BVSD Board of Education · Document
8734 - BVSD FES GMP Exhibits A-P.pdf (5,249 KB)
Regular Meeting, November 10, 2026 · item 7.7: Amendment to the contract for Foothill Elementary School · 77 pages
This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.
Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Current Drawings Drawing Number
Drawing Title
Revision
Drawing Date
Received Date
Set
Status
Cover Sheet 001
Cover Sheet
1
08/25/2026
26.08.25 - CD's
Published
CODE COMPLIANCE
1
08/25/2026
26.08.25 - CD's
Published
S-001
GENERAL NOTES
1
08/25/2026
26.08.25 - CD's
Published
S-002
GENERAL NOTES
1
08/25/2026
26.08.25 - CD's
Published
S-003
LOAD KEYS
1
08/25/2026
26.08.25 - CD's
Published
S-101
STRUCTURAL FLOOR PLAN
1
08/25/2026
26.08.25 - CD's
Published
S-121
STRUCTURAL ROOF PLAN
1
08/25/2026
26.08.25 - CD's
Published
AD-101
OVERALL DEMOLITION FLOOR PLAN
1
08/25/2026
26.08.25 - CD's
Published
AD-121
OVERALL ROOF DEMOLITION
2
09/16/2026
09/16/2026
26.09.16 - Addendum 1
Published
A-121
OVERALL ROOF PLAN
3
09/16/2026
09/16/2026
26.09.16 - Addendum 1
Published
A-361
EXTERIOR SECTION DETAILS
2
09/16/2026
09/16/2026
26.09.16 - Addendum 1
Published
A-415
LARGE SCALE FLOOR AND DEMOLITION PLANS
1
08/25/2026
26.08.25 - CD's
Published
A-416
LARGE FLOOR AND DEMOLITION PLANS
1
08/25/2026
26.08.25 - CD's
Published
FS101
KITCHEN EQUIPMENT - PLUMBING - ELECTRICAL
1
08/25/2026
26.08.25 - CD's
Published
FS501
KITCHEN GENERAL NOTES - DETAILS
1
08/25/2026
26.08.25 - CD's
Published
PD-201A
AREA A PLUMBING DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
P-001
PLUMBING GENERAL INFORMATION
1
08/25/2026
26.08.25 - CD's
Published
GENERAL G-001 Structural
Architectural
Food Service
Plumbing
Page 1 of 4
Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Drawing Number
Drawing Title
Revision
Drawing Date
Received Date
Set
Status
P-201A
AREA A PLUMBING PLAN
1
08/25/2026
26.08.25 - CD's
Published
P-201C
AREA C PLUMBING PLAN
1
08/25/2026
26.08.25 - CD's
Published
P-601
PLUMBING DETAILS
1
08/25/2026
26.08.25 - CD's
Published
MD-201A
AREA A MECHANICAL DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
M-001
MECHANICAL GENERAL INFORMATION
1
08/25/2026
26.08.25 - CD's
Published
M-002
MECHANICAL COMCHECK
1
08/25/2026
26.08.25 - CD's
Published
M-201A
AREA A MECHANICAL PLAN
1
08/25/2026
26.08.25 - CD's
Published
M-601
MECHANICAL DETAILS
1
08/25/2026
26.08.25 - CD's
Published
E-001
ELECTRICAL GENERAL INFORMATION
1
08/25/2026
26.08.25 - CD's
Published
ED-201A
AREA A POWER DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
ED-211A
AREA A LIGHTING DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
ED-211B
AREA B LIGHTING DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
ED-211C
AREA C LIGHTING DEMOLITION
0
08/25/2026
26.08.25 - CD's
Published
ED-211D
AREA D LIGHTING DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-002
ELECTRICAL PROJECT NOTES
1
08/25/2026
26.08.25 - CD's
Published
E-003
ELECTRICAL SCHEDULES
1
08/25/2026
26.08.25 - CD's
Published
E-004
ELECTRICAL COMCHECK
0
08/25/2026
26.08.25 - CD's
Published
E-201A
AREA A POWER PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-201C
AREA C POWER PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-201D
AREA D POWER PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-211A
AREA A LIGHTING PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-211B
AREA B LIGHTING PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-211C
AREA C LIGHTING PLAN
0
08/25/2026
26.08.25 - CD's
Published
Mechanical
Electrical
Page 2 of 4
Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Drawing Number
Drawing Title
Revision
Drawing Date
Received Date
Set
Status
E-211D
AREA D LIGHTING PLAN
1
08/25/2026
26.08.25 - CD's
Published
E-501
ELECTRICAL ONE-LINE DIAGRAM
0
08/25/2026
26.08.25 - CD's
Published
E-502
PANEL SCHEDULES
0
08/25/2026
26.08.25 - CD's
Published
T-001
COMMUNICATIONS TITLE SHEET
1
08/25/2026
26.08.25 - CD's
Published
TD-201A
AREA A COMMUNICATIONS
1
08/25/2026
26.08.25 - CD's
Published
TD-201B
AREA B COMMUNICATIONS DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
TD-201C
AREA C COMMUNICATIONS DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
TD-201D
AREA D COMMUNICATIONS DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
T-002
COMMUNICATIONS PROJECT NOTES
1
08/25/2026
26.08.25 - CD's
Published
T-003
COMMUNICATIONS SCHEDULES
1
08/25/2026
26.08.25 - CD's
Published
T-201A
AREA A COMMUNICATIONS PLAN
1
08/25/2026
26.08.25 - CD's
Published
T-201B
AREA B COMMUNICATIONS PLAN
1
08/25/2026
26.08.25 - CD's
Published
T-201C
AREA C COMMUNICATIONS PLAN
1
08/25/2026
26.08.25 - CD's
Published
T-201D
AREA D COMMUNICATIONS PLAN
1
08/25/2026
26.08.25 - CD's
Published
T-601
COMMUNICATIONS DETAILS
1
08/25/2026
26.08.25 - CD's
Published
FA-001
FIRE ALARM GENERAL INFORMATION
1
08/25/2026
26.08.25 - CD's
Published
FAD-211A
AREA A FIRE ALARM DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
FAD-211B
AREA B FIRE ALARM DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
FAD-211C
AREA C FIRE ALARM DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
FAD-211D
AREA D FIRE ALARM DEMOLITION PLAN
1
08/25/2026
26.08.25 - CD's
Published
FA-201A
AREA A FIRE ALARM PLAN
1
08/25/2026
26.08.25 - CD's
Published
FA-201B
AREA B FIRE ALARM PLAN
1
08/25/2026
26.08.25 - CD's
Published
FA-201C
AREA C FIRE ALARM PLAN
1
08/25/2026
26.08.25 - CD's
Published
Telecommunications
Fire Alarm
Page 3 of 4
Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Drawing Number FA-201D
Drawing Title AREA D FIRE ALARM PLAN
Revision 1
Drawing Date 08/25/2026
Page 4 of 4
Received Date
Set 26.08.25 - CD's
Status Published
Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Current Specifications Number
Description
Revision
Issued Date
Received Date
Set
00 - Procurement and Contracting Requirements 00 0106
Cover Page
0
26.08.25 - CD's
00 0107
Seals Page
0
26.08.25 - CD's
00 0110
Table of Contents
0
26.08.25 - CD's
00 1000
Performance Bond
0
26.08.25 - CD's
00 1100
Labor and Material Payment Bond
0
26.08.25 - CD's
00 1300
Asbestos Management Plan Contractor Responsibility
0
26.08.25 - CD's
00 1400
Lead Based Paint Contractor Responsibility
0
26.08.25 - CD's
00 3100
Available Project Information
0
26.08.25 - CD's
00 3200
2023 Asbestos Summary
0
26.08.25 - CD's
00 6000
Project Forms
0
26.08.25 - CD's
00 6001
RFI Form
0
26.08.25 - CD's
00 6002
Substitution Request Form
0
26.08.25 - CD's
00 6003
Proposal Request Form
0
26.08.25 - CD's
00 6004
ASI Form
0
26.08.25 - CD's
00 6005
Change Construction Directive Form
0
26.08.25 - CD's
00 6006
Electronic Media Disclaimer Acknowledgement
0
26.08.25 - CD's
01 - General Requirements 01 1000
Summary
0
26.08.25 - CD's
01 2000
Price and Payment Procedures
0
26.08.25 - CD's
01 2100
Allowances
0
26.08.25 - CD's
01 2300
Alternates
0
26.08.25 - CD's
01 2500
Substitution Procedures
0
26.08.25 - CD's
01 3000
Administrative Requirements
0
26.08.25 - CD's
01 3216
Construction Progress Schedule
0
26.08.25 - CD's
01 4000
Quality Requirements
0
26.08.25 - CD's
01 4216
Definitions and Explanations
0
26.08.25 - CD's
01 5000
Temporary Facilities and Controls
0
26.08.25 - CD's
01 6000
Product Requirements
0
26.08.25 - CD's
01 6116
Volatile Organic Compound (VOC) Content Restrictions
0
26.08.25 - CD's
01 7000
Execution and Closeout Requirements
0
26.08.25 - CD's
01 7419
Construction Waste Management and Disposal
0
26.08.25 - CD's
01 7610
Temporary Protective Coverings
0
26.08.25 - CD's
01 7800
Closeout Submittals
0
26.08.25 - CD's
01 7900
Demonstration and Training
0
26.08.25 - CD's
Masonry Mortaring and Grouting
0
26.08.25 - CD's
04 - Masonry 04 0511
Page 1 of 3
Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Number 04 2000
Description
Revision
Issued Date
Received Date
Set
Unit Masonry
0
26.08.25 - CD's
Metal Ladders
0
26.08.25 - CD's
0
26.08.25 - CD's
05 - Metals 05 5133
06 - Wood, Plastics, and Composites 06 1000
Rough Carpentry
07 - Thermal and Moisture Protection 07 0150
Maintenance of Membrane Roofing
0
07 5300
Elastomeric Membrane Roofing
1
08/26/26
08/26/26
26.08.25 - CD's 26.08.25 - CD's Corrections
07 6200
Sheet Metal Flashing and Trim
1
08/26/26
08/26/26
26.08.25 - CD's Corrections
07 7200
Roof Accessories
0
26.08.25 - CD's
07 8400
Firestopping
0
26.08.25 - CD's
07 9200
Joint Sealants
0
26.08.25 - CD's
09 0561
Common Work Results for Flooring Preparation
0
26.08.25 - CD's
09 2116
Gypsum Board Assemblies
0
26.08.25 - CD's
09 5100
Acoustical Ceilings
0
26.08.25 - CD's
09 6500
Resilient Flooring and Base
0
26.08.25 - CD's
09 6813
Tile Carpeting
0
26.08.25 - CD's
09 9123
Interior Painting
0
26.08.25 - CD's
Wall and Door Protection
0
26.08.25 - CD's
11 4000
Food Service Equipment
0
26.08.25 - CD's
11 8129
Facility Fall Protection
0
26.08.25 - CD's
12 3200
Manufactured Wood Casework
0
26.08.25 - CD's
12 3600
Countertops
0
26.08.25 - CD's
22 0000
Basic Plumbing Requirements
0
26.08.25 - CD's
22 0500
Common Work Results for Plumbing
0
26.08.25 - CD's
22 0519
Meters and Gauges for Plumbing Piping
0
26.08.25 - CD's
22 0523
General-Duty Valves for Plumbing Piping
0
26.08.25 - CD's
22 0529
Hangers and Supports for Plumbing Piping and Equipment
0
26.08.25 - CD's
22 0553
Identification for Plumbing Piping and Equipment
0
26.08.25 - CD's
22 0700
Plumbing Insulation
0
26.08.25 - CD's
22 1116
Domestic Water Piping
0
26.08.25 - CD's
22 1119
Domestic Water Piping Specialties
0
26.08.25 - CD's
22 3200
Water Heaters
0
26.08.25 - CD's
22 4000
Plumbing Fixtures
0
26.08.25 - CD's
0
26.08.25 - CD's
09 - Finishes
10 - Specialties 10 2600 11 - Equipment
12 - Furnishings
22 - Plumbing
23 - Heating, Ventilating, and Air Conditioning (HVAC) 23 0000
Basic Mechanical Requirements
Page 2 of 3
Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction
Number
Description
Revision
Issued Date
Received Date
Set
23 0500
Common Work Results for HVAC
0
26.08.25 - CD's
23 0529
Supports and Anchors
0
26.08.25 - CD's
23 0800
Mechanical Commissioning
0
26.08.25 - CD's
23 1123
Natural Gas Systems
0
26.08.25 - CD's
26 0500
Basic Electrical Requirements
0
26.08.25 - CD's
26 0510
Electrical Remodeling Provisions
0
26.08.25 - CD's
26 0519
Building Wire and Cable
0
26.08.25 - CD's
26 0526
Grounding and Bonding
0
26.08.25 - CD's
26 0529
Supporting Devices and Seals
0
26.08.25 - CD's
26 0532
Conduit
0
26.08.25 - CD's
26 0534
Electrical Boxes and Fittings
0
26.08.25 - CD's
26 0553
Electrical Identification
0
26.08.25 - CD's
26 0580
Equipment Wiring Systems
0
26.08.25 - CD's
26 2726
Wiring Devices
0
26.08.25 - CD's
26 2816
Enclosed Switches
0
26.08.25 - CD's
26 5100
Interior Lighting
0
26.08.25 - CD's
0
26.08.25 - CD's
26 - Electrical
27 - Communications 27 0553
Identification for Communications Systems
Page 3 of 3
K1225 - BVSD - FOOTHILL ES RENOVATIONS 1001 Hawthorne Ave., Boulder, CO, 80304 Estimate: CD Estimate
PREPARED FOR:
ARCHITECT / DESIGNER:
Boulder Valley School District
MOA Architecture
DATE PRINTED: 10/21/2026
Clarifications Report General Clarifications - Prevailing wages have not been included. - Sales tax has not been included. - A&P excludes any delegated design that is not listed in the contract documents. - Any delays or cost impacts due to pandemics have not been included in the estimate.
Items by Others - All independent testing and inspections, including commissioning. - Technology – Servers, computers, phones, uninterruptible power supply (UPS), etc. - Residential Equipment (Kitchen appliances, Fitness Equipment, etc). - Land Costs, Legal Fees, or Tap Fees. - Architectural and Engineering Fees. - Owner contingency. - All fees associated with utilities will be paid for by Owner (water, electric, gas). - Any expenses associated with dry utilities and getting them to the site (cable, fiber, power and gas). - Removal or working with hazardous materials, including asbestos and lead abatement as defined by OSHA. - All moving costs. - All artwork - purchasing, moving, and installation. - Technology - Computers, Servers, phones, etc. – purchasing, moving and installation. - Furniture, Desks, chairs, tables, moveable casework – purchasing, moving and installation. - Audio / Visual Projectors, Projection Screens, Smart Boards, Televisions.
Documents - Drawings dated 08/25/2026 - Project Manual dated 08/25/2026
B Shell - In addition to the 25-year roof warranty, a 90 MPH wind rider is include pending manufacturer approved pull test. The specifications call for a 100 MPH wind speed warranty which cannot be achieved and therefore not included.
- Included an allowance of 25K for Tectum Roof Panel/Structural Replacement. - Removal of the existing system includes gravel, flood coats, built up roofing membrane, plywood & sleepers, and EPS insulation. Existing asphalt layer installed directly to Tectum likely to remain and be utilized as a vapor barrier to protect the integrity of the Tectum decking.
- Snow removal from roof is not included. - Vacuum & removal of loose gravel from the existing roof surface is included. Cleaning or washing gravel for reuse is not included.
C Interiors - Alternate A3 - An allowance of $5K was included for drywall, framing, & patching, access panel door, & MEP rerouting for moving the access panel where the new kitchenette will be located.
DATE PRINTED: 10/21/2026
C Interiors - For Alternate 1, one ADA door operator & push button for each door pair is included. The conduit for the ADA operators is figured to be surface mounted.
- For Alternate 2, a new reception desk to the west of the existing reception desk is included. Existing reception desk to remain as is. - Included an allowance of $10K for wall/ceiling patches due to scope associated with the kitchen refrigerator repairs.
D Services - Included an allowance of $15K for 3rd party design for wind for rooftop equipment. - Included an allowance of $5,500 for piping changes that might be necessary for different meter size installed by Excel. - Included an allowance of $6K for disconnecting & reconnecting MEP Rooftop Equipment. - Updating obsolete HVAC controls is not included. Per BVSD, a controls upgrade was previously completed. - VFA V3 for addressing HVAC noisy fans is not included. It is to be completed by BVSD Facilities.
Z General Requirements - A site security guard has not been included. - General protection of adjacent surfaces is included for the work shown in the plans.
DATE PRINTED: 10/21/2026
797 Ventura Street, Aurora, CO 80011 Project: K1225 - BVSD - Foothill ES Renovations Owner: Boulder Valley School District Architect: MOA Architecture
Date: Estimator: Project SF: Duration in Months: Estimate #:
10/21/26 Karra Damiana 76,021 3.00 CD Estimate - Amendment 1 Includes Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk, & Alternate 3 Main Office Kitchenette
Project Summary Sheet - Estimated Cost of the Work Division #0 Division #1 Division #2 Division #3
Division #4
Division #5
Division #6
Division #7 Division #8
Division #9 Division #10
Division #11 Division #12 Division #13 Division #14 Division #21
Procurement and Contracting Requirements General Requirements/AP Labor Existing Conditions Concrete
DD Estimate CD Estimate $103,044 $87,058 $379,492 $352,216 $0 $0 $0 $0 $18,957 $6,309
Difference ($15,986) ($27,276) $0 $0 ($12,648)
Masonry $30,725
$28,459
$50,777
$75,572
$24,795
$1,125,921
$748,220
($377,701)
$0
$22,348
$22,348
$76,705
$147,687
$70,982
Openings
Plumbing
Division #23 Division #25
Heating, Ventilating and Air Conditioning Integrated Automation
$4.63
/SF
13.3% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
Cost Delta Comments from DD's Drop Due to 3 Projects ILO 4 Projects Includes AP Labor. Not Applicable Not Applicable
0.2% of Direct Costs
Brick infill at the two existing downspouts around the gym was revised to sheet metal covers, with an external downspout installed over the sheet metal cover at one location.
1.2% of Direct Costs
Added three aluminum rooftop ladders & fall protection railing to the original scope of modifying wall rail at ramp adjacent to new downspout.
2.9% of Direct Costs
Slight modification of roof rough carpentry. Added Alternate 2 - Main Office Reception Desk & Alternate 3 - Mian Office Kitchenette.
$0.99
Thermal and Moisture Protection
Division #22
3.3% of Direct Costs
$0.40
Wood, Plastics, and Composites
Equipment Furnishings Special Construction Conveying Equipment Fire Suppression
/SF
$0.08
$2,266
Metals
Finishes Specialties
$1.15
$0 $62,454
$0 $47,432
$0 ($15,022)
$0 $0 $0 $0 $158,027
$0 $0 $0 $0 $323,257
$0 $0 $0 $0 $165,230
$10,593 $0
$15,000 $0
/SF
/SF
/SF
$9.84
/SF
28.3% of Direct Costs
Scope Associated with Removing/Reinstalling Existing Rooftop Equipment & Drains Moved to MEP Divisions; Reduced Additional Layers of Deck Sheathing;
$0.29
/SF
0.8% of Direct Costs
Added Alternate 1 - ADA Door Operators
$1.94
/SF
5.6% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.62
/SF
1.8% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$4.25
/SF
12.2% of Direct Costs
$0.20
/SF
0.6% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$4,407 $0
Added drywall patch & repair at drywall walls & ceilings for paging & fire alarm device removals; patch & repair of acoustical tile ceilings at device removals; paint touch-up associated with paging & fire alarm removals; painting fire alarm conduit & repainting of modified & existing ramp railings at the new downspout. Added Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk & Alternate 3 - Mian Office Kitchenette. (drywall & paint patch & repair) Not Applicable At DDs, the existing walk-in cooler manufacturer & serial number were unknown. At CDs, this information was provided, allowing for more accurate & improved pricing. Not Applicable Not Applicable Not Applicable Not Applicable This includes Plumbing & HVAC scope. Added/clarified CD scope for curb modifications at 8 exhaust fans and 5 roof caps, repair/extension of 51 plumbing vents, raising approximately 380 LF of rooftop piping, replacement of 16 existing roof drain strainers with cast iron strainers, extension of existing drain piping for raising roof drains, camera inspection of all storm roof drains, & crane support for removal/reinstallation of roof equipment. Also, added gas meter to be replaced. Even though the gas meter should be replaced by Excel, piping change necessary for different meter size was included. Included $15K Allowance for 3rd Party Design for Wind Not Applicable
$75,685
Division #26 Division #27
Division #28 Division #31 Division #32 Division #33
Electrical Communications
$156,487
$80,802
$2.06
/SF
5.9% of Direct Costs
$2.97
/SF
8.5% of Direct Costs
$223,411 $335,622
$225,694 $405,754
$2,283 $70,132
$5.34
/SF
15.3% of Direct Costs
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
$0.00
/SF
0.0% of Direct Costs
Subtotal
$2,622,954
$2,643,759
$20,805
$34.78
/SF
100.0% of Direct Costs
Utility Tap & Devel. Fees Permit Allowance Use Tax Construction Contingency Builders Risk Insurance Comprehensive General Liability Insurance Sub Default Insurance Performance and Payment Bond Escalation Allowance Contractors Fee Preconstruction Services
By Owner By Owner By Owner $209,836 $5,666 $33,993 Not Included $19,263 Not Included $132,666 $17,500
By Owner By Owner By Owner $79,313 $5,868 $35,207 Not Included $19,951 Not Included $132,341 $0
$0.00
/SF
$0.00
/SF
0.00% of Project
$0.00
/SF
0.00% of Project
$1.04
/SF
3.00% of Project
$0.08
/SF
0.20% of Costs
$0.46
/SF
1.20% of Project
$0.00
/SF
0.00% of Costs
$0.26
/SF
0.68% of Project
$0.00
/SF
0.00% of Project
($325) ($17,500)
$1.74
/SF
4.86% of Project
$0.00
/SF
$3,041,878
$2,916,439
($125,439)
$38.36
/SF
Electronic Safety and Security Earthwork Exterior Improvements Utilities
($130,523) $202 $1,214 $688
Estimated Cost of Construction
CD Estimate - Amendment 1 Base Contract Amendment 1 Total:
$17,500 $2,916,439 $2,933,939
100.0% of Project
SD/DD budget based on Carlton & Montgomery pricing. At CD, Carlton & Montgomery declined due to Summer 2027 schedule filled up; pricing received from Encore, Exceed & E-Light. Potential buyout remains; scope review meetings not yet held. CD roofing plans also added electrical scope for rooftop equipment disconnect/reconnect and additional EMT/flex wiring due to raised roof assemblies. Added Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk & Alternate 3 Mian Office Kitchenette. SD/DD budget based on Carlton & Montgomery pricing. At CD, Carlton & Montgomery declined due to Summer 2027 schedule filled up; pricing received from Encore, Exceed & E-Light. Potential buyout remains; scope review meetings not yet held. Not Applicable Not Applicable Not Applicable
Dropped to 3% from 8% Per RFP Response Per RFP Response Per RFP Response Per RFP Response This amount is the base contract.
Detail Report DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 00 Procurement and Contracting Requirements 00 72 00 AIA General Conditions 00100 General Conditions of the Contract Subtotal 00 72 00 AIA General Conditions
Total 00 Procurement and Contracting Requirements
DATE PRINTED: 10/21/2026
$87,058 1.00 ls
87,058.00
$87,058 $87,058
$87,058
See Below, Priced per AIA 201
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 01 General Requirements 01 32 00 Construction Progress Documentation
$0
01100 Video Monitoring and documentation
Not Included
Subtotal 01 32 00 Construction Progress Documentation
$0
01 33 00 Submittal Procedures
$0
01110 Delivery Costs / Messenger Services
Included
01130 Reproduction Costs
Included
01170 Sustainability Project Requirements
Not Included
Subtotal 01 33 00 Submittal Procedures
$0
01 35 53 Security Procedures
$0
01160 Site Security Cameras & Monitoring
Not Included
Subtotal 01 35 53 Security Procedures
$0
01 45 00 Quality Control
$0
01200 Independent Testing
Not Included
01210 Soil Compaction Tests
Not Included
01220 Concrete Tests
Not Included
01230 Steel Weld Test / Inspections
Not Included
01250 Field Quality Control Procedures
Included
01260 3rd Party Envelope Consultant
Not Included
Subtotal 01 45 00 Quality Control
$0
01 51 00 Temporary Facilities
$46,650
01270 Temporary Electricity - Jobsite
By Owner
01280 Generators 36kw
Not Included
01290 Fuel for Generator (full load)
Not Included
01300 Generator Setup & Containment
Not Included
01310 Temporary Fire Protection
3.00 mo
375.00
$1,125
01330 Temp Heating Equipment & Labor
Not Included
01340 Temp Heating Fuel
Not Included
01350 Temporary Building Enclosure for Temp Heating
Not Included
01360 Temporary lighting
General lighting by EC
01370 Temporary Water
By Owner
01380 Sanitary Facilities 01390 Temporary Elevators
DATE PRINTED: 10/21/2026
3.00 mo
4,085.00
$12,255
For Subcontractors Not Included
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
01400 Temporary Hoists
Not Included
01410 Gradall for Jobsite
Not Included
01420 Bobcat & Operator for Jobsite
Not Included
01430 Fuel for Equipment
Not Included
01440 Temporary Cranes
By Division
01450 Temporary Scaffolding & Platforms
By Division
01460 Temporary Stairs & Ramps
Not Included
01470 Temporary Swing Staging
Not Included
01480 Temporary Access Roads
Not Included
01490 Weather Conditions
Not Included
01500 Dumpsters
36.00 ea
550.00
$19,800
01510 Temporary Parking Areas
Not Included
01520 Temporary Air & Noise Barriers
Not Included
01530 Temporary Fencing
1,000.00 lf
9.00
$9,000
01531 >Screening Around Temporary Fencing
1,000.00 lf
1.00
$1,000
01540 Temporary Barricades 01560 Temporary Connex(s) 01620 Temporary Interior Signage
By Division 3.00 mo
650.00
$1,950
76,021.00 sf
0.02
$1,520
Subtotal 01 51 00 Temporary Facilities
$46,650
01 70 00 Execution and Closeout 01665 AP Labor
$273,963 1.00 ls
273,963.00
$273,963
01720 Construction Surveying
By Trade
01730 Protection of Adjacent Construction
By Division
Subtotal 01 70 00 Execution and Closeout
$273,963
01 74 00 Cleaning
$31,603
01630 Progress Cleaning Material
456,126.00 sf
0.00
$1,520
01710 Final Clean Building
76,021.00 sf
0.40
$30,083
Subtotal 01 74 00 Cleaning 01 90 00 Life Cycle Activities
$31,603 $0
01740 Substructure Commissioning
Not Included
01750 Structure commissioning
Not Included
01760 Exterior enclosure commissioning
Not Included
01770 Roofing Commissioning
Not Included
01780 Systems Commissioning
Not Included
DATE PRINTED: 10/21/2026
DESCRIPTION Subtotal 01 90 00 Life Cycle Activities
Total 01 General Requirements
DATE PRINTED: 10/21/2026
QTY UOM UNIT PRICE
TOTAL COST $0
$352,216
NOTES / COMMENTS
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 04 Masonry 04 20 00 Unit Masonry
$6,309
04201 Patching Damaged Brick at Downspouts
Not Included
04203 Repair Broken CMU at Base of Wall (Ref. Details 3 & 10/A-415, Keynotes 1.07 & 2.04.)
1.00 ea
3,705.00
$3,705
04205 CMU Patchback at Drinking Fountains (Ref. Detail 6/A-415, Keynote 2.08)
1.00 ls
2,604.00
$2,604
Subtotal 04 20 00 Unit Masonry
Total 04 Masonry
DATE PRINTED: 10/21/2026
$6,309
$6,309
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 05 Metals 05 50 00 Metal Fabrications 05501 Misc. Metals Scope of Work
$30,725 1.00 sub
30,725.00
$30,725
05505 >Provide/Install Roof Access Ladder, Prefabricated Aluminum Ship Ladder w/ Platform & Return, 6063 Alloy, T52 Temper, Mill Finish (Ref. A4/A-361 - Keynote 2.83)
Included
05507 >Provide/Install Fall Protection Railing (Ref. A121 - Keynote 11 8129)
Included
05509 >Modify Wall Rail at Ramp Adjacent to New Downspout
Included
05511 >>Remove Portion of Existing Handrail as Required for Downspout Installation (Ref. 3/A415 - Keynote 1.13)
Included
05513 >>Field Weld 05 5213 Pipe & Tube Railings to Existing Adjacent Handrail on Each Side & Grind Smooth (Ref. 10 & 12/A-415)
Included
Subtotal 05 50 00 Metal Fabrications
Total 05 Metals
DATE PRINTED: 10/21/2026
$30,725
$30,725
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 06 Woods, Plastics and Composites 06 10 10 Rough Carpentry 06101 Interior Rough Carpentry
$52,477 4,000.00 sf
1.98
$7,920
06103 Rough Carpentry at Roof
See Below
06105 >8'' Parapet
844.00 lf
9.18
$7,748
06107 >Mechanical Curb Extensions
142.00 lf
18.80
$2,670
06109 >Gravel Stop Blocking (Detail B3/A361)
60.00 lf
4.38
$263
06111 >Roof to Wall Transition Blocking (Detail D2/A361)
1,099.00 lf
7.60
$8,352
25,000.00
$25,000
6.99
$524
06113 >Tectum Roof Panel/Structural Replacement
1.00 allow
06115 Interior Rough Carpentry - Backing for Casework
75.00 sf
Subtotal 06 10 10 Rough Carpentry
$52,477
06 22 00 Finish Carpentry 06221 Provide & Install New Reception Desk
Allowance
$23,095 1.00 ls
9,251.00
$9,251
06223 >Plastic Laminate Drawer Base Cabinet
Included
06225 >Provide/Install Plastic Laminate Top
Included
06227 >Wood Framed Die Wall w/ Plastic Laminate Finish
Included
06229 Provide & Install New Admin Kitchenette
1.00 ls
13,444.00
$13,444
06231 >Plastic Laminate Base Casework
Included
06232 >Provide/Install Solid Surface Top
Included
06233 >Plastic Laminate Upper Casework
Included
06235 >Remove Existing Furniture in Main Office Waiting Area Subtotal 06 22 00 Finish Carpentry
Total 06 Woods, Plastics and Composites
DATE PRINTED: 10/21/2026
4.00 hr
100.00
$400 $23,095
$75,572
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 07 Thermal and Moisture Protection 07 53 23 Roofing & Roof Insulation 07301 Full Roof Replacement
$748,220 1.00 sub
740,775.00
$740,775
07303 >Existing Roof Disassembly - RD-1
Included
07305 >>Remove Existing Built-up Roof Assembly / Gravel
Included
07307 >>Remove Existing 1/2" Plywood Cover Board
Included
07309 >>Remove Existing XPS Board Insulation & Wood Sleepers Between Insulation
Included
07311 >Existing Roof Disassembly - RD-2
Included
07313 >>Remove Existing Smooth Surface Asphalt Coated Built-up Roof Assembly
Included
07315 >>Remove Existing 1/2" Wood Fiberboard
Included
07317 >>Remove Existing 3/4" Fiberglass Insulation
Included
07319 >Existing Roof Disassembly - RD-3
Included
07321 >>Remove Existing Smooth Surface Asphalt Coated Built-up Roof Assembly
Included
07323 >>Remove Existing 1/2" Wood Fiberboard, (2) Layers
Included
07325 >>Remove Existing 1/2" Plywood
Included
07327 >>Remove Existing 1/2" Fiberboard, (3) Layers
Included
07329 >Existing Roof Disassembly - RD-1, RD-2, RD-3
Included
07331 >>Remove Existing Sheet Metal Cap, Existing Curb to Remain (Keynote 1.91)
Included
07333 >>Remove Existing Roof Hatch Assembly (Keynote 1.92)
Included
07335 >>Remove Existing Exhaust Fan (Keynote 1.93)
By Mechanical Sub
07337 >>Remove Existing Paver-Mounted Condensing Unit (Paver Removal ONLY - Condensing Unit Removal by Mechanical Sub) (Keynote - 1.94)
Included
07339 >>Remove Existing Sheet Metal Parapet Coping (Keynote 1.95)
Included
07341 >>Remove Existing Built-up Roof Base Flashing, Flashings & Counter Flashings Around Perimeter of Roof (Keynote 1.96)
Included
07343 >>Remove Existing Sheet Gravel Stop, Existing Gutter to Remain (Keynote 1.97)
Included
07345 >>Remove Existing Sheet Metal Gravel Stop (Keynote 1.98)
Included
07347 >>Remove Existing Roof-Mounted Condensing Unit & Line-Sets for Walk-in Cooler Repair (Keynote 1.99) 07349 >Roof Assembly - R1
DATE PRINTED: 10/21/2026
By Food Service Sub
Included
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
07351 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black
Included
07353 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)
Included
07355 >>07 5300.06 Insulation, 5-1/2" Thick
Included
07357 >Roof Assembly - R1.1
Included
07359 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black
Included
07361 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)
Included
07363 >>07 5300.06 Insulation, 5-1/2" Thick
Included
07365 >>07 5300.02 Deck Sheathing, 5/8" Thick x 2Layers (Per Structural S-003)
Included
07367 >Roof Assembly - R2
Included
07369 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black
Included
07371 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)
Included
07373 >>07 5300.06 Insulation, 5-1/2" Thick
Included
07375 >Roof Assembly - R3
Included
07377 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black
Included
07379 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)
Included
07381 >Miscellaneous
See Below
07383 >>Existing Roof Top Mechanical Equipment & Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side, Typ. (Keynote 2.72)
Included
07385 >>Existing Exhaust Fan to Remain. Provide Tapered Insulation Cricket on Uphill Side as Indicated & Typical Slip Flashing Detail, (Keynote 2.73) (ref. C2/A-361)
Included
07387 >>Existing Vent Through Roof to Remain. Extend or Repair as Required & Provide Prefabricated Flexible Stack Boot (Keynote 2.74)
By Mechanical Sub
07389 >>Existing Skylight & Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side, Typ. (Keynote 2.77)
Included
07391 >>Existing Sheet Metal Capped Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side & Typical Slip Flashing Detail. (Keynote 2.78)
Included
07393 >>Existing Roof Drain Location to Remain. Provide 4'-0" Tapered Insulation Sump in Each Direction (Keynote 2.79)
Included
07395 >>>Supply/ Install New Cast Iron Roof Drain Strainers (Ref. D1/A-361)
Included
DATE PRINTED: 10/21/2026
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
07397 >>Existing Channel Scupper Location to Remain. Wrap Membrane into Channel at Bottom & Sides (Keynote 2.81)
Included
07399 >>Existing Exposed Piping/Conduit on Roof to Remain. Provide Utility Support Blocks, Adjust Height to Conform to Roof Slope & Height of Pipe (Keynote 2.82)
Included
07401 >>New Galvanized Sheet Metal Cap on Extended Curb (Extended Curb by Others) (Keynote 2.91)
Included
07403 >>Reinstall Existing Roof Hatch (Keynote 2.92)
Included
07405 >>>Extension Post Assembly (Ref. 07 7200.06) 07407 >>Provide Tapered Insulation Cricket on Uphill Side of Extended Exhaust Fan Curbs (Extended Curb by Others) (Keynote 2.93)
Included
07409 >>Supply/Install Walkway Pads (Keynote 07 5300.10)
Included
07411 > Provide 25-Year Warranty
Included
07413 > Provide Extended Wind Warranty
Included
07415 >Roof Flashing
See Below
07417 >>22 Gauge Galvanized Slip Flashing at all Roof Top Curb Details (Ref. A1/A-361)
Included
07419 >>2-Piece Reglet Counterflashing at Interior Walls & Existing Cap Flashing Locations Ref. D2/A-361)
Included
07421 >>07 6200.2C Pre-finished Galvanized Steel Sheet Metal, 24 Gauge - Coping (Ref. B1 & C1/A -361)
Included
07423 >>07 6200.2GS Pre-finished Galvanized Steel Sheet Metal, 24 Guage - Gravel Stop
Included
07425 >>Existing Through Wall Roof Scupper Location to Remain. Provide New Scupper Materials (Keynote 2.83 & A2/A-361)
Included
07427 >>Cover at Existing Downspout (Ref. 11 & 12/A415) - 07 6200.02 Pre-finished Galvanized Steel, 20 Guage, Sheet Metal Cover with Hemmed Edges, Approx. 1'-4" Wide. Attach Sheet Metal Cover to Existing Masonry with Gasketed Fasteners at 12" O.C. Sealant all along each side.
Included
07429 >>Downspout (Ref. 12/A-415) - 07 6200.2DS Pre-finished Galvanized Steel, 20 Guage, Sheet Metal Tie Into Existing Sheet Gutter Above
Included
07431 Roof Cleanup
22,902.00 sf
0.05
$1,145
07433 Safety Measures for Roof Work Perimeter/Openings
1,260.00 lf
5.00
$6,300
07435 Exterior Scaffold Stair Tower
Not Included
07437 Hoisting for Roofing Materials
Included
DATE PRINTED: 10/21/2026
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
07439 Snow Removal for Roof Work Subtotal 07 53 23 Roofing & Roof Insulation
Total 07 Thermal and Moisture Protection
DATE PRINTED: 10/21/2026
NOTES / COMMENTS Not Included
$748,220
$748,220
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 08 Openings 08 70 00 Hardware 08701 Provide ADA Door Operators & Push Buttons to Existing Door Pairs
$22,348 2.00 Pair
9,674.00
$19,348
08703 >ADA Operator & Push Button for Each Door Pair with Surface Mounted Conduit 08705 >Patch/Repair Holes in Doors/Frames
Included 2.00 Pair
1,500.00
$3,000
Subtotal 08 70 00 Hardware
$22,348
Total 08 Openings
$22,348
DATE PRINTED: 10/21/2026
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 09 Finishes 09 21 16 Gypsum Board Assemblies
$54,800
09213 Drywall Patch & Repair - Ceiling at Kitchen Refrigerator
1.00 allow
10,000.00
$10,000
09215 Drywall Patch & Repair - Paging Device Demo in Walls/Gyp Ceilings
25.00 ea
200.00
$5,000
09217 Drywall Patch & Repair - Fire Alarm Device Demo in Walls/Gyp Ceilings
144.00 ea
200.00
$28,800
09221 Drywall Patch & Repair
2.00 ea
1,500.00
$3,000
09225 Drywall Patch & Repair
1.00 ls
1,500.00
$1,500
09227 Drywall Patch & Repair
1.00 ls
1,500.00
$1,500
09229 Relocated Wall Access Panel
1.00 ls
5,000.00
$5,000
Subtotal 09 21 16 Gypsum Board Assemblies
$54,800
09 51 00 Acoustical Ceilings
$8,900
09251 Patch & Repair Acoustic Tile Ceiling - Paging Device Demo
117.00 ea
50.00
$5,850
09253 Patch & Repair Acoustic Tile Ceiling - Fire Alarm Device Demo
61.00 ea
50.00
$3,050
Subtotal 09 51 00 Acoustical Ceilings
$8,900
09 65 00 Resilient Flooring
$6,590
09651 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls 14.00 lf
3.00
$42
09655 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls
16.00 lf
3.00
$48
09659 Resilient Transitions
Included 10,000.00 sf
0.65
Subtotal 09 65 00 Resilient Flooring
$6,500 $6,590
09 68 00 Carpet
$42,372
09679 Remove Portion of Existing Carpet & Rubber Base for Installation of New Base Cabinets (Ref. AD-101, 2/A-415 - Keynote 1.11)
25.00 sf
35.36
$884
09681 CPT-1, Carpet Tile, Interface - Open Air Stria, 25cm x 1m, Charcoal 103242
667.00 sy
44.64
$29,776
09683 >Remove Existing Broadloom Carpet & Rubber Base Throughout Room (Ref. AD-101, 1/A-416 Keynote 1.9)
6,002.00 sf
0.64
$3,870
09685 >Floor Prep
6,002.00 sf
0.60
$3,601
8.00 ea
125.00
$1,000
09687 >Moisture tests (1/1000sf)
DATE PRINTED: 10/21/2026
Allowance
Included
09653 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls
09661 Floor Protection
Allowance
DESCRIPTION 09689 Floor Protection
QTY UOM UNIT PRICE 6,002.00 sf
0.54
Subtotal 09 68 00 Carpet
TOTAL COST $3,241 $42,372
09 90 00 Painting and Coating
$35,025
09903 Paint Modified & Existing Wall Rail at Ramp Adjacent to New Downspout (Ref. 12/A-415)
1.00 ls
750.00
$750
09905 Paint Touch Up/Repair - Fire Alarm Device Demo in Walls/Gyp Ceilings
144.00 ea
75.00
$10,800
09907 Paint Fire Alarm Conduit
144.00 ea
75.00
$10,800
09909 Paint Touch Up/Repair - Paging Device Demo in Walls/Gyp Ceilings
25.00 ea
75.00
$1,875
09911 Repaint Existing Walls in Media Center Area, SW Promar 200 Zero VOC, Eggshel Finish Match Existing Colors
1.00 ls
7,775.00
$7,775
09913 Paint Damage Touch-Up
16.00 hr
75.00
$1,200
09915 Paint Damage Touch-Up
8.00 hr
75.00
$600
09917 Repainting Existing Waiting Room Drywall Walls After New Casework is Installed. (Ref. 2/A-415 Keynote 1.08)
8.00 hr
153.13
$1,225
Subtotal 09 90 00 Painting and Coating
Total 09 Finishes
DATE PRINTED: 10/21/2026
$35,025
$147,687
NOTES / COMMENTS
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 11 Equipment 11 40 00 Food Service Equipment 11401 Refrigerator Renewal
$47,432 1.00 ls
47,432.00
$47,432
11403 >Remove Existing Roof-Mounted Condensing Unit & Line Sets for Walk-in Cooler Repair (Ref. AD-121 - Keynote 1.99)
Included
11405 >Provide & Install Roof-Top Mounted Condensing Unit & Line Sets for Walk-in Cooler Repair (Ref. 1/FS101 - Item Number 3)
Included
11407 >Provide & Install Walk-in Cooler Evaporator Coil (Ref. 1/FS101 - Item Number 2)
Included
11409 >>Provide New Refrigerant Line Set From New Roof-Mounted Condensing Unit Down to New Kitchen Cooler Evaporator Coil
Included
11411 >>Extend Drain to Existing Floor Sink
Included
11413 >Walk in Cooler Door & Frame Replacement (Ref.8/A-415 Keynote 2.05, Ref. 1/FS101 - Item Number 1)
Included
11415 >Heating Holding & Proofing Cabinet (Ref. 1/FS101 - Item Number 4)
Included
11417 >Provide & Install Junction Boxes with Conduit, Stub as Indicated for Direct Connection
Included
11419 >Provide & Install Special Purpose Outlet, 120/208-Volt as Indicated, Ground Type, Horizontal Mount
Included
Subtotal 11 40 00 Food Service Equipment
Total 11 Equipment
DATE PRINTED: 10/21/2026
$47,432
$47,432
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 22 Plumbing 22 00 00 Plumbing 22000 Mechanical Scope of Work
$323,257 1.00 sub
317,757.00
$317,757
22001 Full Roof Replacement - Plumbing Scope
See Below
22003 >Camera/Inspect Roof Drains
Included
22004 >Raise Roof Drains, Replace Baskets
Included
22005 Water Heater Renewal (Mechanical Room A28)
See Below
22007 >Prior to Construction Verify Existing GPM Flow Rates for Each of the (2) Existing Domestic Hot Water Recirculation Pump for Rebalancing the New Equipment
Included
22009 >Prior to Construction Verify with Gas Utility Provider the Existing Gas Meter CFH Capacity and Pressure at the Meter
Included
22011 Plumbing Demo
See Below
22013 >Remove Existing Building Domestic Hot Water Boiler and Associated Storage Tanks and Piping Back to Mains (Ref. PD-201A - Keynote P2)
Included
22015 >>Salvage Existing Boiler & Return to Owner
Included
22017 >Remove a Portion of Existing Mains Back to Domestic Hot Water Equipment in Mechanical Room (Ref. PD-201A - Keynote P3)
Included
22019 >Remove Existing Recirculation Pump Serving Building (Ref. PD-201A - Keynote P4)
Included
22021 >Remove Existing Recirculation Pump Serving Kitchen (Ref. PD-201A - Keynote P5)
Included
22023 >Remove Existing Master Mixing Valve (Ref. PD -201A - Keynote P6)
Included
22025 >Remove Existing Gas Piping from Domestic Hot Water Equipment (Ref. PD-201A - Keynote P8)
Included
22027 >Existing Gas Meter to be Replaced. Coordinate with Utility Provider for New Meter Install. (Ref. PD-201A - Keynote P14) 22029 >Equipment & Duct/Pipe Demo - Cut, Cap, & Drop. Removal of Materials and Equipment to Dumpster Provide by GC 22031 Plumbing Equipment
1.00 allow
5,500.00
$5,500
Allowance
Included
See Below
22033 >Provide & Install (2) Gas-Fired Domestic Condensing Water Heaters with Condensate Neutralizers, T&P Valves, & Drain Pans (DWH-1 & DWH-2)
Included
22035 >Provide & Install (1) Expansion Tank (DET-1)
Included
22037 >Provide & Install (2) Domestic Circulation Pumps (DCP-1 & DCP-2)
Included
22039 >Provide & Install (1) Master Mixing Valve (DMV -1) (BMS Integrated is Not Applicable. It is not
Included
DATE PRINTED: 10/21/2026
DESCRIPTION -1) (BMS Integrated is Not Applicable. It is not monitored.)
QTY UOM UNIT PRICE
TOTAL COST
22041 Piping Systems
NOTES / COMMENTS
See Below
22043 >Sanitary Waste/Vent - Cast Iron No-Hub with Standard No-Hub Couplings
Included
22045 >Domestic Cold/Hot Water - Type L Copper with Solder Joints
Included
22047 >Natural Gas - Black Steel Sch. 40 Pipe with Treaded/Welded Joints
Included
22049 Insulation, Fire Stopping/Caulking Associated with Mechanical and Plumbing Systems
Included
22051 Test and Balance for Air and Water Systems
Included
22053 Domestic Water Chlorination
Included
22055 Pressure Testing for New Piping per Code
Included
22057 Drinking Fountains
See Below
22059 >Remove Existing Drinking Fountains & Provide New Dual Height Electric Water Cooler w/ Bottle Filler
Included
22061 Kitchen Refrigerator
See Below
22063 >Remove Existing Refrigerator & Freezer Condensate Piping From Removed Evaporator Back to Floor Sink. Provide New Condensate Piping from New Evaporator to Floor Drain. Terminate Above Floor Sink with Air Gap.(Ref. P -201A - Keynote P13) Subtotal 22 00 00 Plumbing
Total 22 Plumbing
DATE PRINTED: 10/21/2026
Included
$323,257
$323,257
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 23 Heating, Ventilating and Air Conditioning 23 00 00 Heating, Ventilating and Air Conditioning
$15,000
23001 Replace HVAC Fans
Not Included
23003 Update HVAC Controls
Not Included
23005 Water Heater Renewal (Mechanical Room A28)
See Below
23007 Mechanical Demo
See Below
23009 >Remove Existing Domestic Water Boiler & Return to Owner (Ref. MD-201A - Keynote M1)
Included
23011 >Remove Existing Flue Serving Domestic Water Boiler Up Through Roof. Retain Roof Penetration for New Concentric Vent (Ref. MD201A - Keynote M2)
Included
23013 >Remove Existing 12x8 Combustion Air Intake Duct in its Entirety. (Ref. MD-201A - Keynote M3)
Included
23015 >Retain Existing Combustion Air Intake Duct Penetration for New Concentric Vent Routing Through Roof (Ref. MD-201A - Keynote M4)
Included
23017 >Equipment & Duct/Pipe Demo - Cut, Cap, & Drop. Removal of Materials and Equipment to Dumpster Provide by GC
Included
23019 Mechanical Equipment
See Below
23021 >Provide & Install New Domestic Water Heater (Ref. M-201A - Keynote M5)
Included
23023 >Provide & Install New Combustion Air Intake and Flue to Serve New Domestic Water Heater. Provide New 4" Concentric Vent Through Existing Roof Penetration. Concentric Vent to Connect to 3" Combustion Air Intake & 3" Flue that Serve New Water Heater. (Ref. M-201A Keynote M6)
Included
23025 Test and Balance for Air and Water Systems
Included
23029 Full Roof Replacement
See Below
23029 Insulation, Fire Stopping/Caulking Associated with Mechanical and Plumbing Systems
Included
23031 >Remove & Reinstall Rooftop Mechanical Equipment (Ref. A-121 - Keynotes 2.91, 2.93, 2.99)
Included
23033 >Provide New Curb Caps
Included
23035 >Provide New Curb for Existing Condensing Unit (Ref. A-121 - Keynote 07 7200.01)
Included
23037 >3rd Party Design for Wind Subtotal 23 00 00 Heating, Ventilating and Air Conditioning
Total 23 Heating, Ventilating and Air Conditioning
DATE PRINTED: 10/21/2026
1.00 allow
15,000.00
$15,000 $15,000
$15,000
Allowance
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 26 Electrical 26 00 00 Electrical
$156,487
26000 Electrical Scope of Work
1.00 sub
135,419.30
$135,419
26001 Electrical Load Metering & Monitoring, 30 Day
1.00 ls
2,500.00
$2,500
26002 Built-Up Roofing 26003 >Existing Rooftop Exhaust Fans Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.93) 26005 >Existing Rooftop Condensing Unit Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.94) 26007 Drinking Fountains
See Below 1.00 allow
6,000.00
$6,000
Allowance
Included w/ Above
See Below
26009 >Provide New 20A, 120V Branch Circuit from Nearest Electrical Panel (Ref. E-201C - Keynote E8)
Included
26011 >Furnish & Install GFCI Duplex Receptacle Below Drinking Fountain/Bottle Filler (Ref. E201C - Keynote E8)
Included
26013 >Connect Electric Water Cooler/Bottle Filler Units to Receptacle
Included
26015 Emergency Lighting/Exit Sign Modifications
See Below
26017 >Disconnect & Remove Existing Battery Exit Signs
Included
26019 >Furnish & Install New AC-only Exit Signs at Existing Locations (Ref. E-211A/B/C/D - Keynote L2)
Included
26021 >Extend or Modify Wiring as Required to Connect Exit Signs to Generator-backed Emergency Branch Circuits (Ref. E-211A/B/C/D - Keynote L2)
Included
26023 Water Heater Replacement
See Below
26025 >Maintain Existing Emergency Power Off 'EPO' System & Pushbutton(s) in Place. Disconnect Two (2) Domestic Water Heaters from System. (Ref. ED-201A - Keynote E1)
Included
26027 >Retain Existing 20A, 120V Branch Circuit Serving Hot Water Boiler & Associated Pump Being Removed (Ref. ED-201A - Keynote E6)
Included
26029 >Retain Existing 20A, 120V Branch Circuit Serving Circulation Pump Being Removed (Ref. ED-201A - Keynote E10)
Included
26031 >Route Water Heater Branch Circuits Through Existing Emergency Power Off 'EPO' System (Ref. E-201A - Keynote E2)
Included
26033 >Use Existing 20A, 120V Branch Circuit Which Served Hot Water Boiler for Connections to New Domestic Water Heaters DWH-1/2 (Ref E-201A Keynote E12)
Included
DATE PRINTED: 10/21/2026
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
26035 >Use Existing 20A, 120V Branch Circuit Which Served Circulation Pump for Connections to New Domestic Circulation Pumps DCP-1/2 & DMV-1 (Ref E-201A - Keynote E142)
NOTES / COMMENTS Included
26037 Walk-in Cooler/Freezer Replacement
See Below
26039 >Disconnect Existing Branch Circuit From Walkin Cooler Condensing Unit on Roof & Remove Branch Circuit (ED-201A - Keynote E5)
Included
26041 >Remove Existing Branch Circuit from Walk-in Cooler Evaporator Coil (ED-201A - Keynote E9)
Included
26043 >Remove Existing Branch Circuit from Walk-in Cooler Door & Frame (ED-201A - Keynote E11)
Included
26045 >Remove Existing Receptacle & 120V Branch Circuit Serving Heating Cabinet Being Removed (ED-201A - Keynote E13)
Included
26047 >Reconnect Existing Circuits to New Refrigeration Equipment
Included
26049 >Reconnect Rooftop Condenser/Compressor Power
Included
26051 Fire Alarm Head End
Included
26053 >Disconnect Existing Branch Circuit(s) From Main Fire Alarm Control Panel & Any Associated Booster Panels
Included
26055 >Extend Existing 120V Circuit to New Fire Alarm Control Panel Location & Connect. (Ref. E-201A - Keynote E16)
Included
26057 >>Supply & Install Wall Junction Box
Included
26059 Paging System Replacement
See Below
26061 >Rough-in Backboxes & Conduit 26063 New 20A, 120 V Branch Circuits to Door Header of Openings for New ADA Openings
Included 2.00 ea
2,477.15
$4,954
26065 >Supply & Install 120V Power Connection for Motorized Door Operator with STO for Local Disconnect. Install Raceway & Junction Boxes for Controls. Install Controls. Interface with Security System as Required for Release. (Ref. E-201D - Keynote E3) 26067 New 20A Dedicated Quad Receptacle at New Reception Desk
Included
1.00 ea
4,047.90
$4,048
26069 >Furnish & Install New 120V 20A Circuit & Quadplex Receptacle Flush Mounted in Kneespace. New Raceway Shall be Concealed. (Ref. E-201A - Keynote E4) 26071 Receptacles at New Kitchenette
Included
1.00 ls
3,565.86
$3,566
26073 >Furnish & Install New 120V 20 Circuit & Receptacle for the New Under Counter Refrigerator
Included
26075 >Furnish & Install New Wall Duplex Receptacles (Ref. E-201A)
Included
DATE PRINTED: 10/21/2026
DESCRIPTION Subtotal 26 00 00 Electrical
Total 26 Electrical
DATE PRINTED: 10/21/2026
QTY UOM UNIT PRICE
TOTAL COST $156,487
$156,487
NOTES / COMMENTS
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 27 Communications 27 51 00 Distributed AV systems 27511 Paging System Replacement
$225,694 1.00 ls
225,694.00
$225,694
27513 >Remove Existing Paging System Equipment & Wiring
Included
27515 >Furnish & Install Valcom IP6000 Head End Equipment
Included
27517 >Provide New Paging System Cabling
Included
27519 >Furnish & Install Paging Speakers
Included
27521 >Furnish & Install Classroom Call Switches
Included
Subtotal 27 51 00 Distributed AV systems
Total 27 Communications
DATE PRINTED: 10/21/2026
$225,694
$225,694
DESCRIPTION
QTY UOM UNIT PRICE
TOTAL COST
NOTES / COMMENTS
DETAILED COST: 28 Electronic Safety and Security 28 30 00 Electronic Detection and Alarm 28301 Fire Alarm Head End: Full Fire Alarm System Replacement with Voice Evacuation
$405,754 1.00 ls
405,754.26
$405,754
28303 >Remove Existing Fire Alarm System (Panels, Devices, Wiring, Conduit)
Included
28305 >Furnish & Install New Fully Addressable Mircom FACP
Included
28307 >Furnish & Install New Voice Evacuation Panel & Amplifier
Included
28309 >Furnish & Install New Smoke Detectors, Pull Stations, & Monitor Modules
Included
28311 >Furnish & Install Horn/Strobes or Speaker/Strobes Throughout Building
Included
28313 >Provide A New Fire Alarm Control Panel, Graphic Map, Dialer, & Record Document Box (Ref. FA-201A - Keynote FA1)
Included
28315 >Provide New Remote Annunciator & Graphic Map (Ref. FA-201A - Keynote FA2)
Included
28317 >Interface Fire Alarm System with Kitchen Hood Suppression System (Ref. FA-201A - Keynote FA3)
Included
28319 >Provide Fire Alarm Interface with Fire Sprinkler System (Ref. FA-201B - Keynote FA4)
Included
28321 >Provide Weatherproof Horn/Strobe Above FDC (Ref. FA-201B - Keynote FA5)
Included
28323 >Provide New Duct Smoke Detection, Control Relay & Remote Test Switch (Ref. FA-201A/B/D - Keynote FA6)
Included
28325 >Provide Fire Alarm Interface with Existing Magnetic Door Holders (Ref. FA-201C - Keynote FA7)
Included
28327 >Provide Fire Alarm Interface with Sound System to Shut Down Sound System on Activation of Fire Alarm (Ref. FA-201C - Keynote FA8)
Included
28329 >Provide a Fixed, High Temperature Heat Detector Above the Kiln (Ref. FA-201D Keynote FA9)
Included
28331 >Provide & Install New Carbon Monoxide Detector (Ref. FA-201A/B/D - Keynote FA10)
Included
28333 >Provide Fire Alarm System Interface for Damper Control. Provide Additional Smoke Detectors (Area or Duct) for Fire/Smoke Dampers as Requited. (Ref. FA-201B - Keynote FA11)
Included
Subtotal 28 30 00 Electronic Detection and Alarm
DATE PRINTED: 10/21/2026
$405,754
DESCRIPTION
Total 28 Electronic Safety and Security
DATE PRINTED: 10/21/2026
QTY UOM UNIT PRICE
TOTAL COST
$405,754
NOTES / COMMENTS
Line
Name
Duration
Start
Finish
A 4
BVSD Foothills ES Milestones School Milestones
544d
8/1/2025
9/24/2027
521d
8/1/2025
8/24/2027
521d
8/1/2025
8/24/2027
8/1/2025 A
8/13/2025 A
1
Summer Break - 2025 (School Back In Session)
9d
2
Thankgiving Break - 2025
3d 11/24/2025 A 11/26/2025 A
3
Winter Break - 2025
8d 12/23/2025 A
1/6/2026 A
4
Spring Break - 2026
5d 3/16/2026 A
3/20/2026 A
5
Summer Break - 2026
34d 5/21/2026 A
8/13/2026 A
6
Thankgiving Break - 2026
3d
11/24/2026
11/30/2026
7
Winter Break - 2026
10d
12/22/2026
1/7/2027
8
Spring Break - 2027
5d
3/23/2027
3/29/2027
9
Summer Break - 2027 - START
6/3/2027
6/3/2027
10
Summer Break - 2027 - FINISH
8/24/2027
8/24/2027
8/1/2025
11/5/2026
321d
8/1/2025
11/5/2026
150d
8/1/2025 A
11/5/2026
Project Milestones Preconstruction Milestones 11
DAT Meetings - Finals
12
Notice to Proceed
13
DAT Meetings
14
Post-Award Meetings Construction Milestones
321d
2025 S O N D J F 25 15 6 27 17 8 29 19 9
Thankgiving Break - 2025
Winter Break - 2025
Spring Break - 2026
Summer Break - 2026
Thankgiving Break - 2026
Winter Break - 2026
Spring Break - 2027
Summer Break - 2027 - START
Summer Break - 2027 - FINISH
DAT Meetings - Finals
Notice to Proceed
10/26/2026 A
DAT Meetings
12/15/2025 A 12/15/2025 A 447d
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
Summer Break - 2025 (School Back In Session)
10/15/2025 A 10/15/2025 A 123d 12/1/2025 A
M 2
11/4/2025
8/11/2027
136d 11/4/2025 A
10/26/2026 A
Post-Award Meetings
15
Early Investigations
16
Mobilization Start
3/9/2027
3/9/2027
17
Abatement Start
5/21/2027
5/21/2027
18
Abatement Finish
5/27/2027
5/27/2027
Abatement Finish
19
Demo Start
6/7/2027
6/7/2027
Demo Start
20
Rough-in Start
6/16/2027
6/16/2027
Rough-in Start
21
Demo Finish
6/18/2027
6/18/2027
Demo Finish
22
Rough-in Finish
7/21/2027
7/21/2027
23
Substantial Completion
7/30/2027
7/30/2027
Substantial Completion
24
TCO
7/30/2027
7/30/2027
TCO
25
Owner Move-in Complete
8/11/2027
8/11/2027
8/28/2025
3/30/2027
Preconstruction & Design
400d
RFP / RFQ Information
33d
8/28/2025
10/15/2025
26
RFP/RFQ - Issuance of RFP
8/28/2025 A
8/28/2025 A
27
RFP/RFQ - Pre-Proposal Submission
9/8/2025 A
9/8/2025 A
Early Investigations
Mobilization Start
Abatement Start
Rough-in Finish
Owner Move-in Complete
RFP/RFQ - Issuance of RFP
RFP/RFQ - Pre-Proposal Submission
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 1 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
28
RFP/RFQ - Inquiries Due
9/12/2025 A
9/12/2025 A
RFP/RFQ - Inquiries Due
29
RFP/RFQ - Addendum's
9/18/2025 A
9/18/2025 A
RFP/RFQ - Addendum's
30
RFP/RFQ - Submission Deadline
9/25/2025 A
9/25/2025 A
RFP/RFQ - Submission Deadline
31
RFP/RFQ - Evaluation / Award
10/7/2025 A
10/7/2025 A
RFP/RFQ - Evaluation / Award
32
Notice of Award
10/15/2025 A 10/15/2025 A
Document Development
34 35
Notice of Award
258d 10/21/2025 10/27/2026
Programming / DAT 33
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
Program - Electrical Upgrades (Design & Precon / Estimating Services/Deliverables) Program - Mechanical Upgrades (Design & Precon / Estimating Services/Deliverables) Program - Roofing Upgrades (Design & Precon / Estimating Services/Deliverables) Schematic Design
78d 10/21/2025
2/12/2026
78d 10/21/2025 A
2/12/2026 A
Program - Electrical Upgrades (Design & Precon / Estimating Services/Deliverables)
78d 10/21/2025 A
2/12/2026 A
Program - Mechanical Upgrades (Design & Precon / Estimating Services/Deliverables)
78d 10/21/2025 A
2/12/2026 A
Program - Roofing Upgrades (Design & Precon / Estimating Services/Deliverables)
61d
2/20/2026
5/15/2026
36
SD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)
1d 2/20/2026 A
2/20/2026 A
37
SD - Cost Estimating & Constructability Review
16d 2/20/2026 A
3/13/2026 A
38
SD - Estimate Review
8d 3/16/2026 A
3/25/2026 A
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - BUR (Built-Up Roofing) with Gravel - 1989 Renewal
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - The Old HVAC Fans Are Noisy and Need to be Addressed" - REBUILD OPTION
39 40
SD - Alternates - BUR (Built-Up Roofing) with Gravel 1989 Renewal SD - Alternates - The Old HVAC Fans Are Noisy and Need to be Addressed" - REBUILD OPTION
SD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)
SD - Cost Estimating & Constructability Review
SD - Estimate Review
41
SD - Alternates - Fire Alarm System - Option 2 & 3
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - Fire Alarm System - Option 2 & 3
42
SD - Alternates - Alternate 1 - ADA Door Operators
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - Alternate 1 - ADA Door Operators
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - Priority 1 Exterior Door into Corridor D27 (Adjacent Teachers Lounge)
37d 3/26/2026 A
5/15/2026 A
SD - Alternates - Priority 2 Exterior Door into Corridor D62 (Adjacent Gym)
43 44
SD - Alternates - Priority 1 Exterior Door into Corridor D27 (Adjacent Teachers Lounge) SD - Alternates - Priority 2 Exterior Door into Corridor D62 (Adjacent Gym)
45
SD - Alternate 2 - Main Office Reception Desk
37d 3/26/2026 A
5/15/2026 A
SD - Alternate 2 - Main Office Reception Desk
46
SD - Alternate 3 - Main Office Kitchenette
37d 3/26/2026 A
5/15/2026 A
SD - Alternate 3 - Main Office Kitchenette
5/15/2026 A
SD - Alternate 5 - Low Exit Signs
47
37d 3/26/2026 A
SD - Alternate 5 - Low Exit Signs Design Development
122d
2/20/2026
8/12/2026
48
DD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)
61d 2/20/2026 A
5/15/2026 A
49
DD - Cost Estimating & Constructability Review
10d 5/15/2026 A
5/29/2026 A
50
DD - Estimate Review
14d 5/18/2026 A
6/17/2026 A
51
Establish IGMP
6/17/2026 A
6/17/2026 A
52
DD - Alternates 10 - Fire Alarm System - Option 2 & 3
32d 6/17/2026 A
8/12/2026 A
DD - Alternates 10 - Fire Alarm System - Option 2 & 3
53
DD - Alternate 1 - ADA Door Operators
36d 6/17/2026 A
8/6/2026 A
DD - Alternate 1 - ADA Door Operators
54
DD - Alternate 1 - Hardware Group - Option 1
36d 6/17/2026 A
8/6/2026 A
DD - Alternate 1 - Hardware Group - Option 1
55
DD - Alternate 1 - Hardware Group - Option 2
36d 6/17/2026 A
8/6/2026 A
DD - Alternate 1 - Hardware Group - Option 2
56
DD - Alternate 2 - Main Office Reception Desk
36d 6/17/2026 A
8/6/2026 A
DD - Alternate 2 - Main Office Reception Desk
57
DD - Alternate 3 - Main Office Kitchenette
36d 6/17/2026 A
8/6/2026 A
DD - Alternate 3 - Main Office Kitchenette
58
DD - Alternate - Low Exit Signs
36d 6/17/2026 A
8/6/2026 A
DD - Alternate - Low Exit Signs
BVSD Foothills ES Proposal Schedule Boulder Valley School District
DD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)
DD - Cost Estimating & Constructability Review
DD - Estimate Review
Establish IGMP
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 2 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
59
DD - Alternate 4 - Music Room Storage Construction Documents
36d 6/17/2026 A
8/6/2026 A
42d
10/27/2026
8/28/2026
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4 DD - Alternate 4 - Music Room Storage
60
CD - Drawings 100% (Design & Precon / Estimating Services/Deliverables/GMP)
1d 8/28/2026 A
8/28/2026 A
61
CD - Alternate 1 - ADA Door Operators
41d 8/28/2026 A
10/26/2026 A
CD - Alternate 1 - ADA Door Operators
62
CD - Alternate 2 - Main Office Reception Desk
41d 8/28/2026 A
10/26/2026 A
CD - Alternate 2 - Main Office Reception Desk
63
CD - Alternate 3 - Main Office Kitchenette
41d 8/28/2026 A
10/26/2026 A
64
CD - Cost Estimating & Constructability Review
10d 8/31/2026 A
9/14/2026 A
65
CD - Estimate Review
10d 9/15/2026 A
9/28/2026 A
CD - Estimate Review
66
Establish FGMP
9/28/2026 A
9/28/2026 A
Establish FGMP
67
BVSD Board Meeting
1d
10/27/2026
10/27/2026
121d
8/28/2026
2/22/2027
Permitting
CD - Drawings 100% (Design & Precon / Estimating Services/Deliverables/GMP)
CD - Alternate 3 - Main Office Kitchenette
CD - Cost Estimating & Constructability Review
BVSD Board Meeting
68
Permit - Submit to State
61d 8/28/2026 A
11/24/2026
69
Permit - Electrical Submit to Dora
60d
10/27/2026
1/25/2027
Permit - Electrical Submit to Dora
70
Permit - Plumbing Submit to Dora
60d
10/27/2026
1/25/2027
Permit - Plumbing Submit to Dora
71
Permit - Building (In Hand)
40d
11/25/2026
1/26/2027
Permit - Building (In Hand)
72
Permit - Electrical (In Hand)
20d
1/26/2027
2/22/2027
Permit - Electrical (In Hand)
73
Permit - Plumbing (In Hand)
20d
1/26/2027
2/22/2027
Permit - Plumbing (In Hand)
Contracting & Award
15d 10/28/2026 11/17/2026
Award Early Trades
10d 10/28/2026 11/10/2026
Permit - Submit to State
74
AW - Div 22 - Plumbing
10d
10/28/2026
11/10/2026
AW - Div 22 - Plumbing
75
AW - Div 23 - HVAC
10d
10/28/2026
11/10/2026
AW - Div 23 - HVAC
76
AW - Div 26 - Electrical
10d
10/28/2026
11/10/2026
AW - Div 26 - Electrical
10d
10/28/2026
11/10/2026
AW - Div 28 - Fire Alarm
77
AW - Div 28 - Fire Alarm Award Trades
15d 10/28/2026 11/17/2026
78
AW - Div 03 - Concrete
15d
10/28/2026
11/17/2026
AW - Div 03 - Concrete
79
AW - Div 04 - Masonry
15d
10/28/2026
11/17/2026
AW - Div 04 - Masonry
80
AW - Div 05 - Metals
15d
10/28/2026
11/17/2026
AW - Div 05 - Metals
81
AW - Div 06 - Wood & Plastics
15d
10/28/2026
11/17/2026
AW - Div 06 - Wood & Plastics
82
AW - Div 07 - Thermal Insulation
15d
10/28/2026
11/17/2026
AW - Div 07 - Thermal Insulation
83
AW - Div 08 - Openings
15d
10/28/2026
11/17/2026
AW - Div 08 - Openings
84
AW - Div 09 - Finshes
15d
10/28/2026
11/17/2026
AW - Div 09 - Finshes
85
AW - Div 10 - Specialties
15d
10/28/2026
11/17/2026
AW - Div 10 - Specialties
86
AW - Div 11 - Equipment
15d
10/28/2026
11/17/2026
AW - Div 11 - Equipment
87
AW - Div 12 - Furnishing
15d
10/28/2026
11/17/2026
AW - Div 12 - Furnishing
95d 11/11/2026
3/30/2027
Submittals & Procurement
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 3 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
Division 03
50d 11/18/2026
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
2/2/2027
88
S&P - Underslab Vapor Barrier - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
89
S&P - Underslab Vapor Barrier - AP Review
10d
12/4/2026
12/17/2026
90
S&P - Underslab Vapor Barrier - Owner Review
10d
12/18/2026
1/5/2027
91
S&P - Underslab Vapor Barrier - Fabricate/Deliver
20d
1/6/2027
2/2/2027
Division 04
2025 S O N D J F 25 15 6 27 17 8 29 19 9
90d 11/18/2026
3/30/2027
S&P - Underslab Vapor Barrier - Contractor Prepare/Submit
S&P - Underslab Vapor Barrier - AP Review
S&P - Underslab Vapor Barrier - Owner Review
S&P - Underslab Vapor Barrier - Fabricate/Deliver
92
S&P - Masonry Mortaring & Grout - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Masonry Mortaring & Grout - Contractor Prepare/Submit
93
S&P - Unit Masonry - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Unit Masonry - Contractor Prepare/Submit
94
S&P - Masonry Mortaring & Grout - AP Review
10d
12/4/2026
12/17/2026
S&P - Masonry Mortaring & Grout - AP Review
95
S&P - Unit Masonry - AP Review
10d
12/4/2026
12/17/2026
S&P - Unit Masonry - AP Review
96
S&P - Masonry Mortaring & Grout - Owner Review
10d
12/18/2026
1/5/2027
S&P - Masonry Mortaring & Grout - Owner Review
97
S&P - Unit Masonry - Owner Review
10d
12/18/2026
1/5/2027
S&P - Unit Masonry - Owner Review
98
S&P - Masonry Mortaring & Grout - Fabricate/Deliver
30d
1/6/2027
2/16/2027
99
S&P - Unit Masonry - Fabricate/Deliver
60d
1/6/2027
3/30/2027
Division 05 100 101 102 103
80d 11/18/2026
S&P - Metals (Div 05 - Contractor Prepare/Submit Shop Drawings) S&P - AP Review (Div 05 - AP Review/Submit Shop Drawings) S&P - A&E Review (Div 05 - Owner Review/Approve Shop Drawings) S&P - Metals Procurement (Div 07 - Fabricate/Deliver) Division 06
10d
11/18/2026
12/3/2026
S&P - Metals (Div 05 - Contractor Prepare/Submit Shop Drawings)
10d
12/4/2026
12/17/2026
S&P - AP Review (Div 05 - AP Review/Submit Shop Drawings)
10d
12/18/2026
1/5/2027
50d
1/6/2027
3/16/2027 2/16/2027
10d
11/18/2026
12/3/2026
S&P - Rough Carpentry - AP Review
10d
12/4/2026
12/17/2026
106
S&P - Rough Carpentry - Owner Review
10d
12/18/2026
1/5/2027
107
S&P - Rough Carpentry - Fabricate/Deliver
30d
1/6/2027
2/16/2027
S&P - Rough Carpentry - Contractor Prepare/Submit
105
Division 07
S&P - Unit Masonry - Fabricate/Deliver
3/16/2027
60d 11/18/2026
104
S&P - Masonry Mortaring & Grout - Fabricate/Deliver
80d 11/18/2026
3/16/2027
S&P - A&E Review (Div 05 - Owner Review/Approve Shop Drawings)
S&P - Metals Procurement (Div 07 - Fabricate/Deliver)
S&P - Rough Carpentry - Contractor Prepare/Submit
S&P - Rough Carpentry - AP Review
S&P - Rough Carpentry - Owner Review
S&P - Rough Carpentry - Fabricate/Deliver
108
S&P - Prep For Re-Roofing - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Prep For Re-Roofing - Subcontractor Submit
109
S&P - Fire And Smoke Assembly ID - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Fire And Smoke Assembly ID - Subcontractor Submit
110
S&P - EPDM Roofing - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - EPDM Roofing - Subcontractor Submit
111
S&P - Roofing Accessories - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Roofing Accessories - Subcontractor Submit
112
S&P - Sheet-Metal Flashing And Trim - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Sheet-Metal Flashing And Trim - Subcontractor Submit
113
S&P - Joint Sealants - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Joint Sealants - Subcontractor Submit
114
S&P - Prep For Re-Roofing - - AP Review
10d
12/4/2026
12/17/2026
S&P - Prep For Re-Roofing - - AP Review
115
S&P - Fire And Smoke Assembly ID - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Fire And Smoke Assembly ID - AP Review/Submit
116
S&P - EPDM Roofing - - AP Review
10d
12/4/2026
12/17/2026
S&P - EPDM Roofing - - AP Review
117
S&P - Roofing Accessories - - AP Review
10d
12/4/2026
12/17/2026
S&P - Roofing Accessories - - AP Review
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 4 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
118
S&P - Sheet-Metal Flashing And Trim - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Sheet-Metal Flashing And Trim - AP Review/Submit
119
S&P - Joint Sealants - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Joint Sealants - AP Review/Submit
120
S&P - Prep For Re-Roofing - A&E Review
10d
12/18/2026
1/5/2027
S&P - Prep For Re-Roofing - A&E Review
121
S&P - Fire And Smoke Assembly ID - A&E Review
10d
12/18/2026
1/5/2027
S&P - Fire And Smoke Assembly ID - A&E Review
122
S&P - EPDM Roofing - A&E Review
10d
12/18/2026
1/5/2027
S&P - EPDM Roofing - A&E Review
123
S&P - Roofing Accessories - A&E Review
10d
12/18/2026
1/5/2027
S&P - Roofing Accessories - A&E Review
124
S&P - Sheet-Metal Flashing And Trim - A&E Review
10d
12/18/2026
1/5/2027
S&P - Sheet-Metal Flashing And Trim - A&E Review
125
S&P - Joint Sealants - A&E Review
10d
12/18/2026
1/5/2027
S&P - Joint Sealants - A&E Review
50d
1/6/2027
3/16/2027
25d
1/6/2027
2/9/2027
50d
1/6/2027
3/16/2027
50d
1/6/2027
3/16/2027
S&P - Roofing Accessories - Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Sheet-Metal Flashing And Trim Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Joint Sealants Procurement/Fabricate/Deliver
126 127 128 129 130 131
S&P - Prep For Re-Roofing Procurement/Fabricate/Deliver S&P - Fire And Smoke Assembly ID Procurement/Fabricate/Deliver S&P - EPDM Roofing - Procurement/Fabricate/Deliver S&P - Roofing Accessories Procurement/Fabricate/Deliver S&P - Sheet-Metal Flashing And Trim Procurement/Fabricate/Deliver S&P - Joint Sealants Procurement/Fabricate/Deliver Division 08
132 133 134 135
70d 11/18/2026
S&P - ALTERNATE - Openings (Div 08 - Contractor Prepare/Submit Shop Drawings) S&P - AP Review (Div 08 - AP Review/Submit Shop Drawings) S&P - A&E Review (Div 08 - Owner Review/Approve Shop Drawings) S&P - ALTERNATE - Openings Procurement (Div 07 Fabricate/Deliver) Division 09
S&P - Prep For Re-Roofing - Procurement/Fabricate/Deliver
S&P - Fire And Smoke Assembly ID Procurement/Fabricate/Deliver
S&P - EPDM Roofing - Procurement/Fabricate/Deliver
3/2/2027
10d
11/18/2026
12/3/2026
10d
12/4/2026
12/17/2026
10d
12/18/2026
1/5/2027
40d
1/6/2027
3/2/2027
S&P - ALTERNATE - Openings (Div 08 - Contractor Prepare/Submit Shop Drawings)
S&P - AP Review (Div 08 - AP Review/Submit Shop Drawings)
S&P - A&E Review (Div 08 - Owner Review/Approve Shop Drawings)
S&P - ALTERNATE - Openings Procurement (Div 07 - Fabricate/Deliver)
55d 11/18/2026
2/9/2027
10d
11/18/2026
12/3/2026
S&P - Common Work Results for Flooring Prep - Subcontractor Submit
S&P - Gyp Board Assemblies - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Gyp Board Assemblies - Subcontractor Submit
138
S&P - Acoustical Ceilings - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Acoustical Ceilings - Subcontractor Submit
139
S&P - Resilient Flooring & Base - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Resilient Flooring & Base - Subcontractor Submit
140
S&P - Tile Carpeting - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Tile Carpeting - Subcontractor Submit
141
S&P - Interior Painting - Subcontractor Submit
10d
11/18/2026
12/3/2026
S&P - Interior Painting - Subcontractor Submit
142
S&P - Common Work Results for Flooring Prep - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Common Work Results for Flooring Prep - AP Review/Submit
143
S&P - Gyp Board Assemblies - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Gyp Board Assemblies - AP Review/Submit
144
S&P - Acoustical Ceilings - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Acoustical Ceilings - AP Review/Submit
145
S&P - Resilient Flooring & Base - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Resilient Flooring & Base - AP Review/Submit
146
S&P - Tile Carpeting - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Tile Carpeting - AP Review/Submit
147
S&P - Interior Painting - AP Review/Submit
10d
12/4/2026
12/17/2026
S&P - Interior Painting - AP Review/Submit
148
S&P - Common Work Results for Flooring Prep - A&E Review
10d
12/18/2026
1/5/2027
S&P - Common Work Results for Flooring Prep - A&E Review
149
S&P - Gyp Board Assemblies - A&E Review
10d
12/18/2026
1/5/2027
S&P - Gyp Board Assemblies - A&E Review
150
S&P - Acoustical Ceilings - A&E Review
10d
12/18/2026
1/5/2027
S&P - Acoustical Ceilings - A&E Review
136
S&P - Common Work Results for Flooring Prep Subcontractor Submit
137
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 5 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
151
S&P - Resilient Flooring & Base - A&E Review
10d
12/18/2026
1/5/2027
S&P - Resilient Flooring & Base - A&E Review
152
S&P - Tile Carpeting - A&E Review
10d
12/18/2026
1/5/2027
S&P - Tile Carpeting - A&E Review
153
S&P - Interior Painting - A&E Review
10d
12/18/2026
1/5/2027
S&P - Interior Painting - A&E Review
25d
1/6/2027
2/9/2027
S&P - Common Work Results for Flooring Prep Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Gyp Board Assemblies Procurement/Fabricate/Deliver
154 155
S&P - Common Work Results for Flooring Prep Procurement/Fabricate/Deliver S&P - Gyp Board Assemblies Procurement/Fabricate/Deliver
156
S&P - Acoustical Ceilings Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Acoustical Ceilings Procurement/Fabricate/Deliver
157
S&P - Resilient Flooring & Base Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Resilient Flooring & Base Procurement/Fabricate/Deliver
158
S&P - Tile Carpeting Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Tile Carpeting Procurement/Fabricate/Deliver
159
S&P - Interior Painting Procurement/Fabricate/Deliver
25d
1/6/2027
2/9/2027
S&P - Interior Painting Procurement/Fabricate/Deliver
Division 10
60d 11/18/2026
2/16/2027
160
S&P - Wall & Door Protection - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
161
S&P - Wall & Door Protection - AP Review
10d
12/4/2026
12/17/2026
162
S&P - Wall & Door Protection - Owner Review
10d
12/18/2026
1/5/2027
163
S&P - Wall & Door Protection - Fabricate/Deliver
30d
1/6/2027
2/16/2027
Division 11
60d 11/18/2026
2/16/2027
S&P - Wall & Door Protection - Contractor Prepare/Submit
S&P - Wall & Door Protection - AP Review
S&P - Wall & Door Protection - Owner Review
S&P - Wall & Door Protection - Fabricate/Deliver
164
S&P - Food Service Equipment - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Food Service Equipment - Contractor Prepare/Submit
165
S&P - Facility Fall Protection - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Facility Fall Protection - Contractor Prepare/Submit
166
S&P - Food Service Equipment - AP Review
10d
12/4/2026
12/17/2026
S&P - Food Service Equipment - AP Review
167
S&P - Facility Fall Protection - AP Review
10d
12/4/2026
12/17/2026
S&P - Facility Fall Protection - AP Review
168
S&P - Food Service Equipment - Owner Review
10d
12/18/2026
1/5/2027
S&P - Food Service Equipment - Owner Review
169
S&P - Facility Fall Protection - Owner Review
10d
12/18/2026
1/5/2027
S&P - Facility Fall Protection - Owner Review
170
S&P - Food Service Equipment - Fabricate/Deliver
30d
1/6/2027
2/16/2027
S&P - Food Service Equipment - Fabricate/Deliver
30d
1/6/2027
2/16/2027
S&P - Facility Fall Protection - Fabricate/Deliver
171
S&P - Facility Fall Protection - Fabricate/Deliver Division 12
60d 11/18/2026
2/16/2027
172
S&P - Manufactured Wood Casework - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Manufactured Wood Casework - Contractor Prepare/Submit
173
S&P - Countertops - Contractor Prepare/Submit
10d
11/18/2026
12/3/2026
S&P - Countertops - Contractor Prepare/Submit
174
S&P - Manufactured Wood Casework - AP Review
10d
12/4/2026
12/17/2026
S&P - Manufactured Wood Casework - AP Review
175
S&P - Countertops - AP Review
10d
12/4/2026
12/17/2026
S&P - Countertops - AP Review
176
S&P - Manufactured Wood Casework - Owner Review
10d
12/18/2026
1/5/2027
S&P - Manufactured Wood Casework - Owner Review
177
S&P - Countertops - Owner Review
10d
12/18/2026
1/5/2027
S&P - Countertops - Owner Review
178
S&P - Manufactured Wood Casework - Fabricate/Deliver
30d
1/6/2027
2/16/2027
S&P - Manufactured Wood Casework - Fabricate/Deliver
179
S&P - Countertops - Fabricate/Deliver
30d
1/6/2027
2/16/2027
S&P - Countertops - Fabricate/Deliver
Division 22 180 181
S&P - Basic Plumbing Requirements - Contractor Prepare/Submit S&P - Common Work For Plumbing - Contractor Prepare/Submit
70d 11/11/2026
2/23/2027
10d
11/11/2026
11/24/2026
S&P - Basic Plumbing Requirements - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Common Work For Plumbing - Contractor Prepare/Submit
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 6 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
182 183 184
S&P - Meters & Gauges Plumbing Piping - Contractor Prepare/Submit S&P - General Duty Valves Plumbing Piping - Contractor Prepare/Submit S&P - Hanger & Supports For Plumbing - Contractor Prepare/Submit
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
10d
11/11/2026
11/24/2026
S&P - Meters & Gauges Plumbing Piping - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - General Duty Valves Plumbing Piping - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Hanger & Supports For Plumbing - Contractor Prepare/Submit
185
S&P - ID For Plumbing - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - ID For Plumbing - Contractor Prepare/Submit
186
S&P - Plumbing Insulation - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Plumbing Insulation - Contractor Prepare/Submit
187
S&P - Domestic Water Piping - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Domestic Water Piping - Contractor Prepare/Submit
188
S&P - Domestic Water Piping Specialties - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Domestic Water Piping Specialties - Contractor Prepare/Submit
189
S&P - Water Heaters - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Water Heaters - Contractor Prepare/Submit
190
S&P - Plumbing Fixtures - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Plumbing Fixtures - Contractor Prepare/Submit
191
S&P - Basic Plumbing Requirements - AP Review
10d
11/25/2026
12/10/2026
S&P - Basic Plumbing Requirements - AP Review
192
S&P - Common Work For Plumbing - AP Review
10d
11/25/2026
12/10/2026
S&P - Common Work For Plumbing - AP Review
193
S&P - Meters & Gauges Plumbing Piping - AP Review
10d
11/25/2026
12/10/2026
S&P - Meters & Gauges Plumbing Piping - AP Review
194
S&P - General Duty Valves Plumbing Piping - AP Review
10d
11/25/2026
12/10/2026
S&P - General Duty Valves Plumbing Piping - AP Review
195
S&P - Hanger & Supports For Plumbing - AP Review
10d
11/25/2026
12/10/2026
S&P - Hanger & Supports For Plumbing - AP Review
196
S&P - ID For Plumbing - AP Review
10d
11/25/2026
12/10/2026
S&P - ID For Plumbing - AP Review
197
S&P - Plumbing Insulation - AP Review
10d
11/25/2026
12/10/2026
S&P - Plumbing Insulation - AP Review
198
S&P - Domestic Water Piping - AP Review
10d
11/25/2026
12/10/2026
S&P - Domestic Water Piping - AP Review
199
S&P - Domestic Water Piping Specialties - AP Review
10d
11/25/2026
12/10/2026
S&P - Domestic Water Piping Specialties - AP Review
200
S&P - Water Heaters - AP Review
10d
11/25/2026
12/10/2026
S&P - Water Heaters - AP Review
201
S&P - Plumbing Fixtures - AP Review
10d
11/25/2026
12/10/2026
S&P - Plumbing Fixtures - AP Review
202
S&P - Basic Plumbing Requirements - Owner Review
10d
12/11/2026
12/28/2026
S&P - Basic Plumbing Requirements - Owner Review
203
S&P - Common Work For Plumbing - Owner Review
10d
12/11/2026
12/28/2026
S&P - Common Work For Plumbing - Owner Review
204
S&P - Meters & Gauges Plumbing Piping - Owner Review
10d
12/11/2026
12/28/2026
S&P - Meters & Gauges Plumbing Piping - Owner Review
205
S&P - General Duty Valves Plumbing Piping - Owner Review
10d
12/11/2026
12/28/2026
S&P - General Duty Valves Plumbing Piping - Owner Review
206
S&P - Hanger & Supports For Plumbing - Owner Review
10d
12/11/2026
12/28/2026
S&P - Hanger & Supports For Plumbing - Owner Review
207
S&P - ID For Plumbing - Owner Review
10d
12/11/2026
12/28/2026
S&P - ID For Plumbing - Owner Review
208
S&P - Plumbing Insulation - Owner Review
10d
12/11/2026
12/28/2026
S&P - Plumbing Insulation - Owner Review
209
S&P - Domestic Water Piping - Owner Review
10d
12/11/2026
12/28/2026
S&P - Domestic Water Piping - Owner Review
210
S&P - Domestic Water Piping Specialties - Owner Review
10d
12/11/2026
12/28/2026
S&P - Domestic Water Piping Specialties - Owner Review
211
S&P - Water Heaters - Owner Review
10d
12/11/2026
12/28/2026
S&P - Water Heaters - Owner Review
212
S&P - Plumbing Fixtures - Owner Review
10d
12/11/2026
12/28/2026
S&P - Plumbing Fixtures - Owner Review
213
S&P - Basic Plumbing Requirements - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Basic Plumbing Requirements - Fabricate/Deliver
214
S&P - Common Work For Plumbing - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Common Work For Plumbing - Fabricate/Deliver
40d
12/29/2026
2/23/2027
S&P - Meters & Gauges Plumbing Piping - Fabricate/Deliver
40d
12/29/2026
2/23/2027
S&P - General Duty Valves Plumbing Piping - Fabricate/Deliver
215 216
S&P - Meters & Gauges Plumbing Piping Fabricate/Deliver S&P - General Duty Valves Plumbing Piping Fabricate/Deliver
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 7 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
217
S&P - Hanger & Supports For Plumbing Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Hanger & Supports For Plumbing - Fabricate/Deliver
218
S&P - ID For Plumbing - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - ID For Plumbing - Fabricate/Deliver
219
S&P - Plumbing Insulation - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Plumbing Insulation - Fabricate/Deliver
220
S&P - Domestic Water Piping - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Domestic Water Piping - Fabricate/Deliver
221
S&P - Domestic Water Piping Specialties Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Domestic Water Piping Specialties - Fabricate/Deliver
222
S&P - Water Heaters - Fabricate/Deliver
40d
12/29/2026
2/23/2027
S&P - Water Heaters - Fabricate/Deliver
223
S&P - Plumbing Fixtures - Fabricate/Deliver
40d
12/29/2026
2/23/2027
S&P - Plumbing Fixtures - Fabricate/Deliver
60d 11/11/2026
2/9/2027
Division 23 224
S&P - Basic Mechanical Requirements - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Basic Mechanical Requirements - Contractor Prepare/Submit
225
S&P - Common Work HVAC - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Common Work HVAC - Contractor Prepare/Submit
226
S&P - Supports & Anchors - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Supports & Anchors - Contractor Prepare/Submit
227
S&P - Mechanical ID - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Mechanical ID - Contractor Prepare/Submit
228
S&P - Mechanical Insulation - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Mechanical Insulation - Contractor Prepare/Submit
229
S&P - Mechanical Cx - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Mechanical Cx - Contractor Prepare/Submit
230
S&P - Natural Gas Systems - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Natural Gas Systems - Contractor Prepare/Submit
231
S&P - Hydronic Piping - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Hydronic Piping - Contractor Prepare/Submit
232
S&P - Refrigerant Piping - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Refrigerant Piping - Contractor Prepare/Submit
233
S&P - Basic Mechanical Requirements - AP Review
10d
11/25/2026
12/10/2026
S&P - Basic Mechanical Requirements - AP Review
234
S&P - Common Work HVAC - AP Review
10d
11/25/2026
12/10/2026
S&P - Common Work HVAC - AP Review
235
S&P - Supports & Anchors - AP Review
10d
11/25/2026
12/10/2026
S&P - Supports & Anchors - AP Review
236
S&P - Mechanical ID - AP Review
10d
11/25/2026
12/10/2026
S&P - Mechanical ID - AP Review
237
S&P - Mechanical Insulation - AP Review
10d
11/25/2026
12/10/2026
S&P - Mechanical Insulation - AP Review
238
S&P - Mechanical Cx - AP Review
10d
11/25/2026
12/10/2026
S&P - Mechanical Cx - AP Review
239
S&P - Natural Gas Systems - AP Review
10d
11/25/2026
12/10/2026
S&P - Natural Gas Systems - AP Review
240
S&P - Hydronic Piping - AP Review
10d
11/25/2026
12/10/2026
S&P - Hydronic Piping - AP Review
241
S&P - Refrigerant Piping - AP Review
10d
11/25/2026
12/10/2026
S&P - Refrigerant Piping - AP Review
242
S&P - Basic Mechanical Requirements - Owner Review
10d
12/11/2026
12/28/2026
S&P - Basic Mechanical Requirements - Owner Review
243
S&P - Common Work HVAC - Owner Review
10d
12/11/2026
12/28/2026
S&P - Common Work HVAC - Owner Review
244
S&P - Supports & Anchors - Owner Review
10d
12/11/2026
12/28/2026
S&P - Supports & Anchors - Owner Review
245
S&P - Mechanical ID - Owner Review
10d
12/11/2026
12/28/2026
S&P - Mechanical ID - Owner Review
246
S&P - Mechanical Insulation - Owner Review
10d
12/11/2026
12/28/2026
S&P - Mechanical Insulation - Owner Review
247
S&P - Mechanical Cx - Owner Review
10d
12/11/2026
12/28/2026
S&P - Mechanical Cx - Owner Review
248
S&P - Natural Gas Systems - Owner Review
10d
12/11/2026
12/28/2026
S&P - Natural Gas Systems - Owner Review
249
S&P - Hydronic Piping - Owner Review
10d
12/11/2026
12/28/2026
S&P - Hydronic Piping - Owner Review
250
S&P - Refrigerant Piping - Owner Review
10d
12/11/2026
12/28/2026
S&P - Refrigerant Piping - Owner Review
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 8 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
251
S&P - Basic Mechanical Requirements - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Basic Mechanical Requirements - Fabricate/Deliver
252
S&P - Common Work HVAC - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Common Work HVAC - Fabricate/Deliver
253
S&P - Supports & Anchors - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Supports & Anchors - Fabricate/Deliver
254
S&P - Mechanical ID - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Mechanical ID - Fabricate/Deliver
255
S&P - Mechanical Insulation - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Mechanical Insulation - Fabricate/Deliver
256
S&P - Mechanical Cx - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Mechanical Cx - Fabricate/Deliver
257
S&P - Natural Gas Systems - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Natural Gas Systems - Fabricate/Deliver
258
S&P - Hydronic Piping - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Hydronic Piping - Fabricate/Deliver
259
S&P - Refrigerant Piping - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Refrigerant Piping - Fabricate/Deliver
60d 11/11/2026
2/9/2027
Division 26 260
S&P - Basic Electrical Requirements - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Basic Electrical Requirements - Contractor Prepare/Submit
261
S&P - Building Wire & Cable - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Building Wire & Cable - Contractor Prepare/Submit
262
S&P - Conduit - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Conduit - Contractor Prepare/Submit
263
S&P - Electrical ID - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Electrical ID - Contractor Prepare/Submit
264
S&P - Wiring Devices - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Wiring Devices - Contractor Prepare/Submit
265
S&P - Enclosed Switches - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Enclosed Switches - Contractor Prepare/Submit
266
S&P - Interior Lighting - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
S&P - Interior Lighting - Contractor Prepare/Submit
267
S&P - Basic Electrical Requirements - AP Review
10d
11/25/2026
12/10/2026
S&P - Basic Electrical Requirements - AP Review
268
S&P - Building Wire & Cable - AP Review
10d
11/25/2026
12/10/2026
S&P - Building Wire & Cable - AP Review
269
S&P - Conduit - AP Review
10d
11/25/2026
12/10/2026
S&P - Conduit - AP Review
270
S&P - Electrical ID - AP Review
10d
11/25/2026
12/10/2026
S&P - Electrical ID - AP Review
271
S&P - Wiring Devices - AP Review
10d
11/25/2026
12/10/2026
S&P - Wiring Devices - AP Review
272
S&P - Enclosed Switches - AP Review
10d
11/25/2026
12/10/2026
S&P - Enclosed Switches - AP Review
273
S&P - Interior Lighting - AP Review
10d
11/25/2026
12/10/2026
S&P - Interior Lighting - AP Review
274
S&P - Basic Electrical Requirements - Owner Review
10d
12/11/2026
12/28/2026
S&P - Basic Electrical Requirements - Owner Review
275
S&P - Building Wire & Cable - Owner Review
10d
12/11/2026
12/28/2026
S&P - Building Wire & Cable - Owner Review
276
S&P - Conduit - Owner Review
10d
12/11/2026
12/28/2026
S&P - Conduit - Owner Review
277
S&P - Electrical ID - Owner Review
10d
12/11/2026
12/28/2026
S&P - Electrical ID - Owner Review
278
S&P - Wiring Devices - Owner Review
10d
12/11/2026
12/28/2026
S&P - Wiring Devices - Owner Review
279
S&P - Enclosed Switches - Owner Review
10d
12/11/2026
12/28/2026
S&P - Enclosed Switches - Owner Review
280
S&P - Interior Lighting - Owner Review
10d
12/11/2026
12/28/2026
S&P - Interior Lighting - Owner Review
281
S&P - Basic Electrical Requirements - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Basic Electrical Requirements - Fabricate/Deliver
282
S&P - Building Wire & Cable - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Building Wire & Cable - Fabricate/Deliver
283
S&P - Conduit - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Conduit - Fabricate/Deliver
284
S&P - Electrical ID - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Electrical ID - Fabricate/Deliver
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:54 AM
Data Date: 10/27/2026
Page 9 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
285
S&P - Wiring Devices - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Wiring Devices - Fabricate/Deliver
286
S&P - Enclosed Switches - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Enclosed Switches - Fabricate/Deliver
287
S&P - Interior Lighting - Fabricate/Deliver
30d
12/29/2026
2/9/2027
S&P - Interior Lighting - Fabricate/Deliver
60d 11/11/2026
2/9/2027
Division 28 288
S&P - Addressable Fire Alarm Systems - Contractor Prepare/Submit
10d
11/11/2026
11/24/2026
289
S&P - Addressable Fire Alarm Systems - AP Review
10d
11/25/2026
12/10/2026
290
S&P - Addressable Fire Alarm Systems - Owner Review
10d
12/11/2026
12/28/2026
291
S&P - Addressable Fire Alarm Systems - Fabricate/Deliver
30d
12/29/2026
2/9/2027
Construction Site Mobilization
463d 10/21/2025
8/19/2027 5/20/2027
54d
3/8/2027
292
Mobilization Start (Week Prior) Spring Break
1d
3/8/2027
3/8/2027
293
Mobilization Complete
5d
3/9/2027
3/15/2027
294
Mobilization Start (Summer)
1d
5/20/2027
5/20/2027
Abatement (If NEEDED)
58d
3/9/2027
5/27/2027
295
Abate - Review Impacts
30d
3/9/2027
4/19/2027
296
Abate - Identify Scope
10d
4/20/2027
5/3/2027
297
Abate - Demo / Remove / Inspections / Tear Down
5d
5/21/2027
5/27/2027
Demolition
25d
5/21/2027
6/25/2027
AREA - A
20d
5/21/2027
6/18/2027
S&P - Addressable Fire Alarm Systems - Contractor Prepare/Submit
S&P - Addressable Fire Alarm Systems - AP Review
S&P - Addressable Fire Alarm Systems - Owner Review
S&P - Addressable Fire Alarm Systems - Fabricate/Deliver
Mobilization Start (Week Prior) Spring Break
Mobilization Complete
Mobilization Start (Summer)
Abate - Review Impacts
Abate - Identify Scope
Abate - Demo / Remove / Inspections / Tear Down
298
Demo - Review Impacts
5d
5/21/2027
5/27/2027
Demo - Review Impacts
299
Demo - Identify Scope
5d
5/28/2027
6/4/2027
Demo - Identify Scope
300
Demo - Demo / Remove - Summer
10d
6/7/2027
6/18/2027
Alternate - A02 Music
2d
5/28/2027
6/1/2027
2d
5/28/2027
6/1/2027
Demo - AREA A - AO2 - Remove Existing Wall Mounted Shelves & Standards (A4)
2d
5/28/2027
6/1/2027
Demo - AREA A - A02 - Remove Drywall For Backing (A4)
13d
5/28/2027
6/16/2027
301 302
Demo - AREA A - AO2 - Remove Existing Wall Mounted Shelves & Standards (A4) Demo - AREA A - A02 - Remove Drywall For Backing (A4) Alternate - A42 Reception/Admin
Demo - Demo / Remove - Summer
303
Demo - AREA A - A42 - Remove Existing Fire Alarm Control Panel
5d
5/28/2027
6/4/2027
Demo - AREA A - A42 - Remove Existing Fire Alarm Control Panel
304
Demo - AREA A - A42 - Remove Existing Cabinets (A3)
2d
6/7/2027
6/8/2027
Demo - AREA A - A42 - Remove Existing Cabinets (A3)
305
Demo - AREA A - A42 - Remove Existing Desk (A2)
2d
6/9/2027
6/10/2027
Demo - AREA A - A42 - Remove Existing Desk (A2)
2d
6/11/2027
6/14/2027
Demo - AREA A - A42 - Remove Existing Carpet & Base (A3)
2d
6/15/2027
6/16/2027
Demo - AREA A - A42 - Remove Drywall For Backing (A3)
12d
5/28/2027
6/15/2027
2d
5/28/2027
6/1/2027
Demo - AREA A - A28 - Remove Existing Hot Water Boiler
2d
6/2/2027
6/3/2027
Demo - AREA A - A28 - Remove Existing Hot Water Mains Back
2d
6/4/2027
6/7/2027
Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Building
306 307
Demo - AREA A - A42 - Remove Existing Carpet & Base (A3) Demo - AREA A - A42 - Remove Drywall For Backing (A3) Alternate - A28 Water Heater
308 309 310
Demo - AREA A - A28 - Remove Existing Hot Water Boiler Demo - AREA A - A28 - Remove Existing Hot Water Mains Back Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Building
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 10 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
311 312 313
Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Kitchen Demo - AREA A - A28 - Remove Existing Master Mixing Valve Demo - AREA A - A28 - Remove Existing Gas Piping From Hot Water Boler AREA - B
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
2d
6/8/2027
6/9/2027
Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Kitchen
2d
6/10/2027
6/11/2027
Demo - AREA A - A28 - Remove Existing Master Mixing Valve
2d
6/14/2027
6/15/2027
Demo - AREA A - A28 - Remove Existing Gas Piping From Hot Water Boler
20d
5/28/2027
6/25/2027
314
Demo - Review Impacts
5d
5/28/2027
6/4/2027
Demo - Review Impacts
315
Demo - Identify Scope
5d
6/7/2027
6/11/2027
Demo - Identify Scope
316
Demo - Demo / Remove - Summer
10d
6/14/2027
6/25/2027
Alternate - Carpet Replacement
15d
5/28/2027
6/18/2027
Demo - Demo / Remove - Summer
317
Demo - AREA B - B15 - Remove Existing Carpet (A?)
2d
5/28/2027
6/1/2027
318
Demo - AREA B - B17 - Remove Existing Carpet (A?)
5d
6/2/2027
6/8/2027
Demo - AREA B - B17 - Remove Existing Carpet (A?)
319
Demo - AREA B - B19 - Remove Existing Carpet (A?)
2d
6/9/2027
6/10/2027
Demo - AREA B - B19 - Remove Existing Carpet (A?)
320
Demo - AREA B - B20 - Remove Existing Carpet (A?)
2d
6/11/2027
6/14/2027
Demo - AREA B - B20 - Remove Existing Carpet (A?)
321
Demo - AREA B - B27 - Remove Existing Carpet (A?)
2d
6/15/2027
6/16/2027
Demo - AREA B - B27 - Remove Existing Carpet (A?)
322
Demo - AREA B - B28 - Remove Existing Carpet (A?)
2d
6/17/2027
6/18/2027
Demo - AREA B - B28 - Remove Existing Carpet (A?)
20d
5/28/2027
6/25/2027
AREA - C
Demo - AREA B - B15 - Remove Existing Carpet (A?)
323
Demo - Review Impacts
5d
5/28/2027
6/4/2027
Demo - Review Impacts
324
Demo - Identify Scope
5d
6/7/2027
6/11/2027
Demo - Identify Scope
325
Demo - Demo / Remove - Summer
10d
6/14/2027
6/25/2027
Alternate - Gym Exterior
7d
5/28/2027
6/8/2027
326
Demo - AREA C - C04 - Remove Existing Handrail (A?)
2d
5/28/2027
6/1/2027
327
Demo - AREA C - C04 - Remove Damaged CMU Block (A?)
5d
6/2/2027
6/8/2027 6/25/2027
AREA - D
Demo - Demo / Remove - Summer
Demo - AREA C - C04 - Remove Existing Handrail (A?)
Demo - AREA C - C04 - Remove Damaged CMU Block (A?)
20d
5/28/2027
328
Demo - Review Impacts
5d
5/28/2027
6/4/2027
Demo - Review Impacts
329
Demo - Identify Scope
5d
6/7/2027
6/11/2027
Demo - Identify Scope
330
Demo - Demo / Remove - Summer
10d
6/14/2027
6/25/2027
Alternate - Corridor
7d
5/28/2027
6/8/2027
2d
5/28/2027
6/1/2027
5d
6/2/2027
6/8/2027
2d
5/28/2027
6/1/2027
2d
5/28/2027
6/1/2027
348d 10/21/2025
3/9/2027
331 332
Demo - AREA D - D51 - Remove Existing Hi-Low Drinking Fountain (A?) Demo - AREA C - C04 - Remove Damaged CMU Block (A?) Alternate - Door
333
Demo - AREA D - D26 - Remove Existing ADA Push Button Actuator (A1) Early Site Development
334
ES - Investigations
335
ES - Setup Compound (Construction Fence/Connexs/Dumpster/ETC Utilities - Xcel Gas Meter REplacement
336
Util - Design Xcel
Demo - Demo / Remove - Summer
Demo - AREA D - D51 - Remove Existing Hi-Low Drinking Fountain (A?)
Demo - AREA C - C04 - Remove Damaged CMU Block (A?)
Demo - AREA D - D26 - Remove Existing ADA Push Button Actuator (A1)
146d 10/21/2025 A 10/26/2026 A 1d
3/9/2027
115d 11/11/2026 60d
11/11/2026
ES - Investigations
3/9/2027
ES - Setup Compound (Construction Fence/Connexs/Dumpster/ETC
4/27/2027 2/9/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Util - Design Xcel
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 11 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
337
Util - Xcel Precon
10d
2/10/2027
2/23/2027
338
Util - Demo Existing Gas Meter
15d
3/10/2027
3/30/2027
339
Util - Install New Gas Meter
15d
3/31/2027
4/20/2027
340
Util - Install New Gas Meter Cx
5d
4/21/2027
4/27/2027
206d 10/27/2026
8/19/2027
168d 10/27/2026
6/25/2027
Building Construction Foundation & Substructure 341
FS - Identify Scope
15d
10/27/2026
11/16/2026
342
FS - Demo Scope
10d
5/28/2027
6/11/2027
343
FS - Repair Foundations
10d
6/14/2027
6/25/2027
173d 10/27/2026
7/2/2027
Superstructure
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4 Util - Xcel Precon
Util - Demo Existing Gas Meter
Util - Install New Gas Meter
Util - Install New Gas Meter Cx
FS - Identify Scope
FS - Demo Scope
FS - Repair Foundations
344
Super - Identify Scope
15d
10/27/2026
11/16/2026
345
Super - Demo for Scope
10d
5/28/2027
6/11/2027
346
Super - Install & Repair from Scope
10d
6/21/2027
7/2/2027
49d
6/3/2027
8/11/2027
7d
6/3/2027
6/11/2027
2d
6/3/2027
6/4/2027
Roof - Demo - Deck #1 - Remove & Reinstall Existing Roof Hatch (1.92)
2d
6/7/2027
6/8/2027
Roof - Demo - Deck #1 - Remove & Reinstall Existing Exhaust Fan (1.93)
3d
6/9/2027
6/11/2027
Roof - Demo - Deck #1 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)
5d
6/3/2027
6/9/2027
2d
6/3/2027
6/4/2027
Roof - Demo - Deck #2 - Remove Sheet Metal Cap Only (1.91)
3d
6/7/2027
6/9/2027
Roof - Demo - Deck #2 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
3d
6/3/2027
6/7/2027
Roofing Roof - Demo - Deck #1 347 348 349
Roof - Demo - Deck #1 - Remove & Reinstall Existing Roof Hatch (1.92) Roof - Demo - Deck #1 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #1 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #2
350 351
Roof - Demo - Deck #2 - Remove Sheet Metal Cap Only (1.91) Roof - Demo - Deck #2 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #3
352
Roof - Demo - Deck #3 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #4
353 354 355
Roof - Demo - Deck #4 - Remove Sheet Metal Cap Only Roof - Demo - Deck #4 - Remove & Reinstall Existing Exhaust Fan Roof - Demo - Deck #4 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #5
356 357 358 359 360
Roof - Demo - Deck #5 - Remove Sheet Metal Cap Only (1.91) Roof - Demo - Deck #5 - Remove & Reinstall Existing Roof Hatch (1.92) Roof - Demo - Deck #5 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #5 - Remove & Reinstall Existing Paver-Mounted Condensing Unit (1.94) Roof - Demo - Deck #5 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #6
361
Roof - Demo - Deck #6 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
Super - Identify Scope
Super - Demo for Scope
Super - Install & Repair from Scope
3d
6/3/2027
6/7/2027
7d
6/3/2027
6/11/2027
2d
6/3/2027
6/4/2027
Roof - Demo - Deck #4 - Remove Sheet Metal Cap Only
2d
6/7/2027
6/8/2027
Roof - Demo - Deck #4 - Remove & Reinstall Existing Exhaust Fan
3d
6/9/2027
6/11/2027
Roof - Demo - Deck #4 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
11d
6/7/2027
6/21/2027
2d
6/7/2027
6/8/2027
Roof - Demo - Deck #5 - Remove Sheet Metal Cap Only (1.91)
2d
6/9/2027
6/10/2027
Roof - Demo - Deck #5 - Remove & Reinstall Existing Roof Hatch (1.92)
2d
6/11/2027
6/14/2027
Roof - Demo - Deck #5 - Remove & Reinstall Existing Exhaust Fan (1.93)
2d
6/15/2027
6/16/2027
Roof - Demo - Deck #5 - Remove & Reinstall Existing Paver-Mounted Condensing Unit (1.94)
3d
6/17/2027
6/21/2027
Roof - Demo - Deck #5 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)
3d
6/7/2027
6/9/2027
3d
6/7/2027
6/9/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Roof - Demo - Deck #3 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
Roof - Demo - Deck #6 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 12 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
Roof - Demo - Deck #7 362 363
Roof - Demo - Deck #7 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #7 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #8
364
Roof - Demo - Deck #8 - Remove Existing Sheet Metal Parapet Coping (1.95) Roof - Demo - Deck #9
365
Roof - Demo - Deck #9 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #10
366 367
Roof - Demo - Deck #10 - Remove & Reinstall Existing Exhaust Fan Roof - Demo - Deck #10 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #11
368 369
Roof - Demo - Deck #11 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #11 - Remove Existing Sheet Metal Stop (1.98) Roof - Demo - Deck #12
370 371 372
Roof - Demo - Deck #12 - Remove Existing Sheet Metal Parapet Coping Roof - Demo - Deck #12 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #12 - Remove Existing Sheet Gravel Stop Roof - Install - Deck #1
373 374 375 376 377 378 379
Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Hatch (2.92) Roof - Install - Deck #1 - Reinstall Existing Roof Hatch (1.92) Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Exhaust Fans (2.93) Roof - Install - Deck #1 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #1 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #1 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #1 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #2
380
381 382 383 384 385
Roof - Install - Deck #2 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #2 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #2 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77) Roof - Install - Deck #2 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #2 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #2 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91) Roof - Install - Deck #3
386 387
Roof - Install - Deck #3 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #3 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
5d
6/7/2027
2d
6/7/2027
6/11/2027 6/8/2027
Roof - Demo - Deck #7 - Remove & Reinstall Existing Exhaust Fan (1.93)
3d
6/9/2027
6/11/2027
Roof - Demo - Deck #7 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)
2d
6/7/2027
6/8/2027
2d
6/7/2027
6/8/2027
3d
6/9/2027
6/11/2027
Roof - Demo - Deck #8 - Remove Existing Sheet Metal Parapet Coping (1.95)
3d
6/9/2027
6/11/2027
5d
6/9/2027
6/15/2027
2d
6/9/2027
6/10/2027
Roof - Demo - Deck #10 - Remove & Reinstall Existing Exhaust Fan
3d
6/11/2027
6/15/2027
Roof - Demo - Deck #10 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
5d
6/9/2027
6/15/2027
3d
6/9/2027
6/11/2027
Roof - Demo - Deck #11 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)
Roof - Demo - Deck #11 - Remove Existing Sheet Metal Stop (1.98)
Roof - Demo - Deck #9 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)
2d
6/14/2027
6/15/2027
8d
6/9/2027
6/18/2027
2d
6/9/2027
6/10/2027
Roof - Demo - Deck #12 - Remove Existing Sheet Metal Parapet Coping
3d
6/11/2027
6/15/2027
Roof - Demo - Deck #12 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof
3d
6/16/2027
6/18/2027
Roof - Demo - Deck #12 - Remove Existing Sheet Gravel Stop
15d
6/7/2027
6/25/2027
2d
6/7/2027
6/8/2027
Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Hatch (2.92)
2d
6/9/2027
6/10/2027
Roof - Install - Deck #1 - Reinstall Existing Roof Hatch (1.92)
2d
6/11/2027
6/14/2027
Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Exhaust Fans (2.93)
2d
6/15/2027
6/16/2027
Roof - Install - Deck #1 - Reinstall Existing Exhaust Fan (1.93)
3d
6/17/2027
6/21/2027
Roof - Install - Deck #1 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
6/22/2027
6/23/2027
Roof - Install - Deck #1 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
6/24/2027
6/25/2027
Roof - Install - Deck #1 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)
15d
6/7/2027
6/25/2027
2d
6/7/2027
6/8/2027
2d
6/14/2027
6/15/2027
Roof - Install - Deck #2 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
6/16/2027
6/17/2027
Roof - Install - Deck #2 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77)
2d
6/18/2027
6/21/2027
Roof - Install - Deck #2 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
6/22/2027
6/23/2027
Roof - Install - Deck #2 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
2d
6/24/2027
6/25/2027
Roof - Install - Deck #2 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91)
4d
6/18/2027
6/23/2027
2d
6/18/2027
6/21/2027
Roof - Install - Deck #3 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
6/22/2027
6/23/2027
Roof - Install - Deck #3 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Roof - Install - Deck #2 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 13 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
Roof - Install - Deck #4 388
389 390
Roof - Install - Deck #4 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #4 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #4 - Provide Added Layers of Cover Board (2.95) Roof - Install - Deck #5
391 392 393 394 395 396 397
Roof - Install - Deck #5 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #5 - Reinstall Existing Roof Hatch (1.92) Roof - Install - Deck #5 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #5 - Reinstall Existing Paver-Mounted Condensing Unit (1.94) Roof - Install - Deck #5 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #5 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #5 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #6
398 399 400
Roof - Install - Deck #6 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #6 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #6 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81) Roof - Install - Deck #7
401 402 403 404 405 406 407 408
Roof - Install - Deck #7 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof - Install - Deck #7 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #7 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #7 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #7 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77) Roof - Install - Deck #7 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #7 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81) Roof - Install - Deck #7 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #8
409
Roof - Install - Deck #8 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #9
410 411 412 413 414 415
Roof - Install - Deck #9 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #9 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #9 - Existing Sheet Metal Capped Curb, Provide Tapered Insulation Cricket (2.78) Roof - Install - Deck #9 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #9 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #9 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #10
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
6d
6/24/2027
7/1/2027
2d
6/24/2027
6/25/2027
Roof - Install - Deck #4 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)
2d
6/28/2027
6/29/2027
Roof - Install - Deck #4 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
6/30/2027
7/1/2027
Roof - Install - Deck #4 - Provide Added Layers of Cover Board (2.95)
8d
7/2/2027
7/14/2027
2d
7/2/2027
7/6/2027
Roof - Install - Deck #5 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)
2d
7/7/2027
7/8/2027
Roof - Install - Deck #5 - Reinstall Existing Roof Hatch (1.92)
2d
7/9/2027
7/12/2027
Roof - Install - Deck #5 - Reinstall Existing Exhaust Fan (1.93)
2d
7/9/2027
7/12/2027
Roof - Install - Deck #5 - Reinstall Existing Paver-Mounted Condensing Unit (1.94)
3d
7/9/2027
7/13/2027
Roof - Install - Deck #5 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
7/9/2027
7/12/2027
Roof - Install - Deck #5 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/13/2027
7/14/2027
Roof - Install - Deck #5 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
7d
7/2/2027
7/13/2027
3d
7/2/2027
7/7/2027
Roof - Install - Deck #6 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/8/2027
7/9/2027
Roof - Install - Deck #6 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
Roof - Install - Deck #6 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)
2d
7/12/2027
7/13/2027
12d
7/2/2027
7/20/2027
2d
7/2/2027
7/6/2027
Roof - Install - Deck #7 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)
2d
7/7/2027
7/8/2027
Roof - Install - Deck #7 - Reinstall Existing Exhaust Fan (1.93)
3d
7/9/2027
7/13/2027
Roof - Install - Deck #7 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)
3d
7/9/2027
7/13/2027
Roof - Install - Deck #7 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/9/2027
7/12/2027
Roof - Install - Deck #7 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77)
2d
7/13/2027
7/14/2027
Roof - Install - Deck #7 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
7/15/2027
7/16/2027
Roof - Install - Deck #7 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)
2d
7/19/2027
7/20/2027
Roof - Install - Deck #7 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
2d
7/7/2027
7/8/2027
2d
7/7/2027
7/8/2027
7d
7/9/2027
7/19/2027
3d
7/9/2027
7/13/2027
Roof - Install - Deck #9 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
7/14/2027
7/15/2027
Roof - Install - Deck #9 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/14/2027
7/15/2027
Roof - Install - Deck #9 - Existing Sheet Metal Capped Curb, Provide Tapered Insulation Cricket (2.78)
2d
7/14/2027
7/15/2027
Roof - Install - Deck #9 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
7/14/2027
7/15/2027
Roof - Install - Deck #9 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
2d
7/16/2027
7/19/2027
Roof - Install - Deck #9 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)
10d
7/9/2027
7/22/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
Roof - Install - Deck #8 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 14 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
416 417 418 419 420 421 422
Roof - Install - Deck #10 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #10 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof - Install - Deck #10 - Reinstall Existing Exhaust Fan Roof - Install - Deck #10 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #10 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #10 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #10 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #11
423 424 425
Roof - Install - Deck #11 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #11 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #11 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #12
426 427 428 429 430 431
Roof - Install - Deck #12 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #12 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #12 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #12 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91) Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof Punch
7/12/2027
Roof - Install - Deck #10 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)
2d
7/13/2027
7/14/2027
Roof - Install - Deck #10 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)
2d
7/15/2027
7/16/2027
Roof - Install - Deck #10 - Reinstall Existing Exhaust Fan
2d
7/19/2027
7/20/2027
Roof - Install - Deck #10 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
7/19/2027
7/20/2027
Roof - Install - Deck #10 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/19/2027
7/20/2027
Roof - Install - Deck #10 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
7/21/2027
7/22/2027
Roof - Install - Deck #10 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
7d
7/13/2027
7/21/2027
3d
7/13/2027
7/15/2027
Roof - Install - Deck #11 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
7/16/2027
7/19/2027
Roof - Install - Deck #11 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
2d
7/20/2027
7/21/2027
Roof - Install - Deck #11 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)
8d
7/13/2027
7/22/2027
2d
7/13/2027
7/14/2027
Roof - Install - Deck #12 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)
2d
7/13/2027
7/14/2027
Roof - Install - Deck #12 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)
2d
7/13/2027
7/14/2027
Roof - Install - Deck #12 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)
2d
7/15/2027
7/16/2027
Roof - Install - Deck #12 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)
2d
7/19/2027
7/20/2027
Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91)
2d
7/21/2027
7/22/2027
Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)
15d
7/22/2027
8/11/2027
Roof - Pre-Punch
5d
7/22/2027
7/28/2027
Roof - Owner Walk
5d
7/29/2027
8/4/2027
434
Roof - Punch Corrections
5d
8/5/2027
8/11/2027
116d
3/9/2027
8/19/2027
97d
3/16/2027
7/30/2027
90d
3/16/2027
7/21/2027
Interior Rough In (Nights & Days) 435
IF-RI - Area A - Fire Alarm Replacement - Nights
15d
3/16/2027
4/5/2027
436
IF-RI - Area A - Interior Rough In Activities - Nights
25d
6/16/2027
7/21/2027
31d
6/17/2027
7/30/2027
Interior Finishes
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
7/9/2027
433
AREA - A.Area A Buildling
M 2
2d
432
Interiors / Mechanical / Electrical / Plumbing
2025 S O N D J F 25 15 6 27 17 8 29 19 9
Roof - Pre-Punch
Roof - Owner Walk
Roof - Punch Corrections
IF-RI - Area A - Fire Alarm Replacement - Nights
IF-RI - Area A - Interior Rough In Activities - Nights
437
IF-FIN - Area A - Repair and Paint
10d
6/23/2027
7/7/2027
IF-FIN - Area A - Repair and Paint
438
IF-FIN - Area A - Pre-Punch
5d
7/9/2027
7/15/2027
IF-FIN - Area A - Pre-Punch
439
IF-FIN - Area A - Owner Walk
1d
7/16/2027
7/16/2027
IF-FIN - Area A - Owner Walk
440
IF-FIN - Area A - Punch Corrections
10d
7/19/2027
7/30/2027
<Untitled>
12d
6/17/2027
7/2/2027
441
IF-FIN - AREA A - AO2 - Install Wood Backing(A4)
2d
6/17/2027
6/18/2027
442
IF-FIN - Area A - A02 - Repair and Paint
5d
6/21/2027
6/25/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
IF-FIN - Area A - Punch Corrections
IF-FIN - AREA A - AO2 - Install Wood Backing(A4)
IF-FIN - Area A - A02 - Repair and Paint
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 15 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
443
IF-FIN - AREA A - A02 - Install Casework Alternate - A42 Reception/Admin
444 445 446
IF-FIN - AREA A - A42 - Install Wood Backing (A3) IF-FIN - AREA A - A42 - Reception Frame Die Walls At Casework (A2) IF-FIN - AREA A - A42 - Reception Install Casework(A2)
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
5d
6/28/2027
7/2/2027
13d
6/21/2027
7/8/2027
5d
6/21/2027
6/25/2027
IF-FIN - AREA A - A42 - Install Wood Backing (A3)
2d
6/28/2027
6/29/2027
IF-FIN - AREA A - A42 - Reception Frame Die Walls At Casework (A2)
2d
6/30/2027
7/1/2027
IF-FIN - AREA A - A42 - Reception Install Casework(A2)
IF-FIN - AREA A - A02 - Install Casework
447
IF-FIN - Area A - A42 - Repair and Paint
2d
7/2/2027
7/6/2027
IF-FIN - Area A - A42 - Repair and Paint
448
IF-FIN - AREA A - A42 - Admin Install Casework (A3)
2d
7/7/2027
7/8/2027
IF-FIN - AREA A - A42 - Admin Install Casework (A3)
102d
3/9/2027
7/30/2027
AREA - B.Area B Building
18d
6/17/2027
7/13/2027
449
Alternate - Carpet Replacement IF-FIN - AREA B - B15 - Install Carpet (A?)
2d
6/17/2027
6/18/2027
450
IF-FIN - AREA B - B17 - Install Carpet (A?)
5d
6/21/2027
6/25/2027
IF-FIN - AREA B - B17 - Install Carpet (A?)
451
IF-FIN - AREA B - B19 - Install Carpet (A?)
2d
6/28/2027
6/29/2027
IF-FIN - AREA B - B19 - Install Carpet (A?)
452
IF-FIN - AREA B - B20 - Install Carpet (A?)
2d
6/30/2027
7/1/2027
IF-FIN - AREA B - B20 - Install Carpet (A?)
453
IF-FIN - AREA B - B27 - Install Carpet (A?)
2d
7/2/2027
7/6/2027
IF-FIN - AREA B - B27 - Install Carpet (A?)
454
IF-FIN - AREA B - B28 - Install Carpet (A?)
2d
7/7/2027
7/8/2027
IF-FIN - AREA B - B28 - Install Carpet (A?)
455
IF-FIN - AREA B - ALL - Install Rubber Base (A?)
5d
7/7/2027
7/13/2027
IF-FIN - AREA B - ALL - Install Rubber Base (A?)
64d
3/9/2027
6/7/2027
Interior Rough In (Nights & Days) 456
IF-RI - Area B - Interior Rough In Activities (Nights)
49d
3/9/2027
5/14/2027
457
IF-RI - Area b - Fire Alarm Replacement - Nights
15d
4/6/2027
4/26/2027
458
IF-RI - Area B - Interior Rough In Activities
15d
5/17/2027
6/7/2027
Interior Finishes
IF-FIN - AREA B - B15 - Install Carpet (A?)
IF-RI - Area B - Interior Rough In Activities (Nights)
IF-RI - Area b - Fire Alarm Replacement - Nights
IF-RI - Area B - Interior Rough In Activities
13d
7/14/2027
7/30/2027
459
IF-FIN - Area B - Repair and Paint
5d
7/14/2027
7/20/2027
IF-FIN - Area B - Repair and Paint
460
IF-FIN - Area B - Pre-Punch
2d
7/21/2027
7/22/2027
IF-FIN - Area B - Pre-Punch
461
IF-FIN - Area B - Owner Walk
1d
7/23/2027
7/23/2027
IF-FIN - Area B - Owner Walk
462
IF-FIN - Area B - Punch Corrections
5d
7/26/2027
7/30/2027
100d
3/9/2027
7/28/2027
AREA - C Interior Rough In (Nights & Days)
IF-FIN - Area B - Punch Corrections
64d
3/9/2027
6/7/2027
463
IF-RI - Area C - Interior Rough In Activities (Nights)
49d
3/9/2027
5/14/2027
IF-RI - Area C - Interior Rough In Activities (Nights)
464
IF-RI - Area C - Fire Alarm Replacement - Nights
15d
4/27/2027
5/17/2027
IF-RI - Area C - Fire Alarm Replacement - Nights
465
IF-RI - Area C - Interior Rough In Activities
15d
5/17/2027
6/7/2027
IF-RI - Area C - Interior Rough In Activities
36d
6/8/2027
7/28/2027
Interior Finishes 466
IF-FIN - Area C - Repair and Paint
15d
6/8/2027
6/28/2027
IF-FIN - Area C - Repair and Paint
467
IF-FIN - Area C - Pre-Punch
10d
6/29/2027
7/13/2027
IF-FIN - Area C - Pre-Punch
468
IF-FIN - Area C - Owner Walk
1d
7/14/2027
7/14/2027
IF-FIN - Area C - Owner Walk
469
IF-FIN - Area C - Punch Corrections
10d
7/15/2027
7/28/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
IF-FIN - Area C - Punch Corrections
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 16 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
AREA - D Interior Rough In (Nights & Days)
66d
5/18/2027
8/19/2027
45d
5/18/2027
7/21/2027
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
470
IF-RI - Area D - Fire Alarm Replacement
45d
5/18/2027
7/21/2027
IF-RI - Area D - Fire Alarm Replacement
471
IF-RI - Area D - Interior Rough In Activities (Nights)
10d
6/9/2027
6/22/2027
IF-RI - Area D - Interior Rough In Activities (Nights)
12d
6/9/2027
6/24/2027
472
Alternate - Corridor IF-FIN - Area D - C04 - Repair CMU Block (A?)
5d
6/9/2027
6/15/2027
473
IF-FIN - AREA D - D51 - Install New Hi-Low Drinking Fountain (A?)
2d
6/23/2027
6/24/2027
2d
6/2/2027
6/3/2027
Alternate - Door 474
IF-FIN - AREA D - D26 - Install ADA Push Button Actuator (A1) Interior Finishes
2d
6/2/2027
6/3/2027
21d
7/22/2027
8/19/2027
IF-FIN - Area D - C04 - Repair CMU Block (A?)
IF-FIN - AREA D - D51 - Install New Hi-Low Drinking Fountain (A?)
IF-FIN - AREA D - D26 - Install ADA Push Button Actuator (A1)
475
IF-FIN - Area D - Repair and Paint
5d
7/22/2027
7/28/2027
IF-FIN - Area D - Repair and Paint
476
IF-FIN - Area D - Pre-Punch
5d
7/29/2027
8/4/2027
IF-FIN - Area D - Pre-Punch
477
IF-FIN - Area D - Owner Walk
1d
8/5/2027
8/5/2027
IF-FIN - Area D - Owner Walk
478
IF-FIN - Area D - Punch Corrections
10d
8/6/2027
8/19/2027
Sitework (Not Needed)
196d 10/27/2026
8/5/2027
IF-FIN - Area D - Punch Corrections
479
FS - Identify Scope
10d
10/27/2026
11/9/2026
480
FS - Demo Playgroundd
5d
6/3/2027
6/9/2027
FS - Demo Playgroundd
481
FS - Demo Pedestrain Pavement
5d
6/3/2027
6/9/2027
FS - Demo Pedestrain Pavement
482
FS - Demo Perimeter Fence
5d
6/3/2027
6/9/2027
FS - Demo Perimeter Fence
483
FS - Repair Playground
20d
6/10/2027
7/8/2027
FS - Repair Playground
484
FS - Prep/Form/Pour Pedestrain Pavement
20d
6/10/2027
7/8/2027
FS - Prep/Form/Pour Pedestrain Pavement
485
FS - Repair Perimeter Fence
20d
6/10/2027
7/8/2027
FS - Repair Perimeter Fence
486
FS - Pre-Punch
5d
7/9/2027
7/15/2027
FS - Pre-Punch
487
FS - Punch
5d
7/16/2027
7/22/2027
FS - Punch
488
FS - Punch Corrections
10d
7/23/2027
8/5/2027
Final Inspections & Closeout
55d
7/9/2027
9/24/2027
MEP Startup & Commissioning
15d
7/22/2027
8/11/2027
Startup / Test & Balance
15d
7/22/2027
8/11/2027
15d
7/22/2027
8/11/2027
6d
7/22/2027
7/29/2027
489
Startup/TAB - Startup / Test & Balance Tasks Commissioning
490
CX - Commissioning Tasks Final Project Punchlist
6d
7/22/2027
7/29/2027
46d
7/22/2027
9/24/2027
491
Punch - Pre-Punch - Final
1d
7/22/2027
7/22/2027
492
Punch - Owner Walk -Final
5d
7/23/2027
7/29/2027
493
Punch - Punch Corrections - Final
40d
7/30/2027
9/24/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
FS - Identify Scope
FS - Punch Corrections
Startup/TAB - Startup / Test & Balance Tasks
CX - Commissioning Tasks
Punch - Pre-Punch - Final
Punch - Owner Walk -Final
Punch - Punch Corrections - Final
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 17 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Line
Name
Duration
Start
Finish
A 4
Final Inspections / TCO Final Inspections
16d
7/9/2027
7/30/2027
16d
7/9/2027
7/30/2027
2025 S O N D J F 25 15 6 27 17 8 29 19 9
M 2
2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4
494
FInsp - Final AHJ Inspection
5d
7/9/2027
7/15/2027
495
FInsp - Final Plumbing Inspection
5d
7/22/2027
7/28/2027
FInsp - Final Plumbing Inspection
496
FInsp - Final Fire Alarm Inspection
5d
7/22/2027
7/28/2027
FInsp - Final Fire Alarm Inspection
497
FInsp - Final Electrical Inspection - State
5d
7/22/2027
7/28/2027
FInsp - Final Electrical Inspection - State
498
FInsp - Final Building Inspection
2d
7/29/2027
7/30/2027
FInsp - Final Building Inspection
499
Substantial Completion - TCO
1d
7/30/2027
7/30/2027
Substantial Completion - TCO
36d
7/22/2027
9/10/2027
Owner Move In Activities 500
Move - Owner Move In Activities Closeout / CO
8d
8/2/2027
8/11/2027
36d
7/22/2027
9/10/2027
501
Closeout - Start
1d
7/22/2027
7/22/2027
502
Closeout - Owner Training
15d
7/23/2027
8/12/2027
503
Closeout - Final Completion
20d
8/13/2027
9/10/2027
BVSD Foothills ES Proposal Schedule Boulder Valley School District
FInsp - Final AHJ Inspection
Move - Owner Move In Activities
Closeout - Start
Closeout - Owner Training
Closeout - Final Completion
Job #: BVSD Foothills ES
Rev. date: 10/30/2026 9:16:55 AM
Data Date: 10/27/2026
Page 18 of 18
BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks
Price Options List K1225 - BVSD - Foothill ES Renovations Current Cost Estimate Target Budget
$2,916,441 Pending Cost Reduction $2,452,054
Delta
#REF!
-$464,387
Description of Item
Status
Pending Cost Reduction
Pending Cost Addition
Accepted Cost
Rejected Cost
Decision Date
Alternate
Date
Alternate 1
9/30/2026 A1 ADA Door Operators
Accepted
Included in Current Cost
Accepted Per Email
10/13/2026
Alternate 2
9/30/2026 A2 Main Office Reception Desk
Accepted
Included in Current Cost
Accepted Per Email
10/13/2026
Included in Current Cost
Accepted Per Email
10/13/2026
Comments
Alternates
Alternate 3
9/30/2026 A3 Main Office Kitchenette
Accepted
Alternate 4
9/30/2026 A4 Music Room Storage
Rejected
$40,772
Allowances Report DESCRIPTION
QTY UOM
UNIT PRICE
TOTAL COST
NOTES / COMMENTS
25,000.00
$25,000
Allowance
ALLOWANCES: 06 Woods, Plastics and Composites 06 10 10 Rough Carpentry 06113 >Tectum Roof Panel/Structural Replacement
1.00 allow
Subtotal 06 10 10 Rough Carpentry
$25,000
TOTAL ALLOWANCES: 06 Woods, Plastics and Composites
$25,000
ALLOWANCES: 09 Finishes 09 21 16 Gypsum Board Assemblies 09213 Drywall Patch & Repair - Ceiling at Kitchen Refrigerator
1.00 allow
10,000.00
$10,000
Allowance
09229 Relocated Wall Access Panel
1.00 ls
5,000.00
$5,000
Allowance
Subtotal 09 21 16 Gypsum Board Assemblies
$15,000
TOTAL ALLOWANCES: 09 Finishes
$15,000
ALLOWANCES: 22 Plumbing 22 00 00 Plumbing 22027 >Existing Gas Meter to be Replaced. Coordinate with Utility Provider for New Meter Install. (Ref. PD-201A - Keynote P14)
1.00 allow
5,500.00
Subtotal 22 00 00 Plumbing
$5,500
Allowance
$5,500
TOTAL ALLOWANCES: 22 Plumbing
$5,500
ALLOWANCES: 23 Heating, Ventilating and Air Conditioning 23 00 00 Heating, Ventilating and Air Conditioning 23037 >3rd Party Design for Wind
1.00 allow
15,000.00
Subtotal 23 00 00 Heating, Ventilating and Air Conditioning
$15,000
Allowance
$15,000
TOTAL ALLOWANCES: 23 Heating, Ventilating and Air Conditioning
$15,000
ALLOWANCES: 26 Electrical 26 00 00 Electrical 26003 >Existing Rooftop Exhaust Fans Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.93) Subtotal 26 00 00 Electrical
TOTAL ALLOWANCES: 26 Electrical
DATE PRINTED: 10/21/2026
1.00 allow
6,000.00
$6,000
$6,000
$6,000
Allowance
Category Bobcat Bobcat Bobcat Bobcat Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Cleaning Equipment Cleaning Equipment Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Fencing Fencing Fencing Forklift Forklift Forklift Forklift
Description Bobcat Bobcat T190 Telehandler Bobcat E35 Mini-Ex Bobcat Breaker (Jackhammer) Bobcat Auger attachment drive unit lowe 1650E Bobcat Auger Bit (6" - 36") Bobcat Auger Extension (2'-4') Bobcat Forks Bobcat Rock Screen Bucket Bobcat Smooth bucket Bobcat Snow blower SR117 Caterpillar Bobcat Snow Broom Bobcat Snow Bucket Bobcat Snow Plow Caterpillar ANGLE BLADE 72IN Bobcat Sweeper Bobcat Tooth bucket Bobcat Trench Compactor Bobcat Vibratory Compactor for E35 Mini-Ex only Implement Rack Floor Buffer Floor Machine scrubber (Riding) Concrete Core Driller Concrete Georgia Buggy (Track, 14 cu-ft) Concrete Georgia Buggy (Electric, Wheeled, 12 cu-ft) Concrete Mixer Concrete Power Trowels - Walk behind Concrete Saw - Walk behind Concrete Soft Cut Saw Concrete Vibrator - high cycle Demo Saw Eco Pan Grout Pump Jumping jack Plate Compactor Rebar Cage Stands Fence Standard 6x12' per panel (.50 cents LF) Snow Fence (one time charge) T Posts (one time charge) Forklift Forklift Mover Gradall 15' Boom Gradall Material Bucket (Trash Box)
2027 Rates $ 2,887.04 $ 3,099.20 $ 2,732.08 $ 1,912.56 $ 1,061.84 $ 291.20 $ 27.04 $ 248.56 $ 991.12 $ 299.52 $ 1,071.20 $ 1,408.16 $ 1,606.80 $ 326.56 $ 1,422.72 $ 340.08 $ 1,815.84 $ 1,390.48 $ 535.60 $ 348.40 $ 1,735.76 $ 647.92 $ 1,178.32 $ 856.96 $ 856.96 $ 605.28 $ 1,071.20 $ 803.92 $ 664.56 $ 765.44 $ 161.20 $ 29.12 $ 590.72 $ 766.48 $ 54.08 $ 7.28 $ 10.40 $ 5.20 $ 7,554.56 $ 161.20 $ 310.96 $ 406.64
Category Forklift Forklift Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Generator Generator Ground Thaw Ground Thaw Office Trailer Office Trailer Office Trailer Office Trailer Accessories Office Trailer Accessories Office Trailer Accessories Office Trailer Accessories Prefab RTV Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Small Tools Small Tools Small Tools Small Tools
Description Gradall Tipping Material Bucket (Trash Box) Spreader Bar Barricade Gates (Set of 2) Jersey Barricade Picking Tool Jersey Barriers - each Barricade Fence Panels (includes barricade) Cattle Gates (Set of 2) Man Gates Generator - (Portable) 5000k -6500k Generator - 70KW (Towable) Ground Thaw 400 (onboard generator) Ground Thaw (requires power source) Office Trailer Double wide Office Trailer Single wide Office Trailer Stairs (each, requires 2) Copier Mobile Office Cabinets Office Trailer Decking Office Trailer Handicap Ramps Fabrication & Operations Support Fee - (10% of Material Costs) Lawn Mower Zero turn 42" Baker Scaffolding Curb Ramps Steel Delineator/Traffic Cones Differential Pressure Manometer Dust Fan Fire Exinguishers Fire Extinguisher stands (plastic) Gas Monitor GX-2009 HEPACart 60 x 29 Negative Air Machine Propane Cages-Large Propane Cages-Small Road Plates Safety Roof Penetator Fall protection Slab Grabbers Stanschions (Roof Warning Line) Yellow Safety Railing and Stands Abrasive Cutoff Chop Saw Air Compressor, Hoses (Portable Porter Cable C2002) Air Conditioner/Move and Cool Banding Machine
2027 Rates $ 520.00 $ 134.16 $ 321.36 $ 482.56 $ 57.20 $ 85.28 $ 268.32 $ 134.16 $ 642.72 $ 3,061.76 $ 7,648.16 $ 6,973.20 $ 2,463.76 $ 1,392.56 $ 80.08 $ 408.72 $ 268.32 $ 80.08 $ 535.60 #VALUE! $ 856.96 $ 214.24 $ 168.48 $ 10.40 $ 268.32 $ 21.84 $ 15.60 $ 15.60 $ 268.32 $ 1,928.16 $ 268.32 $ 249.60 $ 161.20 $ 224.64 $ 578.24 $ 15.60 $ 15.60 $ 69.68 $ 214.24 $ 269.36 $ 535.60 $ 64.48
Category Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Storage Container Storage Container Storage Container Storage Container Stormwater Protection Stormwater Protection Stormwater Protection Stormwater Protection Survey Survey Survey Survey Vehicle Vehicle Vehicle Vehicle Vehicle Weather Protection Weather Protection Weather Protection Weather Protection Weather Protection
Description Chipping hammer Electric (Large Hilti, Bosch or other) Crane Pad Drywall Cart Evaporative Cooling Fan (4 Ft) Fence Post Pounder (gas) Firehose (Rolls) Gang Box Jackhammer Electric Hilti 3000 Ladder 20' (Extension) Ladder-4', 6' or 8' Leaf Blower Pallet Jack Power Washer Table Saw Trash Buggy Trash Pump - Large 3 phase electric Trash Pump - Small Connex 20' Built-out Connex 20' Office Connex 40' Built-out Connex 40' Office 50/50 unit Cattle Guards Fuel Cell with (3) 5gal cans and 40 gal pump Vehicle Tracking Pads FODS Water Wheel Survey - Builders level-B20 Survey - Laser & Accessories 3900 Series Survey - Robotic Total Station (Kit) Survey - Thedolite Street Sweeper Ford F-450 (per 3 Hour) Trailer Event one time charge Truck - Water Truck Vehicle (CM's, Superintendent, Project Manager) Box Truck Concrete Blanket 14x25' Heaters LP Gas small Snow Blankets Snow blower Snow Tarps
2027 Rates $ 433.68 $ 161.20 $ 80.08 $ 161.20 $ 595.92 $ 11.44 $ 85.28 $ 642.72 $ 236.08 $ 34.32 $ 428.48 $ 440.96 $ 651.04 $ 428.48 $ 54.08 $ 482.56 $ 615.68 $ 296.40 $ 626.08 $ 526.24 $ 626.08 $ 268.32 $ 187.20 $ 283.92 $ 1,606.80 $ 226.72 $ 614.64 $ 3,098.16 $ 226.72 $ 418.08 $ 375.44 $ 3,530.80 $ 1,710.80 $ 2,142.40 $ 36.40 $ 32.24 $ 54.08 $ 244.40 $ 85.28
Boulder Valley School District Asbestos Management Plan Contractor Responsibility It is the expectation of the Boulder Valley School District that contractors adhere to all AHERA, EPA, and Colorado Department of Public Health and Environment regulations regarding asbestos treatment and management before and during any construction, renovation or maintenance project. To that end, contractors are expected to review the asbestos management plan before the work begins. Any activity that could potentially disturb asbestos containing building materials must be brought to the attention of BVSD Environmental Services Department prior to the start of work, and if the scope of work changes during the course of the project. Environmental Services will identify all areas of concern and facilitate any necessary abatement in order to help make all projects successful. Therefore, contractors and their subcontractors must provide this signature sheet prior to the start of work to ensure they are aware of BVSD expectations and understand their responsibility. I have read and understand the BVSD Asbestos Management Plan for the buildings in which I will be working. I agree not to disturb or damage any asbestos containing building materials (ACBM), which have been identified in the Asbestos Management Plan. In the event the scope of work changes during the course of the project, or our work causes us to encounter building materials that may be ACBM, we agree to notify BVSD Environmental Services immediately. If any identified ACBM is disturbed or damaged as a result of the work, the contractor and/or their subcontractor may be held financially responsible for all related remediation.
AP Mountain States LLC. Company Name: __________________________________________________
Authorized Representative:
Matt Lewandowski ______________________________________ Print
______________________________________ Signature
10/14/26 Date: ____________________
Drafted and Required by: BOULDER VALLEY SCHOOL DISTRICT ENVIRONMENTAL SERVICES DEPARTMENT
Exhibit P List of all salaried staff to be charged to the Cost of the Work as established in the agreement Kevin Harrison - Construction Manager Cole Ray - Senior Superintendent Hugo Javalera - Superintendent Matt Lewandowski - Project Manager TBD - PE AJ Laskowske- MEP Manager Tanya Ranney - Lower Voltage Specialist Chuck Wempe - Envelope Specialist Mark Kassahn - IT Manager Eric Nguyen - IT Assistant Manager Jill Strait - Project Coordinator Derrick Oppie - Warehouse
6500 East Arapahoe Road | Boulder, Colorado 80303 | 720-561-5930 | www.bond.bvsd.org