú½·ĖħĦÄēĬĖēăĝÄÒĬòĝē§·ÄĝÝĝ ĻÙ§ĦĝÄē§Ė§ĦÄĝĬĝÒĖăùăĦÙÄĖŌĖùĝƚ _ĬĖĦħùÝĝĬúÝĕĬÄòŁĕĬ§òÝŌĽĦăē§ĖĦúÄĖĻÝĦÙŁăĬƚÄăÒÒÄĖƔ Trusted Partnership. Fransen Pittman prides ourselves on building long-lasting, trusted partnerships. We have teamed up with hundreds of schools for renovations, expansions, and new-builds, several of which have evolved into ongoing partnerships. Our proposed team, including Travis Smith as Senior Project U§ú§ÓÄ˧ú½Iăúò§Ėï§ĝyÄúÝăĖyĬēÄĖÝúĦÄú½ÄúĦƕÙ§ĝ¶ÄÄúÙ§ú½ƪēÝ·ïĽ½ĬÄĦăĦÙÄÝĖĖÄòÄĺ§úĦÄŀēÄĖĦÝĝÄƕ ĝĦĖăúÓòħ½ÄĖĝÙÝēĕĬ§òÝĦÝÄĝƕ§ú½ĦÙăĖăĬÓÙĬú½ÄĖĝĦ§ú½ÝúÓăÒŁăĬĖēĖăìÄ·ĦƚÙÄŁïúăĻĻÙ§ĦÝĦĦ§ïÄĝĦă·ĖħĦÄ an environment that will prepare students to be successful, lifelong learners. Unique Process.ăòò§¶ă˧ĦÝăú§ú½·ăùùÝĦùÄúĦ§ĖÄĦÙÄÒăĬú½§ĦÝăúăÒ0˧úĝÄúoÝĦĦù§úƴĝ§ēēĖă§·ÙƚÄ ĖÄ·ăÓúÝŇÄĦÙÄĺ§òĬÄăÒÓÄĦĦÝúÓ§òòĝĦ§ïÄÙăò½ÄĖĝĦăÓÄĦÙÄĖƕÝú·òĬ½ÝúÓy§ú½ēĖăìÄ·Ħ§Ė·ÙÝĦÄ·ĦĝƕĦăù§ïÄ ÝúÒăĖùĽ½Ä·ÝĝÝăúĝ§ĝ§ĦħùƚĬĖÝúÓēĖÄ·ăúĝĦĖĬ·ĦÝăúƕĻÄĻăĖïĦÙĖăĬÓÙăĬĖĬúÝĕĬÄēĖă·ÄĝĝƕU"ǧ ƦUă½Äòƕ"ĝĦÝù§ĦÄƕ˧·ïƧƕēĖăùÝĝÝúÓ§··Ĭ˧·Ł§ú½§··ăĬúĦ§¶ÝòÝĦŁÒăĖĦÙĶĬ½ÓÄĦ§ú½ĝ·ÙĽĬòÄƚ0ĖăùĦÙÄĖÄƕ ăĬĖēĖăìÄ·Ħù§ú§ÓÄĖƕĝĬēÄĖÝúĦÄú½ÄúĦƕ§ú½ŌÄò½ÒăĖ·ÄĝÄùēòăŁ½ÝòÝÓÄúĦ·ăĝĦƕĝ·ÙĽĬòÄƕĝ§ÒÄĦŁƕ§ú½ĕĬ§òÝĦŁ ăēÄ˧ĦÝăúĝĦăÄúĝĬĖÄĦÙ§ĦăĬĖĻăĖïÝĝăÒĦÙÄÙÝÓÙÄĝĦĺ§òĬħú½¶ĬÝòĦĦăĦÙÄÄŀ§·ĦúÄĝĝăÒŁăĬĖĝĦ§ú½§Ė½ĝƚ Success with Similar Projects. Our team brings a wealth of experience building similar projects including 300+ K-12 education facilitiesƚyēÄ·ÝŌ·§òòŁƕăĬĖĦħùÙ§ĝĖÄòÄĺ§úĦÄŀēÄĖÝÄú·ÄĝĬ··ÄĝĝÒĬòòŁĖÄúăĺ§ĦÝúÓ schools on a summer timeline such as the Capital Improvement projects for Littleton Public Schools, yĦƚ˧Ýúy·Ùăăòĝƕ§ú½ÙÄĖĖŁĖÄÄïy·Ùăăòĝƕ§òòĖÄĕĬÝĖÝúÓ§ĝÝùÝò§Ėĝ·ăēÄăÒĻăĖï§ĝŁăĬĖĦÙĖÄÄĝ·Ùăăòĝƚ _ĺÄĖĦÙģħĖĝƕĻÄÙ§ĺÄē§ĖĦúÄĖĽĻÝĦÙyăúĝÄĺÄ˧òēĖăìÄ·ĦĝƕùăĝĦúăĦ§¶òĶÄÝúÓĦÙÄĖÄúăĺ§ĦÝăúăÒ Ä§ĖĖÄÄï"òÄùÄúĦ§ĖŁƚ;ùēĖăĺÄùÄúĦĝÝú·òĬ½Ä½§ú7ĖÄēò§·ÄùÄúĦƕĖăăÒĖÄùăĺ§ò§ú½ĖÄēò§·ÄùÄúĦƕ ēò§ŁÓĖăĬú½ĬēÓ˧½Äĝƕ§ú½ĖÄùă½ÄòăÒ·ò§ĝĝĖăăùĝ§ú½§½ùÝúĝē§·Äĝƚ 0˧úĝÄúoÝĦĦù§úÝĝÓ˧ĦÄÒĬòĦă¶Ä·ăúĝݽÄĖĽÒă˧úăēēăĖĦĬúÝĦŁăÒĦÙÝĝĝÝÓúÝŌ·§ú·Ä§ú½ĻăĬò½¶ÄÙăúăĖĽ Ħăăú·Ä§Ó§Ýúē§ĖĦúÄĖĻÝĦÙyƚÄòăăïÒăĖϧ˽ĦăÒĬĖĦÙÄĖ·ăúĺÄĖĝ§ĦÝăúĻÝĦÙŁăĬĖĦħùƚ
Jeff Pittman, Project Executive
(720) 724-0090; jeffpittman@fransenpittman.com 9563 South Kingston Court, Englewood, CO 80112
2 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
MATERIAL CHANGES TO PREQUALIFICATION IN RFQ 23-23 Văù§ĦÄĖݧò·Ù§úÓÄĝĦăēĖÄĕĬ§òÝŌ·§ĦÝăúƚ
300+ K-12 SCHOOL PROJECTS
95% OF OUR PROJECTS ARE CM/GC
1 HIGHLY QUALIFIED TEAM
3
Maddox ECE
SECTION 2: EXPERIENCE & APPROACH
RELEVANT PROJECT EXPERIENCE BVSD: BEAR CREEK ELEMENTARY Boulder, Colorado. Project scope included an HVAC replacement and a 30,000 SF roof removal and replacement.ÝĦÙ§Ò§ĝĦƪĦ˧·ïĽēĖăìÄ·Ħĝ·ÙĽĬòÄƕ0o§òĝă ·ăùēòÄĦĽ§úÄĻïÝĦ·ÙÄúĖĶĬÝò½ƕĖÄùă½ÄòăÒŕŜ·ò§ĝĝĖăăùĝ§ú½ĝÄĺÄ˧ò§½ùÝú ĝÄĖĺÝ·ÄăÒŌ·Äĝē§·Äĝƕ rebuilt two parking lots, and upgraded two playgrounds to meet code requirements. | $7.8M | 40,000 SF + 2 acres |
BVSD: HORIZONS K-8 CHARTER SCHOOL Boulder, Colorado.y·ăēÄăÒĻăĖïÝú·òĬ½Ä½ĦÙÄĖÄùăĺ§òăÒ§úÝúĦÄĖÝăĖϧòòƕ mechanical and plumbing equipment replacement,ēò§ŁÄĕĬÝēùÄúĦ§ú½ drainage improvements, ĬēÓ˧½Ä½¶ĬÝò½ÝúÓÄúĺÄòăēÄƕĝ§ÒÄĦŁƠ·ă½ÄĬēÓ˧½ÄĝĦÙ§Ħ Ýú·ăĖēă˧ĦĽĝÄĺÄ˧ò1ĖÄÄúĬÝò½ÝúÓē˧·ĦÝ·Äĝ§ú½ĝĬĝĦ§Ýú§¶òÄĝŁĝĦÄùĝƕ§ú½úÄĻ ·ÄÝòÝúÓĝƕòÝÓÙĦÝúÓƕ§ú½ōăăĖÝúÓƚ | $2.6M | 51,000 SF |
BVSD: MANHATTAN MIDDLE SCHOOL Boulder, Colorado. Manhattan Middle School of Arts offers students an in-depth ĝĦĬ½ŁăÒĺ§ĖÝăĬĝ§ĖĦÒăĖùĝ§ĝĻÄòò§ĝ§Ħ˧½ÝĦÝăú§ò§·§½ÄùÝ·ùݽ½òÄĝ·ÙăăòēĖăÓ˧ùƚ The remodel involved interior and exterior door replacement, boiler replacement, mechanical/electrical technology upgrades, §ÓŁù§½½ÝĦÝăúƕ§ú½§úÄŀĦÄúĝÝĺÄ ĖÄùă½ÄòăÒĦÙÄïÝĦ·ÙÄúƕòÝ¶Ė§ĖŁƕ§ú½·ăĬĖĦ٧˽ƚ
| $6.4M | 50,000 SF |
BVSD: UNIVERSITY HILL ELEMENTARY Boulder, Colorado. _ĖÝÓÝú§òòٶĬÝòĦÝúŕŝŔŜƕĦÙÄÙÝĝĦăĖÝ·ĝ·ÙăăòϧĝÝúúÄĽăÒ more space and an interior refresh. FP built an addition behind the school during the winter months, and completed interior renovations and space improvements over two summers. The project also included extensive site work and a new ēò§ŁÓĖăĬú½ƚ | $14.9M | 25,000 SF |
BVSD: PEAK TO PEAK CHARTER SCHOOL Lafayette, Colorado. 0o§ú½oħïĦăoħïƴĝē§ĖĦúÄĖĝÙÝēÙ§ĝĝē§úúĽăĺÄ˧½Ä·§½Äƕ ĻÝĦÙĺ§ĖÝăĬĝēĖăìÄ·Ħĝ·ăùēòÄĦĽăúĦÙÄĝ·Ùăăòƴĝ·§ùēĬĝÝú·òĬ½ÝúÓùĬòĦÝēòħ½½ÝĦÝăúĝ ƦÓŁùƕ·§ÒÄĦÄĖݧƕùݽ½òÄĝ·Ùăăò§ú½ÙÝÓÙĝ·Ùăăò·ò§ĝĝĖăăùĝƧƕrĖÄēò§·ÄùÄúĦƕ auditorium expansion, and multiple renovations (ADA compliance, roof repairs, elevator and safety upgrades, site work, and improved building usage). | $38.5M | 103,000 SF |
PROSPECT RIDGE ACADEMY ĖăăùŌÄò½ƕăòă˧½ăƚ oĖăĝēÄ·ĦrݽÓÄ·§½ÄùŁĝÄĖĺÄĝÓ˧½ÄĝKƪŕŖ§ú½ ĝăĬÓÙĦĦăÄŀē§ú½ĦÙÄÝĖ·§ùēĬĝ§ú½ĝÄĖĺÝ·ÄĝēĖăĺݽĽƚy·ăēÄăÒĻăĖïÝú·òĬ½Ä½ ·ăúĝĦĖĬ·ĦÝăúăÒ§úÄĻÓŁùú§ĝÝĬù§½½ÝĦÝăú§ú½interior renovations. FP phased ĦÙÝĝĻăĖï§ú½·ăùēòÄĦĽÝĦĝ§ÒÄòŁĻÙÝòÄschool remained in session with limited impacts to students and staff. | $4.1M | 22,000 SF |
5 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
RELEVANT PROJECT EXPERIENCE HERITAGE HEIGHTS ACADEMY Centennial, Colorado. After multiple uses and owners, FP remodeled a former y§ÒÄϧŁyĦăĖÄĦăÙăĬĝÄ7ÄĖÝĦ§ÓÄ7ÄÝÓÙĦĝ·§½ÄùŁƚÙÄĖÄùă½ÄòÝú·òĬ½Ä½ ½ÄùăòÝĦÝăúƕ§½½ÝĦÝăú§ò·ò§ĝĝĖăăùĝƕ§ú½ŌúÝĝÙÄĝĦăùÄÄĦĦÙÄúÄĽĝăÒĦÙÄ school. The ùÄ·Ù§úÝ·§òƕÄòÄ·ĦĖÝ·§òƕēòĬù¶ÝúÓƕŌĖħò§ĖùƕĺăÝ·ÄÄĺ§·Ĭ§ĦÝăúƕ§ú½ technology were updated during the renovation. | $3.2M | 58,400 SF |
GILCREST ELEMENTARY Gilcrest, Colorado. FP completed extensive renovations and upgrades ĦÙĖăĬÓÙăĬĦ1Ýò·ĖÄĝĦ"òÄùÄúĦ§ĖŁĦăÝùēĖăĺÄĝĦĬ½ÄúĦĝƴăĺÄ˧òòòħĖúÝúÓ ÄúĺÝĖăúùÄúĦƚyÝĦÄĻăĖïÝú·òĬ½Ä½§úÄĻĖăăÒ§ú½7ùă½ÝŌ·§ĦÝăúĝƚ Playground resurfacing and interior remodeling were also performed, including §òÝ¶Ė§ĖŁĖÄùă½ÄòƕÓŁù§½½ÝĦÝăúƕ§ú½§ĝÄ·ĬĖÄĺÄĝĦݶĬòÄƚ | $4.2M | 26,000 SF|
COMPASS MONTESSORI Wheat Ridge, Colorado. To meet increased space needs, the FP team demolished an existing modular classroom to allow for a 3,000 SF addition and remodeled 2,500 SF of classrooms in the existing school. Scope also included ĦÙħ½½ÝĦÝăúăÒĝïŁòÝÓÙĦĝƕ§úÄĻĦĻăÙăĬĖŌĖÄƪ˧ĦĽϧòò§ú½½ăă˶ÄĦĻÄÄúĦÙÄ §½½ÝĦÝăú§ú½ÄŀÝĝĦÝúÓ¶ĬÝò½ÝúÓƕ§úÄĻŌĖÄò§úÄƕ§ú½site work. | $1.7M | 5,500 SF|
MONTESSORI SCHOOL OF DENVER Denver, Colorado. FP constructed a new addition and completed various improvements to the existing school such as new windows, 7ƕŌúÝĝÙÄĝƠ ŌŀĦĬĖÄĝƕ§ú½§Ĭ½ÝăƠĺÝĝĬ§òĦÄ·ÙúăòăÓŁĬēÓ˧½Äĝƚ | $2M | 9,000 SF|
LITTLETON PUBLIC SCHOOLS: CAPITAL IMPROVEMENTS Littleton, Colorado. Moyƴĝ§ēÝĦ§ò;ùēĖăĺÄùÄúĦē§·ï§ÓÄÝú·òĬ½Ä½ĝĬùùÄĖ ÝùēĖăĺÄùÄúĦĝ§ĦŌĺÄĝ·ÙăăòĝÝĦÄĝƔ7ăēïÝúĝ"yƕrĬúŁăú"yƕ"§ĝĦ"yƕϧÝú"yƕ §ú½7ÄĖÝĦ§ÓÄ7yƚoĖăìÄ·Ħĝ·ăēÄÝú·òĬ½Ä½U"oĬēÓ˧½ÄĝƕÝúĦÄĖÝăĖŌúÝĝÙÄĝƕ and ĝĦĖĬ·ĦĬ˧òĖÄÝúÒăĖ·ÄùÄúĦƚVÄĻÝĖĖÝÓ§ĦÝăúĝŁĝĦÄùĝĻÄĖħòĝăÝúĝĦ§òòĽ§Ħħ·ÙĝÝĦÄƚ | $7.3M | up to 5,000 SF per school |
CHERRY CREEK SCHOOLS: INNOVATION CENTERS/CAPITAL IMPROVEMENTS Aurora, Colorado. Over the span of two summers, FP completed interior upgrades and renovationsÒă˧ùÝŀăÒŕřÄòÄùÄúĦ§Ė٧ú½ùݽ½òÄĝ·ÙăăòĝĻÝĦÙÝú ÙÄĖĖŁĖÄÄïy·ÙăăòÝĝĦĖÝ·Ħƚ | $6.9M | up to 5,000 SF per school |
6
UNDERSTANDING OF THE PROJECT 0˧úĝÄúoÝĦĦù§úƴĝĝĬùùÄĖ·ăúĝĦĖĬ·ĦÝăúĝĦ˧ĦÄÓŁÝĝ¶ĬÝòĦăúù§ŀÝùÝŇÝúÓēĖă½Ĭ·ĦÝĺÝĦٽĬĖÝúÓĝĬùùÄ˶Ėħïƕ ·ăòò§¶ă˧ĦÝúÓ·òăĝÄòŁĻÝĦÙy§ú½ĝ·ÙăăòĦħùĝƕ§ú½ù§ÝúĦ§ÝúÝúÓĝĦĖÝ·Ħĝ§ÒÄĦ٧ú½·ăùùĬúÝ·§ĦÝăú ĝĦ§ú½§Ė½ĝƚŁÒă·ĬĝÝúÓăú·ăú·ÄúĦ˧ĦÝúÓĖÄĝăĬĖ·Äĝ§ú½·ăùēòÄĦÝúÓ½ÝĝĖĬēĦÝĺÄĻăĖï½ĬĖÝúÓĦÙÄĝĬùùÄĖƕăĬĖ ĦħùÝĝ·ăúŌ½ÄúĦÝú½ÄòÝĺÄĖÝúÓĦÙÄUÄĝ§"òÄùÄúĦ§ĖŁƕħĖĖÄÄï"òÄùÄúĦ§ĖŁƕ§ú½ăùùĬúÝĦŁUăúĦÄĝĝăĖÝ projects on time, within budget, and with minimal impact to students and staff. _ĬĖĦħùĻÝòò¶ÄÒĬòòŁ½Ä½Ý·§ĦĽĦăyÒĖăùĦÙÄăĬĦĝÄĦăÒ§Ļ§Ė½ƕĻăĖïÝúÓ·òăĝÄòŁĻÝĦÙĦÙÄēĖăìÄ·Ħƴĝ ĦħùĦăÄúĝĬĖÄĦÙ§ĦĖÄúăĺ§ĦÝăúĝ§ĖÄ·ăùēòÄĦĽēĖÝăĖĦăĦÙÄĝĦ§ĖĦăÒĦÙÄŖŔŖśƠŖŔŖŜĝ·ÙăăòŁÄ§ĖƚòăúÓĻÝĦÙ ēĖăìÄ·ĦĝĦ§ïÄÙăò½ÄĖĝƕĻÄĻÝòòēĖăĺݽÄĖħòƪĦÝùÄ·ăúĝĦĖĬ·Ħ§¶ÝòÝĦŁƕÄĝĦÝù§ĦÝúÓƕ§ú½ăĬĖĦ˧½Äù§ĖïĽU"ǧ ēĖă·ÄĝĝƚŁÝ½ÄúĦÝÒŁÝúÓĝ·ăēÄĝħĖòŁăúÝúĦÙÄU"ǧēĖă·ÄĝĝƕăĬĖĦħùĻÝòòĖÄòħĝÄ·ĖĬ·Ý§òēĖă·ĬĖÄùÄúĦ ÝĦÄùĝ§ú½Ä§ĖòŁ¶Ý½ē§·ïĝĦăïÄÄēĦÙÄĝ·ÙĽĬòÄăúĦ§ĖÓÄĦƚ
SCHEDULE APPROACH 0ĖăùĦÙÄăĬĦĝÄĦăÒĝÝĦÄùă¶ÝòÝҧĦÝăúƕăĬĖĦħùĻÝòòēĖăĦÄ·ĦĦÙÄÄŀÝĝĦÝúÓ7ÒĖăù½ĬĝĦ§ĝĻÄòò§ĝ§òòăĦÙÄĖ ÄĝĝÄúĦݧòÝĦÄùĝƚÄĻÝòòĦÙÄú¶ĬÝò½ĦÄùēăĖ§ĖŁē§ĖĦÝĦÝăúĝĦăēÄĖÒăĖùĦÙÄĻăĖïÝú§ĝ§Òħú½Ýĝăò§ĦĽù§úúÄĖƚ MESA ELEMENTARY (page 9) ÒĦÄĖĦÙÄĝÝĦÄÝĝùă¶ÝòÝŇĽ§ú½ēĖăĦÄ·ĦÝăúĝ§ĖÄ·ăùēòÄĦÄƕM"òÝÓÙĦÝúÓĬēÓ˧½Äĝƕ7·ăúĦĖăòĝƕēòĬù¶ÝúÓ ĻăĖïƕ§ú½ÄŀĦÄĖÝăĖĻăĖïĻÝòò¶ÄÓÝúƕÒăòòăĻĽ¶ŁĦÝòħú½ē§ÝúĦĝ·ăēÄĝƚ"ŀĦÄĖÝăĖĻăĖïĻÝòòÝú·òĬ½ÄĦÙÄ ·ăĖĖÄ·ĦÝăúăÒ½§ù§ÓĽĝăò§Ė§Ė˧ŁĝƕòÝÓÙĦÝúÓŌŀĦĬĖÄĝƕ§ú½·ăú·ĖÄĦÄĖÄē§ÝĖƚ BEAR CREEK ELEMENTARY (page 11) _ú·ÄēĖăĦÄ·ĦÝăúĝ§ĖÄ·ăùēòÄĦÄƕM"òÝÓÙĦÝúÓĬēÓ˧½ÄĝƕŌĖħò§ĖùÙħ½ĬúÝĦĬēÓ˧½Äĝƕ§ú½ÄŀĦÄĖÝăĖĻăĖï will begin. After lighting upgrades are complete, other upgrades will commence including ACT (Acoustical ÄÝòÝúÓÝòÄƧƕ·§ĖēÄĦĖÄēò§·ÄùÄúĦƕ§ú½U"oĻăĖïĦăĖÄē§ÝĖƠÝúĝĦ§òòúÄϧÝĖ·ăú½ÝĦÝăúÝúÓƚVÄŀĦƕÄŀĦÄĖÝăĖĻăĖï ĻÝòò¶ÄÓÝúĻÝĦÙĦÙÄ·ăĖĖÄ·ĦÝăúăÒ½§ù§ÓĽ§ú½½ÄĦÄĖÝă˧ĦÝúÓù§ĝăúĖŁƕĖÄēò§·ÝúÓĦÙĽ§ù§ÓĽēĖÄ·§ĝĦ ·ăēÝúÓƕĖÄēò§·ÝúÓƠĖÄē§ÝĖÝúÓ½§ù§ÓĽĖăăŌúÓƕ§ú½ĖÄē§ÝĖăÒ·Ė§·ïĽă˽§ù§ÓĽēĽÄĝĦĖݧú·ăú·ĖÄĦÄƚ ·ăĖĖÄ·ĦÝăúĝÝúĦÙÄĦĖĬú·§ĦĽ½ăùÄĝ§ú½§ĝēÙ§òĦĖÄē§ÝĖÝúĦÙÄēò§ŁÓĖăĬú½§ĖħĻÝòòÒăòòăĻƚ COMMUNITY MONTESSORI (page 11) ēăú·ăùēòÄĦÝăúăÒēĖăĦÄ·ĦÝăúĝƕĦÙÄ"òÄ·ĦĖÝ·§òo§úÄò§ú½ÒÄĽÄĖĖÄēò§·ÄùÄúĦƠÝùēĖăĺÄùÄúĦĻÝòò·ăùùÄú·Äƚ yÝùĬòĦ§úÄăĬĝòŁƕē§ĺÄùÄúĦĖÄē§Ý˧ú½ĖÄēò§·ÄùÄúĦĻÝòò¶ÄÓÝúăúĦÙÄÄŀĦÄĖÝăĖăÒĦÙĶĬÝò½ÝúÓƕ§ĝĻÄòò§ĝ ĻăĖïăúĦÙÄÓĖħĝÄĦ˧ēƚēăú·ăùēòÄĦÝăúăÒē§úÄò§ú½ÒÄĽÄĖĻăĖïƕÝúĦÄĖÝă˧ú½ÄŀĦÄĖÝăĖÄòÄ·ĦĖÝ·§òĻăĖï will begin. New outlets will be roughed and installed at the roof level adjacent to mechanical units prior to ĦÙÄĝĦ§ĖĦăÒĖăăÒĻăĖïƚÙÝĝĻÝòòÄúĝĬĖÄĦÙ§ĦēĖăēÄĖē§Ħ·ÙÝúÓÝĝ§··ăùēòÝĝÙĽĻÙÝòÄĦÙÄĖăăÒÄĖĝ§ĖÄăúĝÝĦÄ ·ăùēòÄĦÝúÓĦÙÄÝĖĝ·ăēÄăÒĻăĖïƚ;úĦÄĖÝă˧ú½ÄŀĦÄĖÝăĖòÝÓÙĦÝúÓŌŀĦĬĖÄĝĻÝòò§òĝăĦ§ïÄēò§·ÄĬēăú·ăùēòÄĦÝăú ăÒē§úÄòĖÄĻăĖïƚ0ÝĖħò§ĖùĻăĖïĻÝòò¶ÄÓÝúĻÝĦÙĬēÓ˧½ÝúÓĦÙÄúÄĻÝúÝĦݧĦÝúÓ§ú½§ò§Ėù½ÄĺÝ·ÄĝƕÒăòòăĻĽ¶Ł ĦÙÄÝúĝĦ§òòăÒĝùăïÄÙ§Ħ·ÙÄĝƚ ăĻ˧ēĬē·ăúĝĦĖĬ·ĦÝăúăúĦÙÄĦÙĖÄÄĝ·Ùăăòĝƕ§òòúÄĻÄòÄ·ĦĖÝ·§òƕùÄ·Ù§úÝ·§òƕŌĖÄƕ§ú½ĖăăÒ·ăùēăúÄúĦĝĻÝòò ¶ÄÝúĝēÄ·ĦĽ¶ŁĖÄĕĬÝĖĽÓăĺÄĖúÝúÓ¶ă½ÝÄĝƚÙÄēĖăìÄ·ĦĻÝòò¶Ä·ăùēòÄĦĽĻÝĦÙ§ēĬú·Ùϧòï§ú½·ăĖĖÄ·ĦÝăú period prior to substantial completion.
7 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
SCHEDULE DEVELOPMENT & ADHERENCE SUCCESS IS BUILT FROM PLANNING ÙÄïÄŁĦă½ÄòÝĺÄĖÝúÓŁăĬĖēĖăìÄ·ĦăúƪĦÝùÄÝĝĦăĻăĖï·ăòò§¶ă˧ĦÝĺÄòŁĦă ÄúĝĬĖÄĦÙ§Ħ§òòùÝòÄĝĦăúĽ§ĦÄĝ§ĖÄÄĝĦ§¶òÝĝÙĽħĖòŁÒăĖĦÙÄēĖăìÄ·Ħƚ_ĬĖ ēĖăìÄ·Ħĝ§ĖĽÄòÝĺÄĖĽăúĦÝùĶķ§ĬĝÄĻÄÄùēòăŁĝÄĺÄ˧òēĖă§·ĦÝĺÄ ĝ·ÙĽĬòÝúÓùħĝĬĖÄĝƚ;úĦÙÄÄĺÄúĦăÒĬúïúăĻúĝƕĻÄ·ăùùĬúÝ·§ĦÄ ÝùùĽݧĦÄòŁĻÝĦÙĦÙÄ_ĻúÄ˧ú½ēĖăĺݽÄĝăòĬĦÝăúĝĦăù§ïÄĬēĦÝùÄƚ
PROCUREMENT
Pull planning is a collaborative approach to project scheduling that takes a reverse approach to sequencing.
ÄïúăĻĦÙ§ĦēĖă·ĬĖÄùÄúĦÝĝïÄŁĦăĝ·ÙĽĬòÄ·ăúĦĖăòƚÄ·§ĬĝÄ ăÒĦÙÝĝƕĻÄïÄÄē§ù§ĦÄĖݧòù§ĦĖÝŀĦÙ§ĦÝĝĬē½§ĦĽĻÄÄïòٶ§ĝĽăú ĝĬ¶·ăúĦ˧·ĦăĖƠĝĬēēòÝÄĖÝúēĬĦƚ_ĬĖēĖăìÄ·ĦĦħùĻÝòòĬĦÝòÝŇÄĦÙÝĝù§ĦÄĖݧò ù§ĦĖÝŀ½ĬĖÝúÓēĖÄ·ăúĝĦĖĬ·ĦÝăúĦă½ÄĺÄòăē§ēĖă·ĬĖÄùÄúĦĝĦ˧ĦÄÓŁƚ In §½½ÝĦÝăúƕĻÄÙăò½ĻÄÄïòŁùÄÄĦÝúÓĝĻÝĦÙĦÙĽÄĝÝÓúĦħùĦă·ăă˽Ýú§ĦÄ ĝĬ¶ùÝĦĦ§òĝƕr0;ĝƕ§ú½ēĖă·ĬĖÄùÄúĦăĬĦĝݽÄăÒĻÄÄïòŁ_ùÄÄĦÝúÓĝƚ
MONITOR AND COMMUNICATE SCHEDULE PROGRESS Today confirmed 8/30/2022 Unsure/Guess
Item
aspan) S492CP2+Accs) C102B+Accs) 2) UW) AMP1 (AMP-X75) RN1 (37567LS-94") RN2 (70189LS-109") RN3 (37571LS-113") (Science Only) 2 (SPA2-60) om BT1) Pio) h Country) Box LP LC) (PT-VMZ60) een KP1 (TSC-50-G3) Box (GC-100-12 OR GC7/NS/2SL/IR/RT) d)
ly) ly) and West Winter Break Work Only) )
ETA
Notes
Updated 8/30/2022 7/7/2022 Received 7/27/2022 Received 6/1/2022 Received 8/19/2022 Received 5/6/2022 Received 6/13/2022 Received 8/31/2022 stock with ACCU-TECH 6/13/2022 Received 8/25/2022 Added in COB 05. Shipping next week. Arr 7/21/2022 Received 11/15/2022 Delayed to November 8/25/2022 Shipping 8/11. (1) shipped 8/9. Tentative 8/12/2022 Picked up on 8/9. 8/19/2022 Received 8/24/2022 Received last 2 6000 Watt projectors 9/23/2022 Received Received. Custom boxes to secure Global 8/23/2022 received 8/26.
ăÄúĝĬĖÄĦÙ§Ħ§òòăÒăĬĖēĖăìÄ·ĦĝĝĦ§ŁăúĦ˧·ïĻÄÝú·ăĖēă˧ĦÄĦÙÄÒăòòăĻÝúÓ ·ăùùĬúÝ·§ĦÝăúĦăăòĝÝúĦăăĬĖēĖăìÄ·ĦēĖă·ÄĝĝƔ •
òħ˧ú½·ăúĝÝĝĦÄúĦ·ăùùĬúÝ·§ĦÝăúĻÝĦÙyƕĬĦÝòÝŇÝúÓÒĖÄĕĬÄúĦ Ò§·ÄĦăÒ§·ÄùÄÄĦÝúÓĝ§ĝúÄĽĽĦăïÄÄēĦÙÄēĖăìÄ·ĦùăĺÝúÓ ÄÒŌ·ÝÄúĦòŁƕĻÙÝòħĦĦÙÄĝ§ùÄĦÝùÄĖÄĝēÄ·ĦÝúÓĦÙĶĬĝŁĝ·ÙĽĬòÄĝăÒ the Owner's project team.
•
ŁĬĝÝúÓ½ÝÒÒÄĖÄúĦĝ·ÙĽĬòÄĝ·ăēÄĝòÝïħU§ĝĦÄĖy·ÙĽĬòÄƦoU y·ÙĽĬòÄƧƕyÙăĖĦÄĖùy·ÙĽĬòÄƕŗƪÄÄïMăăïÙħ½y·ÙĽĬòÄĝƕ ÄÄïòŁyú§ēĝÙăĦy·ÙĽĬòÄĝƕŕƠŗ§ú½ŖƠŗy·ÙĽĬòÄrÄĺÝÄĻĝƕăĬĖ team maintains schedule control and isolates incidents that could §ÒÒÄ·Ħĝ·ÙĽĬòÄƚħĖÄÄŀēÄĖĦĝ§ĦēÝĺăĦÝúÓ§ú½ù§ïÝúÓ§½ìĬĝĦùÄúĦĝ ÝÒúÄ·Äĝĝ§ĖŁƚ
•
ÄÄïòŁĝú§ēĝÙăĦĝ·ÙĽĬòÄĝݽÄúĦÝÒŁÝùēăĖĦ§úĦùÝòÄĝĦăúÄĝ§ú½ ½§ĦÄĝĻÙÄúïÄŁ½Ä·ÝĝÝăúĝ§ĖÄúÄĽĽÒĖăùĦÙÄ_ĻúÄĖƴĝĦħùƚ ÙÝĝݽÄúĦÝŌÄĝēăÝúĦĝÝúĦÝùÄĦÙĖăĬÓÙăĬĦĦÙÄēĖăìÄ·ĦĦÙ§ĦĝēÄ·ÝŌ· ĝĦ§ïÄÙăò½ÄĖĝĝÙăĬò½¶ÄÝúĺăòĺĽƚ
417 delivered. 320 to ship 8/24. Being sta 8/26/2022 vendor now. 135 delivered. 9 to ship 8/24. ESD 8/26/22 8/26/2022 staged with vendor now. 8/2/2022 Delivered Delayed to ship 8/24. ESD 8/26/22. Being 8/26/2022 vendor now. 8/15/2022 Delayed to ship 8/24. ESD 8/15/22 8/24/2022 Delivered. Staging at vendor until Winter w 10/13/2022 10/13 ship dates
A procurement material matrix helps our team to set decision dates and make recommendations to the Owner and the Architect on procurement of long-lead delivery items.
HOLDING SUBCONTRACTORS TO DURATIONS ÙÄúĻÄĝÄòÄ·ĦĝĬ¶·ăúĦ˧·ĦăĖĝƕĻÄÝú·òĬ½ÄĦÙÄù§ĝĦÄĖĝ·ÙĽĬòħú½Ħ˧½ÄƪĝēÄ·ÝŌ·½ÄĦ§ÝòĽĝ·ÙĽĬòÄĝ ĻÝĦÙÝúĦÙÄÝĖ·ăúĦ˧·ĦĝăēĖăìÄ·ĦÄŀēÄ·Ħ§ĦÝăúĝ§ú½ĦÝùÄòÝúÄĝ§ĖÄ·òħĖòŁ·ăùùĬúÝ·§ĦĽ§ú½¶Ýú½ÝúÓƚÙÄú ĦÙÄēĖăìÄ·Ħ¶ÄÓÝúĝƕăĬĖĻÄòòƪēò§úúĽēĖă·ĬĖÄùÄúĦēĖă·ÄĝĝÄúĝĬĖÄĝĦÙ§ĦòăúÓòħ½ù§ĦÄĖݧòĝ§ĖÄĖħ½ŁÒăĖ ĝĬ¶·ăúĦ˧·ĦăĖĝĻÙÄúĦÙÄÝĖĻăĖïÝĝúÄĽĽƚ ĬĖÝúÓ·ăúĝĦĖĬ·ĦÝăúƕăĬĖyĬēÄĖÝúĦÄú½ÄúĦ¶ĖħïĝĦÙÄăĺÄ˧òòĝ·ÙĽĬòÄÝúĦăŌĺÄƪĻÄÄïÝúĦÄĖĺ§òĝĦÙ§Ħ§ĖÄĬĝĽ Ħă·ăúĦĖăòĦÙĽ§ÝòŁōăĻăÒĦÙÄēĖăìÄ·ĦƚÙÄŁ½ÄēÝ·ĦĦÙÄē§ĝĦĻÄÄïƕēĖÄĝÄúĦĻÄÄïƕ§ú½ĦÙĖÄÄĻÄÄïĝÝúĦăĦÙÄ ÒĬĦĬĖÄƚÙÝĝĝÙăĖĦÝúĦÄĖĺ§òĝ·ÙĽĬòÄÝĝ§ïÄŁēăÝúĦăÒ½Ýĝ·ĬĝĝÝăúÝúĦÙÄĻÄÄïòŁùÄÄĦÝúÓĝĻÝĦÙĝĬ¶·ăúĦ˧·ĦăĖĝ §ú½ïÄÄēĝĦÙÄēĖăìÄ·ĦăúĦÝùÄƚ
8
Replace Damaged Precast Coping Repair/Replace Pedestrian Concrete (Cracked/Damaged)
Repair/Add Non-compliant or Missing Truncated Domes
Repair/Replace Asphalt Playground Surface Replace/Repair Pedestrian Concrete Refresth Damaged Mortar and Caulking in Masonry Exterior Walls
Repair/Replace Playground Surface Address ADA Truncated Domes- Non Compliant or Missing
Project Closeout Inspections (Fire, Electrical, Mechanical, Plumbing, Life Safety, Final
20 21
22
23 24 25
26 27
28 29 1 day 5 days 1 day
12 days 5 days
1 day? 1 day?
5 days 1 day? 1 day?
5 days
5 days 10 days
Start
Tue 7/27/27 Wed 7/28/27 Wed 8/4/27
Tue 7/20/27 Tue 7/20/27
Mon 5/31/27 Mon 5/31/27
Mon 6/21/27 Mon 5/31/27 Mon 5/31/27
Mon 6/21/27
Mon 6/14/27 Mon 6/7/27
Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/21/27 Tue 7/6/27 Mon 5/31/27 Mon 6/7/27 Mon 6/7/27 Mon 6/14/27 Mon 5/31/27 Mon 6/7/27 Mon 6/7/27
Mon 5/31/27 Mon 5/31/27 Mon 5/31/27 Tue 6/1/27
Finish
Tue 7/27/27 Tue 8/3/27 Wed 8/4/27
Wed 8/4/27 Mon 7/26/27
Mon 5/31/27 Mon 5/31/27
Fri 6/25/27 Mon 5/31/27 Mon 5/31/27
Fri 6/25/27
Fri 6/18/27 Fri 6/18/27
Mon 7/19/27 Fri 6/11/27 Fri 6/11/27 Mon 7/19/27 Fri 6/11/27 Fri 6/18/27 Fri 7/2/27 Mon 7/19/27 Fri 6/25/27 Fri 6/18/27 Fri 6/11/27 Fri 6/18/27 Fri 6/25/27 Fri 6/18/27 Fri 6/11/27
Wed 8/4/27 Fri 6/4/27 Mon 5/31/27 Fri 6/4/27
9 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
Owner/Arch Punch Walk Punch Corrections Substantial Completion
Interior Fire Protection system Head End Control Equipment Upgrades EMP Improvements Install Safety Railings LED Lighting Upgrade ACT Ceiling Replacements (Damaged and Stained) Broadloom Carpeting Exterior Electrical, Mechanical, and Plumbing Improvements Replace Air Cooled Condensing Unit - CU-1Install Air-conditioning in Cafeteria Pavement/ Sealants/ Site Work Replace Deteriorating Areas of Roof Re-Caulk Exterior Masonry at Damaged or Deterioated Mortar
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
30 31 32
47 days? 5 days 1 day 4 days
s^DĞƐĂůĞŵĞŶƚĂƌLJZĞŶŽǀĂƚŝŽŶ Mobilization Mobilize to site Protection of Items to Remain, Dust Mitigation, Temporary Partitions
1 2 3 4 30 days 5 days 5 days 30 days 5 days 10 days 10 days 10 days 20 days? 10 days 5 days 5 days 20 days? 10 days 5 days
Duration
Task Name
ID
FP’S PROPOSED SCHEDULE - MESA ES
10
ay 23, '27 May 30, '27 Jun 6, '27 Jun 13, '27 Jun 20, '27 Jun 27, '27 Jul 4, '27 Jul 11, '27 Jul 18, '27 Jul 25, '27 Aug 1, '27 M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W
Repair/Replace Pedestrian Concrete (Cracked/Damaged)
Replace Damaged Precast Coping Repair/Add Non-compliant or Missing Truncated Domes
Repair/Replace Asphalt Playground Surface Project Closeout Inspections (Fire, Electrical, Mechanical, Plumbing, Life Safety, Final
20
21 22
23 24 25
1 day 5 days 1 day
5 days 12 days 5 days
5 days 10 days
10 days
Start
Tue 7/27/27 Wed 7/28/27 Wed 8/4/27
Mon 6/21/27 Tue 7/20/27 Tue 7/20/27
Mon 6/14/27 Mon 6/21/27
Mon 6/7/27
Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/21/27 Tue 7/6/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27 Mon 6/14/27 Mon 6/7/27 Mon 6/7/27 Mon 6/7/27
Mon 5/31/27 Mon 5/31/27 Mon 5/31/27 Tue 6/1/27
Finish
Tue 7/27/27 Tue 8/3/27 Wed 8/4/27
Fri 6/25/27 Wed 8/4/27 Mon 7/26/27
Fri 6/18/27 Fri 7/2/27
Fri 6/18/27
Mon 7/19/27 Fri 6/11/27 Fri 6/11/27 Mon 7/19/27 Fri 6/11/27 Fri 6/18/27 Fri 7/2/27 Mon 7/19/27 Fri 7/2/27 Fri 6/18/27 Fri 6/11/27 Fri 6/18/27 Fri 7/2/27 Fri 6/18/27 Fri 6/11/27
Wed 8/4/27 Fri 6/4/27 Mon 5/31/27 Fri 6/4/27
y 30, '27 M T W
T
F
S
Jun 6, '27 S M T W
T
F
S
30 31 32
20 21 22 23 24 25 26 27 28 29
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 2 3 4
5D 5D 5D 5D
5D 5D 5D
5D 5D 5D 5D 5D 5D 5D 5D 5D 5D
5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D 5D
Cal
Name
s^ŽŵŵƵŶŝƚLJDŽŶƚĞƐƐŽƌŝZĞŶŽǀĂƚŝŽŶ Mobilization Mobilize to site Protection of Items to Remain, Dust Mitigation, Temporary Partitions Interior EMP Improvements Panel and Feeder updates Water Heter- Electric- Point of Use Water Heater- Gas- Comm Interior Lighting Fixures ( Fluorescent) Fire Protection system Initiating and Alarm Device Update and Install Fire Protection- Smoke Hatches for Stage Head End Control Equipment Upgrades Exterior Pavement Asphalt Repair / Replacement Electrical, Mechanical, and Plumbing Improvements Sanitary Wast system-Grease Interceptor for Kitchen Waste Outlet Adds Near HVAC Equipment on Roof Make-Up Air Unit -Outdoor-Gas-Fired Renewal Roof Repairs BUR with Coating BUR with Gravel Lighting Exterior Lighting Fixtures (High Intensity Discharge) Exterior Lighting Fixtures (Incandescent) Project Closeout Inspections (Fire, Electrical, Mechanical, Plumbing, Life Safety, Final Owner/Arch Punch Walk Punch Corrections Substantial Completion
Dur
Start
Finish
Mon 6/7/27 Fri 7/2/27 Mon 6/7/27 Fri 7/2/27 Mon 6/7/27 Fri 6/18/27 4 Mon 6/21/27 Fri 6/25/27 7 Wed 6/23/27 Tue 6/29/27 8FF+2 days Mon 6/21/27 Fri 7/2/27 7 Mon 6/7/27 Fri 7/2/27 Mon 6/7/27 Fri 6/18/27 4 Mon 6/21/27 Fri 6/25/27 12 Mon 6/28/27 Fri 7/2/27 4,13 Tue 6/1/27 Mon 7/19/27 Tue 6/1/27 Mon 6/14/27 Tue 6/1/27 Mon 6/14/27 3 Mon 6/7/27 Wed 7/7/27 Mon 6/7/27 Fri 6/18/27 4 29
29
13 29,14 29
10,8,20 9FF+2 days 29,21 26,29
4 days Mon 6/21/27 Thu 6/24/27 7 23 5 days Wed 6/30/27 Wed 7/7/27 9 29 14 days Fri 6/25/27 Thu 7/15/27 7 days Fri 6/25/27 Tue 7/6/27 20 24 7 days Wed 7/7/27 Thu 7/15/27 23 29 10 days Tue 7/6/27 Mon 7/19/27 5 days Tue 7/6/27 Mon 7/12/27 10 27 5 days Tue 7/13/27 Mon 7/19/27 26 29 14 days Tue 7/20/27 Fri 8/6/27 7 days Tue 7/20/27 Wed 27,17,9,24,13,230 7/28/27 1 day Thu 7/29/27 Thu 7/29/27 29 31 5 days Fri 7/30/27 Thu 8/5/27 30 32 1 day Fri 8/6/27 Fri 8/6/27 31
20 days 20 days 10 days 5 days 5 days 10 days 20 days 10 days 5 days 5 days 34 days 10 days 10 days 22 days 10 days
4,17 7,14,19,12
Predecessors Successors
47 days Mon 5/31/27 Wed 8/4/27 5 days Mon 5/31/27 Fri 6/4/27 1 day Mon 5/31/27 Mon 5/31/27 4 days Tue 6/1/27 Fri 6/4/27 3
0 days 0 days 0 days
2 days 8 days 2 days 2 days 2 days 0 days 0 days 0 days 0 days 0 days
0 days 0 days 0 days 8 days 8 days 0 days 10 days 10 days 10 days 10 days 0 days 24 days 24 days 8 days 20 days
0 days 0 days 0 days 0 days
Total Slack
11 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
ID
As Soon As Possible As Soon As Possible Finish No Later Than
As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible
As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible As Soon As Possible
Start No Earlier Than Start No Earlier Than As Soon As Possible As Soon As Possible
Constraint Type ay 30, '27 M T W T F
Jun 13, '27 S M T
FP’S PROPOSED SCHEDULE - COMMUNITY MONTESSORI
Owner/Arch Punch Walk Punch Corrections Substantial Completion
Interior Fire Protection system Head End Control Equipment Upgrades EMP Improvements Install Safety Railings LED Lighting Upgrade ACT Ceiling Replacements (Damaged and Stained) Broadloom Carpeting Exterior Electrical, Mechanical, and Plumbing Improvements Replace Air Cooled Condensing Unit - CU-1Install Air-conditioning in Cafeteria Pavement/ Sealants/ Site Work Replace Deteriorating Areas of Roof Re-Caulk Exterior Masonry at Damaged or Deterioated Mortar
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
26 27 28
47 days? 5 days 1 day 4 days
s^ĞĂƌƌĞĞŬůĞŵĞŶƚƌLJZĞŶŽǀĂƚŝŽŶ Mobilization Mobilize to site Protection of Items to Remain, Dust Mitigation, Temporary Partitions
1 2 3 4
30 days 5 days 5 days 30 days 5 days 10 days 10 days 10 days 20 days 10 days 5 days 5 days 20 days 10 days 5 days
Duration
Task Name
ID
FP’S PROPOSED SCHEDULE - BEAR CREEK ES
S
W
F
S
F
S
W
T
F
Jun 13, '27 S M T W T
Jun 20, '27 S M T
Jun 6, '27 S M T W T
T
S
F
S
W
T
Jun 20, '27 S M T W T
Jun 27, '27 S M T
F
F
S
S
W
Jun 27, '27 S M T W T
Jul 4, '27 S M T
F
S
T
S
F
Jul 11, '27 S M T
Jul 4, '27 S M T W T
F
S
W
F
S
F
S
W
T
F
Jul 18, '27 S M T W T
Jul 18, '27 S M T
Jul 11, '27 S M T W T
T
F
S
S
W
T
Jul 25, '27 S M T W T
Jul 25, '27 S M T
F
F
S
Aug 1, '27 S M T
F
W
12
Aug 1, '27 S M T W T
S
STREAMLINING COMMUNICATION _ĬĖÄúĦÝĖÄēĖăìÄ·ĦĦħùÝĝÝúĺăòĺĽÒĖăù½§ŁăúÄƕĝĦ§ú½ÝúÓ¶ÄĝݽÄyĦÙĖăĬÓÙăĬĦĦÙÄēĖăìÄ·ĦƴĝòÝÒÄĦÝùÄƕ §ú½ĬĦÝòÝŇÝúÓĦ˧úĝē§ĖÄúĦ§ú½ăēÄú·ăùùĬúÝ·§ĦÝăúƚÄĬú½ÄĖĝĦ§ú½ĦÙÄÝùēăĖĦ§ú·ÄăÒĝĦĖħùòÝúÝúÓ ·ăùùĬúÝ·§ĦÝăúĦăÄúĝĬĖÄĦÙ§ĦĝĦ§ïÄÙăò½ÄĖĝ§ĖÄÝúĺăòĺĽÝúÄĺÄĖŁ½Ä·ÝĝÝăúƕĝĦĬ½ÄúĦòħĖúÝúÓÝĝúăĦ ½ÝĝĖĬēĦĽƕ§ú½Ò§ùÝòÝÄĝĖÄù§ÝúÝúÒăĖùĽƚÄòăϧĖħÒÄĻÄŀ§ùēòÄĝăÒăĬĖēĖă·ÄĝĝƔ •
7ăĝĦÝúÝĦݧòēĖăìÄ·ĦĦħùïÝ·ïƪăÒÒùÄÄĦÝúÓĝĻÝĦÙïÄŁĝ·ÙăăòĝĦ§ÒÒ§ú½ăĦÙÄĖúÄ·Äĝĝ§ĖŁĝ·ÙăăòĝÄ·ĬĖÝĦŁ ăÒŌ·Ý§òĝĦă½Ýĝ·ĬĝĝÄŀēÄ·Ħ§ĦÝăúĝƕúÄĽĝƕ§ú½·ăú·ÄĖúĝ§ĖăĬú½ĝ§ÒÄĦŁƚÄĻÝòòĦÙÄú·ĖħĦħÒĬòòĝ§ÒÄĦŁ §ú½ĝÄ·ĬĖÝĦŁēĖăÓ˧ù·ĬĝĦăùĦ§ÝòăĖĽĦăħ·Ùĝ·Ùăăò§ú½ēĖÄĝÄúĦÝĦ¶§·ïĦăĦÙÄĦħùÒăĖŌú§ò§ēēĖăĺ§ò ¶ÄÒăĖÄĝÙ§ĖÝúÓÝĦĻÝĦÙĝ·ÙăăòÒ§ùÝòÝÄĝƕĝĦ§ÒÒƕ§ú½·ăùùĬúÝĦŁƚ
•
0oĻÝòòÙăò½ĻÄÄïòŁùÄÄĦÝúÓĝĻÝĦÙ§òòēĖăìÄ·ĦĝĦ§ïÄÙăò½ÄĖĝĦă½Ýĝ·Ĭĝĝ¶Ĭ½ÓÄĦƕĝ·ÙĽĬòÄƕ§ú½ construction updates.
•
Iăúò§ĖïƕēĖăēăĝĽyÄúÝăĖyĬēÄĖÝúĦÄú½ÄúĦƕĻÝòòÙăò½ìă¶ĝÝĦÄÙĬ½½òÄĝĻÝĦÙĝĬ¶·ăúĦ˧·ĦăĖĝĦă½Ýĝ·ĬĝĝĦÙÄ Ħ§ĝïĝ§ú½Óă§òĝăÒĦÙÄēĖăìÄ·Ħƕ§ĝĻÄòò§ĝĝ§ÒÄĦŁƪĖÄò§ĦĽĬē½§ĦÄĝ§ú½·ăú·ÄĖúĝƚ
•
;úĦĖă½Ĭ·ÄăĬĖĝÄòĺÄĝĦă§òòĝĬĖĖăĬú½ÝúÓúÄÝÓÙ¶ăĖĝ§ú½¶ĬĝÝúÄĝĝÄĝĦăúăĦÝÒŁĦÙÄù§¶ăĬĦĦÙÄēĖăìÄ·Ħ§ú½ ĝÙ§ĖÄ·ăúĦ§·ĦÝúÒăĖù§ĦÝăúĝăĦÙÄŁ·§úĖħ·ÙăĬĦ½ÝĖÄ·ĦòŁĦăăĬĖĦħùĻÝĦÙĕĬÄĝĦÝăúĝăĖ·ăú·ÄĖúĝ½ĬĖÝúÓ construction.
LIMITING IMPACT ON THE EDUCATIONAL ENVIRONMENT ÝĦÙăĺÄĖŜŔǖăÒăĬĖĻăĖïÝúÓĦ§ïÝúÓēò§·Äăúă··ĬēÝĽĝÝĦÄĝƕăĬĖĦħù½ÝĖÄ·ĦòŁĬú½ÄĖĝĦ§ú½ĝĦÙÄÝúĦĖÝ·§·ÝÄĝ ĦÙ§Ħ·ăùÄĻÝĦÙĻăĖïÝúÓăúĝ·Ùăăò·§ùēĬĝÄĝ§ú½Ä½Ĭ·§ĦÝăúƪ¶§ĝĽҧ·ÝòÝĦÝÄĝƚy§ÒÄĦŁăÒĝĦĬ½ÄúĦĝƕĝĦ§ÒÒƕ §ú½ĻăĖïÄĖĝÝĝăĬĖƙŕēĖÝăĖÝĦŁƚÄĻÝòò½ÄĺÄòăē§ēĖăìÄ·ĦƪĝēÄ·ÝŌ·y§ÒÄĦŁoò§úĦăùÝĦÝÓ§ĦÄĦÙÄÝùē§·ĦăÒ ·ăúĝĦĖĬ·ĦÝăúăúÙÝÓÙƪĦ˧ÒŌ·§ĖħĝƕÄúĝĬĖÄĝ§ÒÄăēÄ˧ĦÝăúĝƕùÝúÝù§ò½ÝĝĖĬēĦÝăúƕ§ú½ĝĦĖăúÓ·ăùùĬúÝ·§ĦÝăúƚ
STRINGENT ACCESS REQUIREMENTS 0˧úĝÄúoÝĦĦù§ú§·ĦÝĺÄòŁĬĝÄĝr§ēĦăĖÝĝĦăĖy§ÒÄÄ·ÙúăòăÓŁ as ăĬĖ·ăúĝĦĖĬ·ĦÝăúĻăĖïÄ˶§·ïÓĖăĬú½·ÙÄ·ï ÒăĖÄĺÄĖŁĝÝúÓòÄĻăĖïÄĖăúĦÙÄìă¶ĝÝĦÄƚ"§·ÙĻăĖïÄĖùĬĝĦ·ăùēòŁĻÝĦÙăĬĖĝĦĖÝ·Ħĝ§ÒÄĦŁēĖăĦă·ăòĝ§ú½ē§ĝĝ§ ¶§·ïÓĖăĬú½·ÙÄ·ï¶ÄÒăĖÄĦÙÄŁ§ĖħòòăĻĽĦăē§ĝĝĦÙÄĦ˧ÝòÄĖƚ ÄĻÝòòēÄĖÒăĖù½§Ýòٶ§·ïÓĖăĬú½·ÙÄ·ïĝÒă˧úŁúÄĻĻăĖïÄĖăĖĺÝĝÝĦăĖĦÙ§Ħ§ĖĖÝĺÄĝăúĝÝĦÄƚ_ú·Ä§ēÄĖĝăú Ýĝĝ·§úúĽƕĦÙÄŁ§ĖÄēĖăĺݽĽ§ēĖÝúĦĽĝĦÝ·ïÄĖĦă¶Ä§ēēòÝĽĦăĦÙÄÝĖÙ§Ė½Ù§ĦƚÙÝĝ§òòăĻĝ0˧úĝÄúoÝĦĦù§ú §ĝĻÄòò§ĝyĝĦ§ÒÒĦăĺÝĝĬ§òòŁÝ½ÄúĦÝÒŁĻÙăÙ§ĝ¶ÄÄúĦÙĖăĬÓÙĦÙͧ·ïÓĖăĬú½·ÙÄ·ï§ú½Ýĝ§òòăĻĽăúĦÙÄ construction site.
MAINTAIN SEPARATION •
ĝÝĦÄƪĝēÄ·ÝŌ·§··Äĝĝēò§úĻÝòò¶Ä·ĖħĦĽ§ú½½ÝĝĦĖݶĬĦĽĦă§òòēĖăìÄ·ĦĝĦ§ïÄÙăò½ÄĖĝƚ
•
0oĻÝòòÄúÓ§ÓÄĻÝĦÙyĝĦ§ÒÒĦă½Ýĝ·ĬĝĝĝĦ˧ĦÄÓÝÄĝ§ú½·ăúŌĖù§úŁ·Ù§úÓÄĝĦăĝÝĦħ··Äĝĝ§ú½ phasing plans as the project progresses.
•
òò·ăúĝĦĖĬ·ĦÝăú§·ĦÝĺÝĦÝÄĝĻÝòò¶ÄïÄēĦĝÄē§Ė§ĦÄÒĖăùĝĦĬ½ÄúĦĝ§ú½ĝĦ§ÒÒƚÄùēăĖ§ĖŁĻ§òòĝ§ú½·ĬĖĦ§Ýúĝ ĻÝòò¶ÄÄĖÄ·ĦĽĻÙÄĖÄúÄĽĽĦăÄúĝĬĖÄēĖăēÄĖĝÄē§Ė§ĦÝăú§ú½ĝ§ÒÄĦŁÝúĝݽÄĦÙĶĬÝò½ÝúÓƦÝú·òĬ½ÝúÓ½ĬĝĦ §ú½úăÝĝÄùÝĦÝÓ§ĦÝăúƧƕĻÙÝòÄēĖăēÄĖĝ§ÒÄĦŁÒÄú·ÝúÓ§ú½ĝÝĦÄĝÝÓú§ÓÄĻÝòò¶ÄēĖÄĝÄúĦăĬĦ½ăăĖĝƚ
•
Iăúò§ĖïĻÝòò·ăùēòÄĦÄĖÄÓĬò§Ėĝ§ÒÄĦŁĻ§òïĝƠÝúĝēÄ·ĦÝăúĝĦăÄúĝĬĖͧĖĖÝÄĖĝƕĝÝÓú§ÓÄƕ§ú½ÙăĬĝÄïÄÄēÝúÓ are maintained.
•
Dedicated entrances/exits will be established for construction personnel and deliveries to avoid crossĦ˧ÒŌ·ĻÝĦÙĝĦĬ½ÄúĦĝ§ú½ĝĦ§ÒÒƕÝú·òĬ½ÝúÓÄŀĦ˧ùÝú½ÒĬòúÄĝĝ§ĖăĬú½½ĖăēƪăÒÒƠēÝ·ïƪĬēĦÝùÄĝƚ
13 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
MET™—MODEL, ESTIMATE, TRACK Building a GMP Through Informed Collaboration COST MODELING WORKSHOP ÙÝĝĻăĖïĝÙăēÓ§ĦÙÄĖĝēĖăìÄ·ĦĖ·ÙÝĦÄ·Ħĝƕ0˧úĝÄú oÝĦĦù§úƕēĖăìÄ·Ħ·ăúĝĬòĦ§úĦĝƕïÄŁĦ˧½Äē§ĖĦúÄĖĝƕ §ú½yƴĝēĖăìÄ·ĦĦħùÒă˧½§ŁƪòăúÓĝÄĝĝÝăú Ħăù§ēăĬĦĦÙÄÄúĦÝĖÄĦŁăÒĦÙÄēĖăìÄ·ĦƚÝĦÙÝú ĦÙÝĝĝÄĝĝÝăúƕĺ§ĖŁÝúÓăēĦÝăúĝÒăĖħ·ÙÒħĦĬĖħĖÄ presented, while FP provides expert counsel to the _ĻúÄĖĖÄӧ˽ÝúӽķÝĝÝăúù§ïÝúÓƚ
1XPEHURI/HYHOV 7RWDO6)3HU3ODQ 6NLQ$VVXPHG 3HULPHWHURI%XLOGLQJ 6NLQ6)5DWLR 5RRI6) 1XPEHURI3DUNLQJ6SDFHV %XLOGLQJ+HLJKW 2YHUDOO6LWH6) $VVXPHG/DQGVFDSHG %XLOGLQJ)RRWSULQW $VVXPHGZLWK6LWH&RQFUHWH
($ 6) 6) /) 6) ($ WR /) 6) 6)
'HVFULSWLRQ
02'(/'$7( %8,/',1*$5($,164)7 '5$:,1*635(3$5('%< '5$:,1*6$5('$7('
7RWDO3URMHFW%XGJHW *HQHUDO&RQGLWLRQV RQ7RWDO3URMHFW%XGJHW &XUUHQW0RGHO7RWDO &XUUHQW0RGHO6)
+LJK/HYHO
0LG/HYHO
*&V
7%'
/RZ/HYHO
0RGHO
'LYLVLRQ6LWHZRUN
6HOHFWLYH6LWH'HPROLWLRQ
PRUHGHPRRIVLWHFRQFUHWHDQGDVSKDOWSDYLQJWR VXSSRUWQHZZRUNDQGXWLOLWLHV
PRUHGHPRRIVLWHFRQFUHWHDQGDVSKDOWSDYLQJ WRVXSSRUWQHZZRUNDQGXWLOLWLHV
'HPRRI7UHHV6KUXEVDQGSDYLQJ
1$
1$
(QYLURQPHQWDO$VVHVVPHQW +D]DUGRXV0DWHULDO5HPHGLDWLRQ
1RQH$QWLFLSDWHG
5HF\FOLQJ :DVWH5HPRYDO
6WDQGDUG5HF\FOLQJ :DVWH5HPRYDO
(DUWKZRUN
0RELOL]DWLRQ6WULS 5HSODFH2QVLWH7RSVRLO &OHDQ8S 2Q6LWH&XW7R)LOO,PSRUW&RPPRQ)LOO&<
1$
6WDQGDUG5HF\FOLQJ :DVWH5HPRYDO
During Cost Modeling, FP showcases each Ýú½ÝĺݽĬ§ò·ăùēăúÄúĦăÒŁăĬĖēĖăìÄ·ĦƚÝÒÒÄĖÄúĦ ¶ĬÝò½ÝúÓĝŁĝĦÄùĝă˽ÄĝÝÓúÒħĦĬĖÄĝ·§ú¶ÄÄŀēòăĖĽ while we evaluate the cost for each option. This provides the team with real-time understanding of how decisions affect the bottom line, putting ÄĺÄĖŁăúÄÝúĦÙÄÝ˶ÄĝĦēăĝÝĦÝăúĦăù§ïÄÄÒÒÄ·ĦÝĺÄ ½Ä·ÝĝÝăúĝħĖòŁÝúĦÙÄēĖă·Äĝĝƚ
+&0
6WDQGDUG5HF\FOLQJ :DVWH5HPRYDO
0RELOL]DWLRQ6WULS 5HSODFH2QVLWH7RSVRLO &OHDQ 8S2Q6LWH&XW7R)LOO,PSRUW&RPPRQ)LOO
'LVFXVVOLPLWVRI HDUWKZRUN DVVRFLDWHG
0RELOL]DWLRQ6WULS 5HSODFH2QVLWH7RSVRLO &OHDQ8S2Q6LWH&XW7R)LOO,PSRUW&RPPRQ)LOO
SIGNIFICANCE: _ĬĖăĝĦUă½ÄòÝĝÙÝĝĦăĖÝ·§òòŁĻÝĦÙÝúŕǖăÒăĬĖ Ōú§ò1UoƕùħúÝúÓĦÙ§ĦÝĦĝÄĦĝ§ú§··Ĭ˧ĦÄĖă§½ ù§ēħĖòŁÝú½ÄĝÝÓúƚ;úĺÝĦÝúÓïÄŁĝĬ¶·ăúĦ˧·ĦăĖĝ gives us accurate pricing on labor and materials. Subcontractors invited to the Cost Modeling ăĖïĝÙăēùĬĝĦĝĦÝòòē§ĖĦÝ·Ýē§ĦÄÝú·ăùēÄĦÝĦÝĺÄòŁ bidding the project.
CONTINUOUS ESTIMATING
$XUDULD0686SDFH,PSURYHPHQWV 0&RQVWUXFWLRQ0$9 (67,0$7('$7(
ÙÄĝÄÄĝĦÝù§ĦÄĝ§Ėͧ·ïĽ¶ŁĖħòƪĦÝùÄ ĝĬ¶·ăúĦ˧·ĦăĖēĖÝ·ÝúÓ§ú½·ăúŌĖùĦÙ§ĦăĬĖĦħùÝĝ ĝĦ§ŁÝúÓ·ăúĝÝĝĦÄúĦĻÝĦÙĦÙĽķÝĝÝăúĝù§½Ä½ĬĖÝúÓ ĦÙÄăĝĦUă½ÄòÝúÓăĖïĝÙăēƚ
%8,/',1*$5($,164)7
We present our estimates at each design milestone (Schematic Design, Design Development, Guaranteed Maximum Price) in a 16 division line ÝĦÄùÒăĖù§Ħƚ"§·ÙòÝúÄÝĦÄùÝĝ¶ĖăïÄú½ăĻú¶Łò§¶ăĖƕ material, equipment, and subcontractor.
'5$:,1*635(3$5('%< $0' '5$:,1*6$5('$7('
',9,6,21 727$/
',9,6,215(&$3
',912
3(5 6)
2) 77/
*HQHUDO&RQGLWLRQV
*HQHUDO5HTXLUHPHQWV([LVWLQJ&RQGLWLRQV6LWH:RUN
&RQFUHWH
0DVRQU\
0HWDOV
&DUSHQWU\
0RLVWXUH3URWHFWLRQ
'RRUV:LQGRZV *ODVV
SIGNIFICANCE: As the project progresses, this process ensures ĦÙ§ĦĻħĖÄù§ÝúĦ§ÝúÝúÓyƴĝēĖÝăĖÝĦÝÄĝƚ
TRACKING LOG ĝĦÙĽÄĝÝÓúÄĺăòĺÄĝƕĻÄĦ˧·ïÄĺÄĖŁ½Äē§ĖĦĬĖÄ ÒĖăùĦÙÄăĖÝÓÝú§ò·ăĝĦùă½Äò§ú½§ú§òŁŇÄħ·Ù proposed departure from a cost, schedule, and ĕĬ§òÝĦŁēÄĖĝēÄ·ĦÝĺÄƚÙÄĝÄ·Ù§úÓÄĝ§ĖħēēĖăĺĽ ¶ŁĦÙÄ_ĻúÄĖƕ¶ĬĦĖÄù§ÝúĖÄ·ă˽Ľ§ĝ§ēÄĖù§úÄúĦ ē§ĖĦăÒĦÙÄĦ˧·ïÝúÓòăÓƚÙÄòăÓ§òòăĻĝēĖăìÄ·Ħ·ăĝĦ to be reconciled from one milestone estimate to the next and grants decisions to be revisited at each development.
7UHQG/RJ $V7UHQGHG&RVW 0RGHO(VWLPDWH
''(VWLPDWH
,WHP
'UDZLQJ3DFNDJH 6\VWHP
''6 ''6
'' ''
6LWH 6LWH
&XUUHQW3HQGLQJ 7RWDO
&KDQJH
'ZJ3NJ
''
$UHD $//
VIFRVW
'DWH ,QLWLDWHG )3 )3
''6
''
6LWH
)3
''6
''
6LWH
)3
''6
''
6LWH
)3
,QLWLDWHG %\
'HVFULSWLRQ
$GG'HGXFW
'HOHWHVHDWZDOOVSHUDFFHSWHGLWHPRQ6'7UHQG/RJ 'HGXFW 5HYLVHFRXUW\DUGWRGHOHWHUHWDLQLQJZDOOVQRQHZHUH 'HGXFW HYHUDQWLFLSDWHG 'HOHWHPRZEDQGVQRQHZHUHHYHUVKRZQ 'HGXFW 5HYLVHGHFRUDWLYHVLGHZDONVWREHVWDQGDUGJUH\DV 'HGXFW GLVFXVVHGGXULQJ&RVW0RGHO 5HYLVHGHFRUDWLYHYHKLFXODUSDYLQJWREHVWDQGDUG 'HGXFW JUH\DVGLVFXVVHGGXULQJ&RVW0RGHO
&KDQJH $PRXQW
6\VWHP
5HMHFWHG
3HQGLQJ
(QFORVXUH )RXQGDWLRQ ,QWHULRUV 0HFK(OHF 5RRI 6LWH 0XOWL 727$/6
5HODWHG ,WHP
'DWH 3UHVHQWHG
'LVSRVLWLRQ RI&KDQJH
3HQGLQJ
3HQGLQJ
3HQGLQJ
3HQGLQJ
3HQGLQJ
$VSKDOWSDYLQJDQGFXUEJXWWHUGLGQ¶WPHHWWKH 7UDFNLQJ/RJJRDOIRU$OWHUQDWHDUHD:HZHUH VXSSRVHG WR UHGXFH WKH $VSKDOW E\ 6< DQG
SIGNIFICANCE: _ĬĖĦ˧·ïÝúÓòăÓ§òòăĻĝăĬĖĦħùĦăĖÄĺÝĝÝĦ½ÄĝÝÓú decisions and re-evaluate in terms of scope, budget, and schedule.
14
GMP TIMELINE JAN
MAR
APRIL
MAY
JUNE
JULY
AUG
SEP
OCT
NOV
DEC
COST MODELING WORKSHOP
2026
SD
FEB DD
CD GMP SUB BIDDING / BUYOUT
PRECONSTRUCTION / PROCUREMENT / EARLY INVESTIGATION
FEB
MAR
APRIL
MAY
2027
JAN
JUNE
JULY
AUG
SEP
OCT
NOV
CONSTRUCTION CLOSE OUT
BUDGET MANAGEMENT Your proposed Senior Project Manager, Travis Smith, will be responsible for monitoring cost and schedule §ú½ĖÄēăĖĦĦăyĝĦ§ïÄÙăò½ÄĖĝ§ĝĻÄòò§ĝïÄŁ0˧úĝÄúoÝĦĦù§úēÄĖĝăúúÄòĦÙĖăĬÓÙħ·ÙēÙ§ĝÄăÒUÄĝ§ "òÄùÄúĦ§ĖŁƕħĖĖÄÄï"òÄùÄúĦ§ĖŁƕ§ú½ăùùĬúÝĦŁUăúĦÄĝĝăĖÝƚ
COST TRANSPARENCY 0˧úĝÄúoÝĦĦù§úăēÄ˧ĦÄĝÝú§ĦĖĬÄăēÄú¶ăăïù§úúÄĖƕÄúĝĬĖÝúÓĦÙ§ĦĻÄ·ĖħĦħ·ĬòĦĬĖÄăÒĦ˧úĝē§ĖÄú·Łƚ ÙÄăēÄúƪ¶ăăïú§ĦĬĖÄăÒăĬĖēĖă·ÄĝĝēĖăĺݽÄĝĺÝĝݶÝòÝĦŁÝúĦă§òòēĖăìÄ·Ħ·ăĝĦĝƕúăĦìĬĝĦĝăùÄƚ"§Ėò٧ú½ §··Ĭ˧ĦÄïúăĻòĽÓÄăÒēĖăìÄ·Ħ·ăĝĦĝ§òòăĻĝÒăĖÝúÒăĖùĽ½Ä·ÝĝÝăúƪù§ïÝúÓ§ú½ÒăĖÄ·§ĝĦÝúÓƕĻÙÝ·ÙÝĝ paramount in ensuring success. ĬĖÝúÓēĖÄ·ăúĝĦĖĬ·ĦÝăú§ú½·ăúĝĦĖĬ·ĦÝăúƕŁăĬ§ĝĦÙÄ_ĻúÄ˧òϧŁĝïúăĻĻÙÄĖÄŁăĬ˽ăòò§Ėĝ§ĖĶÄÝúÓ spent. We build the budget together during our Cost Modeling process, review subcontractor quotes during 1Uo¶Ý½½ÝúÓƕ§ú½§ú§òŁŇÄē§Ł§ēēòÝ·§ĦÝăúĝ½ĬĖÝúÓăĬĖùăúĦÙòٶÝòòÝúÓĝƚÙĖăĬÓÙăĬĖ·ăòò§¶ă˧ĦÝĺÄēĖă·Äĝĝƕ ĻÄÄĝĦ§¶òÝĝÙ§·ĬòĦĬĖÄăÒĦ˧úĝē§ĖÄú·Ł§ú½ĦĖĬĝĦƚ
PROJECT TRACKING 0˧úĝÄúoÝĦĦù§úĬĦÝòÝŇÄĝĦÙÄ·ăúĝĦĖĬ·ĦÝăúĝăÒĦϧĖÄProjectSight ĦăĦ˧·ï§ú½ĖÄēăĖĦăú¶Ĭ½ÓÄĦƕĕĬ§òÝĦŁƕ §ú½ÄÒŌ·ÝÄú·Łăú§½§Ýòٶ§ĝÝĝƚProjectSight is a construction software used to support teams in managing construction projects from a single-source. It enables constant collaboration amongst project team ùÄù¶ÄĖĝƕÄúĝĬĖÝúÓÄĺÄĖŁăúÄÝĝĬē½§ĦĽăú·ĖÝĦÝ·§òÝúÒăĖù§ĦÝăú§ú½ïÄÄēĝĦÙÄÒă·ĬĝăúĦÙÄĦ§ĝï§ĦÙ§ú½ - delivering the project. ProjectSight provides budget and cost management, document control from SD ˧ĻÝúÓĝĦăòăĝÄƪ_ĬĦƕ§ú½ŌÄò½ù§ú§ÓÄùÄúĦƚyƴĝĦħù§ú½ēĖăìÄ·ĦĖ·ÙÝĦÄ·Ħĝ§ĖÄēĖăĺݽĽ§··ÄĝĝĦă ĦÙÄĝĽÝÓÝĦ§òĦăăòĝ§Ħ§òòĦÝùÄĝƕ§ú½ĖÄēăĖĦĝ§ĖÄĝÙ§ĖĽ§ú½½Ýĝ·ĬĝĝĽ½ĬĖÝúÓăĬĖĻÄÄïòŁ_ĻúÄĖƠĖ·ÙÝĦÄ·ĦƠ Contractor (O/A/C) meetings.
MONITORING TRADE PARTNERS Äù§ú§ÓÄăĬĖĝĬ¶·ăúĦ˧·ĦăĖĝ§ú½ĦÙÄÝ˧½ÙÄĖÄú·ÄĦă¶Ĭ½ÓÄĦ¶Łĝ·ĖĬĦÝúÝŇÝúÓĦÙÄÝĖē§Ł§ēēĝĻÙÄúĦÙÄŁ§ĖÄ ĝĬ¶ùÝĦĦĽƚĬĖÝúÓ·ăúĝĦĖĬ·ĦÝăúƕĻħòĝăēĖÄĝÄúĦĦÙÄĝÄùăúĦÙòŁē§Ł§ēēĝ½ĬĖÝúÓÄĺÄĖŁ_ƠƠùÄÄĦÝúÓĝă ĦÙÄ_ĻúÄĖÝĝ§Ļ§ĖÄăÒĦÙÄ·ĬĖĖÄúĦ¶Ĭ½ÓÄĦ§ú½Ù§ĝÒĬòòĦ˧úĝē§ĖÄú·ŁăÒ·ăĝĦƚ
15 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
DEC
Compass Montessori
SECTION 3: PROPOSED TEAM
COMPOSITION OF THE PROPOSED TEAM ÙÄĦħù·ăùēăĝÝĦÝăúăĬĦòÝúĽ¶ÄòăĻĻÝòòēĖăĺݽÄyĻÝĦÙĦÙÄÙÝÓÙÄĝĦòÄĺÄòăÒĝŁú·ÙĖăúÝ·ÝĦŁƕ ăĖÓ§úÝҧĦÝăúƕ§ú½ĝĦĖħùòÝúĽ·ăùùĬúÝ·§ĦÝăúƚĝĦÙÝĝr0oÝĝÒăĖĦÙĖÄÄēĖăìÄ·ĦĝƠĝ·Ùăăòĝ§Ļ§Ė½Ä½ĦăĦÙÄ ĝ§ùÄUƠ1ƕĻÄĻăĬò½òÝïÄĦă·ò§ĖÝÒŁĦÙÄēĖăēăĝĽĦħù·ăùēăĝÝĦÝăúƚAll three schools will work with all team members outlined below.Ä·§ĬĝÄ0˧úĝÄúoÝĦĦù§úÝĝēĖăēăĝÝúÓĦăĖÄúăĺ§ĦÄĦÙÄĦÙĖÄÄĝ·Ùăăòĝ ĝÝùĬòĦ§úÄăĬĝòٽĬĖÝúÓyĬùùÄĖŖŔŖśƕJon Clark, Senior Superintendent, will oversee all three schools and one carpenter will be assigned to each individual school. This approach ensures that construction ÒăĖħ·ÙĝÝĦÄĖĬúĝĝÝùĬòĦ§úÄăĬĝòŁƕĻÙÝòÄIăú§·Ħĝ§ĝ§·ăùùăúĦÙĖħ½¶ÄĦĻÄÄúĦÙÄĝ·Ùăăòĝ¶Łù§ÝúĦ§ÝúÝúÓ ·ăùēĖÄÙÄúĝÝĺÄăĺÄĖĝÝÓÙĦƕù§ú§ÓÄùÄúĦăÒ½§ŁƪĦăƪ½§ŁăēÄ˧ĦÝăúĝƕĕĬ§òÝĦŁ·ăúĦĖăòƕ§ú½ĝ§ÒÄĦŁƚ"§·ÙăÒĦÙÄĝÄ ĦħùùÄù¶ÄĖĝÙ§ĝĦÙÄ·§ē§·ÝĦ٧ú½ÄŀēÄĖĦÝĝÄĦăēĖăĺݽÄyĻÝĦÙĦÙÄÙÝÓÙÄĝĦòÄĺÄòăÒĝÄĖĺÝ·ÄƕÄúĝĬĖÝúÓ ĦÙ§ĦUÄĝ§"yƕħĖĖÄÄï"yƕ§ú½ăùùĬúÝĦŁUăúĦÄĝĝăĖݧĖÄĝĬ··ÄĝĝÒĬòēĖăìÄ·Ħĝƚ
EXECUTIVE OVERSIGHT
ARCHITECT
JEFF PITTMAN
CONSTRUCTION
PRECONSTRUCTION
PROJECT MANAGEMENT
PROJECT EXECUTIVE
* TRAVIS SMITH
SENIOR PROJECT MANAGER
* ALAN ANDERSON PRECONSTRUCTION DIRECTOR
* MARCUS BALTAZAR PRECONSTRUCTION MANAGER
* MIKE MURPHEY
SENIOR ESTIMATOR
CARPENTER MESA ELEMENTARY CARPENTER BEAR CREEK ELEMENTARY
Jon Clark
SENIOR SUPERINTENDENT
CARPENTER COMMUNITY MONTESSORI
* Team member will attend all of the project’s DAT meetings. 17 BVSD RFP 26-10 CM/GC PROJECT SCOPE #4: MESA ES, BEAR CREEK ES, COMMUNITY MONTESSORI
SENIOR PROJECT MANAGER
TRAVIS SMITH 15 YEARS IN CONSTRUCTION, 11 YEARS WITH FP Travis will be the Project Manager and main point of contact for all three BVSD schools.7ÝĝĻăĖï¶ÄÓÝúĝĻÝĦÙ½ÄĺÄòăēÝúÓĦÙÄēĖăìÄ·Ħ¶Ĭ½ÓÄĦƕēĖăĺݽÝúÓ ĺ§òĬħú§òŁĝÝĝƕ§ú½·ăúĝĬòĦÝúÓăú·ăúĝĦĖĬ·Ħ§¶ÝòÝĦŁÝĝĝĬÄĝƚ˧ĺÝĝÙ§ĝ½ÝĖÄ·Ħ ĖÄĝēăúĝݶÝòÝĦŁÒăĖĦÙĽ§ÝòŁ·ăúĝĦĖĬ·ĦÝăúăēÄ˧ĦÝăúĝÝú·òĬ½ÝúÓ·ăúĦ˧·Ħ administration and coordination of subcontractors and suppliers. 7Äù§ÝúĦ§Ýúĝ·ăĝĦ§ú½ĕĬ§òÝĦŁ·ăúĦĖăòĝƚ
BVSD: PEAK TO PEAK CHARTER SCHOOL
EDUCATION
§·ÙÄòăĖăÒy·ÝÄú·ÄÝúăúĝĦĖĬ·ĦÝăú Management, Colorado State úÝĺÄĖĝÝĦŁƕ0ăĖĦăòòÝúĝƕ_
CREDENTIALS
LEED Green Associate Advanced Storm Water Management
REFERENCES
Alan Moore, CCSD, Jacobs alan.moore@jacobs.com (850) 685-7483 Tim BishopƕVÄĻÝĝÝăúÙ§ĖĦÄĖ School, Executive Director tbishop@nvcs.school (970) 593-6827 Sam Todd, oħïĦăoħïÙ§ĖĦÄĖ School, Director of Operations sam.todd@bvsd.org (303) 453-4611
Lafayette, Colorado. Three additions on an occupied campus included a úÄĻŖŘƕśŔŔy0ēĖÄƪ·§ĝĦÓŁùú§ĝÝĬù§ú½·§ÒÄĦÄĖݧƟ§ŕŔƕŖŔŔy0ƕĦĻăƪĝĦăĖŁ ·ò§ĝĝĖăăù§½½ÝĦÝăúĦăĦÙÄùݽ½òÄĝ·ÙăăòƟ§ú½§śƕŖŔŔy0ƕĦĻăƪĝĦăĖŁ§½½ÝĦÝăú ĦăĦÙÄÙÝÓÙĝ·ÙăăòƚÙÄÙÝÓÙĝ·ÙăăòúăĻăÒÒÄĖĝ§ƱÙÝúï§úïƲĻÝĦÙĺ§ĖÝăĬĝ ĝĦĬ½Ł§Ėħĝ§ĝĻÄòò§ĝ§·ăòòÄÓÄ·ăĬúĝÄòÝúÓ§ú½ĖÄ·ĖĬÝĦÝúÓ§Ėħƚ | $16.4M | 42,100 SF |
BVSD: MIDDLE SCHOOL FIELDS & TRACKS Boulder, Colorado.0oĬē½§ĦĽŌĺÄùݽ½òÄĝ·Ùăăòēò§ŁÝúÓŌÄò½ĝÒăĖăĬò½ÄĖ §òòÄŁy·ÙăăòÝĝĦĖÝ·Ħƚē½§ĦÄĝĦăħ·ÙŌÄò½Ýú·òĬ½Ä½§ĝŁúĦÙÄĦÝ·ĦĬĖÒŌÄò½ for football, lacrosse, and soccer with a texture-coated asphalt running Ħ˧·ï§ĖăĬú½ĦÙÄēÄĖÝùÄĦÄĖƚòòŌĺÄŌÄò½ĝĻÄĖÄ·ăúĝĦĖĬ·ĦĽĝÝùĬòĦ§úÄăĬĝòŁ and were completed before the fall semester commenced. | $4.9M | 170,000 SF per school |