8734 - BVSD FES GMP Exhibits A-P.pdf (5,249 KB)

Regular Meeting, November 10, 2026 · item 7.7: Amendment to the contract for Foothill Elementary School · 77 pages

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Current Drawings Drawing Number

Drawing Title

Revision

Drawing Date

Received Date

Set

Status

Cover Sheet 001

Cover Sheet

1

08/25/2026

26.08.25 - CD's

Published

CODE COMPLIANCE

1

08/25/2026

26.08.25 - CD's

Published

S-001

GENERAL NOTES

1

08/25/2026

26.08.25 - CD's

Published

S-002

GENERAL NOTES

1

08/25/2026

26.08.25 - CD's

Published

S-003

LOAD KEYS

1

08/25/2026

26.08.25 - CD's

Published

S-101

STRUCTURAL FLOOR PLAN

1

08/25/2026

26.08.25 - CD's

Published

S-121

STRUCTURAL ROOF PLAN

1

08/25/2026

26.08.25 - CD's

Published

AD-101

OVERALL DEMOLITION FLOOR PLAN

1

08/25/2026

26.08.25 - CD's

Published

AD-121

OVERALL ROOF DEMOLITION

2

09/16/2026

09/16/2026

26.09.16 - Addendum 1

Published

A-121

OVERALL ROOF PLAN

3

09/16/2026

09/16/2026

26.09.16 - Addendum 1

Published

A-361

EXTERIOR SECTION DETAILS

2

09/16/2026

09/16/2026

26.09.16 - Addendum 1

Published

A-415

LARGE SCALE FLOOR AND DEMOLITION PLANS

1

08/25/2026

26.08.25 - CD's

Published

A-416

LARGE FLOOR AND DEMOLITION PLANS

1

08/25/2026

26.08.25 - CD's

Published

FS101

KITCHEN EQUIPMENT - PLUMBING - ELECTRICAL

1

08/25/2026

26.08.25 - CD's

Published

FS501

KITCHEN GENERAL NOTES - DETAILS

1

08/25/2026

26.08.25 - CD's

Published

PD-201A

AREA A PLUMBING DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

P-001

PLUMBING GENERAL INFORMATION

1

08/25/2026

26.08.25 - CD's

Published

GENERAL G-001 Structural

Architectural

Food Service

Plumbing

Page 1 of 4

Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Drawing Number

Drawing Title

Revision

Drawing Date

Received Date

Set

Status

P-201A

AREA A PLUMBING PLAN

1

08/25/2026

26.08.25 - CD's

Published

P-201C

AREA C PLUMBING PLAN

1

08/25/2026

26.08.25 - CD's

Published

P-601

PLUMBING DETAILS

1

08/25/2026

26.08.25 - CD's

Published

MD-201A

AREA A MECHANICAL DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

M-001

MECHANICAL GENERAL INFORMATION

1

08/25/2026

26.08.25 - CD's

Published

M-002

MECHANICAL COMCHECK

1

08/25/2026

26.08.25 - CD's

Published

M-201A

AREA A MECHANICAL PLAN

1

08/25/2026

26.08.25 - CD's

Published

M-601

MECHANICAL DETAILS

1

08/25/2026

26.08.25 - CD's

Published

E-001

ELECTRICAL GENERAL INFORMATION

1

08/25/2026

26.08.25 - CD's

Published

ED-201A

AREA A POWER DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

ED-211A

AREA A LIGHTING DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

ED-211B

AREA B LIGHTING DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

ED-211C

AREA C LIGHTING DEMOLITION

0

08/25/2026

26.08.25 - CD's

Published

ED-211D

AREA D LIGHTING DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-002

ELECTRICAL PROJECT NOTES

1

08/25/2026

26.08.25 - CD's

Published

E-003

ELECTRICAL SCHEDULES

1

08/25/2026

26.08.25 - CD's

Published

E-004

ELECTRICAL COMCHECK

0

08/25/2026

26.08.25 - CD's

Published

E-201A

AREA A POWER PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-201C

AREA C POWER PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-201D

AREA D POWER PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-211A

AREA A LIGHTING PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-211B

AREA B LIGHTING PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-211C

AREA C LIGHTING PLAN

0

08/25/2026

26.08.25 - CD's

Published

Mechanical

Electrical

Page 2 of 4

Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Drawing Number

Drawing Title

Revision

Drawing Date

Received Date

Set

Status

E-211D

AREA D LIGHTING PLAN

1

08/25/2026

26.08.25 - CD's

Published

E-501

ELECTRICAL ONE-LINE DIAGRAM

0

08/25/2026

26.08.25 - CD's

Published

E-502

PANEL SCHEDULES

0

08/25/2026

26.08.25 - CD's

Published

T-001

COMMUNICATIONS TITLE SHEET

1

08/25/2026

26.08.25 - CD's

Published

TD-201A

AREA A COMMUNICATIONS

1

08/25/2026

26.08.25 - CD's

Published

TD-201B

AREA B COMMUNICATIONS DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

TD-201C

AREA C COMMUNICATIONS DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

TD-201D

AREA D COMMUNICATIONS DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

T-002

COMMUNICATIONS PROJECT NOTES

1

08/25/2026

26.08.25 - CD's

Published

T-003

COMMUNICATIONS SCHEDULES

1

08/25/2026

26.08.25 - CD's

Published

T-201A

AREA A COMMUNICATIONS PLAN

1

08/25/2026

26.08.25 - CD's

Published

T-201B

AREA B COMMUNICATIONS PLAN

1

08/25/2026

26.08.25 - CD's

Published

T-201C

AREA C COMMUNICATIONS PLAN

1

08/25/2026

26.08.25 - CD's

Published

T-201D

AREA D COMMUNICATIONS PLAN

1

08/25/2026

26.08.25 - CD's

Published

T-601

COMMUNICATIONS DETAILS

1

08/25/2026

26.08.25 - CD's

Published

FA-001

FIRE ALARM GENERAL INFORMATION

1

08/25/2026

26.08.25 - CD's

Published

FAD-211A

AREA A FIRE ALARM DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

FAD-211B

AREA B FIRE ALARM DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

FAD-211C

AREA C FIRE ALARM DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

FAD-211D

AREA D FIRE ALARM DEMOLITION PLAN

1

08/25/2026

26.08.25 - CD's

Published

FA-201A

AREA A FIRE ALARM PLAN

1

08/25/2026

26.08.25 - CD's

Published

FA-201B

AREA B FIRE ALARM PLAN

1

08/25/2026

26.08.25 - CD's

Published

FA-201C

AREA C FIRE ALARM PLAN

1

08/25/2026

26.08.25 - CD's

Published

Telecommunications

Fire Alarm

Page 3 of 4

Printed on Mon Oct 26, 2026 at 04:16 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Drawing Number FA-201D

Drawing Title AREA D FIRE ALARM PLAN

Revision 1

Drawing Date 08/25/2026

Page 4 of 4

Received Date

Set 26.08.25 - CD's

Status Published

Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Current Specifications Number

Description

Revision

Issued Date

Received Date

Set

00 - Procurement and Contracting Requirements 00 0106

Cover Page

0

26.08.25 - CD's

00 0107

Seals Page

0

26.08.25 - CD's

00 0110

Table of Contents

0

26.08.25 - CD's

00 1000

Performance Bond

0

26.08.25 - CD's

00 1100

Labor and Material Payment Bond

0

26.08.25 - CD's

00 1300

Asbestos Management Plan Contractor Responsibility

0

26.08.25 - CD's

00 1400

Lead Based Paint Contractor Responsibility

0

26.08.25 - CD's

00 3100

Available Project Information

0

26.08.25 - CD's

00 3200

2023 Asbestos Summary

0

26.08.25 - CD's

00 6000

Project Forms

0

26.08.25 - CD's

00 6001

RFI Form

0

26.08.25 - CD's

00 6002

Substitution Request Form

0

26.08.25 - CD's

00 6003

Proposal Request Form

0

26.08.25 - CD's

00 6004

ASI Form

0

26.08.25 - CD's

00 6005

Change Construction Directive Form

0

26.08.25 - CD's

00 6006

Electronic Media Disclaimer Acknowledgement

0

26.08.25 - CD's

01 - General Requirements 01 1000

Summary

0

26.08.25 - CD's

01 2000

Price and Payment Procedures

0

26.08.25 - CD's

01 2100

Allowances

0

26.08.25 - CD's

01 2300

Alternates

0

26.08.25 - CD's

01 2500

Substitution Procedures

0

26.08.25 - CD's

01 3000

Administrative Requirements

0

26.08.25 - CD's

01 3216

Construction Progress Schedule

0

26.08.25 - CD's

01 4000

Quality Requirements

0

26.08.25 - CD's

01 4216

Definitions and Explanations

0

26.08.25 - CD's

01 5000

Temporary Facilities and Controls

0

26.08.25 - CD's

01 6000

Product Requirements

0

26.08.25 - CD's

01 6116

Volatile Organic Compound (VOC) Content Restrictions

0

26.08.25 - CD's

01 7000

Execution and Closeout Requirements

0

26.08.25 - CD's

01 7419

Construction Waste Management and Disposal

0

26.08.25 - CD's

01 7610

Temporary Protective Coverings

0

26.08.25 - CD's

01 7800

Closeout Submittals

0

26.08.25 - CD's

01 7900

Demonstration and Training

0

26.08.25 - CD's

Masonry Mortaring and Grouting

0

26.08.25 - CD's

04 - Masonry 04 0511

Page 1 of 3

Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Number 04 2000

Description

Revision

Issued Date

Received Date

Set

Unit Masonry

0

26.08.25 - CD's

Metal Ladders

0

26.08.25 - CD's

0

26.08.25 - CD's

05 - Metals 05 5133

06 - Wood, Plastics, and Composites 06 1000

Rough Carpentry

07 - Thermal and Moisture Protection 07 0150

Maintenance of Membrane Roofing

0

07 5300

Elastomeric Membrane Roofing

1

08/26/26

08/26/26

26.08.25 - CD's 26.08.25 - CD's Corrections

07 6200

Sheet Metal Flashing and Trim

1

08/26/26

08/26/26

26.08.25 - CD's Corrections

07 7200

Roof Accessories

0

26.08.25 - CD's

07 8400

Firestopping

0

26.08.25 - CD's

07 9200

Joint Sealants

0

26.08.25 - CD's

09 0561

Common Work Results for Flooring Preparation

0

26.08.25 - CD's

09 2116

Gypsum Board Assemblies

0

26.08.25 - CD's

09 5100

Acoustical Ceilings

0

26.08.25 - CD's

09 6500

Resilient Flooring and Base

0

26.08.25 - CD's

09 6813

Tile Carpeting

0

26.08.25 - CD's

09 9123

Interior Painting

0

26.08.25 - CD's

Wall and Door Protection

0

26.08.25 - CD's

11 4000

Food Service Equipment

0

26.08.25 - CD's

11 8129

Facility Fall Protection

0

26.08.25 - CD's

12 3200

Manufactured Wood Casework

0

26.08.25 - CD's

12 3600

Countertops

0

26.08.25 - CD's

22 0000

Basic Plumbing Requirements

0

26.08.25 - CD's

22 0500

Common Work Results for Plumbing

0

26.08.25 - CD's

22 0519

Meters and Gauges for Plumbing Piping

0

26.08.25 - CD's

22 0523

General-Duty Valves for Plumbing Piping

0

26.08.25 - CD's

22 0529

Hangers and Supports for Plumbing Piping and Equipment

0

26.08.25 - CD's

22 0553

Identification for Plumbing Piping and Equipment

0

26.08.25 - CD's

22 0700

Plumbing Insulation

0

26.08.25 - CD's

22 1116

Domestic Water Piping

0

26.08.25 - CD's

22 1119

Domestic Water Piping Specialties

0

26.08.25 - CD's

22 3200

Water Heaters

0

26.08.25 - CD's

22 4000

Plumbing Fixtures

0

26.08.25 - CD's

0

26.08.25 - CD's

09 - Finishes

10 - Specialties 10 2600 11 - Equipment

12 - Furnishings

22 - Plumbing

23 - Heating, Ventilating, and Air Conditioning (HVAC) 23 0000

Basic Mechanical Requirements

Page 2 of 3

Printed on Mon Oct 26, 2026 at 01:04 pm MDT Job #: 8734 BVSD - Foothill ES Renovation 7750 Concord Dr. Boulder, Colorado 80301 Adolfson & Peterson Construction

Number

Description

Revision

Issued Date

Received Date

Set

23 0500

Common Work Results for HVAC

0

26.08.25 - CD's

23 0529

Supports and Anchors

0

26.08.25 - CD's

23 0800

Mechanical Commissioning

0

26.08.25 - CD's

23 1123

Natural Gas Systems

0

26.08.25 - CD's

26 0500

Basic Electrical Requirements

0

26.08.25 - CD's

26 0510

Electrical Remodeling Provisions

0

26.08.25 - CD's

26 0519

Building Wire and Cable

0

26.08.25 - CD's

26 0526

Grounding and Bonding

0

26.08.25 - CD's

26 0529

Supporting Devices and Seals

0

26.08.25 - CD's

26 0532

Conduit

0

26.08.25 - CD's

26 0534

Electrical Boxes and Fittings

0

26.08.25 - CD's

26 0553

Electrical Identification

0

26.08.25 - CD's

26 0580

Equipment Wiring Systems

0

26.08.25 - CD's

26 2726

Wiring Devices

0

26.08.25 - CD's

26 2816

Enclosed Switches

0

26.08.25 - CD's

26 5100

Interior Lighting

0

26.08.25 - CD's

0

26.08.25 - CD's

26 - Electrical

27 - Communications 27 0553

Identification for Communications Systems

Page 3 of 3

K1225 - BVSD - FOOTHILL ES RENOVATIONS 1001 Hawthorne Ave., Boulder, CO, 80304 Estimate: CD Estimate

PREPARED FOR:

ARCHITECT / DESIGNER:

Boulder Valley School District

MOA Architecture

DATE PRINTED: 10/21/2026

Clarifications Report General Clarifications - Prevailing wages have not been included. - Sales tax has not been included. - A&P excludes any delegated design that is not listed in the contract documents. - Any delays or cost impacts due to pandemics have not been included in the estimate.

Items by Others - All independent testing and inspections, including commissioning. - Technology – Servers, computers, phones, uninterruptible power supply (UPS), etc. - Residential Equipment (Kitchen appliances, Fitness Equipment, etc). - Land Costs, Legal Fees, or Tap Fees. - Architectural and Engineering Fees. - Owner contingency. - All fees associated with utilities will be paid for by Owner (water, electric, gas). - Any expenses associated with dry utilities and getting them to the site (cable, fiber, power and gas). - Removal or working with hazardous materials, including asbestos and lead abatement as defined by OSHA. - All moving costs. - All artwork - purchasing, moving, and installation. - Technology - Computers, Servers, phones, etc. – purchasing, moving and installation. - Furniture, Desks, chairs, tables, moveable casework – purchasing, moving and installation. - Audio / Visual Projectors, Projection Screens, Smart Boards, Televisions.

Documents - Drawings dated 08/25/2026 - Project Manual dated 08/25/2026

B Shell - In addition to the 25-year roof warranty, a 90 MPH wind rider is include pending manufacturer approved pull test. The specifications call for a 100 MPH wind speed warranty which cannot be achieved and therefore not included.

- Included an allowance of 25K for Tectum Roof Panel/Structural Replacement. - Removal of the existing system includes gravel, flood coats, built up roofing membrane, plywood & sleepers, and EPS insulation. Existing asphalt layer installed directly to Tectum likely to remain and be utilized as a vapor barrier to protect the integrity of the Tectum decking.

- Snow removal from roof is not included. - Vacuum & removal of loose gravel from the existing roof surface is included. Cleaning or washing gravel for reuse is not included.

C Interiors - Alternate A3 - An allowance of $5K was included for drywall, framing, & patching, access panel door, & MEP rerouting for moving the access panel where the new kitchenette will be located.

DATE PRINTED: 10/21/2026

C Interiors - For Alternate 1, one ADA door operator & push button for each door pair is included. The conduit for the ADA operators is figured to be surface mounted.

- For Alternate 2, a new reception desk to the west of the existing reception desk is included. Existing reception desk to remain as is. - Included an allowance of $10K for wall/ceiling patches due to scope associated with the kitchen refrigerator repairs.

D Services - Included an allowance of $15K for 3rd party design for wind for rooftop equipment. - Included an allowance of $5,500 for piping changes that might be necessary for different meter size installed by Excel. - Included an allowance of $6K for disconnecting & reconnecting MEP Rooftop Equipment. - Updating obsolete HVAC controls is not included. Per BVSD, a controls upgrade was previously completed. - VFA V3 for addressing HVAC noisy fans is not included. It is to be completed by BVSD Facilities.

Z General Requirements - A site security guard has not been included. - General protection of adjacent surfaces is included for the work shown in the plans.

DATE PRINTED: 10/21/2026

797 Ventura Street, Aurora, CO 80011 Project: K1225 - BVSD - Foothill ES Renovations Owner: Boulder Valley School District Architect: MOA Architecture

Date: Estimator: Project SF: Duration in Months: Estimate #:

10/21/26 Karra Damiana 76,021 3.00 CD Estimate - Amendment 1 Includes Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk, & Alternate 3 Main Office Kitchenette

Project Summary Sheet - Estimated Cost of the Work Division #0 Division #1 Division #2 Division #3

Division #4

Division #5

Division #6

Division #7 Division #8

Division #9 Division #10

Division #11 Division #12 Division #13 Division #14 Division #21

Procurement and Contracting Requirements General Requirements/AP Labor Existing Conditions Concrete

DD Estimate CD Estimate $103,044 $87,058 $379,492 $352,216 $0 $0 $0 $0 $18,957 $6,309

Difference ($15,986) ($27,276) $0 $0 ($12,648)

Masonry $30,725

$28,459

$50,777

$75,572

$24,795

$1,125,921

$748,220

($377,701)

$0

$22,348

$22,348

$76,705

$147,687

$70,982

Openings

Plumbing

Division #23 Division #25

Heating, Ventilating and Air Conditioning Integrated Automation

$4.63

/SF

13.3% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

Cost Delta Comments from DD's Drop Due to 3 Projects ILO 4 Projects Includes AP Labor. Not Applicable Not Applicable

0.2% of Direct Costs

Brick infill at the two existing downspouts around the gym was revised to sheet metal covers, with an external downspout installed over the sheet metal cover at one location.

1.2% of Direct Costs

Added three aluminum rooftop ladders & fall protection railing to the original scope of modifying wall rail at ramp adjacent to new downspout.

2.9% of Direct Costs

Slight modification of roof rough carpentry. Added Alternate 2 - Main Office Reception Desk & Alternate 3 - Mian Office Kitchenette.

$0.99

Thermal and Moisture Protection

Division #22

3.3% of Direct Costs

$0.40

Wood, Plastics, and Composites

Equipment Furnishings Special Construction Conveying Equipment Fire Suppression

/SF

$0.08

$2,266

Metals

Finishes Specialties

$1.15

$0 $62,454

$0 $47,432

$0 ($15,022)

$0 $0 $0 $0 $158,027

$0 $0 $0 $0 $323,257

$0 $0 $0 $0 $165,230

$10,593 $0

$15,000 $0

/SF

/SF

/SF

$9.84

/SF

28.3% of Direct Costs

Scope Associated with Removing/Reinstalling Existing Rooftop Equipment & Drains Moved to MEP Divisions; Reduced Additional Layers of Deck Sheathing;

$0.29

/SF

0.8% of Direct Costs

Added Alternate 1 - ADA Door Operators

$1.94

/SF

5.6% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.62

/SF

1.8% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$4.25

/SF

12.2% of Direct Costs

$0.20

/SF

0.6% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$4,407 $0

Added drywall patch & repair at drywall walls & ceilings for paging & fire alarm device removals; patch & repair of acoustical tile ceilings at device removals; paint touch-up associated with paging & fire alarm removals; painting fire alarm conduit & repainting of modified & existing ramp railings at the new downspout. Added Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk & Alternate 3 - Mian Office Kitchenette. (drywall & paint patch & repair) Not Applicable At DDs, the existing walk-in cooler manufacturer & serial number were unknown. At CDs, this information was provided, allowing for more accurate & improved pricing. Not Applicable Not Applicable Not Applicable Not Applicable This includes Plumbing & HVAC scope. Added/clarified CD scope for curb modifications at 8 exhaust fans and 5 roof caps, repair/extension of 51 plumbing vents, raising approximately 380 LF of rooftop piping, replacement of 16 existing roof drain strainers with cast iron strainers, extension of existing drain piping for raising roof drains, camera inspection of all storm roof drains, & crane support for removal/reinstallation of roof equipment. Also, added gas meter to be replaced. Even though the gas meter should be replaced by Excel, piping change necessary for different meter size was included. Included $15K Allowance for 3rd Party Design for Wind Not Applicable

$75,685

Division #26 Division #27

Division #28 Division #31 Division #32 Division #33

Electrical Communications

$156,487

$80,802

$2.06

/SF

5.9% of Direct Costs

$2.97

/SF

8.5% of Direct Costs

$223,411 $335,622

$225,694 $405,754

$2,283 $70,132

$5.34

/SF

15.3% of Direct Costs

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

$0.00

/SF

0.0% of Direct Costs

Subtotal

$2,622,954

$2,643,759

$20,805

$34.78

/SF

100.0% of Direct Costs

Utility Tap & Devel. Fees Permit Allowance Use Tax Construction Contingency Builders Risk Insurance Comprehensive General Liability Insurance Sub Default Insurance Performance and Payment Bond Escalation Allowance Contractors Fee Preconstruction Services

By Owner By Owner By Owner $209,836 $5,666 $33,993 Not Included $19,263 Not Included $132,666 $17,500

By Owner By Owner By Owner $79,313 $5,868 $35,207 Not Included $19,951 Not Included $132,341 $0

$0.00

/SF

$0.00

/SF

0.00% of Project

$0.00

/SF

0.00% of Project

$1.04

/SF

3.00% of Project

$0.08

/SF

0.20% of Costs

$0.46

/SF

1.20% of Project

$0.00

/SF

0.00% of Costs

$0.26

/SF

0.68% of Project

$0.00

/SF

0.00% of Project

($325) ($17,500)

$1.74

/SF

4.86% of Project

$0.00

/SF

$3,041,878

$2,916,439

($125,439)

$38.36

/SF

Electronic Safety and Security Earthwork Exterior Improvements Utilities

($130,523) $202 $1,214 $688

Estimated Cost of Construction

CD Estimate - Amendment 1 Base Contract Amendment 1 Total:

$17,500 $2,916,439 $2,933,939

100.0% of Project

SD/DD budget based on Carlton & Montgomery pricing. At CD, Carlton & Montgomery declined due to Summer 2027 schedule filled up; pricing received from Encore, Exceed & E-Light. Potential buyout remains; scope review meetings not yet held. CD roofing plans also added electrical scope for rooftop equipment disconnect/reconnect and additional EMT/flex wiring due to raised roof assemblies. Added Alternate 1 - ADA Door Operators, Alternate 2 - Main Office Reception Desk & Alternate 3 Mian Office Kitchenette. SD/DD budget based on Carlton & Montgomery pricing. At CD, Carlton & Montgomery declined due to Summer 2027 schedule filled up; pricing received from Encore, Exceed & E-Light. Potential buyout remains; scope review meetings not yet held. Not Applicable Not Applicable Not Applicable

Dropped to 3% from 8% Per RFP Response Per RFP Response Per RFP Response Per RFP Response This amount is the base contract.

Detail Report DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 00 Procurement and Contracting Requirements 00 72 00 AIA General Conditions 00100 General Conditions of the Contract Subtotal 00 72 00 AIA General Conditions

Total 00 Procurement and Contracting Requirements

DATE PRINTED: 10/21/2026

$87,058 1.00 ls

87,058.00

$87,058 $87,058

$87,058

See Below, Priced per AIA 201

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 01 General Requirements 01 32 00 Construction Progress Documentation

$0

01100 Video Monitoring and documentation

Not Included

Subtotal 01 32 00 Construction Progress Documentation

$0

01 33 00 Submittal Procedures

$0

01110 Delivery Costs / Messenger Services

Included

01130 Reproduction Costs

Included

01170 Sustainability Project Requirements

Not Included

Subtotal 01 33 00 Submittal Procedures

$0

01 35 53 Security Procedures

$0

01160 Site Security Cameras & Monitoring

Not Included

Subtotal 01 35 53 Security Procedures

$0

01 45 00 Quality Control

$0

01200 Independent Testing

Not Included

01210 Soil Compaction Tests

Not Included

01220 Concrete Tests

Not Included

01230 Steel Weld Test / Inspections

Not Included

01250 Field Quality Control Procedures

Included

01260 3rd Party Envelope Consultant

Not Included

Subtotal 01 45 00 Quality Control

$0

01 51 00 Temporary Facilities

$46,650

01270 Temporary Electricity - Jobsite

By Owner

01280 Generators 36kw

Not Included

01290 Fuel for Generator (full load)

Not Included

01300 Generator Setup & Containment

Not Included

01310 Temporary Fire Protection

3.00 mo

375.00

$1,125

01330 Temp Heating Equipment & Labor

Not Included

01340 Temp Heating Fuel

Not Included

01350 Temporary Building Enclosure for Temp Heating

Not Included

01360 Temporary lighting

General lighting by EC

01370 Temporary Water

By Owner

01380 Sanitary Facilities 01390 Temporary Elevators

DATE PRINTED: 10/21/2026

3.00 mo

4,085.00

$12,255

For Subcontractors Not Included

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

01400 Temporary Hoists

Not Included

01410 Gradall for Jobsite

Not Included

01420 Bobcat & Operator for Jobsite

Not Included

01430 Fuel for Equipment

Not Included

01440 Temporary Cranes

By Division

01450 Temporary Scaffolding & Platforms

By Division

01460 Temporary Stairs & Ramps

Not Included

01470 Temporary Swing Staging

Not Included

01480 Temporary Access Roads

Not Included

01490 Weather Conditions

Not Included

01500 Dumpsters

36.00 ea

550.00

$19,800

01510 Temporary Parking Areas

Not Included

01520 Temporary Air & Noise Barriers

Not Included

01530 Temporary Fencing

1,000.00 lf

9.00

$9,000

01531 >Screening Around Temporary Fencing

1,000.00 lf

1.00

$1,000

01540 Temporary Barricades 01560 Temporary Connex(s) 01620 Temporary Interior Signage

By Division 3.00 mo

650.00

$1,950

76,021.00 sf

0.02

$1,520

Subtotal 01 51 00 Temporary Facilities

$46,650

01 70 00 Execution and Closeout 01665 AP Labor

$273,963 1.00 ls

273,963.00

$273,963

01720 Construction Surveying

By Trade

01730 Protection of Adjacent Construction

By Division

Subtotal 01 70 00 Execution and Closeout

$273,963

01 74 00 Cleaning

$31,603

01630 Progress Cleaning Material

456,126.00 sf

0.00

$1,520

01710 Final Clean Building

76,021.00 sf

0.40

$30,083

Subtotal 01 74 00 Cleaning 01 90 00 Life Cycle Activities

$31,603 $0

01740 Substructure Commissioning

Not Included

01750 Structure commissioning

Not Included

01760 Exterior enclosure commissioning

Not Included

01770 Roofing Commissioning

Not Included

01780 Systems Commissioning

Not Included

DATE PRINTED: 10/21/2026

DESCRIPTION Subtotal 01 90 00 Life Cycle Activities

Total 01 General Requirements

DATE PRINTED: 10/21/2026

QTY UOM UNIT PRICE

TOTAL COST $0

$352,216

NOTES / COMMENTS

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 04 Masonry 04 20 00 Unit Masonry

$6,309

04201 Patching Damaged Brick at Downspouts

Not Included

04203 Repair Broken CMU at Base of Wall (Ref. Details 3 & 10/A-415, Keynotes 1.07 & 2.04.)

1.00 ea

3,705.00

$3,705

04205 CMU Patchback at Drinking Fountains (Ref. Detail 6/A-415, Keynote 2.08)

1.00 ls

2,604.00

$2,604

Subtotal 04 20 00 Unit Masonry

Total 04 Masonry

DATE PRINTED: 10/21/2026

$6,309

$6,309

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 05 Metals 05 50 00 Metal Fabrications 05501 Misc. Metals Scope of Work

$30,725 1.00 sub

30,725.00

$30,725

05505 >Provide/Install Roof Access Ladder, Prefabricated Aluminum Ship Ladder w/ Platform & Return, 6063 Alloy, T52 Temper, Mill Finish (Ref. A4/A-361 - Keynote 2.83)

Included

05507 >Provide/Install Fall Protection Railing (Ref. A121 - Keynote 11 8129)

Included

05509 >Modify Wall Rail at Ramp Adjacent to New Downspout

Included

05511 >>Remove Portion of Existing Handrail as Required for Downspout Installation (Ref. 3/A415 - Keynote 1.13)

Included

05513 >>Field Weld 05 5213 Pipe & Tube Railings to Existing Adjacent Handrail on Each Side & Grind Smooth (Ref. 10 & 12/A-415)

Included

Subtotal 05 50 00 Metal Fabrications

Total 05 Metals

DATE PRINTED: 10/21/2026

$30,725

$30,725

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 06 Woods, Plastics and Composites 06 10 10 Rough Carpentry 06101 Interior Rough Carpentry

$52,477 4,000.00 sf

1.98

$7,920

06103 Rough Carpentry at Roof

See Below

06105 >8'' Parapet

844.00 lf

9.18

$7,748

06107 >Mechanical Curb Extensions

142.00 lf

18.80

$2,670

06109 >Gravel Stop Blocking (Detail B3/A361)

60.00 lf

4.38

$263

06111 >Roof to Wall Transition Blocking (Detail D2/A361)

1,099.00 lf

7.60

$8,352

25,000.00

$25,000

6.99

$524

06113 >Tectum Roof Panel/Structural Replacement

1.00 allow

06115 Interior Rough Carpentry - Backing for Casework

75.00 sf

Subtotal 06 10 10 Rough Carpentry

$52,477

06 22 00 Finish Carpentry 06221 Provide & Install New Reception Desk

Allowance

$23,095 1.00 ls

9,251.00

$9,251

06223 >Plastic Laminate Drawer Base Cabinet

Included

06225 >Provide/Install Plastic Laminate Top

Included

06227 >Wood Framed Die Wall w/ Plastic Laminate Finish

Included

06229 Provide & Install New Admin Kitchenette

1.00 ls

13,444.00

$13,444

06231 >Plastic Laminate Base Casework

Included

06232 >Provide/Install Solid Surface Top

Included

06233 >Plastic Laminate Upper Casework

Included

06235 >Remove Existing Furniture in Main Office Waiting Area Subtotal 06 22 00 Finish Carpentry

Total 06 Woods, Plastics and Composites

DATE PRINTED: 10/21/2026

4.00 hr

100.00

$400 $23,095

$75,572

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 07 Thermal and Moisture Protection 07 53 23 Roofing & Roof Insulation 07301 Full Roof Replacement

$748,220 1.00 sub

740,775.00

$740,775

07303 >Existing Roof Disassembly - RD-1

Included

07305 >>Remove Existing Built-up Roof Assembly / Gravel

Included

07307 >>Remove Existing 1/2" Plywood Cover Board

Included

07309 >>Remove Existing XPS Board Insulation & Wood Sleepers Between Insulation

Included

07311 >Existing Roof Disassembly - RD-2

Included

07313 >>Remove Existing Smooth Surface Asphalt Coated Built-up Roof Assembly

Included

07315 >>Remove Existing 1/2" Wood Fiberboard

Included

07317 >>Remove Existing 3/4" Fiberglass Insulation

Included

07319 >Existing Roof Disassembly - RD-3

Included

07321 >>Remove Existing Smooth Surface Asphalt Coated Built-up Roof Assembly

Included

07323 >>Remove Existing 1/2" Wood Fiberboard, (2) Layers

Included

07325 >>Remove Existing 1/2" Plywood

Included

07327 >>Remove Existing 1/2" Fiberboard, (3) Layers

Included

07329 >Existing Roof Disassembly - RD-1, RD-2, RD-3

Included

07331 >>Remove Existing Sheet Metal Cap, Existing Curb to Remain (Keynote 1.91)

Included

07333 >>Remove Existing Roof Hatch Assembly (Keynote 1.92)

Included

07335 >>Remove Existing Exhaust Fan (Keynote 1.93)

By Mechanical Sub

07337 >>Remove Existing Paver-Mounted Condensing Unit (Paver Removal ONLY - Condensing Unit Removal by Mechanical Sub) (Keynote - 1.94)

Included

07339 >>Remove Existing Sheet Metal Parapet Coping (Keynote 1.95)

Included

07341 >>Remove Existing Built-up Roof Base Flashing, Flashings & Counter Flashings Around Perimeter of Roof (Keynote 1.96)

Included

07343 >>Remove Existing Sheet Gravel Stop, Existing Gutter to Remain (Keynote 1.97)

Included

07345 >>Remove Existing Sheet Metal Gravel Stop (Keynote 1.98)

Included

07347 >>Remove Existing Roof-Mounted Condensing Unit & Line-Sets for Walk-in Cooler Repair (Keynote 1.99) 07349 >Roof Assembly - R1

DATE PRINTED: 10/21/2026

By Food Service Sub

Included

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

07351 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black

Included

07353 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)

Included

07355 >>07 5300.06 Insulation, 5-1/2" Thick

Included

07357 >Roof Assembly - R1.1

Included

07359 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black

Included

07361 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)

Included

07363 >>07 5300.06 Insulation, 5-1/2" Thick

Included

07365 >>07 5300.02 Deck Sheathing, 5/8" Thick x 2Layers (Per Structural S-003)

Included

07367 >Roof Assembly - R2

Included

07369 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black

Included

07371 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)

Included

07373 >>07 5300.06 Insulation, 5-1/2" Thick

Included

07375 >Roof Assembly - R3

Included

07377 >>07 5300 Elastomeric Membrane Roofing, 90 Mil EPDM Membrane, Fleeceback, Black

Included

07379 >>07 5300.07 Cover Board, 5/8" Thick (Included at Parapets)

Included

07381 >Miscellaneous

See Below

07383 >>Existing Roof Top Mechanical Equipment & Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side, Typ. (Keynote 2.72)

Included

07385 >>Existing Exhaust Fan to Remain. Provide Tapered Insulation Cricket on Uphill Side as Indicated & Typical Slip Flashing Detail, (Keynote 2.73) (ref. C2/A-361)

Included

07387 >>Existing Vent Through Roof to Remain. Extend or Repair as Required & Provide Prefabricated Flexible Stack Boot (Keynote 2.74)

By Mechanical Sub

07389 >>Existing Skylight & Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side, Typ. (Keynote 2.77)

Included

07391 >>Existing Sheet Metal Capped Curb to Remain. Provide Tapered Insulation Cricket on Uphill Side & Typical Slip Flashing Detail. (Keynote 2.78)

Included

07393 >>Existing Roof Drain Location to Remain. Provide 4'-0" Tapered Insulation Sump in Each Direction (Keynote 2.79)

Included

07395 >>>Supply/ Install New Cast Iron Roof Drain Strainers (Ref. D1/A-361)

Included

DATE PRINTED: 10/21/2026

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

07397 >>Existing Channel Scupper Location to Remain. Wrap Membrane into Channel at Bottom & Sides (Keynote 2.81)

Included

07399 >>Existing Exposed Piping/Conduit on Roof to Remain. Provide Utility Support Blocks, Adjust Height to Conform to Roof Slope & Height of Pipe (Keynote 2.82)

Included

07401 >>New Galvanized Sheet Metal Cap on Extended Curb (Extended Curb by Others) (Keynote 2.91)

Included

07403 >>Reinstall Existing Roof Hatch (Keynote 2.92)

Included

07405 >>>Extension Post Assembly (Ref. 07 7200.06) 07407 >>Provide Tapered Insulation Cricket on Uphill Side of Extended Exhaust Fan Curbs (Extended Curb by Others) (Keynote 2.93)

Included

07409 >>Supply/Install Walkway Pads (Keynote 07 5300.10)

Included

07411 > Provide 25-Year Warranty

Included

07413 > Provide Extended Wind Warranty

Included

07415 >Roof Flashing

See Below

07417 >>22 Gauge Galvanized Slip Flashing at all Roof Top Curb Details (Ref. A1/A-361)

Included

07419 >>2-Piece Reglet Counterflashing at Interior Walls & Existing Cap Flashing Locations Ref. D2/A-361)

Included

07421 >>07 6200.2C Pre-finished Galvanized Steel Sheet Metal, 24 Gauge - Coping (Ref. B1 & C1/A -361)

Included

07423 >>07 6200.2GS Pre-finished Galvanized Steel Sheet Metal, 24 Guage - Gravel Stop

Included

07425 >>Existing Through Wall Roof Scupper Location to Remain. Provide New Scupper Materials (Keynote 2.83 & A2/A-361)

Included

07427 >>Cover at Existing Downspout (Ref. 11 & 12/A415) - 07 6200.02 Pre-finished Galvanized Steel, 20 Guage, Sheet Metal Cover with Hemmed Edges, Approx. 1'-4" Wide. Attach Sheet Metal Cover to Existing Masonry with Gasketed Fasteners at 12" O.C. Sealant all along each side.

Included

07429 >>Downspout (Ref. 12/A-415) - 07 6200.2DS Pre-finished Galvanized Steel, 20 Guage, Sheet Metal Tie Into Existing Sheet Gutter Above

Included

07431 Roof Cleanup

22,902.00 sf

0.05

$1,145

07433 Safety Measures for Roof Work Perimeter/Openings

1,260.00 lf

5.00

$6,300

07435 Exterior Scaffold Stair Tower

Not Included

07437 Hoisting for Roofing Materials

Included

DATE PRINTED: 10/21/2026

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

07439 Snow Removal for Roof Work Subtotal 07 53 23 Roofing & Roof Insulation

Total 07 Thermal and Moisture Protection

DATE PRINTED: 10/21/2026

NOTES / COMMENTS Not Included

$748,220

$748,220

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 08 Openings 08 70 00 Hardware 08701 Provide ADA Door Operators & Push Buttons to Existing Door Pairs

$22,348 2.00 Pair

9,674.00

$19,348

08703 >ADA Operator & Push Button for Each Door Pair with Surface Mounted Conduit 08705 >Patch/Repair Holes in Doors/Frames

Included 2.00 Pair

1,500.00

$3,000

Subtotal 08 70 00 Hardware

$22,348

Total 08 Openings

$22,348

DATE PRINTED: 10/21/2026

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 09 Finishes 09 21 16 Gypsum Board Assemblies

$54,800

09213 Drywall Patch & Repair - Ceiling at Kitchen Refrigerator

1.00 allow

10,000.00

$10,000

09215 Drywall Patch & Repair - Paging Device Demo in Walls/Gyp Ceilings

25.00 ea

200.00

$5,000

09217 Drywall Patch & Repair - Fire Alarm Device Demo in Walls/Gyp Ceilings

144.00 ea

200.00

$28,800

09221 Drywall Patch & Repair

2.00 ea

1,500.00

$3,000

09225 Drywall Patch & Repair

1.00 ls

1,500.00

$1,500

09227 Drywall Patch & Repair

1.00 ls

1,500.00

$1,500

09229 Relocated Wall Access Panel

1.00 ls

5,000.00

$5,000

Subtotal 09 21 16 Gypsum Board Assemblies

$54,800

09 51 00 Acoustical Ceilings

$8,900

09251 Patch & Repair Acoustic Tile Ceiling - Paging Device Demo

117.00 ea

50.00

$5,850

09253 Patch & Repair Acoustic Tile Ceiling - Fire Alarm Device Demo

61.00 ea

50.00

$3,050

Subtotal 09 51 00 Acoustical Ceilings

$8,900

09 65 00 Resilient Flooring

$6,590

09651 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls 14.00 lf

3.00

$42

09655 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls

16.00 lf

3.00

$48

09659 Resilient Transitions

Included 10,000.00 sf

0.65

Subtotal 09 65 00 Resilient Flooring

$6,500 $6,590

09 68 00 Carpet

$42,372

09679 Remove Portion of Existing Carpet & Rubber Base for Installation of New Base Cabinets (Ref. AD-101, 2/A-415 - Keynote 1.11)

25.00 sf

35.36

$884

09681 CPT-1, Carpet Tile, Interface - Open Air Stria, 25cm x 1m, Charcoal 103242

667.00 sy

44.64

$29,776

09683 >Remove Existing Broadloom Carpet & Rubber Base Throughout Room (Ref. AD-101, 1/A-416 Keynote 1.9)

6,002.00 sf

0.64

$3,870

09685 >Floor Prep

6,002.00 sf

0.60

$3,601

8.00 ea

125.00

$1,000

09687 >Moisture tests (1/1000sf)

DATE PRINTED: 10/21/2026

Allowance

Included

09653 RB-1, Resilient Wall Base, Tarkett - Traditional Vinyl, Colonial Grey, 6" on Walls

09661 Floor Protection

Allowance

DESCRIPTION 09689 Floor Protection

QTY UOM UNIT PRICE 6,002.00 sf

0.54

Subtotal 09 68 00 Carpet

TOTAL COST $3,241 $42,372

09 90 00 Painting and Coating

$35,025

09903 Paint Modified & Existing Wall Rail at Ramp Adjacent to New Downspout (Ref. 12/A-415)

1.00 ls

750.00

$750

09905 Paint Touch Up/Repair - Fire Alarm Device Demo in Walls/Gyp Ceilings

144.00 ea

75.00

$10,800

09907 Paint Fire Alarm Conduit

144.00 ea

75.00

$10,800

09909 Paint Touch Up/Repair - Paging Device Demo in Walls/Gyp Ceilings

25.00 ea

75.00

$1,875

09911 Repaint Existing Walls in Media Center Area, SW Promar 200 Zero VOC, Eggshel Finish Match Existing Colors

1.00 ls

7,775.00

$7,775

09913 Paint Damage Touch-Up

16.00 hr

75.00

$1,200

09915 Paint Damage Touch-Up

8.00 hr

75.00

$600

09917 Repainting Existing Waiting Room Drywall Walls After New Casework is Installed. (Ref. 2/A-415 Keynote 1.08)

8.00 hr

153.13

$1,225

Subtotal 09 90 00 Painting and Coating

Total 09 Finishes

DATE PRINTED: 10/21/2026

$35,025

$147,687

NOTES / COMMENTS

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 11 Equipment 11 40 00 Food Service Equipment 11401 Refrigerator Renewal

$47,432 1.00 ls

47,432.00

$47,432

11403 >Remove Existing Roof-Mounted Condensing Unit & Line Sets for Walk-in Cooler Repair (Ref. AD-121 - Keynote 1.99)

Included

11405 >Provide & Install Roof-Top Mounted Condensing Unit & Line Sets for Walk-in Cooler Repair (Ref. 1/FS101 - Item Number 3)

Included

11407 >Provide & Install Walk-in Cooler Evaporator Coil (Ref. 1/FS101 - Item Number 2)

Included

11409 >>Provide New Refrigerant Line Set From New Roof-Mounted Condensing Unit Down to New Kitchen Cooler Evaporator Coil

Included

11411 >>Extend Drain to Existing Floor Sink

Included

11413 >Walk in Cooler Door & Frame Replacement (Ref.8/A-415 Keynote 2.05, Ref. 1/FS101 - Item Number 1)

Included

11415 >Heating Holding & Proofing Cabinet (Ref. 1/FS101 - Item Number 4)

Included

11417 >Provide & Install Junction Boxes with Conduit, Stub as Indicated for Direct Connection

Included

11419 >Provide & Install Special Purpose Outlet, 120/208-Volt as Indicated, Ground Type, Horizontal Mount

Included

Subtotal 11 40 00 Food Service Equipment

Total 11 Equipment

DATE PRINTED: 10/21/2026

$47,432

$47,432

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 22 Plumbing 22 00 00 Plumbing 22000 Mechanical Scope of Work

$323,257 1.00 sub

317,757.00

$317,757

22001 Full Roof Replacement - Plumbing Scope

See Below

22003 >Camera/Inspect Roof Drains

Included

22004 >Raise Roof Drains, Replace Baskets

Included

22005 Water Heater Renewal (Mechanical Room A28)

See Below

22007 >Prior to Construction Verify Existing GPM Flow Rates for Each of the (2) Existing Domestic Hot Water Recirculation Pump for Rebalancing the New Equipment

Included

22009 >Prior to Construction Verify with Gas Utility Provider the Existing Gas Meter CFH Capacity and Pressure at the Meter

Included

22011 Plumbing Demo

See Below

22013 >Remove Existing Building Domestic Hot Water Boiler and Associated Storage Tanks and Piping Back to Mains (Ref. PD-201A - Keynote P2)

Included

22015 >>Salvage Existing Boiler & Return to Owner

Included

22017 >Remove a Portion of Existing Mains Back to Domestic Hot Water Equipment in Mechanical Room (Ref. PD-201A - Keynote P3)

Included

22019 >Remove Existing Recirculation Pump Serving Building (Ref. PD-201A - Keynote P4)

Included

22021 >Remove Existing Recirculation Pump Serving Kitchen (Ref. PD-201A - Keynote P5)

Included

22023 >Remove Existing Master Mixing Valve (Ref. PD -201A - Keynote P6)

Included

22025 >Remove Existing Gas Piping from Domestic Hot Water Equipment (Ref. PD-201A - Keynote P8)

Included

22027 >Existing Gas Meter to be Replaced. Coordinate with Utility Provider for New Meter Install. (Ref. PD-201A - Keynote P14) 22029 >Equipment & Duct/Pipe Demo - Cut, Cap, & Drop. Removal of Materials and Equipment to Dumpster Provide by GC 22031 Plumbing Equipment

1.00 allow

5,500.00

$5,500

Allowance

Included

See Below

22033 >Provide & Install (2) Gas-Fired Domestic Condensing Water Heaters with Condensate Neutralizers, T&P Valves, & Drain Pans (DWH-1 & DWH-2)

Included

22035 >Provide & Install (1) Expansion Tank (DET-1)

Included

22037 >Provide & Install (2) Domestic Circulation Pumps (DCP-1 & DCP-2)

Included

22039 >Provide & Install (1) Master Mixing Valve (DMV -1) (BMS Integrated is Not Applicable. It is not

Included

DATE PRINTED: 10/21/2026

DESCRIPTION -1) (BMS Integrated is Not Applicable. It is not monitored.)

QTY UOM UNIT PRICE

TOTAL COST

22041 Piping Systems

NOTES / COMMENTS

See Below

22043 >Sanitary Waste/Vent - Cast Iron No-Hub with Standard No-Hub Couplings

Included

22045 >Domestic Cold/Hot Water - Type L Copper with Solder Joints

Included

22047 >Natural Gas - Black Steel Sch. 40 Pipe with Treaded/Welded Joints

Included

22049 Insulation, Fire Stopping/Caulking Associated with Mechanical and Plumbing Systems

Included

22051 Test and Balance for Air and Water Systems

Included

22053 Domestic Water Chlorination

Included

22055 Pressure Testing for New Piping per Code

Included

22057 Drinking Fountains

See Below

22059 >Remove Existing Drinking Fountains & Provide New Dual Height Electric Water Cooler w/ Bottle Filler

Included

22061 Kitchen Refrigerator

See Below

22063 >Remove Existing Refrigerator & Freezer Condensate Piping From Removed Evaporator Back to Floor Sink. Provide New Condensate Piping from New Evaporator to Floor Drain. Terminate Above Floor Sink with Air Gap.(Ref. P -201A - Keynote P13) Subtotal 22 00 00 Plumbing

Total 22 Plumbing

DATE PRINTED: 10/21/2026

Included

$323,257

$323,257

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 23 Heating, Ventilating and Air Conditioning 23 00 00 Heating, Ventilating and Air Conditioning

$15,000

23001 Replace HVAC Fans

Not Included

23003 Update HVAC Controls

Not Included

23005 Water Heater Renewal (Mechanical Room A28)

See Below

23007 Mechanical Demo

See Below

23009 >Remove Existing Domestic Water Boiler & Return to Owner (Ref. MD-201A - Keynote M1)

Included

23011 >Remove Existing Flue Serving Domestic Water Boiler Up Through Roof. Retain Roof Penetration for New Concentric Vent (Ref. MD201A - Keynote M2)

Included

23013 >Remove Existing 12x8 Combustion Air Intake Duct in its Entirety. (Ref. MD-201A - Keynote M3)

Included

23015 >Retain Existing Combustion Air Intake Duct Penetration for New Concentric Vent Routing Through Roof (Ref. MD-201A - Keynote M4)

Included

23017 >Equipment & Duct/Pipe Demo - Cut, Cap, & Drop. Removal of Materials and Equipment to Dumpster Provide by GC

Included

23019 Mechanical Equipment

See Below

23021 >Provide & Install New Domestic Water Heater (Ref. M-201A - Keynote M5)

Included

23023 >Provide & Install New Combustion Air Intake and Flue to Serve New Domestic Water Heater. Provide New 4" Concentric Vent Through Existing Roof Penetration. Concentric Vent to Connect to 3" Combustion Air Intake & 3" Flue that Serve New Water Heater. (Ref. M-201A Keynote M6)

Included

23025 Test and Balance for Air and Water Systems

Included

23029 Full Roof Replacement

See Below

23029 Insulation, Fire Stopping/Caulking Associated with Mechanical and Plumbing Systems

Included

23031 >Remove & Reinstall Rooftop Mechanical Equipment (Ref. A-121 - Keynotes 2.91, 2.93, 2.99)

Included

23033 >Provide New Curb Caps

Included

23035 >Provide New Curb for Existing Condensing Unit (Ref. A-121 - Keynote 07 7200.01)

Included

23037 >3rd Party Design for Wind Subtotal 23 00 00 Heating, Ventilating and Air Conditioning

Total 23 Heating, Ventilating and Air Conditioning

DATE PRINTED: 10/21/2026

1.00 allow

15,000.00

$15,000 $15,000

$15,000

Allowance

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 26 Electrical 26 00 00 Electrical

$156,487

26000 Electrical Scope of Work

1.00 sub

135,419.30

$135,419

26001 Electrical Load Metering & Monitoring, 30 Day

1.00 ls

2,500.00

$2,500

26002 Built-Up Roofing 26003 >Existing Rooftop Exhaust Fans Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.93) 26005 >Existing Rooftop Condensing Unit Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.94) 26007 Drinking Fountains

See Below 1.00 allow

6,000.00

$6,000

Allowance

Included w/ Above

See Below

26009 >Provide New 20A, 120V Branch Circuit from Nearest Electrical Panel (Ref. E-201C - Keynote E8)

Included

26011 >Furnish & Install GFCI Duplex Receptacle Below Drinking Fountain/Bottle Filler (Ref. E201C - Keynote E8)

Included

26013 >Connect Electric Water Cooler/Bottle Filler Units to Receptacle

Included

26015 Emergency Lighting/Exit Sign Modifications

See Below

26017 >Disconnect & Remove Existing Battery Exit Signs

Included

26019 >Furnish & Install New AC-only Exit Signs at Existing Locations (Ref. E-211A/B/C/D - Keynote L2)

Included

26021 >Extend or Modify Wiring as Required to Connect Exit Signs to Generator-backed Emergency Branch Circuits (Ref. E-211A/B/C/D - Keynote L2)

Included

26023 Water Heater Replacement

See Below

26025 >Maintain Existing Emergency Power Off 'EPO' System & Pushbutton(s) in Place. Disconnect Two (2) Domestic Water Heaters from System. (Ref. ED-201A - Keynote E1)

Included

26027 >Retain Existing 20A, 120V Branch Circuit Serving Hot Water Boiler & Associated Pump Being Removed (Ref. ED-201A - Keynote E6)

Included

26029 >Retain Existing 20A, 120V Branch Circuit Serving Circulation Pump Being Removed (Ref. ED-201A - Keynote E10)

Included

26031 >Route Water Heater Branch Circuits Through Existing Emergency Power Off 'EPO' System (Ref. E-201A - Keynote E2)

Included

26033 >Use Existing 20A, 120V Branch Circuit Which Served Hot Water Boiler for Connections to New Domestic Water Heaters DWH-1/2 (Ref E-201A Keynote E12)

Included

DATE PRINTED: 10/21/2026

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

26035 >Use Existing 20A, 120V Branch Circuit Which Served Circulation Pump for Connections to New Domestic Circulation Pumps DCP-1/2 & DMV-1 (Ref E-201A - Keynote E142)

NOTES / COMMENTS Included

26037 Walk-in Cooler/Freezer Replacement

See Below

26039 >Disconnect Existing Branch Circuit From Walkin Cooler Condensing Unit on Roof & Remove Branch Circuit (ED-201A - Keynote E5)

Included

26041 >Remove Existing Branch Circuit from Walk-in Cooler Evaporator Coil (ED-201A - Keynote E9)

Included

26043 >Remove Existing Branch Circuit from Walk-in Cooler Door & Frame (ED-201A - Keynote E11)

Included

26045 >Remove Existing Receptacle & 120V Branch Circuit Serving Heating Cabinet Being Removed (ED-201A - Keynote E13)

Included

26047 >Reconnect Existing Circuits to New Refrigeration Equipment

Included

26049 >Reconnect Rooftop Condenser/Compressor Power

Included

26051 Fire Alarm Head End

Included

26053 >Disconnect Existing Branch Circuit(s) From Main Fire Alarm Control Panel & Any Associated Booster Panels

Included

26055 >Extend Existing 120V Circuit to New Fire Alarm Control Panel Location & Connect. (Ref. E-201A - Keynote E16)

Included

26057 >>Supply & Install Wall Junction Box

Included

26059 Paging System Replacement

See Below

26061 >Rough-in Backboxes & Conduit 26063 New 20A, 120 V Branch Circuits to Door Header of Openings for New ADA Openings

Included 2.00 ea

2,477.15

$4,954

26065 >Supply & Install 120V Power Connection for Motorized Door Operator with STO for Local Disconnect. Install Raceway & Junction Boxes for Controls. Install Controls. Interface with Security System as Required for Release. (Ref. E-201D - Keynote E3) 26067 New 20A Dedicated Quad Receptacle at New Reception Desk

Included

1.00 ea

4,047.90

$4,048

26069 >Furnish & Install New 120V 20A Circuit & Quadplex Receptacle Flush Mounted in Kneespace. New Raceway Shall be Concealed. (Ref. E-201A - Keynote E4) 26071 Receptacles at New Kitchenette

Included

1.00 ls

3,565.86

$3,566

26073 >Furnish & Install New 120V 20 Circuit & Receptacle for the New Under Counter Refrigerator

Included

26075 >Furnish & Install New Wall Duplex Receptacles (Ref. E-201A)

Included

DATE PRINTED: 10/21/2026

DESCRIPTION Subtotal 26 00 00 Electrical

Total 26 Electrical

DATE PRINTED: 10/21/2026

QTY UOM UNIT PRICE

TOTAL COST $156,487

$156,487

NOTES / COMMENTS

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 27 Communications 27 51 00 Distributed AV systems 27511 Paging System Replacement

$225,694 1.00 ls

225,694.00

$225,694

27513 >Remove Existing Paging System Equipment & Wiring

Included

27515 >Furnish & Install Valcom IP6000 Head End Equipment

Included

27517 >Provide New Paging System Cabling

Included

27519 >Furnish & Install Paging Speakers

Included

27521 >Furnish & Install Classroom Call Switches

Included

Subtotal 27 51 00 Distributed AV systems

Total 27 Communications

DATE PRINTED: 10/21/2026

$225,694

$225,694

DESCRIPTION

QTY UOM UNIT PRICE

TOTAL COST

NOTES / COMMENTS

DETAILED COST: 28 Electronic Safety and Security 28 30 00 Electronic Detection and Alarm 28301 Fire Alarm Head End: Full Fire Alarm System Replacement with Voice Evacuation

$405,754 1.00 ls

405,754.26

$405,754

28303 >Remove Existing Fire Alarm System (Panels, Devices, Wiring, Conduit)

Included

28305 >Furnish & Install New Fully Addressable Mircom FACP

Included

28307 >Furnish & Install New Voice Evacuation Panel & Amplifier

Included

28309 >Furnish & Install New Smoke Detectors, Pull Stations, & Monitor Modules

Included

28311 >Furnish & Install Horn/Strobes or Speaker/Strobes Throughout Building

Included

28313 >Provide A New Fire Alarm Control Panel, Graphic Map, Dialer, & Record Document Box (Ref. FA-201A - Keynote FA1)

Included

28315 >Provide New Remote Annunciator & Graphic Map (Ref. FA-201A - Keynote FA2)

Included

28317 >Interface Fire Alarm System with Kitchen Hood Suppression System (Ref. FA-201A - Keynote FA3)

Included

28319 >Provide Fire Alarm Interface with Fire Sprinkler System (Ref. FA-201B - Keynote FA4)

Included

28321 >Provide Weatherproof Horn/Strobe Above FDC (Ref. FA-201B - Keynote FA5)

Included

28323 >Provide New Duct Smoke Detection, Control Relay & Remote Test Switch (Ref. FA-201A/B/D - Keynote FA6)

Included

28325 >Provide Fire Alarm Interface with Existing Magnetic Door Holders (Ref. FA-201C - Keynote FA7)

Included

28327 >Provide Fire Alarm Interface with Sound System to Shut Down Sound System on Activation of Fire Alarm (Ref. FA-201C - Keynote FA8)

Included

28329 >Provide a Fixed, High Temperature Heat Detector Above the Kiln (Ref. FA-201D Keynote FA9)

Included

28331 >Provide & Install New Carbon Monoxide Detector (Ref. FA-201A/B/D - Keynote FA10)

Included

28333 >Provide Fire Alarm System Interface for Damper Control. Provide Additional Smoke Detectors (Area or Duct) for Fire/Smoke Dampers as Requited. (Ref. FA-201B - Keynote FA11)

Included

Subtotal 28 30 00 Electronic Detection and Alarm

DATE PRINTED: 10/21/2026

$405,754

DESCRIPTION

Total 28 Electronic Safety and Security

DATE PRINTED: 10/21/2026

QTY UOM UNIT PRICE

TOTAL COST

$405,754

NOTES / COMMENTS

Line

Name

Duration

Start

Finish

A 4

BVSD Foothills ES Milestones School Milestones

544d

8/1/2025

9/24/2027

521d

8/1/2025

8/24/2027

521d

8/1/2025

8/24/2027

8/1/2025 A

8/13/2025 A

1

Summer Break - 2025 (School Back In Session)

9d

2

Thankgiving Break - 2025

3d 11/24/2025 A 11/26/2025 A

3

Winter Break - 2025

8d 12/23/2025 A

1/6/2026 A

4

Spring Break - 2026

5d 3/16/2026 A

3/20/2026 A

5

Summer Break - 2026

34d 5/21/2026 A

8/13/2026 A

6

Thankgiving Break - 2026

3d

11/24/2026

11/30/2026

7

Winter Break - 2026

10d

12/22/2026

1/7/2027

8

Spring Break - 2027

5d

3/23/2027

3/29/2027

9

Summer Break - 2027 - START

6/3/2027

6/3/2027

10

Summer Break - 2027 - FINISH

8/24/2027

8/24/2027

8/1/2025

11/5/2026

321d

8/1/2025

11/5/2026

150d

8/1/2025 A

11/5/2026

Project Milestones Preconstruction Milestones 11

DAT Meetings - Finals

12

Notice to Proceed

13

DAT Meetings

14

Post-Award Meetings Construction Milestones

321d

2025 S O N D J F 25 15 6 27 17 8 29 19 9

Thankgiving Break - 2025

Winter Break - 2025

Spring Break - 2026

Summer Break - 2026

Thankgiving Break - 2026

Winter Break - 2026

Spring Break - 2027

Summer Break - 2027 - START

Summer Break - 2027 - FINISH

DAT Meetings - Finals

Notice to Proceed

10/26/2026 A

DAT Meetings

12/15/2025 A 12/15/2025 A 447d

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

Summer Break - 2025 (School Back In Session)

10/15/2025 A 10/15/2025 A 123d 12/1/2025 A

M 2

11/4/2025

8/11/2027

136d 11/4/2025 A

10/26/2026 A

Post-Award Meetings

15

Early Investigations

16

Mobilization Start

3/9/2027

3/9/2027

17

Abatement Start

5/21/2027

5/21/2027

18

Abatement Finish

5/27/2027

5/27/2027

Abatement Finish

19

Demo Start

6/7/2027

6/7/2027

Demo Start

20

Rough-in Start

6/16/2027

6/16/2027

Rough-in Start

21

Demo Finish

6/18/2027

6/18/2027

Demo Finish

22

Rough-in Finish

7/21/2027

7/21/2027

23

Substantial Completion

7/30/2027

7/30/2027

Substantial Completion

24

TCO

7/30/2027

7/30/2027

TCO

25

Owner Move-in Complete

8/11/2027

8/11/2027

8/28/2025

3/30/2027

Preconstruction & Design

400d

RFP / RFQ Information

33d

8/28/2025

10/15/2025

26

RFP/RFQ - Issuance of RFP

8/28/2025 A

8/28/2025 A

27

RFP/RFQ - Pre-Proposal Submission

9/8/2025 A

9/8/2025 A

Early Investigations

Mobilization Start

Abatement Start

Rough-in Finish

Owner Move-in Complete

RFP/RFQ - Issuance of RFP

RFP/RFQ - Pre-Proposal Submission

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 1 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

28

RFP/RFQ - Inquiries Due

9/12/2025 A

9/12/2025 A

RFP/RFQ - Inquiries Due

29

RFP/RFQ - Addendum's

9/18/2025 A

9/18/2025 A

RFP/RFQ - Addendum's

30

RFP/RFQ - Submission Deadline

9/25/2025 A

9/25/2025 A

RFP/RFQ - Submission Deadline

31

RFP/RFQ - Evaluation / Award

10/7/2025 A

10/7/2025 A

RFP/RFQ - Evaluation / Award

32

Notice of Award

10/15/2025 A 10/15/2025 A

Document Development

34 35

Notice of Award

258d 10/21/2025 10/27/2026

Programming / DAT 33

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

Program - Electrical Upgrades (Design & Precon / Estimating Services/Deliverables) Program - Mechanical Upgrades (Design & Precon / Estimating Services/Deliverables) Program - Roofing Upgrades (Design & Precon / Estimating Services/Deliverables) Schematic Design

78d 10/21/2025

2/12/2026

78d 10/21/2025 A

2/12/2026 A

Program - Electrical Upgrades (Design & Precon / Estimating Services/Deliverables)

78d 10/21/2025 A

2/12/2026 A

Program - Mechanical Upgrades (Design & Precon / Estimating Services/Deliverables)

78d 10/21/2025 A

2/12/2026 A

Program - Roofing Upgrades (Design & Precon / Estimating Services/Deliverables)

61d

2/20/2026

5/15/2026

36

SD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)

1d 2/20/2026 A

2/20/2026 A

37

SD - Cost Estimating & Constructability Review

16d 2/20/2026 A

3/13/2026 A

38

SD - Estimate Review

8d 3/16/2026 A

3/25/2026 A

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - BUR (Built-Up Roofing) with Gravel - 1989 Renewal

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - The Old HVAC Fans Are Noisy and Need to be Addressed" - REBUILD OPTION

39 40

SD - Alternates - BUR (Built-Up Roofing) with Gravel 1989 Renewal SD - Alternates - The Old HVAC Fans Are Noisy and Need to be Addressed" - REBUILD OPTION

SD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)

SD - Cost Estimating & Constructability Review

SD - Estimate Review

41

SD - Alternates - Fire Alarm System - Option 2 & 3

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - Fire Alarm System - Option 2 & 3

42

SD - Alternates - Alternate 1 - ADA Door Operators

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - Alternate 1 - ADA Door Operators

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - Priority 1 Exterior Door into Corridor D27 (Adjacent Teachers Lounge)

37d 3/26/2026 A

5/15/2026 A

SD - Alternates - Priority 2 Exterior Door into Corridor D62 (Adjacent Gym)

43 44

SD - Alternates - Priority 1 Exterior Door into Corridor D27 (Adjacent Teachers Lounge) SD - Alternates - Priority 2 Exterior Door into Corridor D62 (Adjacent Gym)

45

SD - Alternate 2 - Main Office Reception Desk

37d 3/26/2026 A

5/15/2026 A

SD - Alternate 2 - Main Office Reception Desk

46

SD - Alternate 3 - Main Office Kitchenette

37d 3/26/2026 A

5/15/2026 A

SD - Alternate 3 - Main Office Kitchenette

5/15/2026 A

SD - Alternate 5 - Low Exit Signs

47

37d 3/26/2026 A

SD - Alternate 5 - Low Exit Signs Design Development

122d

2/20/2026

8/12/2026

48

DD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)

61d 2/20/2026 A

5/15/2026 A

49

DD - Cost Estimating & Constructability Review

10d 5/15/2026 A

5/29/2026 A

50

DD - Estimate Review

14d 5/18/2026 A

6/17/2026 A

51

Establish IGMP

6/17/2026 A

6/17/2026 A

52

DD - Alternates 10 - Fire Alarm System - Option 2 & 3

32d 6/17/2026 A

8/12/2026 A

DD - Alternates 10 - Fire Alarm System - Option 2 & 3

53

DD - Alternate 1 - ADA Door Operators

36d 6/17/2026 A

8/6/2026 A

DD - Alternate 1 - ADA Door Operators

54

DD - Alternate 1 - Hardware Group - Option 1

36d 6/17/2026 A

8/6/2026 A

DD - Alternate 1 - Hardware Group - Option 1

55

DD - Alternate 1 - Hardware Group - Option 2

36d 6/17/2026 A

8/6/2026 A

DD - Alternate 1 - Hardware Group - Option 2

56

DD - Alternate 2 - Main Office Reception Desk

36d 6/17/2026 A

8/6/2026 A

DD - Alternate 2 - Main Office Reception Desk

57

DD - Alternate 3 - Main Office Kitchenette

36d 6/17/2026 A

8/6/2026 A

DD - Alternate 3 - Main Office Kitchenette

58

DD - Alternate - Low Exit Signs

36d 6/17/2026 A

8/6/2026 A

DD - Alternate - Low Exit Signs

BVSD Foothills ES Proposal Schedule Boulder Valley School District

DD - Drawings 100% (Design & Precon / Estimating Services/Deliverables)

DD - Cost Estimating & Constructability Review

DD - Estimate Review

Establish IGMP

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 2 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

59

DD - Alternate 4 - Music Room Storage Construction Documents

36d 6/17/2026 A

8/6/2026 A

42d

10/27/2026

8/28/2026

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4 DD - Alternate 4 - Music Room Storage

60

CD - Drawings 100% (Design & Precon / Estimating Services/Deliverables/GMP)

1d 8/28/2026 A

8/28/2026 A

61

CD - Alternate 1 - ADA Door Operators

41d 8/28/2026 A

10/26/2026 A

CD - Alternate 1 - ADA Door Operators

62

CD - Alternate 2 - Main Office Reception Desk

41d 8/28/2026 A

10/26/2026 A

CD - Alternate 2 - Main Office Reception Desk

63

CD - Alternate 3 - Main Office Kitchenette

41d 8/28/2026 A

10/26/2026 A

64

CD - Cost Estimating & Constructability Review

10d 8/31/2026 A

9/14/2026 A

65

CD - Estimate Review

10d 9/15/2026 A

9/28/2026 A

CD - Estimate Review

66

Establish FGMP

9/28/2026 A

9/28/2026 A

Establish FGMP

67

BVSD Board Meeting

1d

10/27/2026

10/27/2026

121d

8/28/2026

2/22/2027

Permitting

CD - Drawings 100% (Design & Precon / Estimating Services/Deliverables/GMP)

CD - Alternate 3 - Main Office Kitchenette

CD - Cost Estimating & Constructability Review

BVSD Board Meeting

68

Permit - Submit to State

61d 8/28/2026 A

11/24/2026

69

Permit - Electrical Submit to Dora

60d

10/27/2026

1/25/2027

Permit - Electrical Submit to Dora

70

Permit - Plumbing Submit to Dora

60d

10/27/2026

1/25/2027

Permit - Plumbing Submit to Dora

71

Permit - Building (In Hand)

40d

11/25/2026

1/26/2027

Permit - Building (In Hand)

72

Permit - Electrical (In Hand)

20d

1/26/2027

2/22/2027

Permit - Electrical (In Hand)

73

Permit - Plumbing (In Hand)

20d

1/26/2027

2/22/2027

Permit - Plumbing (In Hand)

Contracting & Award

15d 10/28/2026 11/17/2026

Award Early Trades

10d 10/28/2026 11/10/2026

Permit - Submit to State

74

AW - Div 22 - Plumbing

10d

10/28/2026

11/10/2026

AW - Div 22 - Plumbing

75

AW - Div 23 - HVAC

10d

10/28/2026

11/10/2026

AW - Div 23 - HVAC

76

AW - Div 26 - Electrical

10d

10/28/2026

11/10/2026

AW - Div 26 - Electrical

10d

10/28/2026

11/10/2026

AW - Div 28 - Fire Alarm

77

AW - Div 28 - Fire Alarm Award Trades

15d 10/28/2026 11/17/2026

78

AW - Div 03 - Concrete

15d

10/28/2026

11/17/2026

AW - Div 03 - Concrete

79

AW - Div 04 - Masonry

15d

10/28/2026

11/17/2026

AW - Div 04 - Masonry

80

AW - Div 05 - Metals

15d

10/28/2026

11/17/2026

AW - Div 05 - Metals

81

AW - Div 06 - Wood & Plastics

15d

10/28/2026

11/17/2026

AW - Div 06 - Wood & Plastics

82

AW - Div 07 - Thermal Insulation

15d

10/28/2026

11/17/2026

AW - Div 07 - Thermal Insulation

83

AW - Div 08 - Openings

15d

10/28/2026

11/17/2026

AW - Div 08 - Openings

84

AW - Div 09 - Finshes

15d

10/28/2026

11/17/2026

AW - Div 09 - Finshes

85

AW - Div 10 - Specialties

15d

10/28/2026

11/17/2026

AW - Div 10 - Specialties

86

AW - Div 11 - Equipment

15d

10/28/2026

11/17/2026

AW - Div 11 - Equipment

87

AW - Div 12 - Furnishing

15d

10/28/2026

11/17/2026

AW - Div 12 - Furnishing

95d 11/11/2026

3/30/2027

Submittals & Procurement

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 3 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

Division 03

50d 11/18/2026

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

2/2/2027

88

S&P - Underslab Vapor Barrier - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

89

S&P - Underslab Vapor Barrier - AP Review

10d

12/4/2026

12/17/2026

90

S&P - Underslab Vapor Barrier - Owner Review

10d

12/18/2026

1/5/2027

91

S&P - Underslab Vapor Barrier - Fabricate/Deliver

20d

1/6/2027

2/2/2027

Division 04

2025 S O N D J F 25 15 6 27 17 8 29 19 9

90d 11/18/2026

3/30/2027

S&P - Underslab Vapor Barrier - Contractor Prepare/Submit

S&P - Underslab Vapor Barrier - AP Review

S&P - Underslab Vapor Barrier - Owner Review

S&P - Underslab Vapor Barrier - Fabricate/Deliver

92

S&P - Masonry Mortaring & Grout - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Masonry Mortaring & Grout - Contractor Prepare/Submit

93

S&P - Unit Masonry - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Unit Masonry - Contractor Prepare/Submit

94

S&P - Masonry Mortaring & Grout - AP Review

10d

12/4/2026

12/17/2026

S&P - Masonry Mortaring & Grout - AP Review

95

S&P - Unit Masonry - AP Review

10d

12/4/2026

12/17/2026

S&P - Unit Masonry - AP Review

96

S&P - Masonry Mortaring & Grout - Owner Review

10d

12/18/2026

1/5/2027

S&P - Masonry Mortaring & Grout - Owner Review

97

S&P - Unit Masonry - Owner Review

10d

12/18/2026

1/5/2027

S&P - Unit Masonry - Owner Review

98

S&P - Masonry Mortaring & Grout - Fabricate/Deliver

30d

1/6/2027

2/16/2027

99

S&P - Unit Masonry - Fabricate/Deliver

60d

1/6/2027

3/30/2027

Division 05 100 101 102 103

80d 11/18/2026

S&P - Metals (Div 05 - Contractor Prepare/Submit Shop Drawings) S&P - AP Review (Div 05 - AP Review/Submit Shop Drawings) S&P - A&E Review (Div 05 - Owner Review/Approve Shop Drawings) S&P - Metals Procurement (Div 07 - Fabricate/Deliver) Division 06

10d

11/18/2026

12/3/2026

S&P - Metals (Div 05 - Contractor Prepare/Submit Shop Drawings)

10d

12/4/2026

12/17/2026

S&P - AP Review (Div 05 - AP Review/Submit Shop Drawings)

10d

12/18/2026

1/5/2027

50d

1/6/2027

3/16/2027 2/16/2027

10d

11/18/2026

12/3/2026

S&P - Rough Carpentry - AP Review

10d

12/4/2026

12/17/2026

106

S&P - Rough Carpentry - Owner Review

10d

12/18/2026

1/5/2027

107

S&P - Rough Carpentry - Fabricate/Deliver

30d

1/6/2027

2/16/2027

S&P - Rough Carpentry - Contractor Prepare/Submit

105

Division 07

S&P - Unit Masonry - Fabricate/Deliver

3/16/2027

60d 11/18/2026

104

S&P - Masonry Mortaring & Grout - Fabricate/Deliver

80d 11/18/2026

3/16/2027

S&P - A&E Review (Div 05 - Owner Review/Approve Shop Drawings)

S&P - Metals Procurement (Div 07 - Fabricate/Deliver)

S&P - Rough Carpentry - Contractor Prepare/Submit

S&P - Rough Carpentry - AP Review

S&P - Rough Carpentry - Owner Review

S&P - Rough Carpentry - Fabricate/Deliver

108

S&P - Prep For Re-Roofing - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Prep For Re-Roofing - Subcontractor Submit

109

S&P - Fire And Smoke Assembly ID - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Fire And Smoke Assembly ID - Subcontractor Submit

110

S&P - EPDM Roofing - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - EPDM Roofing - Subcontractor Submit

111

S&P - Roofing Accessories - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Roofing Accessories - Subcontractor Submit

112

S&P - Sheet-Metal Flashing And Trim - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Sheet-Metal Flashing And Trim - Subcontractor Submit

113

S&P - Joint Sealants - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Joint Sealants - Subcontractor Submit

114

S&P - Prep For Re-Roofing - - AP Review

10d

12/4/2026

12/17/2026

S&P - Prep For Re-Roofing - - AP Review

115

S&P - Fire And Smoke Assembly ID - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Fire And Smoke Assembly ID - AP Review/Submit

116

S&P - EPDM Roofing - - AP Review

10d

12/4/2026

12/17/2026

S&P - EPDM Roofing - - AP Review

117

S&P - Roofing Accessories - - AP Review

10d

12/4/2026

12/17/2026

S&P - Roofing Accessories - - AP Review

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 4 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

118

S&P - Sheet-Metal Flashing And Trim - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Sheet-Metal Flashing And Trim - AP Review/Submit

119

S&P - Joint Sealants - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Joint Sealants - AP Review/Submit

120

S&P - Prep For Re-Roofing - A&E Review

10d

12/18/2026

1/5/2027

S&P - Prep For Re-Roofing - A&E Review

121

S&P - Fire And Smoke Assembly ID - A&E Review

10d

12/18/2026

1/5/2027

S&P - Fire And Smoke Assembly ID - A&E Review

122

S&P - EPDM Roofing - A&E Review

10d

12/18/2026

1/5/2027

S&P - EPDM Roofing - A&E Review

123

S&P - Roofing Accessories - A&E Review

10d

12/18/2026

1/5/2027

S&P - Roofing Accessories - A&E Review

124

S&P - Sheet-Metal Flashing And Trim - A&E Review

10d

12/18/2026

1/5/2027

S&P - Sheet-Metal Flashing And Trim - A&E Review

125

S&P - Joint Sealants - A&E Review

10d

12/18/2026

1/5/2027

S&P - Joint Sealants - A&E Review

50d

1/6/2027

3/16/2027

25d

1/6/2027

2/9/2027

50d

1/6/2027

3/16/2027

50d

1/6/2027

3/16/2027

S&P - Roofing Accessories - Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Sheet-Metal Flashing And Trim Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Joint Sealants Procurement/Fabricate/Deliver

126 127 128 129 130 131

S&P - Prep For Re-Roofing Procurement/Fabricate/Deliver S&P - Fire And Smoke Assembly ID Procurement/Fabricate/Deliver S&P - EPDM Roofing - Procurement/Fabricate/Deliver S&P - Roofing Accessories Procurement/Fabricate/Deliver S&P - Sheet-Metal Flashing And Trim Procurement/Fabricate/Deliver S&P - Joint Sealants Procurement/Fabricate/Deliver Division 08

132 133 134 135

70d 11/18/2026

S&P - ALTERNATE - Openings (Div 08 - Contractor Prepare/Submit Shop Drawings) S&P - AP Review (Div 08 - AP Review/Submit Shop Drawings) S&P - A&E Review (Div 08 - Owner Review/Approve Shop Drawings) S&P - ALTERNATE - Openings Procurement (Div 07 Fabricate/Deliver) Division 09

S&P - Prep For Re-Roofing - Procurement/Fabricate/Deliver

S&P - Fire And Smoke Assembly ID Procurement/Fabricate/Deliver

S&P - EPDM Roofing - Procurement/Fabricate/Deliver

3/2/2027

10d

11/18/2026

12/3/2026

10d

12/4/2026

12/17/2026

10d

12/18/2026

1/5/2027

40d

1/6/2027

3/2/2027

S&P - ALTERNATE - Openings (Div 08 - Contractor Prepare/Submit Shop Drawings)

S&P - AP Review (Div 08 - AP Review/Submit Shop Drawings)

S&P - A&E Review (Div 08 - Owner Review/Approve Shop Drawings)

S&P - ALTERNATE - Openings Procurement (Div 07 - Fabricate/Deliver)

55d 11/18/2026

2/9/2027

10d

11/18/2026

12/3/2026

S&P - Common Work Results for Flooring Prep - Subcontractor Submit

S&P - Gyp Board Assemblies - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Gyp Board Assemblies - Subcontractor Submit

138

S&P - Acoustical Ceilings - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Acoustical Ceilings - Subcontractor Submit

139

S&P - Resilient Flooring & Base - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Resilient Flooring & Base - Subcontractor Submit

140

S&P - Tile Carpeting - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Tile Carpeting - Subcontractor Submit

141

S&P - Interior Painting - Subcontractor Submit

10d

11/18/2026

12/3/2026

S&P - Interior Painting - Subcontractor Submit

142

S&P - Common Work Results for Flooring Prep - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Common Work Results for Flooring Prep - AP Review/Submit

143

S&P - Gyp Board Assemblies - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Gyp Board Assemblies - AP Review/Submit

144

S&P - Acoustical Ceilings - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Acoustical Ceilings - AP Review/Submit

145

S&P - Resilient Flooring & Base - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Resilient Flooring & Base - AP Review/Submit

146

S&P - Tile Carpeting - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Tile Carpeting - AP Review/Submit

147

S&P - Interior Painting - AP Review/Submit

10d

12/4/2026

12/17/2026

S&P - Interior Painting - AP Review/Submit

148

S&P - Common Work Results for Flooring Prep - A&E Review

10d

12/18/2026

1/5/2027

S&P - Common Work Results for Flooring Prep - A&E Review

149

S&P - Gyp Board Assemblies - A&E Review

10d

12/18/2026

1/5/2027

S&P - Gyp Board Assemblies - A&E Review

150

S&P - Acoustical Ceilings - A&E Review

10d

12/18/2026

1/5/2027

S&P - Acoustical Ceilings - A&E Review

136

S&P - Common Work Results for Flooring Prep Subcontractor Submit

137

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 5 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

151

S&P - Resilient Flooring & Base - A&E Review

10d

12/18/2026

1/5/2027

S&P - Resilient Flooring & Base - A&E Review

152

S&P - Tile Carpeting - A&E Review

10d

12/18/2026

1/5/2027

S&P - Tile Carpeting - A&E Review

153

S&P - Interior Painting - A&E Review

10d

12/18/2026

1/5/2027

S&P - Interior Painting - A&E Review

25d

1/6/2027

2/9/2027

S&P - Common Work Results for Flooring Prep Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Gyp Board Assemblies Procurement/Fabricate/Deliver

154 155

S&P - Common Work Results for Flooring Prep Procurement/Fabricate/Deliver S&P - Gyp Board Assemblies Procurement/Fabricate/Deliver

156

S&P - Acoustical Ceilings Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Acoustical Ceilings Procurement/Fabricate/Deliver

157

S&P - Resilient Flooring & Base Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Resilient Flooring & Base Procurement/Fabricate/Deliver

158

S&P - Tile Carpeting Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Tile Carpeting Procurement/Fabricate/Deliver

159

S&P - Interior Painting Procurement/Fabricate/Deliver

25d

1/6/2027

2/9/2027

S&P - Interior Painting Procurement/Fabricate/Deliver

Division 10

60d 11/18/2026

2/16/2027

160

S&P - Wall & Door Protection - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

161

S&P - Wall & Door Protection - AP Review

10d

12/4/2026

12/17/2026

162

S&P - Wall & Door Protection - Owner Review

10d

12/18/2026

1/5/2027

163

S&P - Wall & Door Protection - Fabricate/Deliver

30d

1/6/2027

2/16/2027

Division 11

60d 11/18/2026

2/16/2027

S&P - Wall & Door Protection - Contractor Prepare/Submit

S&P - Wall & Door Protection - AP Review

S&P - Wall & Door Protection - Owner Review

S&P - Wall & Door Protection - Fabricate/Deliver

164

S&P - Food Service Equipment - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Food Service Equipment - Contractor Prepare/Submit

165

S&P - Facility Fall Protection - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Facility Fall Protection - Contractor Prepare/Submit

166

S&P - Food Service Equipment - AP Review

10d

12/4/2026

12/17/2026

S&P - Food Service Equipment - AP Review

167

S&P - Facility Fall Protection - AP Review

10d

12/4/2026

12/17/2026

S&P - Facility Fall Protection - AP Review

168

S&P - Food Service Equipment - Owner Review

10d

12/18/2026

1/5/2027

S&P - Food Service Equipment - Owner Review

169

S&P - Facility Fall Protection - Owner Review

10d

12/18/2026

1/5/2027

S&P - Facility Fall Protection - Owner Review

170

S&P - Food Service Equipment - Fabricate/Deliver

30d

1/6/2027

2/16/2027

S&P - Food Service Equipment - Fabricate/Deliver

30d

1/6/2027

2/16/2027

S&P - Facility Fall Protection - Fabricate/Deliver

171

S&P - Facility Fall Protection - Fabricate/Deliver Division 12

60d 11/18/2026

2/16/2027

172

S&P - Manufactured Wood Casework - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Manufactured Wood Casework - Contractor Prepare/Submit

173

S&P - Countertops - Contractor Prepare/Submit

10d

11/18/2026

12/3/2026

S&P - Countertops - Contractor Prepare/Submit

174

S&P - Manufactured Wood Casework - AP Review

10d

12/4/2026

12/17/2026

S&P - Manufactured Wood Casework - AP Review

175

S&P - Countertops - AP Review

10d

12/4/2026

12/17/2026

S&P - Countertops - AP Review

176

S&P - Manufactured Wood Casework - Owner Review

10d

12/18/2026

1/5/2027

S&P - Manufactured Wood Casework - Owner Review

177

S&P - Countertops - Owner Review

10d

12/18/2026

1/5/2027

S&P - Countertops - Owner Review

178

S&P - Manufactured Wood Casework - Fabricate/Deliver

30d

1/6/2027

2/16/2027

S&P - Manufactured Wood Casework - Fabricate/Deliver

179

S&P - Countertops - Fabricate/Deliver

30d

1/6/2027

2/16/2027

S&P - Countertops - Fabricate/Deliver

Division 22 180 181

S&P - Basic Plumbing Requirements - Contractor Prepare/Submit S&P - Common Work For Plumbing - Contractor Prepare/Submit

70d 11/11/2026

2/23/2027

10d

11/11/2026

11/24/2026

S&P - Basic Plumbing Requirements - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Common Work For Plumbing - Contractor Prepare/Submit

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 6 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

182 183 184

S&P - Meters & Gauges Plumbing Piping - Contractor Prepare/Submit S&P - General Duty Valves Plumbing Piping - Contractor Prepare/Submit S&P - Hanger & Supports For Plumbing - Contractor Prepare/Submit

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

10d

11/11/2026

11/24/2026

S&P - Meters & Gauges Plumbing Piping - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - General Duty Valves Plumbing Piping - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Hanger & Supports For Plumbing - Contractor Prepare/Submit

185

S&P - ID For Plumbing - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - ID For Plumbing - Contractor Prepare/Submit

186

S&P - Plumbing Insulation - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Plumbing Insulation - Contractor Prepare/Submit

187

S&P - Domestic Water Piping - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Domestic Water Piping - Contractor Prepare/Submit

188

S&P - Domestic Water Piping Specialties - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Domestic Water Piping Specialties - Contractor Prepare/Submit

189

S&P - Water Heaters - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Water Heaters - Contractor Prepare/Submit

190

S&P - Plumbing Fixtures - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Plumbing Fixtures - Contractor Prepare/Submit

191

S&P - Basic Plumbing Requirements - AP Review

10d

11/25/2026

12/10/2026

S&P - Basic Plumbing Requirements - AP Review

192

S&P - Common Work For Plumbing - AP Review

10d

11/25/2026

12/10/2026

S&P - Common Work For Plumbing - AP Review

193

S&P - Meters & Gauges Plumbing Piping - AP Review

10d

11/25/2026

12/10/2026

S&P - Meters & Gauges Plumbing Piping - AP Review

194

S&P - General Duty Valves Plumbing Piping - AP Review

10d

11/25/2026

12/10/2026

S&P - General Duty Valves Plumbing Piping - AP Review

195

S&P - Hanger & Supports For Plumbing - AP Review

10d

11/25/2026

12/10/2026

S&P - Hanger & Supports For Plumbing - AP Review

196

S&P - ID For Plumbing - AP Review

10d

11/25/2026

12/10/2026

S&P - ID For Plumbing - AP Review

197

S&P - Plumbing Insulation - AP Review

10d

11/25/2026

12/10/2026

S&P - Plumbing Insulation - AP Review

198

S&P - Domestic Water Piping - AP Review

10d

11/25/2026

12/10/2026

S&P - Domestic Water Piping - AP Review

199

S&P - Domestic Water Piping Specialties - AP Review

10d

11/25/2026

12/10/2026

S&P - Domestic Water Piping Specialties - AP Review

200

S&P - Water Heaters - AP Review

10d

11/25/2026

12/10/2026

S&P - Water Heaters - AP Review

201

S&P - Plumbing Fixtures - AP Review

10d

11/25/2026

12/10/2026

S&P - Plumbing Fixtures - AP Review

202

S&P - Basic Plumbing Requirements - Owner Review

10d

12/11/2026

12/28/2026

S&P - Basic Plumbing Requirements - Owner Review

203

S&P - Common Work For Plumbing - Owner Review

10d

12/11/2026

12/28/2026

S&P - Common Work For Plumbing - Owner Review

204

S&P - Meters & Gauges Plumbing Piping - Owner Review

10d

12/11/2026

12/28/2026

S&P - Meters & Gauges Plumbing Piping - Owner Review

205

S&P - General Duty Valves Plumbing Piping - Owner Review

10d

12/11/2026

12/28/2026

S&P - General Duty Valves Plumbing Piping - Owner Review

206

S&P - Hanger & Supports For Plumbing - Owner Review

10d

12/11/2026

12/28/2026

S&P - Hanger & Supports For Plumbing - Owner Review

207

S&P - ID For Plumbing - Owner Review

10d

12/11/2026

12/28/2026

S&P - ID For Plumbing - Owner Review

208

S&P - Plumbing Insulation - Owner Review

10d

12/11/2026

12/28/2026

S&P - Plumbing Insulation - Owner Review

209

S&P - Domestic Water Piping - Owner Review

10d

12/11/2026

12/28/2026

S&P - Domestic Water Piping - Owner Review

210

S&P - Domestic Water Piping Specialties - Owner Review

10d

12/11/2026

12/28/2026

S&P - Domestic Water Piping Specialties - Owner Review

211

S&P - Water Heaters - Owner Review

10d

12/11/2026

12/28/2026

S&P - Water Heaters - Owner Review

212

S&P - Plumbing Fixtures - Owner Review

10d

12/11/2026

12/28/2026

S&P - Plumbing Fixtures - Owner Review

213

S&P - Basic Plumbing Requirements - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Basic Plumbing Requirements - Fabricate/Deliver

214

S&P - Common Work For Plumbing - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Common Work For Plumbing - Fabricate/Deliver

40d

12/29/2026

2/23/2027

S&P - Meters & Gauges Plumbing Piping - Fabricate/Deliver

40d

12/29/2026

2/23/2027

S&P - General Duty Valves Plumbing Piping - Fabricate/Deliver

215 216

S&P - Meters & Gauges Plumbing Piping Fabricate/Deliver S&P - General Duty Valves Plumbing Piping Fabricate/Deliver

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 7 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

217

S&P - Hanger & Supports For Plumbing Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Hanger & Supports For Plumbing - Fabricate/Deliver

218

S&P - ID For Plumbing - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - ID For Plumbing - Fabricate/Deliver

219

S&P - Plumbing Insulation - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Plumbing Insulation - Fabricate/Deliver

220

S&P - Domestic Water Piping - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Domestic Water Piping - Fabricate/Deliver

221

S&P - Domestic Water Piping Specialties Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Domestic Water Piping Specialties - Fabricate/Deliver

222

S&P - Water Heaters - Fabricate/Deliver

40d

12/29/2026

2/23/2027

S&P - Water Heaters - Fabricate/Deliver

223

S&P - Plumbing Fixtures - Fabricate/Deliver

40d

12/29/2026

2/23/2027

S&P - Plumbing Fixtures - Fabricate/Deliver

60d 11/11/2026

2/9/2027

Division 23 224

S&P - Basic Mechanical Requirements - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Basic Mechanical Requirements - Contractor Prepare/Submit

225

S&P - Common Work HVAC - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Common Work HVAC - Contractor Prepare/Submit

226

S&P - Supports & Anchors - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Supports & Anchors - Contractor Prepare/Submit

227

S&P - Mechanical ID - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Mechanical ID - Contractor Prepare/Submit

228

S&P - Mechanical Insulation - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Mechanical Insulation - Contractor Prepare/Submit

229

S&P - Mechanical Cx - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Mechanical Cx - Contractor Prepare/Submit

230

S&P - Natural Gas Systems - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Natural Gas Systems - Contractor Prepare/Submit

231

S&P - Hydronic Piping - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Hydronic Piping - Contractor Prepare/Submit

232

S&P - Refrigerant Piping - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Refrigerant Piping - Contractor Prepare/Submit

233

S&P - Basic Mechanical Requirements - AP Review

10d

11/25/2026

12/10/2026

S&P - Basic Mechanical Requirements - AP Review

234

S&P - Common Work HVAC - AP Review

10d

11/25/2026

12/10/2026

S&P - Common Work HVAC - AP Review

235

S&P - Supports & Anchors - AP Review

10d

11/25/2026

12/10/2026

S&P - Supports & Anchors - AP Review

236

S&P - Mechanical ID - AP Review

10d

11/25/2026

12/10/2026

S&P - Mechanical ID - AP Review

237

S&P - Mechanical Insulation - AP Review

10d

11/25/2026

12/10/2026

S&P - Mechanical Insulation - AP Review

238

S&P - Mechanical Cx - AP Review

10d

11/25/2026

12/10/2026

S&P - Mechanical Cx - AP Review

239

S&P - Natural Gas Systems - AP Review

10d

11/25/2026

12/10/2026

S&P - Natural Gas Systems - AP Review

240

S&P - Hydronic Piping - AP Review

10d

11/25/2026

12/10/2026

S&P - Hydronic Piping - AP Review

241

S&P - Refrigerant Piping - AP Review

10d

11/25/2026

12/10/2026

S&P - Refrigerant Piping - AP Review

242

S&P - Basic Mechanical Requirements - Owner Review

10d

12/11/2026

12/28/2026

S&P - Basic Mechanical Requirements - Owner Review

243

S&P - Common Work HVAC - Owner Review

10d

12/11/2026

12/28/2026

S&P - Common Work HVAC - Owner Review

244

S&P - Supports & Anchors - Owner Review

10d

12/11/2026

12/28/2026

S&P - Supports & Anchors - Owner Review

245

S&P - Mechanical ID - Owner Review

10d

12/11/2026

12/28/2026

S&P - Mechanical ID - Owner Review

246

S&P - Mechanical Insulation - Owner Review

10d

12/11/2026

12/28/2026

S&P - Mechanical Insulation - Owner Review

247

S&P - Mechanical Cx - Owner Review

10d

12/11/2026

12/28/2026

S&P - Mechanical Cx - Owner Review

248

S&P - Natural Gas Systems - Owner Review

10d

12/11/2026

12/28/2026

S&P - Natural Gas Systems - Owner Review

249

S&P - Hydronic Piping - Owner Review

10d

12/11/2026

12/28/2026

S&P - Hydronic Piping - Owner Review

250

S&P - Refrigerant Piping - Owner Review

10d

12/11/2026

12/28/2026

S&P - Refrigerant Piping - Owner Review

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 8 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

251

S&P - Basic Mechanical Requirements - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Basic Mechanical Requirements - Fabricate/Deliver

252

S&P - Common Work HVAC - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Common Work HVAC - Fabricate/Deliver

253

S&P - Supports & Anchors - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Supports & Anchors - Fabricate/Deliver

254

S&P - Mechanical ID - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Mechanical ID - Fabricate/Deliver

255

S&P - Mechanical Insulation - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Mechanical Insulation - Fabricate/Deliver

256

S&P - Mechanical Cx - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Mechanical Cx - Fabricate/Deliver

257

S&P - Natural Gas Systems - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Natural Gas Systems - Fabricate/Deliver

258

S&P - Hydronic Piping - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Hydronic Piping - Fabricate/Deliver

259

S&P - Refrigerant Piping - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Refrigerant Piping - Fabricate/Deliver

60d 11/11/2026

2/9/2027

Division 26 260

S&P - Basic Electrical Requirements - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Basic Electrical Requirements - Contractor Prepare/Submit

261

S&P - Building Wire & Cable - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Building Wire & Cable - Contractor Prepare/Submit

262

S&P - Conduit - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Conduit - Contractor Prepare/Submit

263

S&P - Electrical ID - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Electrical ID - Contractor Prepare/Submit

264

S&P - Wiring Devices - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Wiring Devices - Contractor Prepare/Submit

265

S&P - Enclosed Switches - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Enclosed Switches - Contractor Prepare/Submit

266

S&P - Interior Lighting - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

S&P - Interior Lighting - Contractor Prepare/Submit

267

S&P - Basic Electrical Requirements - AP Review

10d

11/25/2026

12/10/2026

S&P - Basic Electrical Requirements - AP Review

268

S&P - Building Wire & Cable - AP Review

10d

11/25/2026

12/10/2026

S&P - Building Wire & Cable - AP Review

269

S&P - Conduit - AP Review

10d

11/25/2026

12/10/2026

S&P - Conduit - AP Review

270

S&P - Electrical ID - AP Review

10d

11/25/2026

12/10/2026

S&P - Electrical ID - AP Review

271

S&P - Wiring Devices - AP Review

10d

11/25/2026

12/10/2026

S&P - Wiring Devices - AP Review

272

S&P - Enclosed Switches - AP Review

10d

11/25/2026

12/10/2026

S&P - Enclosed Switches - AP Review

273

S&P - Interior Lighting - AP Review

10d

11/25/2026

12/10/2026

S&P - Interior Lighting - AP Review

274

S&P - Basic Electrical Requirements - Owner Review

10d

12/11/2026

12/28/2026

S&P - Basic Electrical Requirements - Owner Review

275

S&P - Building Wire & Cable - Owner Review

10d

12/11/2026

12/28/2026

S&P - Building Wire & Cable - Owner Review

276

S&P - Conduit - Owner Review

10d

12/11/2026

12/28/2026

S&P - Conduit - Owner Review

277

S&P - Electrical ID - Owner Review

10d

12/11/2026

12/28/2026

S&P - Electrical ID - Owner Review

278

S&P - Wiring Devices - Owner Review

10d

12/11/2026

12/28/2026

S&P - Wiring Devices - Owner Review

279

S&P - Enclosed Switches - Owner Review

10d

12/11/2026

12/28/2026

S&P - Enclosed Switches - Owner Review

280

S&P - Interior Lighting - Owner Review

10d

12/11/2026

12/28/2026

S&P - Interior Lighting - Owner Review

281

S&P - Basic Electrical Requirements - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Basic Electrical Requirements - Fabricate/Deliver

282

S&P - Building Wire & Cable - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Building Wire & Cable - Fabricate/Deliver

283

S&P - Conduit - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Conduit - Fabricate/Deliver

284

S&P - Electrical ID - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Electrical ID - Fabricate/Deliver

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:54 AM

Data Date: 10/27/2026

Page 9 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

285

S&P - Wiring Devices - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Wiring Devices - Fabricate/Deliver

286

S&P - Enclosed Switches - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Enclosed Switches - Fabricate/Deliver

287

S&P - Interior Lighting - Fabricate/Deliver

30d

12/29/2026

2/9/2027

S&P - Interior Lighting - Fabricate/Deliver

60d 11/11/2026

2/9/2027

Division 28 288

S&P - Addressable Fire Alarm Systems - Contractor Prepare/Submit

10d

11/11/2026

11/24/2026

289

S&P - Addressable Fire Alarm Systems - AP Review

10d

11/25/2026

12/10/2026

290

S&P - Addressable Fire Alarm Systems - Owner Review

10d

12/11/2026

12/28/2026

291

S&P - Addressable Fire Alarm Systems - Fabricate/Deliver

30d

12/29/2026

2/9/2027

Construction Site Mobilization

463d 10/21/2025

8/19/2027 5/20/2027

54d

3/8/2027

292

Mobilization Start (Week Prior) Spring Break

1d

3/8/2027

3/8/2027

293

Mobilization Complete

5d

3/9/2027

3/15/2027

294

Mobilization Start (Summer)

1d

5/20/2027

5/20/2027

Abatement (If NEEDED)

58d

3/9/2027

5/27/2027

295

Abate - Review Impacts

30d

3/9/2027

4/19/2027

296

Abate - Identify Scope

10d

4/20/2027

5/3/2027

297

Abate - Demo / Remove / Inspections / Tear Down

5d

5/21/2027

5/27/2027

Demolition

25d

5/21/2027

6/25/2027

AREA - A

20d

5/21/2027

6/18/2027

S&P - Addressable Fire Alarm Systems - Contractor Prepare/Submit

S&P - Addressable Fire Alarm Systems - AP Review

S&P - Addressable Fire Alarm Systems - Owner Review

S&P - Addressable Fire Alarm Systems - Fabricate/Deliver

Mobilization Start (Week Prior) Spring Break

Mobilization Complete

Mobilization Start (Summer)

Abate - Review Impacts

Abate - Identify Scope

Abate - Demo / Remove / Inspections / Tear Down

298

Demo - Review Impacts

5d

5/21/2027

5/27/2027

Demo - Review Impacts

299

Demo - Identify Scope

5d

5/28/2027

6/4/2027

Demo - Identify Scope

300

Demo - Demo / Remove - Summer

10d

6/7/2027

6/18/2027

Alternate - A02 Music

2d

5/28/2027

6/1/2027

2d

5/28/2027

6/1/2027

Demo - AREA A - AO2 - Remove Existing Wall Mounted Shelves & Standards (A4)

2d

5/28/2027

6/1/2027

Demo - AREA A - A02 - Remove Drywall For Backing (A4)

13d

5/28/2027

6/16/2027

301 302

Demo - AREA A - AO2 - Remove Existing Wall Mounted Shelves & Standards (A4) Demo - AREA A - A02 - Remove Drywall For Backing (A4) Alternate - A42 Reception/Admin

Demo - Demo / Remove - Summer

303

Demo - AREA A - A42 - Remove Existing Fire Alarm Control Panel

5d

5/28/2027

6/4/2027

Demo - AREA A - A42 - Remove Existing Fire Alarm Control Panel

304

Demo - AREA A - A42 - Remove Existing Cabinets (A3)

2d

6/7/2027

6/8/2027

Demo - AREA A - A42 - Remove Existing Cabinets (A3)

305

Demo - AREA A - A42 - Remove Existing Desk (A2)

2d

6/9/2027

6/10/2027

Demo - AREA A - A42 - Remove Existing Desk (A2)

2d

6/11/2027

6/14/2027

Demo - AREA A - A42 - Remove Existing Carpet & Base (A3)

2d

6/15/2027

6/16/2027

Demo - AREA A - A42 - Remove Drywall For Backing (A3)

12d

5/28/2027

6/15/2027

2d

5/28/2027

6/1/2027

Demo - AREA A - A28 - Remove Existing Hot Water Boiler

2d

6/2/2027

6/3/2027

Demo - AREA A - A28 - Remove Existing Hot Water Mains Back

2d

6/4/2027

6/7/2027

Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Building

306 307

Demo - AREA A - A42 - Remove Existing Carpet & Base (A3) Demo - AREA A - A42 - Remove Drywall For Backing (A3) Alternate - A28 Water Heater

308 309 310

Demo - AREA A - A28 - Remove Existing Hot Water Boiler Demo - AREA A - A28 - Remove Existing Hot Water Mains Back Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Building

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 10 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

311 312 313

Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Kitchen Demo - AREA A - A28 - Remove Existing Master Mixing Valve Demo - AREA A - A28 - Remove Existing Gas Piping From Hot Water Boler AREA - B

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

2d

6/8/2027

6/9/2027

Demo - AREA A - A28 - Remove Existing Recirc. Pump Serving Kitchen

2d

6/10/2027

6/11/2027

Demo - AREA A - A28 - Remove Existing Master Mixing Valve

2d

6/14/2027

6/15/2027

Demo - AREA A - A28 - Remove Existing Gas Piping From Hot Water Boler

20d

5/28/2027

6/25/2027

314

Demo - Review Impacts

5d

5/28/2027

6/4/2027

Demo - Review Impacts

315

Demo - Identify Scope

5d

6/7/2027

6/11/2027

Demo - Identify Scope

316

Demo - Demo / Remove - Summer

10d

6/14/2027

6/25/2027

Alternate - Carpet Replacement

15d

5/28/2027

6/18/2027

Demo - Demo / Remove - Summer

317

Demo - AREA B - B15 - Remove Existing Carpet (A?)

2d

5/28/2027

6/1/2027

318

Demo - AREA B - B17 - Remove Existing Carpet (A?)

5d

6/2/2027

6/8/2027

Demo - AREA B - B17 - Remove Existing Carpet (A?)

319

Demo - AREA B - B19 - Remove Existing Carpet (A?)

2d

6/9/2027

6/10/2027

Demo - AREA B - B19 - Remove Existing Carpet (A?)

320

Demo - AREA B - B20 - Remove Existing Carpet (A?)

2d

6/11/2027

6/14/2027

Demo - AREA B - B20 - Remove Existing Carpet (A?)

321

Demo - AREA B - B27 - Remove Existing Carpet (A?)

2d

6/15/2027

6/16/2027

Demo - AREA B - B27 - Remove Existing Carpet (A?)

322

Demo - AREA B - B28 - Remove Existing Carpet (A?)

2d

6/17/2027

6/18/2027

Demo - AREA B - B28 - Remove Existing Carpet (A?)

20d

5/28/2027

6/25/2027

AREA - C

Demo - AREA B - B15 - Remove Existing Carpet (A?)

323

Demo - Review Impacts

5d

5/28/2027

6/4/2027

Demo - Review Impacts

324

Demo - Identify Scope

5d

6/7/2027

6/11/2027

Demo - Identify Scope

325

Demo - Demo / Remove - Summer

10d

6/14/2027

6/25/2027

Alternate - Gym Exterior

7d

5/28/2027

6/8/2027

326

Demo - AREA C - C04 - Remove Existing Handrail (A?)

2d

5/28/2027

6/1/2027

327

Demo - AREA C - C04 - Remove Damaged CMU Block (A?)

5d

6/2/2027

6/8/2027 6/25/2027

AREA - D

Demo - Demo / Remove - Summer

Demo - AREA C - C04 - Remove Existing Handrail (A?)

Demo - AREA C - C04 - Remove Damaged CMU Block (A?)

20d

5/28/2027

328

Demo - Review Impacts

5d

5/28/2027

6/4/2027

Demo - Review Impacts

329

Demo - Identify Scope

5d

6/7/2027

6/11/2027

Demo - Identify Scope

330

Demo - Demo / Remove - Summer

10d

6/14/2027

6/25/2027

Alternate - Corridor

7d

5/28/2027

6/8/2027

2d

5/28/2027

6/1/2027

5d

6/2/2027

6/8/2027

2d

5/28/2027

6/1/2027

2d

5/28/2027

6/1/2027

348d 10/21/2025

3/9/2027

331 332

Demo - AREA D - D51 - Remove Existing Hi-Low Drinking Fountain (A?) Demo - AREA C - C04 - Remove Damaged CMU Block (A?) Alternate - Door

333

Demo - AREA D - D26 - Remove Existing ADA Push Button Actuator (A1) Early Site Development

334

ES - Investigations

335

ES - Setup Compound (Construction Fence/Connexs/Dumpster/ETC Utilities - Xcel Gas Meter REplacement

336

Util - Design Xcel

Demo - Demo / Remove - Summer

Demo - AREA D - D51 - Remove Existing Hi-Low Drinking Fountain (A?)

Demo - AREA C - C04 - Remove Damaged CMU Block (A?)

Demo - AREA D - D26 - Remove Existing ADA Push Button Actuator (A1)

146d 10/21/2025 A 10/26/2026 A 1d

3/9/2027

115d 11/11/2026 60d

11/11/2026

ES - Investigations

3/9/2027

ES - Setup Compound (Construction Fence/Connexs/Dumpster/ETC

4/27/2027 2/9/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Util - Design Xcel

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 11 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

337

Util - Xcel Precon

10d

2/10/2027

2/23/2027

338

Util - Demo Existing Gas Meter

15d

3/10/2027

3/30/2027

339

Util - Install New Gas Meter

15d

3/31/2027

4/20/2027

340

Util - Install New Gas Meter Cx

5d

4/21/2027

4/27/2027

206d 10/27/2026

8/19/2027

168d 10/27/2026

6/25/2027

Building Construction Foundation & Substructure 341

FS - Identify Scope

15d

10/27/2026

11/16/2026

342

FS - Demo Scope

10d

5/28/2027

6/11/2027

343

FS - Repair Foundations

10d

6/14/2027

6/25/2027

173d 10/27/2026

7/2/2027

Superstructure

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4 Util - Xcel Precon

Util - Demo Existing Gas Meter

Util - Install New Gas Meter

Util - Install New Gas Meter Cx

FS - Identify Scope

FS - Demo Scope

FS - Repair Foundations

344

Super - Identify Scope

15d

10/27/2026

11/16/2026

345

Super - Demo for Scope

10d

5/28/2027

6/11/2027

346

Super - Install & Repair from Scope

10d

6/21/2027

7/2/2027

49d

6/3/2027

8/11/2027

7d

6/3/2027

6/11/2027

2d

6/3/2027

6/4/2027

Roof - Demo - Deck #1 - Remove & Reinstall Existing Roof Hatch (1.92)

2d

6/7/2027

6/8/2027

Roof - Demo - Deck #1 - Remove & Reinstall Existing Exhaust Fan (1.93)

3d

6/9/2027

6/11/2027

Roof - Demo - Deck #1 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)

5d

6/3/2027

6/9/2027

2d

6/3/2027

6/4/2027

Roof - Demo - Deck #2 - Remove Sheet Metal Cap Only (1.91)

3d

6/7/2027

6/9/2027

Roof - Demo - Deck #2 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

3d

6/3/2027

6/7/2027

Roofing Roof - Demo - Deck #1 347 348 349

Roof - Demo - Deck #1 - Remove & Reinstall Existing Roof Hatch (1.92) Roof - Demo - Deck #1 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #1 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #2

350 351

Roof - Demo - Deck #2 - Remove Sheet Metal Cap Only (1.91) Roof - Demo - Deck #2 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #3

352

Roof - Demo - Deck #3 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #4

353 354 355

Roof - Demo - Deck #4 - Remove Sheet Metal Cap Only Roof - Demo - Deck #4 - Remove & Reinstall Existing Exhaust Fan Roof - Demo - Deck #4 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #5

356 357 358 359 360

Roof - Demo - Deck #5 - Remove Sheet Metal Cap Only (1.91) Roof - Demo - Deck #5 - Remove & Reinstall Existing Roof Hatch (1.92) Roof - Demo - Deck #5 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #5 - Remove & Reinstall Existing Paver-Mounted Condensing Unit (1.94) Roof - Demo - Deck #5 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #6

361

Roof - Demo - Deck #6 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

Super - Identify Scope

Super - Demo for Scope

Super - Install & Repair from Scope

3d

6/3/2027

6/7/2027

7d

6/3/2027

6/11/2027

2d

6/3/2027

6/4/2027

Roof - Demo - Deck #4 - Remove Sheet Metal Cap Only

2d

6/7/2027

6/8/2027

Roof - Demo - Deck #4 - Remove & Reinstall Existing Exhaust Fan

3d

6/9/2027

6/11/2027

Roof - Demo - Deck #4 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

11d

6/7/2027

6/21/2027

2d

6/7/2027

6/8/2027

Roof - Demo - Deck #5 - Remove Sheet Metal Cap Only (1.91)

2d

6/9/2027

6/10/2027

Roof - Demo - Deck #5 - Remove & Reinstall Existing Roof Hatch (1.92)

2d

6/11/2027

6/14/2027

Roof - Demo - Deck #5 - Remove & Reinstall Existing Exhaust Fan (1.93)

2d

6/15/2027

6/16/2027

Roof - Demo - Deck #5 - Remove & Reinstall Existing Paver-Mounted Condensing Unit (1.94)

3d

6/17/2027

6/21/2027

Roof - Demo - Deck #5 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)

3d

6/7/2027

6/9/2027

3d

6/7/2027

6/9/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Roof - Demo - Deck #3 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

Roof - Demo - Deck #6 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 12 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

Roof - Demo - Deck #7 362 363

Roof - Demo - Deck #7 - Remove & Reinstall Existing Exhaust Fan (1.93) Roof - Demo - Deck #7 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #8

364

Roof - Demo - Deck #8 - Remove Existing Sheet Metal Parapet Coping (1.95) Roof - Demo - Deck #9

365

Roof - Demo - Deck #9 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #10

366 367

Roof - Demo - Deck #10 - Remove & Reinstall Existing Exhaust Fan Roof - Demo - Deck #10 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #11

368 369

Roof - Demo - Deck #11 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96) Roof - Demo - Deck #11 - Remove Existing Sheet Metal Stop (1.98) Roof - Demo - Deck #12

370 371 372

Roof - Demo - Deck #12 - Remove Existing Sheet Metal Parapet Coping Roof - Demo - Deck #12 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof Roof - Demo - Deck #12 - Remove Existing Sheet Gravel Stop Roof - Install - Deck #1

373 374 375 376 377 378 379

Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Hatch (2.92) Roof - Install - Deck #1 - Reinstall Existing Roof Hatch (1.92) Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Exhaust Fans (2.93) Roof - Install - Deck #1 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #1 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #1 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #1 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #2

380

381 382 383 384 385

Roof - Install - Deck #2 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #2 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #2 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77) Roof - Install - Deck #2 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #2 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #2 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91) Roof - Install - Deck #3

386 387

Roof - Install - Deck #3 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #3 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

5d

6/7/2027

2d

6/7/2027

6/11/2027 6/8/2027

Roof - Demo - Deck #7 - Remove & Reinstall Existing Exhaust Fan (1.93)

3d

6/9/2027

6/11/2027

Roof - Demo - Deck #7 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)

2d

6/7/2027

6/8/2027

2d

6/7/2027

6/8/2027

3d

6/9/2027

6/11/2027

Roof - Demo - Deck #8 - Remove Existing Sheet Metal Parapet Coping (1.95)

3d

6/9/2027

6/11/2027

5d

6/9/2027

6/15/2027

2d

6/9/2027

6/10/2027

Roof - Demo - Deck #10 - Remove & Reinstall Existing Exhaust Fan

3d

6/11/2027

6/15/2027

Roof - Demo - Deck #10 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

5d

6/9/2027

6/15/2027

3d

6/9/2027

6/11/2027

Roof - Demo - Deck #11 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)

Roof - Demo - Deck #11 - Remove Existing Sheet Metal Stop (1.98)

Roof - Demo - Deck #9 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof (1.96)

2d

6/14/2027

6/15/2027

8d

6/9/2027

6/18/2027

2d

6/9/2027

6/10/2027

Roof - Demo - Deck #12 - Remove Existing Sheet Metal Parapet Coping

3d

6/11/2027

6/15/2027

Roof - Demo - Deck #12 - Remove Existing Built-Up Roof Base Flashing & Counter Flashing Perimeter of Roof

3d

6/16/2027

6/18/2027

Roof - Demo - Deck #12 - Remove Existing Sheet Gravel Stop

15d

6/7/2027

6/25/2027

2d

6/7/2027

6/8/2027

Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Hatch (2.92)

2d

6/9/2027

6/10/2027

Roof - Install - Deck #1 - Reinstall Existing Roof Hatch (1.92)

2d

6/11/2027

6/14/2027

Roof - Install - Deck #1 - Extend or Repair Existing Roof Curbs at Roof Exhaust Fans (2.93)

2d

6/15/2027

6/16/2027

Roof - Install - Deck #1 - Reinstall Existing Exhaust Fan (1.93)

3d

6/17/2027

6/21/2027

Roof - Install - Deck #1 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

6/22/2027

6/23/2027

Roof - Install - Deck #1 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

6/24/2027

6/25/2027

Roof - Install - Deck #1 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)

15d

6/7/2027

6/25/2027

2d

6/7/2027

6/8/2027

2d

6/14/2027

6/15/2027

Roof - Install - Deck #2 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

6/16/2027

6/17/2027

Roof - Install - Deck #2 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77)

2d

6/18/2027

6/21/2027

Roof - Install - Deck #2 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

6/22/2027

6/23/2027

Roof - Install - Deck #2 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

2d

6/24/2027

6/25/2027

Roof - Install - Deck #2 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91)

4d

6/18/2027

6/23/2027

2d

6/18/2027

6/21/2027

Roof - Install - Deck #3 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

6/22/2027

6/23/2027

Roof - Install - Deck #3 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Roof - Install - Deck #2 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 13 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

Roof - Install - Deck #4 388

389 390

Roof - Install - Deck #4 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #4 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #4 - Provide Added Layers of Cover Board (2.95) Roof - Install - Deck #5

391 392 393 394 395 396 397

Roof - Install - Deck #5 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #5 - Reinstall Existing Roof Hatch (1.92) Roof - Install - Deck #5 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #5 - Reinstall Existing Paver-Mounted Condensing Unit (1.94) Roof - Install - Deck #5 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #5 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #5 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #6

398 399 400

Roof - Install - Deck #6 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #6 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #6 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81) Roof - Install - Deck #7

401 402 403 404 405 406 407 408

Roof - Install - Deck #7 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof - Install - Deck #7 - Reinstall Existing Exhaust Fan (1.93) Roof - Install - Deck #7 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #7 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #7 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77) Roof - Install - Deck #7 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #7 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81) Roof - Install - Deck #7 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #8

409

Roof - Install - Deck #8 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #9

410 411 412 413 414 415

Roof - Install - Deck #9 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #9 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #9 - Existing Sheet Metal Capped Curb, Provide Tapered Insulation Cricket (2.78) Roof - Install - Deck #9 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #9 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #9 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #10

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

6d

6/24/2027

7/1/2027

2d

6/24/2027

6/25/2027

Roof - Install - Deck #4 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)

2d

6/28/2027

6/29/2027

Roof - Install - Deck #4 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

6/30/2027

7/1/2027

Roof - Install - Deck #4 - Provide Added Layers of Cover Board (2.95)

8d

7/2/2027

7/14/2027

2d

7/2/2027

7/6/2027

Roof - Install - Deck #5 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)

2d

7/7/2027

7/8/2027

Roof - Install - Deck #5 - Reinstall Existing Roof Hatch (1.92)

2d

7/9/2027

7/12/2027

Roof - Install - Deck #5 - Reinstall Existing Exhaust Fan (1.93)

2d

7/9/2027

7/12/2027

Roof - Install - Deck #5 - Reinstall Existing Paver-Mounted Condensing Unit (1.94)

3d

7/9/2027

7/13/2027

Roof - Install - Deck #5 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

7/9/2027

7/12/2027

Roof - Install - Deck #5 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/13/2027

7/14/2027

Roof - Install - Deck #5 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

7d

7/2/2027

7/13/2027

3d

7/2/2027

7/7/2027

Roof - Install - Deck #6 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/8/2027

7/9/2027

Roof - Install - Deck #6 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

Roof - Install - Deck #6 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)

2d

7/12/2027

7/13/2027

12d

7/2/2027

7/20/2027

2d

7/2/2027

7/6/2027

Roof - Install - Deck #7 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)

2d

7/7/2027

7/8/2027

Roof - Install - Deck #7 - Reinstall Existing Exhaust Fan (1.93)

3d

7/9/2027

7/13/2027

Roof - Install - Deck #7 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)

3d

7/9/2027

7/13/2027

Roof - Install - Deck #7 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/9/2027

7/12/2027

Roof - Install - Deck #7 - Existing Skylight & Curb Remains, Provide Tapered Insulation Cricket (2.77)

2d

7/13/2027

7/14/2027

Roof - Install - Deck #7 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

7/15/2027

7/16/2027

Roof - Install - Deck #7 - Existing Roof Scupper Location Remains, Wrap with Membrane Into Channel (2.81)

2d

7/19/2027

7/20/2027

Roof - Install - Deck #7 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

2d

7/7/2027

7/8/2027

2d

7/7/2027

7/8/2027

7d

7/9/2027

7/19/2027

3d

7/9/2027

7/13/2027

Roof - Install - Deck #9 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

7/14/2027

7/15/2027

Roof - Install - Deck #9 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/14/2027

7/15/2027

Roof - Install - Deck #9 - Existing Sheet Metal Capped Curb, Provide Tapered Insulation Cricket (2.78)

2d

7/14/2027

7/15/2027

Roof - Install - Deck #9 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

7/14/2027

7/15/2027

Roof - Install - Deck #9 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

2d

7/16/2027

7/19/2027

Roof - Install - Deck #9 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)

10d

7/9/2027

7/22/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

Roof - Install - Deck #8 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 14 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

416 417 418 419 420 421 422

Roof - Install - Deck #10 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72) Roof - Install - Deck #10 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof - Install - Deck #10 - Reinstall Existing Exhaust Fan Roof - Install - Deck #10 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #10 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #10 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #10 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #11

423 424 425

Roof - Install - Deck #11 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #11 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #11 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83) Roof - Install - Deck #12

426 427 428 429 430 431

Roof - Install - Deck #12 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73) Roof - Install - Deck #12 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74) Roof - Install - Deck #12 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79) Roof - Install - Deck #12 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82) Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91) Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93) Roof Punch

7/12/2027

Roof - Install - Deck #10 - Existing Mech. Equip & Curbs Remains, Provide Tapered Insulation Cricket (2.72)

2d

7/13/2027

7/14/2027

Roof - Install - Deck #10 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)

2d

7/15/2027

7/16/2027

Roof - Install - Deck #10 - Reinstall Existing Exhaust Fan

2d

7/19/2027

7/20/2027

Roof - Install - Deck #10 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

7/19/2027

7/20/2027

Roof - Install - Deck #10 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/19/2027

7/20/2027

Roof - Install - Deck #10 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

7/21/2027

7/22/2027

Roof - Install - Deck #10 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

7d

7/13/2027

7/21/2027

3d

7/13/2027

7/15/2027

Roof - Install - Deck #11 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

7/16/2027

7/19/2027

Roof - Install - Deck #11 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

2d

7/20/2027

7/21/2027

Roof - Install - Deck #11 - Existing Roof Scupper Locations, Provide New Scupper Materials (2.83)

8d

7/13/2027

7/22/2027

2d

7/13/2027

7/14/2027

Roof - Install - Deck #12 - Existing Exhaust Remains, Provide Tapered Insulation Cricket & Slip Flashing (2.73)

2d

7/13/2027

7/14/2027

Roof - Install - Deck #12 - Extend or Repair Existing Roof Vents & Provide Stack Boot (2.74)

2d

7/13/2027

7/14/2027

Roof - Install - Deck #12 - Existing Roof Drain Locations, Provide 4' Tapered Insulation Sump (2.79)

2d

7/15/2027

7/16/2027

Roof - Install - Deck #12 - Existing Piping/Conduits Remains, Provide Utility Supports Blocks (2.82)

2d

7/19/2027

7/20/2027

Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide New Galv Sheet Metal Cap (2.91)

2d

7/21/2027

7/22/2027

Roof - Install - Deck #12 - Extend Existing Roof Curbs & Provide Tapered Cricket (2.93)

15d

7/22/2027

8/11/2027

Roof - Pre-Punch

5d

7/22/2027

7/28/2027

Roof - Owner Walk

5d

7/29/2027

8/4/2027

434

Roof - Punch Corrections

5d

8/5/2027

8/11/2027

116d

3/9/2027

8/19/2027

97d

3/16/2027

7/30/2027

90d

3/16/2027

7/21/2027

Interior Rough In (Nights & Days) 435

IF-RI - Area A - Fire Alarm Replacement - Nights

15d

3/16/2027

4/5/2027

436

IF-RI - Area A - Interior Rough In Activities - Nights

25d

6/16/2027

7/21/2027

31d

6/17/2027

7/30/2027

Interior Finishes

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

7/9/2027

433

AREA - A.Area A Buildling

M 2

2d

432

Interiors / Mechanical / Electrical / Plumbing

2025 S O N D J F 25 15 6 27 17 8 29 19 9

Roof - Pre-Punch

Roof - Owner Walk

Roof - Punch Corrections

IF-RI - Area A - Fire Alarm Replacement - Nights

IF-RI - Area A - Interior Rough In Activities - Nights

437

IF-FIN - Area A - Repair and Paint

10d

6/23/2027

7/7/2027

IF-FIN - Area A - Repair and Paint

438

IF-FIN - Area A - Pre-Punch

5d

7/9/2027

7/15/2027

IF-FIN - Area A - Pre-Punch

439

IF-FIN - Area A - Owner Walk

1d

7/16/2027

7/16/2027

IF-FIN - Area A - Owner Walk

440

IF-FIN - Area A - Punch Corrections

10d

7/19/2027

7/30/2027

<Untitled>

12d

6/17/2027

7/2/2027

441

IF-FIN - AREA A - AO2 - Install Wood Backing(A4)

2d

6/17/2027

6/18/2027

442

IF-FIN - Area A - A02 - Repair and Paint

5d

6/21/2027

6/25/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

IF-FIN - Area A - Punch Corrections

IF-FIN - AREA A - AO2 - Install Wood Backing(A4)

IF-FIN - Area A - A02 - Repair and Paint

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 15 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

443

IF-FIN - AREA A - A02 - Install Casework Alternate - A42 Reception/Admin

444 445 446

IF-FIN - AREA A - A42 - Install Wood Backing (A3) IF-FIN - AREA A - A42 - Reception Frame Die Walls At Casework (A2) IF-FIN - AREA A - A42 - Reception Install Casework(A2)

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

5d

6/28/2027

7/2/2027

13d

6/21/2027

7/8/2027

5d

6/21/2027

6/25/2027

IF-FIN - AREA A - A42 - Install Wood Backing (A3)

2d

6/28/2027

6/29/2027

IF-FIN - AREA A - A42 - Reception Frame Die Walls At Casework (A2)

2d

6/30/2027

7/1/2027

IF-FIN - AREA A - A42 - Reception Install Casework(A2)

IF-FIN - AREA A - A02 - Install Casework

447

IF-FIN - Area A - A42 - Repair and Paint

2d

7/2/2027

7/6/2027

IF-FIN - Area A - A42 - Repair and Paint

448

IF-FIN - AREA A - A42 - Admin Install Casework (A3)

2d

7/7/2027

7/8/2027

IF-FIN - AREA A - A42 - Admin Install Casework (A3)

102d

3/9/2027

7/30/2027

AREA - B.Area B Building

18d

6/17/2027

7/13/2027

449

Alternate - Carpet Replacement IF-FIN - AREA B - B15 - Install Carpet (A?)

2d

6/17/2027

6/18/2027

450

IF-FIN - AREA B - B17 - Install Carpet (A?)

5d

6/21/2027

6/25/2027

IF-FIN - AREA B - B17 - Install Carpet (A?)

451

IF-FIN - AREA B - B19 - Install Carpet (A?)

2d

6/28/2027

6/29/2027

IF-FIN - AREA B - B19 - Install Carpet (A?)

452

IF-FIN - AREA B - B20 - Install Carpet (A?)

2d

6/30/2027

7/1/2027

IF-FIN - AREA B - B20 - Install Carpet (A?)

453

IF-FIN - AREA B - B27 - Install Carpet (A?)

2d

7/2/2027

7/6/2027

IF-FIN - AREA B - B27 - Install Carpet (A?)

454

IF-FIN - AREA B - B28 - Install Carpet (A?)

2d

7/7/2027

7/8/2027

IF-FIN - AREA B - B28 - Install Carpet (A?)

455

IF-FIN - AREA B - ALL - Install Rubber Base (A?)

5d

7/7/2027

7/13/2027

IF-FIN - AREA B - ALL - Install Rubber Base (A?)

64d

3/9/2027

6/7/2027

Interior Rough In (Nights & Days) 456

IF-RI - Area B - Interior Rough In Activities (Nights)

49d

3/9/2027

5/14/2027

457

IF-RI - Area b - Fire Alarm Replacement - Nights

15d

4/6/2027

4/26/2027

458

IF-RI - Area B - Interior Rough In Activities

15d

5/17/2027

6/7/2027

Interior Finishes

IF-FIN - AREA B - B15 - Install Carpet (A?)

IF-RI - Area B - Interior Rough In Activities (Nights)

IF-RI - Area b - Fire Alarm Replacement - Nights

IF-RI - Area B - Interior Rough In Activities

13d

7/14/2027

7/30/2027

459

IF-FIN - Area B - Repair and Paint

5d

7/14/2027

7/20/2027

IF-FIN - Area B - Repair and Paint

460

IF-FIN - Area B - Pre-Punch

2d

7/21/2027

7/22/2027

IF-FIN - Area B - Pre-Punch

461

IF-FIN - Area B - Owner Walk

1d

7/23/2027

7/23/2027

IF-FIN - Area B - Owner Walk

462

IF-FIN - Area B - Punch Corrections

5d

7/26/2027

7/30/2027

100d

3/9/2027

7/28/2027

AREA - C Interior Rough In (Nights & Days)

IF-FIN - Area B - Punch Corrections

64d

3/9/2027

6/7/2027

463

IF-RI - Area C - Interior Rough In Activities (Nights)

49d

3/9/2027

5/14/2027

IF-RI - Area C - Interior Rough In Activities (Nights)

464

IF-RI - Area C - Fire Alarm Replacement - Nights

15d

4/27/2027

5/17/2027

IF-RI - Area C - Fire Alarm Replacement - Nights

465

IF-RI - Area C - Interior Rough In Activities

15d

5/17/2027

6/7/2027

IF-RI - Area C - Interior Rough In Activities

36d

6/8/2027

7/28/2027

Interior Finishes 466

IF-FIN - Area C - Repair and Paint

15d

6/8/2027

6/28/2027

IF-FIN - Area C - Repair and Paint

467

IF-FIN - Area C - Pre-Punch

10d

6/29/2027

7/13/2027

IF-FIN - Area C - Pre-Punch

468

IF-FIN - Area C - Owner Walk

1d

7/14/2027

7/14/2027

IF-FIN - Area C - Owner Walk

469

IF-FIN - Area C - Punch Corrections

10d

7/15/2027

7/28/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

IF-FIN - Area C - Punch Corrections

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 16 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

AREA - D Interior Rough In (Nights & Days)

66d

5/18/2027

8/19/2027

45d

5/18/2027

7/21/2027

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

470

IF-RI - Area D - Fire Alarm Replacement

45d

5/18/2027

7/21/2027

IF-RI - Area D - Fire Alarm Replacement

471

IF-RI - Area D - Interior Rough In Activities (Nights)

10d

6/9/2027

6/22/2027

IF-RI - Area D - Interior Rough In Activities (Nights)

12d

6/9/2027

6/24/2027

472

Alternate - Corridor IF-FIN - Area D - C04 - Repair CMU Block (A?)

5d

6/9/2027

6/15/2027

473

IF-FIN - AREA D - D51 - Install New Hi-Low Drinking Fountain (A?)

2d

6/23/2027

6/24/2027

2d

6/2/2027

6/3/2027

Alternate - Door 474

IF-FIN - AREA D - D26 - Install ADA Push Button Actuator (A1) Interior Finishes

2d

6/2/2027

6/3/2027

21d

7/22/2027

8/19/2027

IF-FIN - Area D - C04 - Repair CMU Block (A?)

IF-FIN - AREA D - D51 - Install New Hi-Low Drinking Fountain (A?)

IF-FIN - AREA D - D26 - Install ADA Push Button Actuator (A1)

475

IF-FIN - Area D - Repair and Paint

5d

7/22/2027

7/28/2027

IF-FIN - Area D - Repair and Paint

476

IF-FIN - Area D - Pre-Punch

5d

7/29/2027

8/4/2027

IF-FIN - Area D - Pre-Punch

477

IF-FIN - Area D - Owner Walk

1d

8/5/2027

8/5/2027

IF-FIN - Area D - Owner Walk

478

IF-FIN - Area D - Punch Corrections

10d

8/6/2027

8/19/2027

Sitework (Not Needed)

196d 10/27/2026

8/5/2027

IF-FIN - Area D - Punch Corrections

479

FS - Identify Scope

10d

10/27/2026

11/9/2026

480

FS - Demo Playgroundd

5d

6/3/2027

6/9/2027

FS - Demo Playgroundd

481

FS - Demo Pedestrain Pavement

5d

6/3/2027

6/9/2027

FS - Demo Pedestrain Pavement

482

FS - Demo Perimeter Fence

5d

6/3/2027

6/9/2027

FS - Demo Perimeter Fence

483

FS - Repair Playground

20d

6/10/2027

7/8/2027

FS - Repair Playground

484

FS - Prep/Form/Pour Pedestrain Pavement

20d

6/10/2027

7/8/2027

FS - Prep/Form/Pour Pedestrain Pavement

485

FS - Repair Perimeter Fence

20d

6/10/2027

7/8/2027

FS - Repair Perimeter Fence

486

FS - Pre-Punch

5d

7/9/2027

7/15/2027

FS - Pre-Punch

487

FS - Punch

5d

7/16/2027

7/22/2027

FS - Punch

488

FS - Punch Corrections

10d

7/23/2027

8/5/2027

Final Inspections & Closeout

55d

7/9/2027

9/24/2027

MEP Startup & Commissioning

15d

7/22/2027

8/11/2027

Startup / Test & Balance

15d

7/22/2027

8/11/2027

15d

7/22/2027

8/11/2027

6d

7/22/2027

7/29/2027

489

Startup/TAB - Startup / Test & Balance Tasks Commissioning

490

CX - Commissioning Tasks Final Project Punchlist

6d

7/22/2027

7/29/2027

46d

7/22/2027

9/24/2027

491

Punch - Pre-Punch - Final

1d

7/22/2027

7/22/2027

492

Punch - Owner Walk -Final

5d

7/23/2027

7/29/2027

493

Punch - Punch Corrections - Final

40d

7/30/2027

9/24/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

FS - Identify Scope

FS - Punch Corrections

Startup/TAB - Startup / Test & Balance Tasks

CX - Commissioning Tasks

Punch - Pre-Punch - Final

Punch - Owner Walk -Final

Punch - Punch Corrections - Final

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 17 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Line

Name

Duration

Start

Finish

A 4

Final Inspections / TCO Final Inspections

16d

7/9/2027

7/30/2027

16d

7/9/2027

7/30/2027

2025 S O N D J F 25 15 6 27 17 8 29 19 9

M 2

2026 2027 2028 A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D 23 13 4 25 15 6 27 17 7 28 19 9 30 21 11 1 22 15 5 26 17 7 28 19 9 30 20 11 1 22 13 3 24 14 6 27 17 8 29 19 10 31 21 11 2 23 13 4

494

FInsp - Final AHJ Inspection

5d

7/9/2027

7/15/2027

495

FInsp - Final Plumbing Inspection

5d

7/22/2027

7/28/2027

FInsp - Final Plumbing Inspection

496

FInsp - Final Fire Alarm Inspection

5d

7/22/2027

7/28/2027

FInsp - Final Fire Alarm Inspection

497

FInsp - Final Electrical Inspection - State

5d

7/22/2027

7/28/2027

FInsp - Final Electrical Inspection - State

498

FInsp - Final Building Inspection

2d

7/29/2027

7/30/2027

FInsp - Final Building Inspection

499

Substantial Completion - TCO

1d

7/30/2027

7/30/2027

Substantial Completion - TCO

36d

7/22/2027

9/10/2027

Owner Move In Activities 500

Move - Owner Move In Activities Closeout / CO

8d

8/2/2027

8/11/2027

36d

7/22/2027

9/10/2027

501

Closeout - Start

1d

7/22/2027

7/22/2027

502

Closeout - Owner Training

15d

7/23/2027

8/12/2027

503

Closeout - Final Completion

20d

8/13/2027

9/10/2027

BVSD Foothills ES Proposal Schedule Boulder Valley School District

FInsp - Final AHJ Inspection

Move - Owner Move In Activities

Closeout - Start

Closeout - Owner Training

Closeout - Final Completion

Job #: BVSD Foothills ES

Rev. date: 10/30/2026 9:16:55 AM

Data Date: 10/27/2026

Page 18 of 18

BVSD Foothills ES Progressed 10.26.26 Filter: No Summary Tasks

Price Options List K1225 - BVSD - Foothill ES Renovations Current Cost Estimate Target Budget

$2,916,441 Pending Cost Reduction $2,452,054

Delta

#REF!

-$464,387

Description of Item

Status

Pending Cost Reduction

Pending Cost Addition

Accepted Cost

Rejected Cost

Decision Date

Alternate

Date

Alternate 1

9/30/2026 A1 ADA Door Operators

Accepted

Included in Current Cost

Accepted Per Email

10/13/2026

Alternate 2

9/30/2026 A2 Main Office Reception Desk

Accepted

Included in Current Cost

Accepted Per Email

10/13/2026

Included in Current Cost

Accepted Per Email

10/13/2026

Comments

Alternates

Alternate 3

9/30/2026 A3 Main Office Kitchenette

Accepted

Alternate 4

9/30/2026 A4 Music Room Storage

Rejected

$40,772

Allowances Report DESCRIPTION

QTY UOM

UNIT PRICE

TOTAL COST

NOTES / COMMENTS

25,000.00

$25,000

Allowance

ALLOWANCES: 06 Woods, Plastics and Composites 06 10 10 Rough Carpentry 06113 >Tectum Roof Panel/Structural Replacement

1.00 allow

Subtotal 06 10 10 Rough Carpentry

$25,000

TOTAL ALLOWANCES: 06 Woods, Plastics and Composites

$25,000

ALLOWANCES: 09 Finishes 09 21 16 Gypsum Board Assemblies 09213 Drywall Patch & Repair - Ceiling at Kitchen Refrigerator

1.00 allow

10,000.00

$10,000

Allowance

09229 Relocated Wall Access Panel

1.00 ls

5,000.00

$5,000

Allowance

Subtotal 09 21 16 Gypsum Board Assemblies

$15,000

TOTAL ALLOWANCES: 09 Finishes

$15,000

ALLOWANCES: 22 Plumbing 22 00 00 Plumbing 22027 >Existing Gas Meter to be Replaced. Coordinate with Utility Provider for New Meter Install. (Ref. PD-201A - Keynote P14)

1.00 allow

5,500.00

Subtotal 22 00 00 Plumbing

$5,500

Allowance

$5,500

TOTAL ALLOWANCES: 22 Plumbing

$5,500

ALLOWANCES: 23 Heating, Ventilating and Air Conditioning 23 00 00 Heating, Ventilating and Air Conditioning 23037 >3rd Party Design for Wind

1.00 allow

15,000.00

Subtotal 23 00 00 Heating, Ventilating and Air Conditioning

$15,000

Allowance

$15,000

TOTAL ALLOWANCES: 23 Heating, Ventilating and Air Conditioning

$15,000

ALLOWANCES: 26 Electrical 26 00 00 Electrical 26003 >Existing Rooftop Exhaust Fans Electrical Disconnect/Reconnect (Ref. AD-121 - Keynote 1.93) Subtotal 26 00 00 Electrical

TOTAL ALLOWANCES: 26 Electrical

DATE PRINTED: 10/21/2026

1.00 allow

6,000.00

$6,000

$6,000

$6,000

Allowance

Category Bobcat Bobcat Bobcat Bobcat Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Bobcat Accessories Cleaning Equipment Cleaning Equipment Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Concrete Fencing Fencing Fencing Forklift Forklift Forklift Forklift

Description Bobcat Bobcat T190 Telehandler Bobcat E35 Mini-Ex Bobcat Breaker (Jackhammer) Bobcat Auger attachment drive unit lowe 1650E Bobcat Auger Bit (6" - 36") Bobcat Auger Extension (2'-4') Bobcat Forks Bobcat Rock Screen Bucket Bobcat Smooth bucket Bobcat Snow blower SR117 Caterpillar Bobcat Snow Broom Bobcat Snow Bucket Bobcat Snow Plow Caterpillar ANGLE BLADE 72IN Bobcat Sweeper Bobcat Tooth bucket Bobcat Trench Compactor Bobcat Vibratory Compactor for E35 Mini-Ex only Implement Rack Floor Buffer Floor Machine scrubber (Riding) Concrete Core Driller Concrete Georgia Buggy (Track, 14 cu-ft) Concrete Georgia Buggy (Electric, Wheeled, 12 cu-ft) Concrete Mixer Concrete Power Trowels - Walk behind Concrete Saw - Walk behind Concrete Soft Cut Saw Concrete Vibrator - high cycle Demo Saw Eco Pan Grout Pump Jumping jack Plate Compactor Rebar Cage Stands Fence Standard 6x12' per panel (.50 cents LF) Snow Fence (one time charge) T Posts (one time charge) Forklift Forklift Mover Gradall 15' Boom Gradall Material Bucket (Trash Box)

2027 Rates $ 2,887.04 $ 3,099.20 $ 2,732.08 $ 1,912.56 $ 1,061.84 $ 291.20 $ 27.04 $ 248.56 $ 991.12 $ 299.52 $ 1,071.20 $ 1,408.16 $ 1,606.80 $ 326.56 $ 1,422.72 $ 340.08 $ 1,815.84 $ 1,390.48 $ 535.60 $ 348.40 $ 1,735.76 $ 647.92 $ 1,178.32 $ 856.96 $ 856.96 $ 605.28 $ 1,071.20 $ 803.92 $ 664.56 $ 765.44 $ 161.20 $ 29.12 $ 590.72 $ 766.48 $ 54.08 $ 7.28 $ 10.40 $ 5.20 $ 7,554.56 $ 161.20 $ 310.96 $ 406.64

Category Forklift Forklift Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Gates and Barricades Generator Generator Ground Thaw Ground Thaw Office Trailer Office Trailer Office Trailer Office Trailer Accessories Office Trailer Accessories Office Trailer Accessories Office Trailer Accessories Prefab RTV Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Safety Small Tools Small Tools Small Tools Small Tools

Description Gradall Tipping Material Bucket (Trash Box) Spreader Bar Barricade Gates (Set of 2) Jersey Barricade Picking Tool Jersey Barriers - each Barricade Fence Panels (includes barricade) Cattle Gates (Set of 2) Man Gates Generator - (Portable) 5000k -6500k Generator - 70KW (Towable) Ground Thaw 400 (onboard generator) Ground Thaw (requires power source) Office Trailer Double wide Office Trailer Single wide Office Trailer Stairs (each, requires 2) Copier Mobile Office Cabinets Office Trailer Decking Office Trailer Handicap Ramps Fabrication & Operations Support Fee - (10% of Material Costs) Lawn Mower Zero turn 42" Baker Scaffolding Curb Ramps Steel Delineator/Traffic Cones Differential Pressure Manometer Dust Fan Fire Exinguishers Fire Extinguisher stands (plastic) Gas Monitor GX-2009 HEPACart 60 x 29 Negative Air Machine Propane Cages-Large Propane Cages-Small Road Plates Safety Roof Penetator Fall protection Slab Grabbers Stanschions (Roof Warning Line) Yellow Safety Railing and Stands Abrasive Cutoff Chop Saw Air Compressor, Hoses (Portable Porter Cable C2002) Air Conditioner/Move and Cool Banding Machine

2027 Rates $ 520.00 $ 134.16 $ 321.36 $ 482.56 $ 57.20 $ 85.28 $ 268.32 $ 134.16 $ 642.72 $ 3,061.76 $ 7,648.16 $ 6,973.20 $ 2,463.76 $ 1,392.56 $ 80.08 $ 408.72 $ 268.32 $ 80.08 $ 535.60 #VALUE! $ 856.96 $ 214.24 $ 168.48 $ 10.40 $ 268.32 $ 21.84 $ 15.60 $ 15.60 $ 268.32 $ 1,928.16 $ 268.32 $ 249.60 $ 161.20 $ 224.64 $ 578.24 $ 15.60 $ 15.60 $ 69.68 $ 214.24 $ 269.36 $ 535.60 $ 64.48

Category Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Small Tools Storage Container Storage Container Storage Container Storage Container Stormwater Protection Stormwater Protection Stormwater Protection Stormwater Protection Survey Survey Survey Survey Vehicle Vehicle Vehicle Vehicle Vehicle Weather Protection Weather Protection Weather Protection Weather Protection Weather Protection

Description Chipping hammer Electric (Large Hilti, Bosch or other) Crane Pad Drywall Cart Evaporative Cooling Fan (4 Ft) Fence Post Pounder (gas) Firehose (Rolls) Gang Box Jackhammer Electric Hilti 3000 Ladder 20' (Extension) Ladder-4', 6' or 8' Leaf Blower Pallet Jack Power Washer Table Saw Trash Buggy Trash Pump - Large 3 phase electric Trash Pump - Small Connex 20' Built-out Connex 20' Office Connex 40' Built-out Connex 40' Office 50/50 unit Cattle Guards Fuel Cell with (3) 5gal cans and 40 gal pump Vehicle Tracking Pads FODS Water Wheel Survey - Builders level-B20 Survey - Laser & Accessories 3900 Series Survey - Robotic Total Station (Kit) Survey - Thedolite Street Sweeper Ford F-450 (per 3 Hour) Trailer Event one time charge Truck - Water Truck Vehicle (CM's, Superintendent, Project Manager) Box Truck Concrete Blanket 14x25' Heaters LP Gas small Snow Blankets Snow blower Snow Tarps

2027 Rates $ 433.68 $ 161.20 $ 80.08 $ 161.20 $ 595.92 $ 11.44 $ 85.28 $ 642.72 $ 236.08 $ 34.32 $ 428.48 $ 440.96 $ 651.04 $ 428.48 $ 54.08 $ 482.56 $ 615.68 $ 296.40 $ 626.08 $ 526.24 $ 626.08 $ 268.32 $ 187.20 $ 283.92 $ 1,606.80 $ 226.72 $ 614.64 $ 3,098.16 $ 226.72 $ 418.08 $ 375.44 $ 3,530.80 $ 1,710.80 $ 2,142.40 $ 36.40 $ 32.24 $ 54.08 $ 244.40 $ 85.28

Boulder Valley School District Asbestos Management Plan Contractor Responsibility It is the expectation of the Boulder Valley School District that contractors adhere to all AHERA, EPA, and Colorado Department of Public Health and Environment regulations regarding asbestos treatment and management before and during any construction, renovation or maintenance project. To that end, contractors are expected to review the asbestos management plan before the work begins. Any activity that could potentially disturb asbestos containing building materials must be brought to the attention of BVSD Environmental Services Department prior to the start of work, and if the scope of work changes during the course of the project. Environmental Services will identify all areas of concern and facilitate any necessary abatement in order to help make all projects successful. Therefore, contractors and their subcontractors must provide this signature sheet prior to the start of work to ensure they are aware of BVSD expectations and understand their responsibility. I have read and understand the BVSD Asbestos Management Plan for the buildings in which I will be working. I agree not to disturb or damage any asbestos containing building materials (ACBM), which have been identified in the Asbestos Management Plan. In the event the scope of work changes during the course of the project, or our work causes us to encounter building materials that may be ACBM, we agree to notify BVSD Environmental Services immediately. If any identified ACBM is disturbed or damaged as a result of the work, the contractor and/or their subcontractor may be held financially responsible for all related remediation.

AP Mountain States LLC. Company Name: __________________________________________________

Authorized Representative:

Matt Lewandowski ______________________________________ Print

______________________________________ Signature

10/14/26 Date: ____________________

Drafted and Required by: BOULDER VALLEY SCHOOL DISTRICT ENVIRONMENTAL SERVICES DEPARTMENT

Exhibit P List of all salaried staff to be charged to the Cost of the Work as established in the agreement Kevin Harrison - Construction Manager Cole Ray - Senior Superintendent Hugo Javalera - Superintendent Matt Lewandowski - Project Manager TBD - PE AJ Laskowske- MEP Manager Tanya Ranney - Lower Voltage Specialist Chuck Wempe - Envelope Specialist Mark Kassahn - IT Manager Eric Nguyen - IT Assistant Manager Jill Strait - Project Coordinator Derrick Oppie - Warehouse

6500 East Arapahoe Road | Boulder, Colorado 80303 | 720-561-5930 | www.bond.bvsd.org