Boulder Politics

BVSD Board of Education · Document

CBOC Action Item - Heatherwood ES 10.14.pdf (122 KB)

Regular Meeting, November 10, 2026 · item 7.11: Amendment to the contract for Heatherwood Elementary School · 2 pages

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

COMMUNITY BOND OVERSIGHT COMMITTEE ACTION ITEM | October 14, 2026

Heatherwood Elementary School Mechanical & Electrical Link to presentation BACKGROUND The 2022 Facilities Critical Needs Plan outlines a districtwide commitment to maintaining and improving essential building systems and athletic facilities. At Heatherwood Elementary School, additional pressing needs have emerged that require immediate attention. Heatherwood has mechanical units located inside a rooftop penthouse (a dedicated structural enclosure on the roof that houses building equipment). These are four multi-zone (MZ) air handling units (AHU). These AHUs are 27 years old and due to how they are set inside of the penthouse, maintenance access is extremely limited and refurbishment is not identified as a feasible long term solution. There are also outdoor condensing units that represent an additional near-term reliability risk. The compressors are estimated to be original and have exceeded their typical 10- to 15-year median expected life. The existing systems use R-22 refrigerant, which was phased out approximately 15 years ago, making future refrigerant recharges increasingly costly and difficult. The 2022 Facilities Critical Needs Plan identifies the need to repair or replace aging HVAC, electrical, and plumbing system components to avoid future disruptions. Also identified for Heatherwood is to upgrade lighting fixtures which have also seen escalated pricing due to code required lighting control upgrades. PROPOSED PROJECT This project includes two primary scopes of work at Heatherwood Elementary School:

1. HVAC System Replacement and Upgrades: ○ Replacement of the AHUs and condensing identified in the 2022 Critical Needs Plan 2. LED Lighting Upgrades ○ Upgrading to LED lighting fixtures throughout the school identified in the 2022 Critical Needs Plan

The combined work addresses both immediate health and comfort concerns. These improvements will prevent future equipment failure and improve learning environments while aligning with the goals of the 2022 Facilities Critical Needs Plan. REQUEST TO CBOC (RECOMMENDED MOTION): Move that the Community Bond Oversight Committee recommend the transfer of $985,601 in Bond Premium funds to the Heatherwood Elementary School budget for expenditures related to HVAC component replacement, and lighting upgrades.