Attachment B - 2024-6-24 - ECC preliminary analysis DRAFT

Regular Meeting, October 15, 2026 · item 7A: Public Safety Building Relocation Options Analysis · 1 page

Open the original file

This is the text extracted from the file, without its layout, tables, or images. Use the original for anything that matters.

Attachment B

ECC Project This analysis considers the project costs to design, construct, operate and maintain the ECC project and analyzes preliminary project funding needs based on financing options and other high-level assumptions. Phase

Construction Start Year

1

2027

Fleet service & fueling

2

2028

Public safety building, police impound area and parking

3

2029

Public works & parks, and connecter

4

2030

Conditioned storage, road material storage and vehicle

5

2031

Public offices

Other

2030

District energy plant

Assets

Included scope in this preliminary financial analysis

Phase 1 assets ($000s) 140,000

Phase 2 assets ($000s)

Phase 3 assets ($000s)

Phase 4 assets ($000s)

Phase 5 assets ($000s)

District Energy Plant ($000s)

$33m

$125m

$116m

$56m

$59m

$7m

1

1

1

1

1

1

120,000 100,000 80,000 60,000 40,000 20,000 -

Infrastructure cost

Building cost

WORKING DRAFT – FOR INTERNAL DISCUSSION PURPOSES ONLY

Total Capex

1