Attachment D - PSB Relocation Comparison

Regular Meeting, October 15, 2026 · item 7A: Public Safety Building Relocation Options Analysis · 1 page

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

Attachment D

New Replacement Building

Current Building

Identified Existing Building

RESILIENT Flood Vulnerability Wildfire Vulnerability

500 year; surrounded by floodplain all sides well outside Ignition Risk Areas good location; backup generator; vulnerable infrastructure

500 year, requires modification; less surrounded adjacent to Ignition Risk Area 3

out of flood plain and  not surrounded

located in Ignition Risk Area 3

good location; backup generator

good location; backup  generator

yes

 yes

very high EUI

low EUI

 med-low EUI potential

high operational carbon

low Operational Carbon; Higher Embodied Carbon

adaptive reuse = low embodied carbon;  medium-low operational carbon

good: poor proximity to Fleet Services; decent for staff commute

best: Adjacent to Fleet Services; good for staff commute, best proximity to alt modes and bike path

better: close to Fleet  Services, good for staff commute

will comply

 will comply

will include

 will include

good

 moderate

Experience for the Community poor

will fully address

 will fully address

Experience for Staff

poor

will fully address

 will fully address

Employee Wellness

minimal

will be included

 will be included

Capital Cost

uses good money after bad

highest capital cost

Operating Costs

highest operating cost

built to be most efficient

Financial Asset

property could be sold; collateralization

Procurement/Development Process

difficult, lengthy procurement for repairs/renovations

lengthy development process

poor condition

constructed to good constructed to good condition and then well-  condition and then well-  maintained maintained

70,000 SF

100,000 SF

 81,535 SF

sized for current and future needs

adequately sized, some space needs need to be  accomodated elsewhere

can be provided

cannot be  accomodated, will need to be built elsewhere

Disaster Readiness Essential Services Building

yes

SUSTAINABLE Building Energy Use Intensity

Carbon Footprint

Transportation Emissions Reductions

ACCESSIBLE & EQUITABLE ADA Compliance Inclusivity Accessibility

out of compliance with current standards in several areas poorly addreses inclusivity standards moderate

EXPERIENTIAL

ECONOMICAL

Facility Condition Index

collateralization; unlikely to be sold

lower capital cost a little more than a new  building if purchased, property could be sold; collateralization straightforward purchase and permitting

FUNCTIONAL Total Size

Office, training and specialty space needs

very undersized, current space poorly configured

Firing Range

yes

Secure/Covered Parking

insufficient/none

can be provided

 included

Future Adaptability

none

high degree

 some, limited

Security

adequate

can be provided

 will need enhancement

Maintenance & Operations

costly and critical

efficient

 efficient